CLIN 0002 Response Sheet.pdf
PDF 150 KB Posted
- Attached to
- Well #14 Repair Federal contract opportunity
- Solicitation number
- FA489724QC063
About this file
This document appears to be a CLIN (Contract Line Item Number) Response Sheet related to Solicitation FA489724QC063 for the repair of Well #14 issued by the Department of the Air Force Air Combat Command.
The solicitation requires contractors to provide diagnostic and repair services to restore the operational capacity of Well #14 to 1300 gallons per minute. Contractors must submit their labor categories, hourly rates, and other related costs such as G&A, overhead, and profit as percentages. The contractor must then apply the total percentage to the total of parts and labor to provide a final price for the required repairs. The evaluation criteria for CLIN 0002 is specified in the Combined Synopsis/Solicitation. Per the Performance Work Statement, the contractor must complete the diagnostic, create a Work Plan detailing the parts, labor hours, and timeline, and then perform the necessary repairs to restore the well to full operational capability.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Wage Determination Effective 7.22.24.pdf | ||
| FA489724QC0063.pdf | ||
| PWS- Well Repair.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
366TH CONTRACTING SQUADRON (ACC)
MOUNTAIN HOME AIR FORCE BASE IDAHO
Solicitation FA489724QC063 13 August 2024
INSTRUCTIONS TO RESPOND TO CLIN 0002:
Contractors shall fill out the below information and submit their response along with their quote. Labor categories should be in compliance with the Service Contract Wage Determination that can be found as attachment two of this solicitation. Other related cost such as G&A, Overhead, and Profit must be represented as a percentage.
Table 1
Labor Category Amount Per Hour
Table 2
Other Cost Percentage G&A
Overhead Profit
Total Percentage
Evaluation for CLIN 0002:
See the Combined Synopsis/Solicitation for the evaluation criteria.
Execution of CLIN 0002:
Per the PWS, the Contractor shall complete their diagnostic and create a Work Plan. This Work Plan will include a list of parts required, labor hours needed, and an estimated timeline for the repairs. The contractor shall then take their total percentage calculated in Table 2 and apply the percentage to the total of the parts and labor to create a final price for all repairs required to get the well back to its full functioning capability.
File details come from the government source that posted it. Updated .