This is a comprehensive plan set for the 2025 Micro Paving Program (Contract 25-10) for Hopewell Township in Mercer County, New Jersey, prepared by Van Cleef Engineering Associates. The project involves micro paving and surface treatment for various roads within the township, including Aunt Molly Road, Bayberry Road, Church Street, Dublin Road, Fiddler's Creek Road, Mine Road, Old Mill Road, and Pleasant Valley Harbourton Road. The plan set includes detailed site location maps, quantities and construction details, traffic control plans, and detour plans for each road segment. The project requires careful traffic management, with all roadways required to remain passable (one lane) at all times for local traffic, school buses, garbage trucks, and emergency services.

The contract includes specific technical requirements for the micro paving process, such as applying emulsified asphalt that can be covered within 10 minutes, ensuring sufficient stone is on-site, and preventing asphalt from contacting curbs, sidewalks, and driveways. The contractor must provide solar-powered variable message signs at each road's end, prepare door hang tags for residents, and coordinate with the township on work schedules. Additional requirements include sweeping roadways before and during work, completing preparatory work prior to micro paving, and conducting sweeping and striping within five days of the chip seal/micro paving process. The project emphasizes minimal disruption to local residents and maintaining emergency and essential service access throughout the construction period.

View the file

Other files for this state and local contract opportunity

Other files attached to 25-10 2025 MICRO PAVING PROGRAM, newest first.
File Type Posted
Certified_COMPLETE_SPECS_2025MicroPaving__70702301.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N.T.S.

SITUATED IN

PREPARED FOR

CONTRACT 25-10

2025 MICRO PAVING PROGRAM

VARIOUS ROADS

HOPEWELL TOWNSHIP , MERCER COUNTY NEW JERSEY

HOPEWELL TOWNSHIP

SITE LOCATION MAP

sn j-sd

1\ D at a\ jo bf ile \7

1\

D w g\

C

H

IP

S

EA

L

PR

O G

RA

M

\7

1-

-C

O V

ER

V

A

RI

O U

S

RD

S.

dw g r ya hn 6

/2 3/

:2

2:

P M

PLAN NOTATION

VAN CLEEF ENGINEERING ASSOCIATES, LLC

4 AAA DRIVE, SUITE 103, HAMILTON, NJ 08691

WEB: WWW.VANCLEEFENGINEERING.COM

PHONE (609) 689-1100

CERT. OF AUTHORIZATION NO. 24GA28132300

of 11

HOPEWELL TOWNSHIP

MERCER COUNTY, NEW JERSEY

DESCRIPTION AUTH DATEREV

JOB NUMBER:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

SCALE:

DATE:

70702301 H.J.S.

R.R.F.\R.K.Y.

G.S.

JUNE 18, 2025

W it h O ff ic es in

N ew

J er se y, Ea st er n

P en n sy lv an ia a n d

D el aw ar e

SERIAL NO. __________

B ri d g es /H ig h w ay s C o n st ru ct io n In sp ec ti o n En vi ro n m en ta l G eo te ch n ic al

/D am s La n d sc ap e A rc h it ec tu re

Lo ca l/ R eg io n al

P la n n in g

M u n ic ip al

E n g in ee ri n g

Si te

D ev el o p m en t

Su rv ey in g /A er ia l D ro n es

/G

IS

W at er /W as te w at er

ENGINEERING WITH FOCUS

EN

G

IN

EE

RI

NG

W

IT

H

FO

CU

S

Know what's below.

Call before you dig.

or 1-800-272-1000

TO LOCATE UNDERGROUND UTILITIES

IF YOU'RE GOING TO DIG, BLAST OR DRILL

THREE (3) WORKING DAYS NOTICE

REMEMBER

IT'S THE LAW!

Dig Safely.

ONE CALL

NEW JERSEY

HERBERT J. SEEBURGER , JR.

NEW JERSEY PROFESSIONAL

ENGINEER NUMBER 24GE04748700

DATE

CONTRACT 25-10

2025 MICRO PAVING

PROGRAM

FOR

6/18/25

INDEX OF SHEETS

SHEET No.

TITLE

COVER SHEET

2 QUANTITIES & CONSTRUCTION DETAILS

4-11 DETOUR & ROAD CLOSURE PLANS

3 TRAFFIC CONTROL PLAN

COVER SHEET

WENDY BIRKHEAD

NEW JERSEY PROFESSIONAL ENGINEER NUMBER 24GE04519500

DATE

TOWNSHIP OF HOPEWELL

MERCER COUNTY

201 Washington Crossing Pennington Road Titusville, New Jersey 08560-1410

BY: 6/18/25

DEPUTY MAYOR

UMA PURANDARE

COURTNEY PETERS-MANNING

TOWNSHIP COMMITTEE

MAYOR

DAVID CHAIT

KEVIN KUCHINSKI

MICHAEL RUGER

SEE

L E G E N D

L E G E N D

QUANTITIES &

CONSTRUCTION

DETAILS

sn j-sd

1\ D at a\ jo bf ile \7

1\

D w g\

C

H

IP

S

EA

L

PR

O G

RA

M

\7

1-

-C

O V

ER

V

A

RI

O U

S

RD

S.

dw g r ya hn 6

/1 9/

:1

7:

P M

PLAN NOTATION

VAN CLEEF ENGINEERING ASSOCIATES, LLC

4 AAA DRIVE, SUITE 103, HAMILTON, NJ 08691

WEB: WWW.VANCLEEFENGINEERING.COM

PHONE (609) 689-1100

CERT. OF AUTHORIZATION NO. 24GA28132300

of 11

HOPEWELL TOWNSHIP

MERCER COUNTY, NEW JERSEY

DESCRIPTION AUTH DATEREV

JOB NUMBER:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

SCALE:

DATE:

70702301 H.J.S.

R.R.F.\R.K.Y.

G.S.

JUNE 18, 2025

W it h O ff ic es in

N ew

J er se y, Ea st er n

P en n sy lv an ia a n d

D el aw ar e

SERIAL NO. __________

B ri d g es /H ig h w ay s C o n st ru ct io n In sp ec ti o n En vi ro n m en ta l G eo te ch n ic al

/D am s La n d sc ap e A rc h it ec tu re

Lo ca l/ R eg io n al

P la n n in g

M u n ic ip al

E n g in ee ri n g

Si te

D ev el o p m en t

Su rv ey in g /A er ia l D ro n es

/G

IS

W at er /W as te w at er

ENGINEERING WITH FOCUS

EN

G

IN

EE

RI

NG

W

IT

H

FO

CU

S

Know what's below.

Call before you dig.

or 1-800-272-1000

TO LOCATE UNDERGROUND UTILITIES

IF YOU'RE GOING TO DIG, BLAST OR DRILL

THREE (3) WORKING DAYS NOTICE

REMEMBER

IT'S THE LAW!

Dig Safely.

ONE CALL

NEW JERSEY

HERBERT J. SEEBURGER , JR.

NEW JERSEY PROFESSIONAL

ENGINEER NUMBER 24GE04748700

DATE

CONTRACT 25-10

2025 MICRO PAVING

PROGRAM

FOR

6/18/25

AS NOTED

1. TRAFFIC CONTROL SHALL BE IN ACCORDANCE WITH THE TRAFFIC CONTROL PLAN. ALL ROADWAYS MUST REMAIN PASSABLE (ONE LANE) AT ALL

TIMES TO LOCAL TRAFFIC, SCHOOL BUSES, GARBAGE TRUCKS, AND EMERGENCY SERVICES.

2. THE LIST OF ROADS AND QUANTITIES PROVIDED IS A BEST ESTIMATE OF THE WORK REQUIRED ON EACH ROAD BASED ON CONDITIONS OBSERVED FROM THE SURFACE. THIS INFORMATION IS INTENDED TO GIVE THE CONTRACTOR AN APPROXIMATE SCOPE OF WORK FOR EACH ROADWAY. ACTUAL FIELD QUANTITIES MAY VARY SLIGHTLY BASED UP ACTUAL CONDITIONS AT THE TIME OF CONSTRUCTION.

CONSTRUCTION NOTES

TRAFFIC CONTROL

PLAN

sn j-sd

1\ D at a\ jo bf ile \7

1\

D w g\

C

H

IP

S

EA

L

PR

O G

RA

M

\7

1-

-C

O V

ER

V

A

RI

O U

S

RD

S.

dw g r ya hn 6

/1 9/

:1

8:

P M

PLAN NOTATION

VAN CLEEF ENGINEERING ASSOCIATES, LLC

4 AAA DRIVE, SUITE 103, HAMILTON, NJ 08691

WEB: WWW.VANCLEEFENGINEERING.COM

PHONE (609) 689-1100

CERT. OF AUTHORIZATION NO. 24GA28132300

of 11

HOPEWELL TOWNSHIP

MERCER COUNTY, NEW JERSEY

DESCRIPTION AUTH DATEREV

JOB NUMBER:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

SCALE:

DATE:

70702301 H.J.S.

R.R.F.\R.K.Y.

G.S.

JUNE 18, 2025

W it h O ff ic es in

N ew

J er se y, Ea st er n

P en n sy lv an ia a n d

D el aw ar e

SERIAL NO. __________

B ri d g es /H ig h w ay s C o n st ru ct io n In sp ec ti o n En vi ro n m en ta l G eo te ch n ic al

/D am s La n d sc ap e A rc h it ec tu re

Lo ca l/ R eg io n al

P la n n in g

M u n ic ip al

E n g in ee ri n g

Si te

D ev el o p m en t

Su rv ey in g /A er ia l D ro n es

/G

IS

W at er /W as te w at er

ENGINEERING WITH FOCUS

EN

G

IN

EE

RI

NG

W

IT

H

FO

CU

S

Know what's below.

Call before you dig.

or 1-800-272-1000

TO LOCATE UNDERGROUND UTILITIES

IF YOU'RE GOING TO DIG, BLAST OR DRILL

THREE (3) WORKING DAYS NOTICE

REMEMBER

IT'S THE LAW!

Dig Safely.

ONE CALL

NEW JERSEY

HERBERT J. SEEBURGER , JR.

NEW JERSEY PROFESSIONAL

ENGINEER NUMBER 24GE04748700

DATE

CONTRACT 25-10

2025 MICRO PAVING

PROGRAM

FOR

6/18/25

AS NOTED

1. TRAFFIC CONTROL SHALL BE IN ACCORDANCE WITH THE TRAFFIC CONTROL PLAN. ALL ROADWAYS MUST REMAIN PASSABLE (ONE LANE) AT ALL

TIMES TO LOCAL TRAFFIC, SCHOOL BUSES, GARBAGE TRUCKS, AND EMERGENCY SERVICES.

2. THE LIST OF ROADS AND QUANTITIES PROVIDED IS A BEST ESTIMATE OF THE WORK REQUIRED ON EACH ROAD BASED ON CONDITIONS OBSERVED FROM THE SURFACE. THIS INFORMATION IS INTENDED TO GIVE THE CONTRACTOR AN APPROXIMATE SCOPE OF WORK FOR EACH ROADWAY. ACTUAL FIELD QUANTITIES MAY VARY SLIGHTLY BASED UP ACTUAL CONDITIONS AT THE TIME OF CONSTRUCTION.

CONSTRUCTION NOTES

SIGN PLACEMENT

CONSTRUCTION NOTES:

1. CONTRACTOR SHALL PLACE ONE (1) SOLAR POWERED VARIABLE MESSAGE SIGN AT EACH END OF EACH ROAD TO BE CHIP SEALED A MINIMUM OF ONE

(1) DAYS PRIOR TO START OF WORK. THE SIGNS SHALL ADVISE RESIDENTS OF THE DATE(S) OF WORK. EXACT MESSAGE TO BE APPROVED BY

ENGINEER PRIOR TO PLACING OF SIGNS.

2. CONTRACTOR SHALL PROVIDE ENGINEER WITH A WRITTEN SCHEDULE OF ALL WORK AT LEAST FIVE (5) DAYS PRIOR TO THE START OF WORK. THE ENGINEER WILL COORDINATE THE POSTING OF A NOTICE ON THE TOWNSHIP WEB SITE AND CABLE CHANNEL. THE ENGINEER WILL ALSO NOTIFY ALL

EMERGENCY SERVICES AND THE SCHOOL DISTRICT IF REQUIRED.

3. CONTRACTOR SHALL PREPARE A DOOR HANG TAG TO THE PLACES ON EVERY RESIDENTS DOOR AT LEAST TWO (2) DAYS PRIOR TO THE START OF EACH PHASE OF WORK ON THEIR ROAD. CONTRACTOR SHALL PROVIDE A COPY OF THE DOOR HANG TAG TO THE ENGINEER TWO (2) DAYS PRIOR TO

HANGING FOR ENGINEER'S APPROVAL.

4. DURING THE CHIP SEAL PROCESS, THE CONTRACTOR SHALL ONLY APPLY AS MUCH EMULSIFIED ASPHALT AS CAN BE READILY COVERED WITHIN 10 MINUTES. SUFFICIENT STONE SHALL BE ON-SITE AND READY TO BE APPLIED PRIOR TO PLACEMENT OF EMULSIFIED ASPHALT. THIS IS REQUIRED IN CASE OF AN EMERGENCY. CONTRACTOR SHALL PROVIDE SUFFICIENT PERSONNEL TO PREVENT TRAFFIC, PEDESTRIAN AND RESIDENTS FROM DRIVING AND/OR WALKING ON EMULSIFIED ASPHALT AFTER APPLICATION AND PRIOR TO APPLICATION OF STONE.

5. CARE SHALL BE TAKEN TO PREVENT EMULSIFIED ASPHALT FROM CONTACTING CURB, SIDEWALKS AND DRIVEWAYS. HAND TOOLS SHALL BE USED

WHERE REQUIRED ADJACENT TO THESE ITEMS.

6. CONTRACTOR AND ENGINEER TO AGREE UPON A STAGING AREA PRIOR TO ALL WORK. CONTRACTOR IS RESPONSIBLE TO SECURE STAGING AREA.

7. ANY EMULSIFIED ASPHALT OR STONE, DROPPED, SPILLED OR TRACKED ONTO ADJACENT ROADS OR DRIVEWAYS SHALL BE REMOVED IMMEDIATELY.

8. CONTRACTOR TO PROVIDE TRAFFIC CONTROL IN ACCORDANCE WITH TRAFFIC CONTROL PLANS CONTAINED HEREIN.

9. EMERGENCY ACCESS SHALL BE PROVIDED AT ALL TIMES DURING CONSTRUCTION. CONTRACTOR TO COORDINATE WORK FOR MAIL DELIVERY AND

TRASH PICK UP.

10. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MONITORING OF WEATHER CONDITIONS. NO WORK SHALL BE PERFORMED UNLESS OPTIMAL

WEATHER CONDITIONS EXIST AND ARE PREDICTED TO CONTINUE THROUGH THE REQUIRED CURING TIME OF EACH MATERIAL APPLIED.

11. ROADWAYS ARE TO BE SWEPT PRIOR TO THE START OF WORK AND AT SUCH OTHER INTERVALS REQUIRED TO PROVIDE FOR A SAFE DRIVING AND

WALKING SURFACE.

12. REQUIRED PREPARATORY WORK SHALL BE COMPLETED PRIOR TO THE INSTALLATION OF THE CHIP SEAL.

13. SWEEPING & STRIPING SHALL OCCUR WITHIN FIVE (5) DAYS OF CHIP SEAL/ MICRO PAVING.

DETOUR PLAN

sn j-sd

1\ D at a\ jo bf ile \7

1\

D w g\

C

H

IP

S

EA

L

PR

O G

RA

M

\7

1-

-D

ET

O

U R.

dw g r ya hn 6 /1

9/

:2 5:

P

M

PLAN NOTATION

VAN CLEEF ENGINEERING ASSOCIATES, LLC

4 AAA DRIVE, SUITE 103, HAMILTON, NJ 08691

WEB: WWW.VANCLEEFENGINEERING.COM

PHONE (609) 689-1100

CERT. OF AUTHORIZATION NO. 24GA28132300

of 11

HOPEWELL TOWNSHIP

MERCER COUNTY, NEW JERSEY

DESCRIPTION AUTH DATEREV

JOB NUMBER:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

SCALE:

DATE:

70702301 H.J.S.

R.R.F.\R.K.Y.

G.S.

JUNE 18, 2025

W it h O ff ic es in

N ew

J er se y, Ea st er n

P en n sy lv an ia a n d

D el aw ar e

SERIAL NO. __________

B ri d g es /H ig h w ay s C o n st ru ct io n In sp ec ti o n En vi ro n m en ta l G eo te ch n ic al

/D am s La n d sc ap e A rc h it ec tu re

Lo ca l/ R eg io n al

P la n n in g

M u n ic ip al

E n g in ee ri n g

Si te

D ev el o p m en t

Su rv ey in g /A er ia l D ro n es

/G

IS

W at er /W as te w at er

ENGINEERING WITH FOCUS

EN

G

IN

EE

RI

NG

W

IT

H

FO

CU

S

Know what's below.

Call before you dig.

or 1-800-272-1000

TO LOCATE UNDERGROUND UTILITIES

IF YOU'RE GOING TO DIG, BLAST OR DRILL

THREE (3) WORKING DAYS NOTICE

REMEMBER

IT'S THE LAW!

Dig Safely.

ONE CALL

NEW JERSEY

HERBERT J. SEEBURGER , JR.

NEW JERSEY PROFESSIONAL

ENGINEER NUMBER 24GE04748700

DATE

CONTRACT 25-10

2025 MICRO PAVING

PROGRAM

FOR

6/18/25

1"=1,000'

AUNT MOLLY ROAD

HOPEWELL

TOWNSHIP

HOPEWELL

TOWNSHIP

DETOUR PLAN

SIGN PLACEMENT

BOROUGH

HOPEWELL

TOWNSHIP

MONTGOMERY

DETOUR PLAN

1. CONTRACTOR SHALL PLACE ONE (1) SOLAR POWERED VARIABLE MESSAGE SIGN AT EACH END OF EACH ROAD TO BE CHIP SEALED A MINIMUM OF ONE

(1) DAYS PRIOR TO START OF WORK. THE SIGNS SHALL ADVISE RESIDENTS OF THE DATE(S) OF WORK. EXACT MESSAGE TO BE APPROVED BY

ENGINEER PRIOR TO PLACING OF SIGNS.

2. CONTRACTOR SHALL PROVIDE ENGINEER WITH A WRITTEN SCHEDULE OF ALL WORK AT LEAST FIVE (5) DAYS PRIOR TO THE START OF WORK. THE ENGINEER WILL COORDINATE THE POSTING OF A NOTICE ON THE TOWNSHIP WEB SITE AND CABLE CHANNEL. THE ENGINEER WILL ALSO NOTIFY ALL

EMERGENCY SERVICES AND THE SCHOOL DISTRICT IF REQUIRED.

3. CONTRACTOR SHALL PREPARE A DOOR HANG TAG TO THE PLACES ON EVERY RESIDENTS DOOR AT LEAST TWO (2) DAYS PRIOR TO THE START OF EACH PHASE OF WORK ON THEIR ROAD. CONTRACTOR SHALL PROVIDE A COPY OF THE DOOR HANG TAG TO THE ENGINEER TWO (2) DAYS PRIOR TO

HANGING FOR ENGINEER'S APPROVAL.

4. DURING THE CHIP SEAL PROCESS, THE CONTRACTOR SHALL ONLY APPLY AS MUCH EMULSIFIED ASPHALT AS CAN BE READILY COVERED WITHIN 10 MINUTES. SUFFICIENT STONE SHALL BE ON-SITE AND READY TO BE APPLIED PRIOR TO PLACEMENT OF EMULSIFIED ASPHALT. THIS IS REQUIRED IN CASE OF AN EMERGENCY. CONTRACTOR SHALL PROVIDE SUFFICIENT PERSONNEL TO PREVENT TRAFFIC, PEDESTRIAN AND RESIDENTS FROM DRIVING AND/OR WALKING ON EMULSIFIED ASPHALT AFTER APPLICATION AND PRIOR TO APPLICATION OF STONE.

5. CARE SHALL BE TAKEN TO PREVENT EMULSIFIED ASPHALT FROM CONTACTING CURB, SIDEWALKS AND DRIVEWAYS. HAND TOOLS SHALL BE USED

WHERE REQUIRED ADJACENT TO THESE ITEMS.

6. CONTRACTOR AND ENGINEER TO AGREE UPON A STAGING AREA PRIOR TO ALL WORK. CONTRACTOR IS RESPONSIBLE TO SECURE STAGING AREA.

7. ANY EMULSIFIED ASPHALT OR STONE, DROPPED, SPILLED OR TRACKED ONTO ADJACENT ROADS OR DRIVEWAYS SHALL BE REMOVED IMMEDIATELY.

8. CONTRACTOR TO PROVIDE TRAFFIC CONTROL IN ACCORDANCE WITH TRAFFIC CONTROL PLANS CONTAINED HEREIN.

9. EMERGENCY ACCESS SHALL BE PROVIDED AT ALL TIMES DURING CONSTRUCTION. CONTRACTOR TO COORDINATE WORK FOR MAIL DELIVERY AND

TRASH PICK UP.

10. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MONITORING OF WEATHER CONDITIONS. NO WORK SHALL BE PERFORMED UNLESS OPTIMAL

WEATHER CONDITIONS EXIST AND ARE PREDICTED TO CONTINUE THROUGH THE REQUIRED CURING TIME OF EACH MATERIAL APPLIED.

11. ROADWAYS ARE TO BE SWEPT PRIOR TO THE START OF WORK AND AT SUCH OTHER INTERVALS REQUIRED TO PROVIDE FOR A SAFE DRIVING AND

WALKING SURFACE.

12. REQUIRED PREPARATORY WORK SHALL BE COMPLETED PRIOR TO THE INSTALLATION OF THE CHIP SEAL.

13. SWEEPING & STRIPING SHALL OCCUR WITHIN FIVE (5) DAYS OF CHIP SEAL/ MICRO PAVING.

DETOUR PLAN

sn j-sd

1\ D at a\ jo bf ile \7

1\

D w g\

C

H

IP

S

EA

L

PR

O G

RA

M

\7

1-

-D

ET

O

U R.

dw g r ya hn 6 /1

9/

:2 5:

P

M

PLAN NOTATION

VAN CLEEF ENGINEERING ASSOCIATES, LLC

4 AAA DRIVE, SUITE 103, HAMILTON, NJ 08691

WEB: WWW.VANCLEEFENGINEERING.COM

PHONE (609) 689-1100

CERT. OF AUTHORIZATION NO. 24GA28132300

of 11

HOPEWELL TOWNSHIP

MERCER COUNTY, NEW JERSEY

DESCRIPTION AUTH DATEREV

JOB NUMBER:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

SCALE:

DATE:

70702301 H.J.S.

R.R.F.\R.K.Y.

G.S.

JUNE 18, 2025

W it h O ff ic es in

N ew

J er se y, Ea st er n

P en n sy lv an ia a n d

D el aw ar e

SERIAL NO. __________

B ri d g es /H ig h w ay s C o n st ru ct io n In sp ec ti o n En vi ro n m en ta l G eo te ch n ic al

/D am s La n d sc ap e A rc h it ec tu re

Lo ca l/ R eg io n al

P la n n in g

M u n ic ip al

E n g in ee ri n g

Si te

D ev el o p m en t

Su rv ey in g /A er ia l D ro n es

/G

IS

W at er /W as te w at er

ENGINEERING WITH FOCUS

EN

G

IN

EE

RI

NG

W

IT

H

FO

CU

S

Know what's below.

Call before you dig.

or 1-800-272-1000

TO LOCATE UNDERGROUND UTILITIES

IF YOU'RE GOING TO DIG, BLAST OR DRILL

THREE (3) WORKING DAYS NOTICE

REMEMBER

IT'S THE LAW!

Dig Safely.

ONE CALL

NEW JERSEY

HERBERT J. SEEBURGER , JR.

NEW JERSEY PROFESSIONAL

ENGINEER NUMBER 24GE04748700

DATE

CONTRACT 25-10

2025 MICRO PAVING

PROGRAM

FOR

6/18/25

AS NOTED

BAYBERRY ROAD

HOPEWELL

TOWNSHIP

LAWRENCE

TOWNSHIP

SIGN PLACEMENT

PRINCETON

1. CONTRACTOR SHALL PLACE ONE (1) SOLAR POWERED VARIABLE MESSAGE SIGN AT EACH END OF EACH ROAD TO BE CHIP SEALED A MINIMUM OF ONE

(1) DAYS PRIOR TO START OF WORK. THE SIGNS SHALL ADVISE RESIDENTS OF THE DATE(S) OF WORK. EXACT MESSAGE TO BE APPROVED BY

ENGINEER PRIOR TO PLACING OF SIGNS.

2. CONTRACTOR SHALL PROVIDE ENGINEER WITH A WRITTEN SCHEDULE OF ALL WORK AT LEAST FIVE (5) DAYS PRIOR TO THE START OF WORK. THE ENGINEER WILL COORDINATE THE POSTING OF A NOTICE ON THE TOWNSHIP WEB SITE AND CABLE CHANNEL. THE ENGINEER WILL ALSO NOTIFY ALL

EMERGENCY SERVICES AND THE SCHOOL DISTRICT IF REQUIRED.

3. CONTRACTOR SHALL PREPARE A DOOR HANG TAG TO THE PLACES ON EVERY RESIDENTS DOOR AT LEAST TWO (2) DAYS PRIOR TO THE START OF EACH PHASE OF WORK ON THEIR ROAD. CONTRACTOR SHALL PROVIDE A COPY OF THE DOOR HANG TAG TO THE ENGINEER TWO (2) DAYS PRIOR TO

HANGING FOR ENGINEER'S APPROVAL.

4. DURING THE CHIP SEAL PROCESS, THE CONTRACTOR SHALL ONLY APPLY AS MUCH EMULSIFIED ASPHALT AS CAN BE READILY COVERED WITHIN 10 MINUTES. SUFFICIENT STONE SHALL BE ON-SITE AND READY TO BE APPLIED PRIOR TO PLACEMENT OF EMULSIFIED ASPHALT. THIS IS REQUIRED IN CASE OF AN EMERGENCY. CONTRACTOR SHALL PROVIDE SUFFICIENT PERSONNEL TO PREVENT TRAFFIC, PEDESTRIAN AND RESIDENTS FROM DRIVING AND/OR WALKING ON EMULSIFIED ASPHALT AFTER APPLICATION AND PRIOR TO APPLICATION OF STONE.

5. CARE SHALL BE TAKEN TO PREVENT EMULSIFIED ASPHALT FROM CONTACTING CURB, SIDEWALKS AND DRIVEWAYS. HAND TOOLS SHALL BE USED

WHERE REQUIRED ADJACENT TO THESE ITEMS.

6. CONTRACTOR AND ENGINEER TO AGREE UPON A STAGING AREA PRIOR TO ALL WORK. CONTRACTOR IS RESPONSIBLE TO SECURE STAGING AREA.

7. ANY EMULSIFIED ASPHALT OR STONE, DROPPED, SPILLED OR TRACKED ONTO ADJACENT ROADS OR DRIVEWAYS SHALL BE REMOVED IMMEDIATELY.

8. CONTRACTOR TO PROVIDE TRAFFIC CONTROL IN ACCORDANCE WITH TRAFFIC CONTROL PLANS CONTAINED HEREIN.

9. EMERGENCY ACCESS SHALL BE PROVIDED AT ALL TIMES DURING CONSTRUCTION. CONTRACTOR TO COORDINATE WORK FOR MAIL DELIVERY AND

TRASH PICK UP.

10. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MONITORING OF WEATHER CONDITIONS. NO WORK SHALL BE PERFORMED UNLESS OPTIMAL

WEATHER CONDITIONS EXIST AND ARE PREDICTED TO CONTINUE THROUGH THE REQUIRED CURING TIME OF EACH MATERIAL APPLIED.

11. ROADWAYS ARE TO BE SWEPT PRIOR TO THE START OF WORK AND AT SUCH OTHER INTERVALS REQUIRED TO PROVIDE FOR A SAFE DRIVING AND

WALKING SURFACE.

12. REQUIRED PREPARATORY WORK SHALL BE COMPLETED PRIOR TO THE INSTALLATION OF THE CHIP SEAL.

13. SWEEPING & STRIPING SHALL OCCUR WITHIN FIVE (5) DAYS OF CHIP SEAL/ MICRO PAVING.

ROAD CLOSURE PLAN

sn j-sd

1\ D at a\ jo bf ile \7

1\

D w g\

C

H

IP

S

EA

L

PR

O G

RA

M

\7

1-

-D

ET

O

U R.

dw g r ya hn 6 /1

9/

:2 6:

P

M

PLAN NOTATION

VAN CLEEF ENGINEERING ASSOCIATES, LLC

4 AAA DRIVE, SUITE 103, HAMILTON, NJ 08691

WEB: WWW.VANCLEEFENGINEERING.COM

PHONE (609) 689-1100

CERT. OF AUTHORIZATION NO. 24GA28132300

of 11

HOPEWELL TOWNSHIP

MERCER COUNTY, NEW JERSEY

DESCRIPTION AUTH DATEREV

JOB NUMBER:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

SCALE:

DATE:

70702301 H.J.S.

R.R.F.\R.K.Y.

G.S.

JUNE 18, 2025

W it h O ff ic es in

N ew

J er se y, Ea st er n

P en n sy lv an ia a n d

D el aw ar e

SERIAL NO. __________

B ri d g es /H ig h w ay s C o n st ru ct io n In sp ec ti o n En vi ro n m en ta l G eo te ch n ic al

/D am s La n d sc ap e A rc h it ec tu re

Lo ca l/ R eg io n al

P la n n in g

M u n ic ip al

E n g in ee ri n g

Si te

D ev el o p m en t

Su rv ey in g /A er ia l D ro n es

/G

IS

W at er /W as te w at er

ENGINEERING WITH FOCUS

EN

G

IN

EE

RI

NG

W

IT

H

FO

CU

S

Know what's below.

Call before you dig.

or 1-800-272-1000

TO LOCATE UNDERGROUND UTILITIES

IF YOU'RE GOING TO DIG, BLAST OR DRILL

THREE (3) WORKING DAYS NOTICE

REMEMBER

IT'S THE LAW!

Dig Safely.

ONE CALL

NEW JERSEY

HERBERT J. SEEBURGER , JR.

NEW JERSEY PROFESSIONAL

ENGINEER NUMBER 24GE04748700

DATE

CONTRACT 25-10

2025 MICRO PAVING

PROGRAM

FOR

6/18/25

1"=600'

CHURCH STREET

HOPEWELL

TOWNSHIP

CONSTRUCTION NOTES:

1. CONTRACTOR SHALL PLACE ONE (1) SOLAR POWERED VARIABLE MESSAGE SIGN AT EACH END OF EACH ROAD TO BE CHIP SEALED A MINIMUM OF ONE

(1) DAYS PRIOR TO START OF WORK. THE SIGNS SHALL ADVISE RESIDENTS OF THE DATE(S) OF WORK. EXACT MESSAGE TO BE APPROVED BY

ENGINEER PRIOR TO PLACING OF SIGNS.

2. CONTRACTOR SHALL PROVIDE ENGINEER WITH A WRITTEN SCHEDULE OF ALL WORK AT LEAST FIVE (5) DAYS PRIOR TO THE START OF WORK. THE ENGINEER WILL COORDINATE THE POSTING OF A NOTICE ON THE TOWNSHIP WEB SITE AND CABLE CHANNEL. THE ENGINEER WILL ALSO NOTIFY ALL

EMERGENCY SERVICES AND THE SCHOOL DISTRICT IF REQUIRED.

3. CONTRACTOR SHALL PREPARE A DOOR HANG TAG TO THE PLACES ON EVERY RESIDENTS DOOR AT LEAST TWO (2) DAYS PRIOR TO THE START OF EACH PHASE OF WORK ON THEIR ROAD. CONTRACTOR SHALL PROVIDE A COPY OF THE DOOR HANG TAG TO THE ENGINEER TWO (2) DAYS PRIOR TO

HANGING FOR ENGINEER'S APPROVAL.

4. DURING THE CHIP SEAL PROCESS, THE CONTRACTOR SHALL ONLY APPLY AS MUCH EMULSIFIED ASPHALT AS CAN BE READILY COVERED WITHIN 10 MINUTES. SUFFICIENT STONE SHALL BE ON-SITE AND READY TO BE APPLIED PRIOR TO PLACEMENT OF EMULSIFIED ASPHALT. THIS IS REQUIRED IN CASE OF AN EMERGENCY. CONTRACTOR SHALL PROVIDE SUFFICIENT PERSONNEL TO PREVENT TRAFFIC, PEDESTRIAN AND RESIDENTS FROM DRIVING AND/OR WALKING ON EMULSIFIED ASPHALT AFTER APPLICATION AND PRIOR TO APPLICATION OF STONE.

5. CARE SHALL BE TAKEN TO PREVENT EMULSIFIED ASPHALT FROM CONTACTING CURB, SIDEWALKS AND DRIVEWAYS. HAND TOOLS SHALL BE USED

WHERE REQUIRED ADJACENT TO THESE ITEMS.

6. CONTRACTOR AND ENGINEER TO AGREE UPON A STAGING AREA PRIOR TO ALL WORK. CONTRACTOR IS RESPONSIBLE TO SECURE STAGING AREA.

7. ANY EMULSIFIED ASPHALT OR STONE, DROPPED, SPILLED OR TRACKED ONTO ADJACENT ROADS OR DRIVEWAYS SHALL BE REMOVED IMMEDIATELY.

8. CONTRACTOR TO PROVIDE TRAFFIC CONTROL IN ACCORDANCE WITH TRAFFIC CONTROL PLANS CONTAINED HEREIN.

9. EMERGENCY ACCESS SHALL BE PROVIDED AT ALL TIMES DURING CONSTRUCTION. CONTRACTOR TO COORDINATE WORK FOR MAIL DELIVERY AND

TRASH PICK UP.

10. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MONITORING OF WEATHER CONDITIONS. NO WORK SHALL BE PERFORMED UNLESS OPTIMAL

WEATHER CONDITIONS EXIST AND ARE PREDICTED TO CONTINUE THROUGH THE REQUIRED CURING TIME OF EACH MATERIAL APPLIED.

11. ROADWAYS ARE TO BE SWEPT PRIOR TO THE START OF WORK AND AT SUCH OTHER INTERVALS REQUIRED TO PROVIDE FOR A SAFE DRIVING AND

WALKING SURFACE.

12. REQUIRED PREPARATORY WORK SHALL BE COMPLETED PRIOR TO THE INSTALLATION OF THE CHIP SEAL.

13. SWEEPING & STRIPING SHALL OCCUR WITHIN FIVE (5) DAYS OF CHIP SEAL/ MICRO PAVING.

DETOUR PLAN

sn j-sd

1\ D at a\ jo bf ile \7

1\

D w g\

C

H

IP

S

EA

L

PR

O G

RA

M

\7

1-

-D

ET

O

U R.

dw g r fe rg us on

/1 9/

:2

1:

P M

PLAN NOTATION

VAN CLEEF ENGINEERING ASSOCIATES, LLC

4 AAA DRIVE, SUITE 103, HAMILTON, NJ 08691

WEB: WWW.VANCLEEFENGINEERING.COM

PHONE (609) 689-1100

CERT. OF AUTHORIZATION NO. 24GA28132300

of 11

HOPEWELL TOWNSHIP

MERCER COUNTY, NEW JERSEY

DESCRIPTION AUTH DATEREV

JOB NUMBER:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

SCALE:

DATE:

70702301 H.J.S.

R.R.F.\R.K.Y.

G.S.

JUNE 18, 2025

W it h O ff ic es in

N ew

J er se y, Ea st er n

P en n sy lv an ia a n d

D el aw ar e

SERIAL NO. __________

B ri d g es /H ig h w ay s C o n st ru ct io n In sp ec ti o n En vi ro n m en ta l G eo te ch n ic al

/D am s La n d sc ap e A rc h it ec tu re

Lo ca l/ R eg io n al

P la n n in g

M u n ic ip al

E n g in ee ri n g

Si te

D ev el o p m en t

Su rv ey in g /A er ia l D ro n es

/G

IS

W at er /W as te w at er

ENGINEERING WITH FOCUS

EN

G

IN

EE

RI

NG

W

IT

H

FO

CU

S

Know what's below.

Call before you dig.

or 1-800-272-1000

TO LOCATE UNDERGROUND UTILITIES

IF YOU'RE GOING TO DIG, BLAST OR DRILL

THREE (3) WORKING DAYS NOTICE

REMEMBER

IT'S THE LAW!

Dig Safely.

ONE CALL

NEW JERSEY

HERBERT J. SEEBURGER , JR.

NEW JERSEY PROFESSIONAL

ENGINEER NUMBER 24GE04748700

DATE

CONTRACT 25-10

2025 MICRO PAVING

PROGRAM

FOR

6/18/25

1"=600'

DUBLIN ROAD

SIGN PLACEMENT

PENNINGTON

BUILDING

MUNICIPAL

BOROUGH

1. CONTRACTOR SHALL PLACE ONE (1) SOLAR POWERED VARIABLE MESSAGE SIGN AT EACH END OF EACH ROAD TO BE CHIP SEALED A MINIMUM OF ONE

(1) DAYS PRIOR TO START OF WORK. THE SIGNS SHALL ADVISE RESIDENTS OF THE DATE(S) OF WORK. EXACT MESSAGE TO BE APPROVED BY

ENGINEER PRIOR TO PLACING OF SIGNS.

2. CONTRACTOR SHALL PROVIDE ENGINEER WITH A WRITTEN SCHEDULE OF ALL WORK AT LEAST FIVE (5) DAYS PRIOR TO THE START OF WORK. THE ENGINEER WILL COORDINATE THE POSTING OF A NOTICE ON THE TOWNSHIP WEB SITE AND CABLE CHANNEL. THE ENGINEER WILL ALSO NOTIFY ALL

EMERGENCY SERVICES AND THE SCHOOL DISTRICT IF REQUIRED.

3. CONTRACTOR SHALL PREPARE A DOOR HANG TAG TO THE PLACES ON EVERY RESIDENTS DOOR AT LEAST TWO (2) DAYS PRIOR TO THE START OF EACH PHASE OF WORK ON THEIR ROAD. CONTRACTOR SHALL PROVIDE A COPY OF THE DOOR HANG TAG TO THE ENGINEER TWO (2) DAYS PRIOR TO

HANGING FOR ENGINEER'S APPROVAL.

4. DURING THE CHIP SEAL PROCESS, THE CONTRACTOR SHALL ONLY APPLY AS MUCH EMULSIFIED ASPHALT AS CAN BE READILY COVERED WITHIN 10 MINUTES. SUFFICIENT STONE SHALL BE ON-SITE AND READY TO BE APPLIED PRIOR TO PLACEMENT OF EMULSIFIED ASPHALT. THIS IS REQUIRED IN CASE OF AN EMERGENCY. CONTRACTOR SHALL PROVIDE SUFFICIENT PERSONNEL TO PREVENT TRAFFIC, PEDESTRIAN AND RESIDENTS FROM DRIVING AND/OR WALKING ON EMULSIFIED ASPHALT AFTER APPLICATION AND PRIOR TO APPLICATION OF STONE.

5. CARE SHALL BE TAKEN TO PREVENT EMULSIFIED ASPHALT FROM CONTACTING CURB, SIDEWALKS AND DRIVEWAYS. HAND TOOLS SHALL BE USED

WHERE REQUIRED ADJACENT TO THESE ITEMS.

6. CONTRACTOR AND ENGINEER TO AGREE UPON A STAGING AREA PRIOR TO ALL WORK. CONTRACTOR IS RESPONSIBLE TO SECURE STAGING AREA.

7. ANY EMULSIFIED ASPHALT OR STONE, DROPPED, SPILLED OR TRACKED ONTO ADJACENT ROADS OR DRIVEWAYS SHALL BE REMOVED IMMEDIATELY.

8. CONTRACTOR TO PROVIDE TRAFFIC CONTROL IN ACCORDANCE WITH TRAFFIC CONTROL PLANS CONTAINED HEREIN.

9. EMERGENCY ACCESS SHALL BE PROVIDED AT ALL TIMES DURING CONSTRUCTION. CONTRACTOR TO COORDINATE WORK FOR MAIL DELIVERY AND

TRASH PICK UP.

10. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MONITORING OF WEATHER CONDITIONS. NO WORK SHALL BE PERFORMED UNLESS OPTIMAL

WEATHER CONDITIONS EXIST AND ARE PREDICTED TO CONTINUE THROUGH THE REQUIRED CURING TIME OF EACH MATERIAL APPLIED.

11. ROADWAYS ARE TO BE SWEPT PRIOR TO THE START OF WORK AND AT SUCH OTHER INTERVALS REQUIRED TO PROVIDE FOR A SAFE DRIVING AND

WALKING SURFACE.

12. REQUIRED PREPARATORY WORK SHALL BE COMPLETED PRIOR TO THE INSTALLATION OF THE CHIP SEAL.

13. SWEEPING & STRIPING SHALL OCCUR WITHIN FIVE (5) DAYS OF CHIP SEAL/ MICRO PAVING.

ROAD CLOSURE PLAN

sn j-sd

1\ D at a\ jo bf ile \7

1\

D w g\

C

H

IP

S

EA

L

PR

O G

RA

M

\7

1-

-D

ET

O

U R.

dw g r fe rg us on

/1 9/

:2

1:

P M

PLAN NOTATION

VAN CLEEF ENGINEERING ASSOCIATES, LLC

4 AAA DRIVE, SUITE 103, HAMILTON, NJ 08691

WEB: WWW.VANCLEEFENGINEERING.COM

PHONE (609) 689-1100

CERT. OF AUTHORIZATION NO. 24GA28132300

of 11

HOPEWELL TOWNSHIP

MERCER COUNTY, NEW JERSEY

DESCRIPTION AUTH DATEREV

JOB NUMBER:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

SCALE:

DATE:

70702301 H.J.S.

R.R.F.\R.K.Y.

G.S.

JUNE 18, 2025

W it h O ff ic es in

N ew

J er se y, Ea st er n

P en n sy lv an ia a n d

D el aw ar e

SERIAL NO. __________

B ri d g es /H ig h w ay s C o n st ru ct io n In sp ec ti o n En vi ro n m en ta l G eo te ch n ic al

/D am s La n d sc ap e A rc h it ec tu re

Lo ca l/ R eg io n al

P la n n in g

M u n ic ip al

E n g in ee ri n g

Si te

D ev el o p m en t

Su rv ey in g /A er ia l D ro n es

/G

IS

W at er /W as te w at er

ENGINEERING WITH FOCUS

EN

G

IN

EE

RI

NG

W

IT

H

FO

CU

S

Know what's below.

Call before you dig.

or 1-800-272-1000

TO LOCATE UNDERGROUND UTILITIES

IF YOU'RE GOING TO DIG, BLAST OR DRILL

THREE (3) WORKING DAYS NOTICE

REMEMBER

IT'S THE LAW!

Dig Safely.

ONE CALL

NEW JERSEY

HERBERT J. SEEBURGER , JR.

NEW JERSEY PROFESSIONAL

ENGINEER NUMBER 24GE04748700

DATE

CONTRACT 25-10

2025 MICRO PAVING

PROGRAM

FOR

6/18/25

1"=600'

FIDDLER'S CREEK

ROAD

1. CONTRACTOR SHALL PLACE ONE (1) SOLAR POWERED VARIABLE MESSAGE SIGN AT EACH END OF EACH ROAD TO BE CHIP SEALED A MINIMUM OF ONE

(1) DAYS PRIOR TO START OF WORK. THE SIGNS SHALL ADVISE RESIDENTS OF THE DATE(S) OF WORK. EXACT MESSAGE TO BE APPROVED BY

ENGINEER PRIOR TO PLACING OF SIGNS.

2. CONTRACTOR SHALL PROVIDE ENGINEER WITH A WRITTEN SCHEDULE OF ALL WORK AT LEAST FIVE (5) DAYS PRIOR TO THE START OF WORK. THE ENGINEER WILL COORDINATE THE POSTING OF A NOTICE ON THE TOWNSHIP WEB SITE AND CABLE CHANNEL. THE ENGINEER WILL ALSO NOTIFY ALL

EMERGENCY SERVICES AND THE SCHOOL DISTRICT IF REQUIRED.

3. CONTRACTOR SHALL PREPARE A DOOR HANG TAG TO THE PLACES ON EVERY RESIDENTS DOOR AT LEAST TWO (2) DAYS PRIOR TO THE START OF EACH PHASE OF WORK ON THEIR ROAD. CONTRACTOR SHALL PROVIDE A COPY OF THE DOOR HANG TAG TO THE ENGINEER TWO (2) DAYS PRIOR TO

HANGING FOR ENGINEER'S APPROVAL.

4. DURING THE CHIP SEAL PROCESS, THE CONTRACTOR SHALL ONLY APPLY AS MUCH EMULSIFIED ASPHALT AS CAN BE READILY COVERED WITHIN 10 MINUTES. SUFFICIENT STONE SHALL BE ON-SITE AND READY TO BE APPLIED PRIOR TO PLACEMENT OF EMULSIFIED ASPHALT. THIS IS REQUIRED IN CASE OF AN EMERGENCY. CONTRACTOR SHALL PROVIDE SUFFICIENT PERSONNEL TO PREVENT TRAFFIC, PEDESTRIAN AND RESIDENTS FROM DRIVING AND/OR WALKING ON EMULSIFIED ASPHALT AFTER APPLICATION AND PRIOR TO APPLICATION OF STONE.

5. CARE SHALL BE TAKEN TO PREVENT EMULSIFIED ASPHALT FROM CONTACTING CURB, SIDEWALKS AND DRIVEWAYS. HAND TOOLS SHALL BE USED

WHERE REQUIRED ADJACENT TO THESE ITEMS.

6. CONTRACTOR AND ENGINEER TO AGREE UPON A STAGING AREA PRIOR TO ALL WORK. CONTRACTOR IS RESPONSIBLE TO SECURE STAGING AREA.

7. ANY EMULSIFIED ASPHALT OR STONE, DROPPED, SPILLED OR TRACKED ONTO ADJACENT ROADS OR DRIVEWAYS SHALL BE REMOVED IMMEDIATELY.

8. CONTRACTOR TO PROVIDE TRAFFIC CONTROL IN ACCORDANCE WITH TRAFFIC CONTROL PLANS CONTAINED HEREIN.

9. EMERGENCY ACCESS SHALL BE PROVIDED AT ALL TIMES DURING CONSTRUCTION. CONTRACTOR TO COORDINATE WORK FOR MAIL DELIVERY AND

TRASH PICK UP.

10. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MONITORING OF WEATHER CONDITIONS. NO WORK SHALL BE PERFORMED UNLESS OPTIMAL

WEATHER CONDITIONS EXIST AND ARE PREDICTED TO CONTINUE THROUGH THE REQUIRED CURING TIME OF EACH MATERIAL APPLIED.

11. ROADWAYS ARE TO BE SWEPT PRIOR TO THE START OF WORK AND AT SUCH OTHER INTERVALS REQUIRED TO PROVIDE FOR A SAFE DRIVING AND

WALKING SURFACE.

12. REQUIRED PREPARATORY WORK SHALL BE COMPLETED PRIOR TO THE INSTALLATION OF THE CHIP SEAL.

13. SWEEPING & STRIPING SHALL OCCUR WITHIN FIVE (5) DAYS OF CHIP SEAL/ MICRO PAVING.

ROAD CLOSURE PLAN

sn j-sd

1\ D at a\ jo bf ile \7

1\

D w g\

C

H

IP

S

EA

L

PR

O G

RA

M

\7

1-

-D

ET

O

U R.

dw g r fe rg us on

/1 9/

:2

1:

P M

PLAN NOTATION

VAN CLEEF ENGINEERING ASSOCIATES, LLC

4 AAA DRIVE, SUITE 103, HAMILTON, NJ 08691

WEB: WWW.VANCLEEFENGINEERING.COM

PHONE (609) 689-1100

CERT. OF AUTHORIZATION NO. 24GA28132300

of 11

HOPEWELL TOWNSHIP

MERCER COUNTY, NEW JERSEY

DESCRIPTION AUTH DATEREV

JOB NUMBER:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

SCALE:

DATE:

70702301 H.J.S.

R.R.F.\R.K.Y.

G.S.

JUNE 18, 2025

W it h O ff ic es in

N ew

J er se y, Ea st er n

P en n sy lv an ia a n d

D el aw ar e

SERIAL NO. __________

B ri d g es /H ig h w ay s C o n st ru ct io n In sp ec ti o n En vi ro n m en ta l G eo te ch n ic al

/D am s La n d sc ap e A rc h it ec tu re

Lo ca l/ R eg io n al

P la n n in g

M u n ic ip al

E n g in ee ri n g

Si te

D ev el o p m en t

Su rv ey in g /A er ia l D ro n es

/G

IS

W at er /W as te w at er

ENGINEERING WITH FOCUS

EN

G

IN

EE

RI

NG

W

IT

H

FO

CU

S

Know what's below.

Call before you dig.

or 1-800-272-1000

TO LOCATE UNDERGROUND UTILITIES

IF YOU'RE GOING TO DIG, BLAST OR DRILL

THREE (3) WORKING DAYS NOTICE

REMEMBER

IT'S THE LAW!

Dig Safely.

ONE CALL

NEW JERSEY

HERBERT J. SEEBURGER , JR.

NEW JERSEY PROFESSIONAL

ENGINEER NUMBER 24GE04748700

DATE

CONTRACT 25-10

2025 MICRO PAVING

PROGRAM

FOR

6/18/25

1"=800'

MINE ROAD

TOWNSHIP

CONSTRUCTION NOTES:

1. CONTRACTOR SHALL PLACE ONE (1) SOLAR POWERED VARIABLE MESSAGE SIGN AT EACH END OF EACH ROAD TO BE CHIP SEALED A MINIMUM OF ONE

(1) DAYS PRIOR TO START OF WORK. THE SIGNS SHALL ADVISE RESIDENTS OF THE DATE(S) OF WORK. EXACT MESSAGE TO BE APPROVED BY

ENGINEER PRIOR TO PLACING OF SIGNS.

2. CONTRACTOR SHALL PROVIDE ENGINEER WITH A WRITTEN SCHEDULE OF ALL WORK AT LEAST FIVE (5) DAYS PRIOR TO THE START OF WORK. THE ENGINEER WILL COORDINATE THE POSTING OF A NOTICE ON THE TOWNSHIP WEB SITE AND CABLE CHANNEL. THE ENGINEER WILL ALSO NOTIFY ALL

EMERGENCY SERVICES AND THE SCHOOL DISTRICT IF REQUIRED.

3. CONTRACTOR SHALL PREPARE A DOOR HANG TAG TO THE PLACES ON EVERY RESIDENTS DOOR AT LEAST TWO (2) DAYS PRIOR TO THE START OF EACH PHASE OF WORK ON THEIR ROAD. CONTRACTOR SHALL PROVIDE A COPY OF THE DOOR HANG TAG TO THE ENGINEER TWO (2) DAYS PRIOR TO

HANGING FOR ENGINEER'S APPROVAL.

4. DURING THE CHIP SEAL PROCESS, THE CONTRACTOR SHALL ONLY APPLY AS MUCH EMULSIFIED ASPHALT AS CAN BE READILY COVERED WITHIN 10 MINUTES. SUFFICIENT STONE SHALL BE ON-SITE AND READY TO BE APPLIED PRIOR TO PLACEMENT OF EMULSIFIED ASPHALT. THIS IS REQUIRED IN CASE OF AN EMERGENCY. CONTRACTOR SHALL PROVIDE SUFFICIENT PERSONNEL TO PREVENT TRAFFIC, PEDESTRIAN AND RESIDENTS FROM DRIVING AND/OR WALKING ON EMULSIFIED ASPHALT AFTER APPLICATION AND PRIOR TO APPLICATION OF STONE.

5. CARE SHALL BE TAKEN TO PREVENT EMULSIFIED ASPHALT FROM CONTACTING CURB, SIDEWALKS AND DRIVEWAYS. HAND TOOLS SHALL BE USED

WHERE REQUIRED ADJACENT TO THESE ITEMS.

6. CONTRACTOR AND ENGINEER TO AGREE UPON A STAGING AREA PRIOR TO ALL WORK. CONTRACTOR IS RESPONSIBLE TO SECURE STAGING AREA.

7. ANY EMULSIFIED ASPHALT OR STONE, DROPPED, SPILLED OR TRACKED ONTO ADJACENT ROADS OR DRIVEWAYS SHALL BE REMOVED IMMEDIATELY.

8. CONTRACTOR TO PROVIDE TRAFFIC CONTROL IN ACCORDANCE WITH TRAFFIC CONTROL PLANS CONTAINED HEREIN.

9. EMERGENCY ACCESS SHALL BE PROVIDED AT ALL TIMES DURING CONSTRUCTION. CONTRACTOR TO COORDINATE WORK FOR MAIL DELIVERY AND

TRASH PICK UP.

10. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MONITORING OF WEATHER CONDITIONS. NO WORK SHALL BE PERFORMED UNLESS OPTIMAL

WEATHER CONDITIONS EXIST AND ARE PREDICTED TO CONTINUE THROUGH THE REQUIRED CURING TIME OF EACH MATERIAL APPLIED.

11. ROADWAYS ARE TO BE SWEPT PRIOR TO THE START OF WORK AND AT SUCH OTHER INTERVALS REQUIRED TO PROVIDE FOR A SAFE DRIVING AND

WALKING SURFACE.

12. REQUIRED PREPARATORY WORK SHALL BE COMPLETED PRIOR TO THE INSTALLATION OF THE CHIP SEAL.

13. SWEEPING & STRIPING SHALL OCCUR WITHIN FIVE (5) DAYS OF CHIP SEAL/ MICRO PAVING.

DETOUR PLAN

sn j-sd

1\ D at a\ jo bf ile \7

1\

D w g\

C

H

IP

S

EA

L

PR

O G

RA

M

\7

1-

-D

ET

O

U R.

dw g r fe rg us on

/1 9/

:2

0:

P M

PLAN NOTATION

VAN CLEEF ENGINEERING ASSOCIATES, LLC

4 AAA DRIVE, SUITE 103, HAMILTON, NJ 08691

WEB: WWW.VANCLEEFENGINEERING.COM

PHONE (609) 689-1100

CERT. OF AUTHORIZATION NO. 24GA28132300

of 11

HOPEWELL TOWNSHIP

MERCER COUNTY, NEW JERSEY

DESCRIPTION AUTH DATEREV

JOB NUMBER:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

SCALE:

DATE:

70702301 H.J.S.

R.R.F.\R.K.Y.

G.S.

JUNE 18, 2025

W it h O ff ic es in

N ew

J er se y, Ea st er n

P en n sy lv an ia a n d

D el aw ar e

SERIAL NO. __________

B ri d g es /H ig h w ay s C o n st ru ct io n In sp ec ti o n En vi ro n m en ta l G eo te ch n ic al

/D am s La n d sc ap e A rc h it ec tu re

Lo ca l/ R eg io n al

P la n n in g

M u n ic ip al

E n g in ee ri n g

Si te

D ev el o p m en t

Su rv ey in g /A er ia l D ro n es

/G

IS

W at er /W as te w at er

ENGINEERING WITH FOCUS

EN

G

IN

EE

RI

NG

W

IT

H

FO

CU

S

Know what's below.

Call before you dig.

or 1-800-272-1000

TO LOCATE UNDERGROUND UTILITIES

IF YOU'RE GOING TO DIG, BLAST OR DRILL

THREE (3) WORKING DAYS NOTICE

REMEMBER

IT'S THE LAW!

Dig Safely.

ONE CALL

NEW JERSEY

HERBERT J. SEEBURGER , JR.

NEW JERSEY PROFESSIONAL

ENGINEER NUMBER 24GE04748700

DATE

CONTRACT 25-10

2025 MICRO PAVING

PROGRAM

FOR

6/18/25

1"=600'

OLD MILL ROAD

SIGN PLACEMENT

PENNINGTON

BOROUGH

HOPEWELL TWP.

TOWNSHIP

CONSTRUCTION NOTES:

1. CONTRACTOR SHALL PLACE ONE (1) SOLAR POWERED VARIABLE MESSAGE SIGN AT EACH END OF EACH ROAD TO BE CHIP SEALED A MINIMUM OF ONE

(1) DAYS PRIOR TO START OF WORK. THE SIGNS SHALL ADVISE RESIDENTS OF THE DATE(S) OF WORK. EXACT MESSAGE TO BE APPROVED BY

ENGINEER PRIOR TO PLACING OF SIGNS.

2. CONTRACTOR SHALL PROVIDE ENGINEER WITH A WRITTEN SCHEDULE OF ALL WORK AT LEAST FIVE (5) DAYS PRIOR TO THE START OF WORK. THE ENGINEER WILL COORDINATE THE POSTING OF A NOTICE ON THE TOWNSHIP WEB SITE AND CABLE CHANNEL. THE ENGINEER WILL ALSO NOTIFY ALL

EMERGENCY SERVICES AND THE SCHOOL DISTRICT IF REQUIRED.

3. CONTRACTOR SHALL PREPARE A DOOR HANG TAG TO THE PLACES ON EVERY RESIDENTS DOOR AT LEAST TWO (2) DAYS PRIOR TO THE START OF EACH PHASE OF WORK ON THEIR ROAD. CONTRACTOR SHALL PROVIDE A COPY OF THE DOOR HANG TAG TO THE ENGINEER TWO (2) DAYS PRIOR TO

HANGING FOR ENGINEER'S APPROVAL.

4. DURING THE CHIP SEAL PROCESS, THE CONTRACTOR SHALL ONLY APPLY AS MUCH EMULSIFIED ASPHALT AS CAN BE READILY COVERED WITHIN 10 MINUTES. SUFFICIENT STONE SHALL BE ON-SITE AND READY TO BE APPLIED PRIOR TO PLACEMENT OF EMULSIFIED ASPHALT. THIS IS REQUIRED IN CASE OF AN EMERGENCY. CONTRACTOR SHALL PROVIDE SUFFICIENT PERSONNEL TO PREVENT TRAFFIC, PEDESTRIAN AND RESIDENTS FROM DRIVING AND/OR WALKING ON EMULSIFIED ASPHALT AFTER APPLICATION AND PRIOR TO APPLICATION OF STONE.

5. CARE SHALL BE TAKEN TO PREVENT EMULSIFIED ASPHALT FROM CONTACTING CURB, SIDEWALKS AND DRIVEWAYS. HAND TOOLS SHALL BE USED

WHERE REQUIRED ADJACENT TO THESE ITEMS.

6. CONTRACTOR AND ENGINEER TO AGREE UPON A STAGING AREA PRIOR TO ALL WORK. CONTRACTOR IS RESPONSIBLE TO SECURE STAGING AREA.

7. ANY EMULSIFIED ASPHALT OR STONE, DROPPED, SPILLED OR TRACKED ONTO ADJACENT ROADS OR DRIVEWAYS SHALL BE REMOVED IMMEDIATELY.

8. CONTRACTOR TO PROVIDE TRAFFIC CONTROL IN ACCORDANCE WITH TRAFFIC CONTROL PLANS CONTAINED HEREIN.

9. EMERGENCY ACCESS SHALL BE PROVIDED AT ALL TIMES DURING CONSTRUCTION. CONTRACTOR TO COORDINATE WORK FOR MAIL DELIVERY AND

TRASH PICK UP.

10. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MONITORING OF WEATHER CONDITIONS. NO WORK SHALL BE PERFORMED UNLESS OPTIMAL

WEATHER CONDITIONS EXIST AND ARE PREDICTED TO CONTINUE THROUGH THE REQUIRED CURING TIME OF EACH MATERIAL APPLIED.

11. ROADWAYS ARE TO BE SWEPT PRIOR TO THE START OF WORK AND AT SUCH OTHER INTERVALS REQUIRED TO PROVIDE FOR A SAFE DRIVING AND

WALKING SURFACE.

12. REQUIRED PREPARATORY WORK SHALL BE COMPLETED PRIOR TO THE INSTALLATION OF THE CHIP SEAL.

13. SWEEPING & STRIPING SHALL OCCUR WITHIN FIVE (5) DAYS OF CHIP SEAL/ MICRO PAVING.

14. LOOSE GRAVEL SIGNS SHALL REMAIN IN PLACE FOR A MINIMUM OF FIVE (5) DAYS AFTER THE CHIP SEAL HAS BEEN INSTALLED.

DETOUR PLAN

sn j-sd

1\ D at a\ jo bf ile \7

1\

D w g\

C

H

IP

S

EA

L

PR

O G

RA

M

\7

1-

-D

ET

O

U R.

dw g r fe rg us on

/1 9/

:2

2:

P M

PLAN NOTATION

VAN CLEEF ENGINEERING ASSOCIATES, LLC

4 AAA DRIVE, SUITE 103, HAMILTON, NJ 08691

WEB: WWW.VANCLEEFENGINEERING.COM

PHONE (609) 689-1100

CERT. OF AUTHORIZATION NO. 24GA28132300

of 11

HOPEWELL TOWNSHIP

MERCER COUNTY, NEW JERSEY

DESCRIPTION AUTH DATEREV

JOB NUMBER:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

SCALE:

DATE:

70702301 H.J.S.

R.R.F.\R.K.Y.

G.S.

JUNE 18, 2025

W it h O ff ic es in

N ew

J er se y, Ea st er n

P en n sy lv an ia a n d

D el aw ar e

SERIAL NO. __________

B ri d g es /H ig h w ay s C o n st ru ct io n In sp ec ti o n En vi ro n m en ta l G eo te ch n ic al

/D am s La n d sc ap e A rc h it ec tu re

Lo ca l/ R eg io n al

P la n n in g

M u n ic ip al

E n g in ee ri n g

Si te

D ev el o p m en t

Su rv ey in g /A er ia l D ro n es

/G

IS

W at er /W as te w at er

ENGINEERING WITH FOCUS

EN

G

IN

EE

RI

NG

W

IT

H

FO

CU

S

Know what's below.

Call before you dig.

or 1-800-272-1000

TO LOCATE UNDERGROUND UTILITIES

IF YOU'RE GOING TO DIG, BLAST OR DRILL

THREE (3) WORKING DAYS NOTICE

REMEMBER

IT'S THE LAW!

Dig Safely.

ONE CALL

NEW JERSEY

HERBERT J. SEEBURGER , JR.

NEW JERSEY PROFESSIONAL

ENGINEER NUMBER 24GE04748700

DATE

CONTRACT 25-10

2025 MICRO PAVING

PROGRAM

FOR

6/18/25

1"=800'

PLEASANT VALLEY

HARBOURTON ROAD

SIGN PLACEMENT

WEST AMWELL

SHT01 COVER
SHT02 QUANTITIES
SHT03 TRAFFIC CONT
SHT04 AUNT MOLLY DETOUR
SHT05 BAYBERRY RD DETOUR
SHT06 CHURCH RD DETOUR
SHT07 DUBLIN RD DETOUR
SHT08 FIDDLER CREEK RD DETOUR
SHT09 MINE RD DETOUR
SHT10 OLD MILL RD DETOUR
SHT11 PLEASANT VAL HARBOR DETOUR
2025-06-23T15:22:34-0400
Herbert J. Seeburger, Jr.
2025-06-23T15:22:37-0400
Herbert J. Seeburger, Jr.
2025-06-23T15:22:40-0400
Herbert J. Seeburger, Jr.
2025-06-23T15:22:43-0400
Herbert J. Seeburger, Jr.
2025-06-23T15:22:46-0400
Herbert J. Seeburger, Jr.
2025-06-23T15:22:50-0400
Herbert J. Seeburger, Jr.
2025-06-23T15:22:53-0400
Herbert J. Seeburger, Jr.
2025-06-23T15:22:56-0400
Herbert J. Seeburger, Jr.
2025-06-23T15:22:58-0400
Herbert J. Seeburger, Jr.
2025-06-23T15:23:02-0400
Herbert J. Seeburger, Jr.
2025-06-23T15:23:04-0400
Herbert J. Seeburger, Jr.

File details come from the government source that posted it. Updated .