This document contains federal acquisition clauses and provisions related to Solicitation Number 12405B23Q0345 for Moronid SNP Arrays issued by the Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery. Key details include that the solicitation is for a firm fixed price contract for the delivery of Moronid SNP Arrays within 150 days of purchase order issuance. Evaluation will be based on lowest price among technically acceptable offers, where technical acceptability requires meeting all solicitation requirements, the offeror must be an authorized distributor of the product to ensure no counterfeiting or quality issues, and the offeror must have an acceptable past performance rating.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOW.docx | DOCX document | |
| Beta Sam Solicitation.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12805B23Q0345, Moronid SNP Array
6.302 Circumstances permitting other than full and open competition.
The following statutory authorities (including applications and limitations) permit contracting without providing for full and open competition. Requirements for justifications to support the use of these authorities are in 6.303.
6.302-1 Only one responsible source and no other supplies or services will satisfy agency requirements.
(a) Authority.
(1) Citations: 10 U.S.C. 3204(a)(1) or 41 U.S.C.3304(a)(1).
(2) When the supplies or services required by the agency are available from only one responsible source, or, for DoD, NASA, and the Coast Guard, from only one or a limited number of responsible sources, and no other type of supplies or services will satisfy agency requirements, full and open competition need not be provided for.
(i) Supplies or services may be considered to be available from only one source if the source has submitted an unsolicited research proposal that-
(A) Demonstrates a unique and innovative concept (see definition at 2.101), or, demonstrates a unique capability of the source to provide the particular research services proposed;
(B) Offers a concept or services not otherwise available to the Government; and
(C) Does not resemble the substance of a pending competitive acquisition. (See 10 U.S.C. 3204(b)(A) and 41 U.S.C. 3304(b)(1).)
(ii) Supplies may be deemed to be available only from the original source in the case of a follow-on contract for the continued development or production of a major system or highly specialized equipment, including major components thereof, when it is likely that award to any other source would result in-
(A) Substantial duplication of cost to the Government that is not expected to be recovered through competition; or
(B) Unacceptable delays in fulfilling the agency’s requirements. (See 10 U.S.C. 3204(b)(B) or 41 U.S.C. 3304(b)(2).)
(iii) For DoD, NASA, and the Coast Guard, services may be deemed to be available only from the original source in the case of follow-on contracts for the continued provision of highly specialized services when it is likely that award to any other source would result in-
(A) Substantial duplication of cost to the Government that is not expected to be recovered through competition; or
(B) Unacceptable delays in fulfilling the agency’s requirements. (See 10 U.S.C. 3204(b)(B)).
(b) Application. This authority shall be used, if appropriate, in preference to the authority in 6.302-7; it shall not be used when any of the other circumstances is applicable. Use of this authority may be appropriate in situations such as the following (these examples are not intended to be all inclusive and do not constitute authority in and of themselves):
(1) When there is a reasonable basis to conclude that the agency’s minimum needs can only be satisfied by-
(i) Unique supplies or services available from only one source or only one supplier with unique capabilities; or
(ii) For DoD, NASA, and the Coast Guard, unique supplies or services available from only one or a limited number of sources or from only one or a limited number of suppliers with unique capabilities.
(2) The existence of limited rights in data, patent rights, copyrights, or secret processes; the control of basic raw material; or similar circumstances, make the supplies and services available from only one source (however, the mere existence of such rights or circumstances does not in and of itself justify the use of these authorities) (see part 27).
(3) When acquiring utility services (see 41.101), circumstances may dictate that only one supplier can furnish the service (see 41.202); or when the contemplated contract is for construction of a part of a utility system and the utility company itself is the only source available to work on the system.
(4) When the agency head has determined in accordance with the agency’s standardization program that only specified makes and models of technical equipment and parts will satisfy the agency’s needs for additional units or replacement items, and only one source is available.
(c) Application for brand-name descriptions.
(1) An acquisition or portion of an acquisition that uses a brand-name description or other purchase description to specify a particular brand-name, product, or feature of a product, peculiar to one manufacturer-
(i) Does not provide for full and open competition, regardless of the number of sources solicited; and
(ii) Shall be justified and approved in accordance with 6.303 and 6.304.
(A) If only a portion of the acquisition is for a brand-name product or item peculiar to one manufacturer, the justification and approval is to cover only the portion of the acquisition which is brand-name or peculiar to one manufacturer. The justification should state it is covering only the portion of the acquisition which is brand-name or peculiar to one manufacturer, and the approval level requirements will then only apply to that portion;
(B) The justification should indicate that the use of such descriptions in the acquisition or portion of an acquisition is essential to the Government’s requirements, thereby precluding consideration of a product manufactured by another company; and
(C) The justification shall be posted with the solicitation (see 5.102(a)(6)).
(2) Brand-name or equal descriptions, and other purchase descriptions that permit prospective contractors to offer products other than those specifically referenced by brand-name, provide for full and open competition and do not require justifications and approvals to support their use.
(d) Limitations.
(1) Contracts awarded using this authority shall be supported by the written justifications and approvals described in 6.303 and 6.304.
(2) For contracts awarded using this authority, the notices required by 5.201 shall have been published and any bids, proposals, quotations, or capability statements must have been considered.
6.303 Justifications.
6.303-1 Requirements.
(a) A contracting officer shall not commence negotiations for a sole source contract, commence negotiations for a contract resulting from an unsolicited proposal, or award any other contract without providing for full and open competition unless the contracting officer-
(1) Justifies, if required in 6.302, the use of such actions in writing;
(2) Certifies the accuracy and completeness of the justification; and
(3) Obtains the approval required by 6.304.
(b) The contracting officer shall not award a sole-source contract under the 8(a) authority ( 15 U.S.C. 637(a)) for an amount exceeding $25 million unless-
(1) The contracting officer justifies the use of a sole-source contract in writing in accordance with 6.303-2;
(2) The justification is approved by the appropriate official designated at 6.304; and
(3) The justification and related information are made public after award in accordance with 6.305.
(c) Technical and requirements personnel are responsible for providing and certifying as accurate and complete necessary data to support their recommendation for other than full and open competition.
(d) Justifications required by paragraph (a) of this section may be made on an individual or class basis. Any justification for contracts awarded under the authority of 6.302-7 shall only be made on an individual basis. Whenever a justification is made and approved on a class basis, the contracting officer must ensure that each contract action taken pursuant to the authority of the class justification and approval is within the scope of the class justification and approval and shall document the contract file for each contract action accordingly.
(e) The justifications for contracts awarded under the authority cited in 6.302-2 may be prepared and approved within a reasonable time after contract award when preparation and approval prior to award would unreasonably delay the acquisitions.
6.303-2 Content.
(a) Each justification shall contain sufficient facts and rationale to justify the use of the specific authority cited.
(b) As a minimum, each justification, except those for sole-source 8(a) contracts over $25 million (see paragraph (d) of this section), shall include the following information:
(1) Identification of the agency and the contracting activity, and specific identification of the document as a "Justification for other than full and open competition."
(2) Nature and/or description of the action being approved.
(3) A description of the supplies or services required to meet the agency’s needs (including the estimated value).
(4) An identification of the statutory authority permitting other than full and open competition.
(5) A demonstration that the proposed contractor’s unique qualifications or the nature of the acquisition requires use of the authority cited.
(6) A description of efforts made to ensure that offers are solicited from as many potential sources as is practicable, including whether a notice was or will be publicized as required by subpart 5.2 and, if not, which exception under 5.202 applies.
(7) A determination by the contracting officer that the anticipated cost to the Government will be fair and reasonable.
(8) A description of the market research conducted (see part 10) and the results or a statement of the reason market research was not conducted.
(9) Any other facts supporting the use of other than full and open competition, such as:
(i) Explanation of why technical data packages, specifications, engineering descriptions, statements of work, or purchase descriptions suitable for full and open competition have not been developed or are not available.
(ii) When 6.302-1 is cited for follow-on acquisitions as described in 6.302-1(a)(2)(ii), an estimate of the cost to the Government that would be duplicated and how the estimate was derived.
(iii) When 6.302-2 is cited, data, estimated cost, or other rationale as to the extent and nature of the harm to the Government.
(10) A listing of the sources, if any, that expressed, in writing, an interest in the acquisition.
(11) A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before any subsequent acquisition for the supplies or services required.
(12) Contracting officer certification that the justification is accurate and complete to the best of the contracting officer’s knowledge and belief.
(c) Each justification shall include evidence that any supporting data that is the responsibility of technical or requirements personnel (e.g., verifying the Government’s minimum needs or schedule requirements or other rationale for other than full and open competition) and which form a basis for the justification have been certified as complete and accurate by the technical or requirements personnel.
(d) As a minimum, each justification for a sole-source 8(a) contract over $25 million shall include the following information:
(1) A description of the needs of the agency concerned for the matters covered by the contract.
(2) A specification of the statutory provision providing the exception from the requirement to use competitive procedures in entering into the contract (see 19.805-1).
(3) A determination that the use of a sole-source contract is in the best interest of the agency concerned.
(4) A determination that the anticipated cost of the contract will be fair and reasonable.
(5) Such other matters as the head of the agency concerned shall specify for purposes of this section.
6.304 Approval of the justification.
(a) Except for paragraph (b) of this section, the justification for other than full and open competition shall be approved in writing-
(1) For a proposed contract not exceeding $750,000, the contracting officer’s certification required by 6.303-2(b)(12) will serve as approval unless a higher approving level is established in agency procedures.
(2) For a proposed contract over $750,000 but not exceeding $15 million, by the advocate for competition for the procuring activity designated pursuant to 6.501 or an official described in paragraph (a)(3) or (4)of this section. This authority is not delegable.
(3) For a proposed contract over $15 million, but not exceeding $75 million, or, for DoD, NASA, and the Coast Guard, not exceeding $100 million, by the head of the procuring activity, or a designee who-
(i) If a member of the armed forces, is a general or flag officer; or
(ii) If a civilian, is serving in a position in a grade above GS-15 under the General Schedule (or in a comparable or higher position under another schedule).
(4) For a proposed contract over $75 million or, for DoD, NASA, and the Coast Guard, over $100 million, by the senior procurement executive of the agency designated pursuant to 41 U.S.C. 1702(c) in accordance with agency procedures.This authority is not delegable except in the case of the Under Secretary of Defense for Acquisition and Sustainment, acting as the senior procurement executive for the Department of Defense.
(b) Any justification for a contract awarded under the authority of 6.302-7, regardless of dollar amount, shall be considered approved when the determination required by 6.302-7(c)(1) is made.
(c) A class justification for other than full and open competition shall be approved in writing in accordance with agency procedures. The approval level shall be determined by the estimated total value of the class.
(d) The estimated dollar value of all options shall be included in determining the approval level of a justification.
AGAR Clauses 452.211-74 Period of Performance The period of performance of this contract is delivery within 150 days of PO issuance.
452.204-70 Modification for Contract Closeout As prescribed in USDA’s Contracting Desk Book 404.804 and 413.302-5, insert the following clause:
MODIFICATION FOR CONTRACT CLOSEOUT (DEVIATION JULY 2022)
“Upon contract closeout for contracts utilizing Simplified Acquisition Procedures (SAP) according to FAR part 13,
(a) If unobligated funds in the amount of $1000 or less remain on the contract, the Contracting Officer (CO) shall issue a unilateral modification for deobligation. The contractor will receive a copy of the modification but will not be required to provide a signature. The CO shall immediately proceed with contract closeout upon completion of the period of performance, receipt and acceptance of supplies or services, and final payment.
(b) If unobligated funds of more than $1000 remain on the contract, the CO shall issue a bilateral modification for deobligation. The contractor will receive a copy of the modification and will be required to provide a signature. (The CO may also request a Release of Claims be completed by the contractor, although not required for contract and orders using SAP.) If the bilateral modification and Release of Claims are not returned to the CO within 60 days, the CO shall release the modification as unilateral and proceed with contract closeout upon completion of the period of performance, receipt and acceptance of supplies or services, and final payment.”
(End of clause) 452.246-70 Inspection and Acceptance.
As prescribed in 446.370, insert the following clause:
INSPECTION AND ACCEPTANCE (FEB 1988)
| (a) | The Contracting Officer or the Contracting Officer's duly authorized representative will inspect and accept the supplies and/or services to be provided under this contract. |
| (b) | Inspection and acceptance will be performed at: |
Auburn, AL (End of Clause)
452.224-70 Confidentiality of Information.
As prescribed in 424.104, insert a clause substantially as follows:
CONFIDENTIALITY OF INFORMATION (FEB 1988)
1. Confidential information, as used in this clause, means --(1) information or data of a personal nature, Proprietary about an individual, or (2) information or data submitted by or pertaining to an organization.
1. In addition to the types of confidential information described in (a)(1) and (2) above, information which might require special consideration with regard to the timing of its disclosure may derive from studies or research, during which public disclosure of primarily invalidated findings could create an erroneous conclusion which might threaten public health or safety if acted upon.
1. The Contracting Officer and the Contractor may, by mutual consent, identify elsewhere in this contract specific information and/or categories of information which the Government will furnish to the Contractor or that the Contractor is expected to generate which is confidential. Similarly, the contracting Officer and the Contractor may, by mutual consent, identify such confidential information from time to time during the performance of the contract. Failure to agree will be settled pursuant to the "Disputes" clause.
1. If it is established that information to be utilized under this contract is subject to the Privacy Act, the Contractor will follow the rules and procedures of disclosure set forth in the Privacy Act of 1974, 5 U.S.C. 552a, and implementing regulations and policies, with respect to systems of records determined to be subject to the Privacy Act.
1. Confidential information, as defined in (a)(1) and (2) above, shall not be disclosed without the prior written consent of the individual, institution or organization.
1. Written advance notice of at least 45 days will be provided to the Contracting Officer of the Contractor's intent to release findings of studies or research, which have the possibility of adverse effects on the public or the Federal agency, as described in (b) above. If the Contracting Officer does not pose any objections in writing within the 45 day period, the contractor may proceed with disclosure. Disagreements not resolved by the Contractor and Contracting Officer will be settled pursuant to the "Disputes" clause.
1. Whenever the Contractor is uncertain with regard to the proper handling of material under the contract, or if the material in question is subject to the Privacy Act or is confidential information subject to the provisions of this clause, the Contractor shall obtain a written determination from the Contracting Officer prior to any release, disclosure, dissemination, or publication.
1. The provisions of paragraph (e) of this clause shall not apply when the information is subject to conflicting or overlapping provisions in other Federal, State or local laws.
(End of Clause)
452.237-74 Key Personnel.
As prescribed in 437.110(d), insert a clause substantially as follows:
KEY PERSONNEL (FEB 1988)
1. The Contractor shall assign to this contract the following key personnel:
1. During the first ninety (90) days of performance, the Contractor shall information required by paragraph
1. To the Contracting Officer at least 15 days prior to making any permanent substitutions.
(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.
(End of Clause)
452.237-75 Restrictions Against Disclosure.
As prescribed in 437.110(e), insert a clause substantially as follows:
RESTRICTIONS AGAINST DISCLOSURE (FEB 1988)
1. The Contractor agrees, in the performance of this contract, to keep all information contained in source documents or other media furnished by the Government in the strictest confidence. The Contractor also agrees not to publish or otherwise divulge such information in whole or in part in any manner or form, or to authorize or permit others to do so, taking such reasonable measures as are necessary to restrict access to such information while in the Contractor's possession, to those employees needing such information to perform the work provided herein, i.e., on a "need to know" basis. The Contractor agrees to immediately notify in writing, the Contracting Officer, named herein, in the event that the Contractor determines or has reason to suspect a breach of this requirement.
1. The Contractor agrees not to disclose any information concerning the work under this contract to any persons or individual unless prior written approval is obtained from the Contracting Officer. The Contractor agrees to insert the substance of this clause in any consultant agreement or subcontract here under.
(End of Clause)
52.204-27 Prohibition on a ByteDance Covered Application.
As prescribed in 4.2203(c), insert the following clause:
Prohibition on a ByteDance Covered Application (Jun 2023)
1. Definitions. As used in this clause— Covered application means the social networking service TikTok or any successor application or service developed or provided by ByteDance Limited or an entity owned by ByteDance Limited.
Information technology, as defined in 40 U.S.C. 11101(6)—
(1) Means any equipment or interconnected system or subsystem of equipment, used in the automatic acquisition, storage, analysis, evaluation, manipulation, management, movement, control, display, switching, interchange, transmission, or reception of data or information by the executive agency, if the equipment is used by the executive agency directly or is used by a contractor under a contract with the executive agency that requires the use—
(i) Of that equipment; or
(ii) Of that equipment to a significant extent in the performance of a service or the furnishing of a product;
(2) Includes computers, ancillary equipment (including imaging peripherals, input, output, and storage devices necessary for security and surveillance), peripheral equipment designed to be controlled by the central processing unit of a computer, software, firmware and similar procedures, services (including support services), and related resources; but
(3) Does not include any equipment acquired by a Federal contractor incidental to a Federal contract.
(b) Prohibition. Section 102 of Division R of the Consolidated Appropriations Act, 2023 (Pub. L. 117-328), the No TikTok on Government Devices Act, and its implementing guidance under Office of Management and Budget (OMB) Memorandum M-23-13, dated February 27, 2023, “No TikTok on Government Devices” Implementation Guidance, collectively prohibit the presence or use of a covered application on executive agency information technology, including certain equipment used by Federal contractors. The Contractor is prohibited from having or using a covered application on any information technology owned or managed by the Government, or on any information technology used or provided by the Contractor under this contract, including equipment provided by the Contractor’s employees; however, this prohibition does not apply if the Contracting Officer provides written notification to the Contractor that an exception has been granted in accordance with OMB Memorandum M-23-13.
(c) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (c), in all subcontracts, including subcontracts for the acquisition of commercial products or commercial services.
(End of clause) Parent topic: 52.204 [Reserved]
FAR 52.212-2 – Evaluation -- Commercial Items (Addendum).
Evaluation -- Commercial Items (Oct 2014)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers: Lowest Priced Technically Acceptable.
Evaluation Methodology
In accordance with FAR Part 13 the Government will award a firm fixed price contract resulting from this solicitation to the responsible Offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
Lowest Price Technically Acceptable (LPTA), evaluation method. Technical Acceptability is defined as:
1) Meeting all requirements as defined in the solicitation, to include submission of all Quote submission documents referenced in Instructions for the Preparation of Offers (FAR 52.212-1 Addendum). Failure to submit ANY of the required document listed in “Offer Submission Documents (52.212-1 Addendum)” will render your quote non-responsive and thus not eligible for award. Failure to acknowledge any and all amendments will render your quote non-responsive and thus not eligible for award.
2) Steris authorized distributor. This requirement will ensure that devices are not counterfeit or adulterated devices, have maintained adequate storage conditions, and any warranties and service and/or preventative maintenance agreements are transferred and will be honored by STERIS Corporation. Failure to submit an Authorized distributor letter will render the quote “Unacceptable” for Technically Acceptability.
3) Acceptable rating in “Past Performance”.
Past performance will be evaluated in accordance with FAR 13.106-2. Past Performance will be rated on an “acceptable” or “unacceptable” basis. The apparent successful, prospective contractor must have “acceptable” past performance. System for Award Management (SAM.gov) exclusions list, Federal Awardee Performance and Integrity Information System, and Contractor Performance Assessment Reporting System (CPARS) shall be considered as part of the past performance evaluation process. Any past performance that is found to be “Negative”, shall result in the entire Past Performance rating as “Unacceptable”. “Negative” is defined as any CPARS past performance evaluation rated less than “Satisfactory”, any Terminations for Default/Cause, or any negative performance references will be rated as ‘Unacceptable’. Note: In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance. Therefore, the offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable.” Any past performance that is found to be “negative”, shall result in the entire Past Performance rating as “Unacceptable” making the overall Technical Acceptability as “Unacceptable”.
(End of Provision)