CDRLCPP.pdf

PDF 197 KB Posted

Attached to
F-16 Circuit Card Assembly, ESDC Federal contract opportunity
Solicitation number
FA821222Q0200
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

View the file

Other files for this federal contract opportunity

Other files attached to F-16 Circuit Card Assembly, ESDC, newest first.
File Type Posted
ITEMDESCRIPTION.pdf PDF
SECTIONC.pdf PDF
ENGINEERINGDATALIST.pdf PDF
ENGIEERINGDATAREQUIRMENTS.pdf PDF
FA821222Q0200.pdf PDF
158PACKAGINGREQUIRMENTS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.

listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY: (Contractor Data Manager) H. DATE I. APPROVED BY: (Engineer) J. DATE

Page of Pages

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

A_CONTRACT_LINE_ITEM_NO:

B_EXHIBIT:

xTDP: Off xTM: Off

OTHER:

DSYSTEMITEM:

E_CONTRACTPR_NO:

FCONTRACTOR:

16_REMARKS_Continued: s. Original drawings are not required. If applicable, reproducible stable base copies of unidimensional drawings and master pattern drawings are required. See Block 14.

Page2: 2 of_pages:

Reset:

xtm: Off
1_DATA_ITEM_NO: A001
2_TITLE_OF_DATA_ITEM: Counterfeit Prevention Plan
3_SUBTITLE: CPP
4_AUTHORITY_Data_Acquisit: DI-MISC-81832
5_CONTRACT_REFERENCE: CLIN for Data
6_REQUIRING_OFFICE: 416 SCMS/GUEAA
7_DID_250_REQ: LT
8_APP_CODE: A
DIST_STATEMENT: D
10_FREQUENCY: ONE/R
11_AS_OF_DATE: SEE BLK 16
12_DATE_OF_FIRST_SUBMISSI: SEE BLK 16
13_DATE_OF_SUBSEQUENT_SUB: SEE BLK 16
addressee1: 416 SCMS/
draft1: 1
reg1: 1
repro1:
addressee2: GUEAA
draft2:
reg2:
repro2:
addressee3: 6070 Gum LN
draft3:
reg3:
repro3:
addressee4: Bldg. 1213
draft4:
reg4:
repro4:
addressee5: Hill AFB, UT
draft5:
reg5:
repro5:
addressee6: 84056-5826
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8: SEE BLK 16
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 1
total_repro: 0
16_REMARKS: NOTE: Changes to office symbols and/or e-mail addresses when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.

1. Block 4: Contractor Format Acceptable.

2. Blocks 7, 8, 14: The contractor shall submit a Letter of Transmittal and send the Contractors Counterfeit Protection Plan (CPP) via e-mail to: jonathan.tuchow@us.af.mil

3. Blocks 8, 10, 11, 12, 13: The contractor shall deliver the Counterfeit prevention Plan (CPP) NLT thirty (30) calendar days after contract award. The Government comments will be provided to the contractor within fourteen (14) calendar days after receipt. The contractor shall resubmit the CPP NLT seven (7) calendar days after receipt of Government comments.

4. Block 9: Distribution Statement, Export Control Warning and Destruction Notice shall be IAW DoD Instruction 5230.24

The following Distribution Statement shall be placed on the first sheet of each document and/or associated lists.

DISTRIBUTION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only (Administration or Operational Use). (Nov 2021). Other requests for this document shall be referred to (416 SCMS/GUEAA, Hill AFB, UT 84056-5826).

EXPORT CONTROL WARNING: All printed and electronic, including digital, technical documents that determined to contain export-controlled technical data shall be marked with the following statement:

WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate IAW provisions of DoD Directive 5230.25.

17_PRICE_GROUP: NSP
ESTIMATED_TOTAL_PRICE: 0.00
G_PREPARED_BY:
H_DATE: 10 Nov 2021
1_APPROVED_BY:
J_DATE: 10 Nov 2021
Page: 1
reg38t: 1
A_CONTRACT_LINE_ITEM_NO:
B_EXHIBIT: A
xTDP: Off
OTHER: MISC
DSYSTEMITEM: Circuit Card Assembly
E_CONTRACTPR_NO: FD2020-22-00200
FCONTRACTOR:
of_pages: 2
Reset:
xTM: Off
16_REMARKS_Continued: c. DESTRUCTION NOTICE: For classified documents, follow the procedures, in DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DoD 5200.1-R, Information Security Program Chapter VI. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
Page2: 2
2021-11-10T12:12:21-0700
PINNEGAR.STEPHANIE.A.1102660737
2021-11-16T09:05:15-0700
TUCHOW.JONATHAN.ADAM.1522585803

File details come from the government source that posted it. Updated .