Chiller maintenance schedule spreadsheet.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
J041--Chiller Maintenance NJHCS Federal contract opportunity
Solicitation number
36C24221Q0383
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

This document contains a solicitation for chiller maintenance services at two Department of Veterans Affairs campuses in New Jersey. The solicitation seeks quarterly and annual preventative maintenance for multiple water-cooled screw chillers, centrifugal chillers, air-cooled screw chillers, rotary chillers, DX units, and associated cooling towers at the East Orange and Lyons campuses. Services include equipment inspections, refrigerant and oil changes, belt replacements, strainer cleaning, and water treatment in accordance with manufacturers' recommendations. Quotes are due by January 28, 2021 with the period of performance estimated from February 1, 2021 to January 31, 2022 and four optional one-year extensions. Award will be made to the offeror with the lowest price technically acceptable quote meeting the requirements.

View the file

Other files for this federal contract opportunity

Other files attached to J041--Chiller Maintenance NJHCS, newest first.
File Type Posted
36C24221Q0383 0001 amendment .docx DOCX document
Response to Solicitation questions 36C24221Q0383.docx DOCX document
36C24221Q0383_1.docx DOCX document
Wage determination 2015-4210 Somerset.pdf PDF
36C24221Q0383.docx DOCX document
Wage determination 2015-4212 Essex County.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Maintenance Schedule - Chillers, Condensers & Evaporators.
SiteEquiptment
TypeLocationModel/SerialAnnualStart -up/ CheckoutQtrly Mid SeasonEddy Current- AnnualEddy Current -
5 Yr.Winter

Shutdown

East OrangeChillers
Building 1 Rm B-128CVHE-M2C/
L84D191212/1/213/15/217/15/2111/1/21
CVHE-M2C/
L84D191222/1/213/15/217/15/2111/1/21
CVHF1300/
L13K045582/1/213/15/217/15/2111/1/21
Building 1 Room B-128DRTHCIDIFOFOG2L3G2LG00U0D/
U00C060222/1/213/15/217/15/2111/1/21
Building 7 Outside, Front of BuildingRTAA110AYJOIA3DOBDG/
U980089062/1/213/15/217/15/2111/1/21
Building 7 Outside, Back of BuildingRTAC275A/U07D031192/1/213/15/217/15/2111/1/21
Building 15 Room 131RTHA18OFCUONDUC3LFLLFNN/
U93B2/1/213/15/217/15/2111/1/21
LYONSChillersBuilding 136Chiller #1 1350- Ton Centrifugal Carrier M#19XR-8989E61EMB68S S#5114Q239322/1/213/15/21
Chiller#2 700Ton ABSORBER2/1/213/15/21
Carrier M# 16JB068-37985 S#HS926613
Chiller #3 1000 Ton Centrifugal Carrier M#19XR---5--66190S#4301Q661902/1/213/15/21
Building 135Chiller #4 350 Ton Centrifugal YORK M# YKDSDS Q5-CKG S# SAVM-207-48
Water towersBuilding 136Tower #1 1350 Ton1/15/213/15/21
Tower #2 1350 Ton1/15/213/15/21
Tower #3 1350 TON1/15/213/15/21
Building #135Tower #4 350 Ton on roof1/15/213/15/21