This document contains two Contract Data Requirements Lists (CDRLs) for the procurement of a Multipurpose Display Assembly. The CDRLs require the submission of a First Article Qualification Test Plan and Procedures no later than 60 days after contract award, as well as a Test/Inspection Report no later than 270 days after award or with delivery of the first articles. The related federal contract opportunity is for the Multipurpose Display Assembly, NSN 1290-01-395-2696, with an estimated quantity of 60 each. The solicitation is open to a limited number of responsible sources including Rockwell Collins, Symbolic Technologies, and Transicoil, LLC. The contract will include five pricing periods as detailed in the attached solicitation. The procuring agency is the Defense Logistics Agency Aviation.

View the file

Other files for this federal contract opportunity

Other files attached to Multipurpose Display Assembly, NSN 1290-01-395-2696, newest first.
File Type Posted
SPRWA121R0005_______0002_signed.pdf PDF
SPRWA121R0005_______0001_Amend 01.pdf PDF
IUIDcklist.pdf PDF
CDRLfour.pdf PDF
ID.pdf PDF
CDRLthree.pdf PDF
transport.pdf PDF
pkg.pdf PDF
FArequirements.pdf PDF
ATTACHMENTPricingMatrix.xlsx XLSX spreadsheet
SPRWA121R0005_final.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved CMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.

A. Contract Line Item No.

B. Exhibit A

C. Category

OTHER - TEST PLANS AND TEST REPORTS

D. System/Item E. Contract/PR NO. F. Contractor

1. Data Item No.

A001

2. Title of Data Item:

First Article Qualification Test Plan and Procedures

3. Subtitle:

4. Authority (Data Acquisition Document No.)

DI-NDTI-81307A

5. Contract Reference 6. Requiring Office

409 SCMS/GUEA

7. DD 250 Req

DD

9. Dist Statement Required 10. Frequency

ONE / R

12. Date of First Submission

SEE BLK 16

14. Distribution

8. APP Code A

F 11. As of Date

SEE BLK 16

13. Date of Subsequent Submission

SEE BLK 16

a. Addressee b. Copies

Draft Final

Reg Repro

SEE BLK 16 1 1 0

16. REMARKS

BLK 2. FIRST ARTICLE TEST PLAN MUST DESCRIBE WHAT REQUIREMENTS ARE TO BE TESTED

AND HOW THE TESTS ARE TO BE PERFORMED. FIRST ARTICLE TESTS MUST CONFORM TO

REQUIREMENTS IDENTIFIED IN THE ASSOCIATED AFMC FORM 260. THE TEST PLAN MUST INCLUDE

A LIST OF THE TEST EQUIPMENT USED DURING TESTING.

BLK 4. CONTRACTOR FORMAT IS ACCEPTABLE.

BLK 9. DISTRIBUTION CODE F: FURTHER DISSEMINATION ONLY AS DIRECTED BY 409 SCMS/GUEA

OR HIGHER DOD AUTHORITY.

BLK 8, 11 – 13. FIRST SUBMISSION IS DUE 60 CALENDAR DAYS AFTER CONTRACT AWARD.

409 SCMS/GUEA APPROVAL WITHIN 45 CALENDAR DAYS AFTER RECEIPT. RESUBMITTAL WITH

REVISIONS WITHIN 30 CALENDAR DAYS OF ORIGINAL SUBMISSION.

BLK 14.SUBMIT FIRST ARTICLE TEST PLAN TO 409 SCMS/GUEA F-15 FIRST ARTICLE MANAGER AT EMAIL ADDRESS: 782CBSG.F15.FAT@US.AF.MIL. ALTERNATELY, THE TEST PLAN MAY BE MAILED TO 409 SCMS/GUEA (ATTENTION F-15 FIRST ARTICLE MANAGER), 235 BYRON STREET, SUITE19A, ROBINS AFB, GA., 31098-1670.

15. TOTAL 1 1 0

1. Data Item No.

A002

2. Title of Data Item:

TEST / INSPECTION REPORT

3. Subtitle:

4. Authority (Data Acquisition Document No.)

DI-NDTI-80809B

5. Contract Reference 6. Requiring Office

409 SCMS/GUEA

7. DD 250 Req

DD

9. Dist Statement Required 10. Frequency

ONE / R

12. Date of First Submission

SEE BLK 16

14. Distribution

8. APP Code A

F 11. As of Date

SEE BLK 16

13. Date of Subsequent Submission N/A

a. Addressee b. Copies

Draft Final

Reg Repro

SEE BLK 16 1 1 0

16. REMARKS

BLK 4. CONTRACTOR FORMAT IS ACCEPTABLE.

BLK 9. DISTRIBUTION CODE F; FURTHER DISSEMINATION ONLY AS DIRECTED BY 409 SCMS/GUEA

OR HIGHER DOD AUTHORITY.

BLK 8, 11 – 13. FIRST SUBMISSION IS DUE 270 CALENDAR DAYS AFTER CONTRACT AWARD OR WITH

DELIVERY OF FIRST ARTICLE(S).

BLK 14.THE VENDOR HAS THE OPTION TO SUBMIT THE FIRST ARTICLE TEST REPORT VIA EMAIL TO:

782CBSG.F15.FAT@US.AF.MIL, OR SUBMIT THE REPORT WITH THE FIRST ARTICLE TEST SAMPLES TO THE ADDRESS IDENTIFIED ON THE ASSOCIATED AFMC FORM 260, BLK 9.F.3.. ALTERNATELY, MAIL A SEPARATE FIRST ARTICLE TEST REPORT TO 409 SCMS/GUEA (ATTENTION F-15 FIRST

ARTICLE MANAGER), 235 BYRON STREET, SUITE19A, ROBINS AFB, GA., 31098-1670.

DMO CONTROL NUMBER DMO SIGNATURE DATE

15. TOTAL 1 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-2, JUN 90 Previous editions are obsolete Page 1 of 1 Pages

D SystemItem: Multipurpose Display (MPD) / Control Panel Assembly → P/N PC82040-4
DMO CONTROL NUMBER: 10.26.001
H DATE: 28 Oct 2020
J DATE:
DATE: 28 October 2020
2020-10-28T10:42:43-0400
FISKE.ROBERT.R.1260632872
2020-10-28T09:23:21-0400
GROVES.SCOTT.B.1279744817
2020-10-29T06:56:45-0400
SEALY.TRACEE.A.1229963011

File details come from the government source that posted it. Updated .