PSS Batteries Federal contract opportunity
Solicitation number
FA8212-21-R-0016
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This is a solicitation for PSS batteries to be awarded as a fixed-price contract by the Department of the Air Force Materiel Command Air Force Sustainment Center. The solicitation seeks proposals for ICBM Minute Man III PSS Batteries, NSN 6135-00-992-8750. The incumbent contractor is Eagle Picher Technologies, LLC, which is currently the only known prequalified source. Interested contractors must submit a source qualification request package to be considered for award. Proposals are due by the response date specified in the solicitation. Award will be made to a qualified source, though the Government reserves the right not to make an award.

View the file

Other files for this federal contract opportunity

Other files attached to PSS Batteries, newest first.
File Type Posted
FA821221R0016_______0002.pdf PDF
QualificationRequirements.pdf PDF
SOW 2021.docx DOCX document
FA8212-21-R-0016.pdf PDF
Transportation Data.pdf PDF
Packaging Requirement.pdf PDF
IUID.pdf PDF
Item Description.pdf PDF
Engineering Data List.pdf PDF
FirstArticle.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Data Requirements List (CDRL) Program: PSS Battery Date: 25 June 2018 Version: 2

1. Introduction This document was developed in accordance with DOD MIL-STD 31000A and represents the general requirements for the Technical Data Package (TDP) for this program. The purpose of this Attachment, Technical Data Package, is to define the data deliverables due for this program, including the instructions for their development, and delivery. All specific delivery instructions are specified on the CDRL forms or its digital (word, excel, pdf) equivalent.

2. General Guidelines The CDRL form, Department of Defense (DD) Form 1423, specifies the data required to be delivered to the Government, as well as the frequency and approval requirements. The Data Item Descriptions (DID), listed on the CDRL form, were selected from the Acquisition Streamlining and Standardization Information System (ASSIST) and provide additional direction for data preparation.

3. Communications Any correspondence related to requests for data delivery deviations and/or amendments, additions or deletions to the CDRL form shall be addressed to the Procuring Contracting Officer (PCO) with a courtesy copy to the Data Management Officer (DMO) (Air Force Nuclear Weapons Center (AFNWC)/NIES) and the cognizant program manager (PM). Copies of all forms & templates noted in this file are available as requested from your program manager, the DMO or your PCO.

4. Codes used in the DD Form 1423 The directions for submittal and approval of data is indicated in Blocks 7, 8, 9, 10, 11, 12, 13, 14, 15 or 16 of the DD Form 1423. Usually, the direction is in the form of a code (explained below). The following abbreviations/codes are common usage within AFNWC.

4.1 Block 7, DD Form 250 Requirements

Block 7 of the CDRL form indicates whether Procurement Quality Assurance (PQA) inspections and acceptance of deliverable data by DD Form 250 is required. “Draft” copies submitted for advance approval and “Preliminary Draft” copies submitted are exempt from the DD Form 250 requirements.

Information copies of DD Form 250 to accompany each letter of transmittal for this category of data.

Code Inspection Acceptance SS Source (DD Form 250 or equivalent document) Source (DD Form 250 or equivalent document)

DD Destination (DD Form 250 or equivalent document)

Destination (DD Form 250 or equivalent document)

SD Source (DD Form 250 or equivalent document)

Destination (DD Form 250 or equivalent document)

DS Destination (DD Form 250 or equivalent document)

Source (DD Form 250 or equivalent document)

Code Inspection LT Letter of Transmittal only NO No inspection or acceptance required

XX Inspection and acceptance requirements specified elsewhere in contract S Indicates the contractor’s facility D Indicates the primary destination point

4.2 Block 8, Approval Code

When document approval is required (code “A”), the approval authority (ORG) for that 1423 is designated with an (A). Approval coordination shall be done using the Contract Document Action Form (CDA). When document approval is not required (code “N/A”), no approval of the CDRL is required (note that documents that do not require approval shall also be marked as “NO” or “LT” in block 7.

Code Description A Approval Required N/A Approval Not Required

4.3 Block 10, Frequency of Submittals

Code Description DAILY Daily WEKLY Weekly BI-WE Each 2 weeks MTHLY Monthly BI-MO Each 2 months QRTLY Quarterly ANNLY Annually SEMIA Each 6 months OTIME One time ONE/R One time and revisions R/ASR Revisions as required ASGEN As generated ASREQ As required* DFDEL Deferred delivery DFORD Deferred ordering DFREQ Deferred requisitioning ONE/P One time preliminary draft XTIME Multiple separate submittals (i.e., 2Time, 3Time)

* When ASREQ is used in Blocks 10, 11, 12 or 13 an explanation of the requirements must be entered in Block 16.

4.4 Block 12 and 13, Dates of Initial and Subsequent Submissions

Code Description ATP Authority To Proceed ASGEN As generated ASREQ As required* CDR Critical Design Review CA Contract Award CO Change Order CD Calendar Day(s)

CP/REQ Change page/as required CP/O Change page/(only) DCARC Defense Cost and Research Center DFDEL Deferred delivery FQT Formal Qualification Test FCA Functional Configuration Audit PCA Physical Configuration Audit TRR Test Readiness Review SA Supplemental Agreement WD Working Day(s)

* When ASREQ is used in Blocks 10, 11, 12 or 13 an explanation of the requirements must be entered in Block 16.

5. Supplemental Data Preparation Instructions

5.1 Data Item Description (DID) Version

The most current version of the DID at the time of the award of the contract or Task Order, whichever date is most current, specified in Block 4, is to be used when submitting data. The most current version can be found at http://quicksearch.dla.mil/.

5.2 DID Tailoring

The DID is a specification for the preparation of data. DID tailoring is reflected in Block 16 of the CDRL form. “T” entered after the DID number in Block 4, means that the DID has been tailored. Block 4 tailoring is made to either relax preparation instructions or to tailor the DID to be in consonance with the source document tailoring contained in the Statement of Work (SOW), Performance Work Statement (SOW) or Statement of Objectives (SOW).

5.3 Distribution Statement Marking

The designation in Block 9 of the CDRL form indicates that one of the following six (6) authorized distribution statements from Department of Defense Instruction (DoDI) 5230.24 and Air Force Instruction (AFI) 61-201 shall be annotated on that technical data. Distribution statements will be selected to denote the audience the data is intended for: A distribution statement marking is distinct from and in addition to a security classification marking assigned in accordance with (IAW) DoD 5200.1 Volume 2. Should Block 9 of the CDRL form and the DID be in conflict, Block 9 of the CDRL form shall take precedence. The following distribution statements are authorized for use in marking technical documents:

Distribution Statement A:

Approved for public release. Distribution is unlimited.

Distribution Statement B:

Distribution authorized to U.S. Government Agencies for Administrative or Operational Use (date of determination). Other requests for this document shall be referred to AFNWC/NI.

Distribution Statement C:

Distribution authorized to U.S. Government Agencies and their contractors (fill in reason) (date of determination). Other requests for this document shall be referred to AFNWC/NI.

Distribution Statement D:

Distribution authorized to Department of Defense and U.S. DoD contractors only for Administrative or Operational Use and Export Control (date of determination). Other requests shall be referred to

AFNWC/NI.

Distribution Statement E:

Distribution authorized to DoD Components only for Test and Evaluation (date determination).

Other requests shall be referred to AFNWC/NI.

Distribution Statement F:

Further dissemination only as directed by

AFNWC/NI.

5.4 Other Notices

All technical documents marked with Distribution Statements B, C, D, E, or F will also be marked with the following notices:

WARNING:

This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

Add the following statement to the bottom of every page of the report except the SF 298, Report Documentation Page: “WARNING: EXPORT CONTROLLED.”

NOTE: The CDO Program Manager (PM) may remove the “Export Control Warning” if “critical technology” is not a reason annotated in the distribution statement and if the CDO PM can verify the technical report/document is not export control.

Destruction Notice:

Documents designated as Distribution B, C, D, E, or F shall be marked with one of the following statements:

For classified documents:

DESTRUCTION NOTICE: Follow the procedures in DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, DoDM 5200.01-V3, DoD Information Security Program: Protection of Classified Information, Enclosure 3, paragraph 17 or AFI 16-1404, Air Force Information Security Program, para 5.2.5.

For unclassified, limited documents:

DESTRUCTION NOTICE: Destroy by any method that will prevent disclosure of contents or reconstruction of the document.

5.5 Pricing CDRL Items Separately

If blocks 17 and 18 of the DD form 1423 documents are marked as "N/A" and "NSP" respectively, then the Government does not want to separately group or price CDRL items. If blocks 17 and 18 are left blank, the Government intends to seek separate pricing for the development costs of each CDRL. This pricing is for development costs of the data items and is considered separate from data rights costs.

6. Supplemental Data Delivery Instructions

6.1 Due Dates

Due dates for delivery of data are to be construed as receipt at destination. Due dates are based on calendar days unless otherwise noted.

6.2 Late Delivery

Delivery of data is considered late if it does not arrive at its destination by 1530 hours (3:30 PM) Mountain Time on the date specified in Blocks 12, 13 or 16 of the CDRL.

6.3 Submittal Procedures

6.3.1 CDRL Submittal Procedure

For the purposes of data submittal, unclassified CDRLs are submitted to the government via TopVue https://icbm.topvue.com/topvue-icbm/. As per contractors must have, at the very least, a T-1 THIS IS FOR UNCLASSIFIED CDRL SUBMITTALS ONLY. (See below for Classified CDRL submittals (6.3.2)) Each data submittal shall be accompanied by a Contract Document Action (CDA) form (please request current version from ORG1). If for any reason a CDA form is not available, a cover letter shall contain the following information:

1. Contract number

2. CDRL sequence number (i.e., A001)

3. Exact title and subtitle (if applicable) of the document being transmitted

4. Line item or CLIN number

5. Modification Number or Order Number

4. Document date, number, and revision information (if applicable)

5. Data delivery method and date of delivery

6. Whether the document is a draft, or final submittal

7. For approval data: State “For Approval”

8. If the document is a re-submittal, reference the Government letter Contractual Document Action (CDA) requesting re-submittal or disapproval of previous submittal

9. For periodic reports: The report period that the document covers

10. Distribution: Information disclosing the total contractual distribution being made per Block 14, or Block 16 of the CDRL Form

6.3.2 Classified CDRL Submittal Procedure

Classified CDRLs and classified documentation are submitted in accordance with this instruction and are never to be emailed. Classified CDRLs or portions of a CDRL, as applicable, shall be forwarded IAW Appendix B of the DD254 DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM). For Classified Disks send two (2) copies.

Outer Envelope:

Address ATTN: Security Office/Document Control

Inner Envelope:

Address ATTN: Name of person for whom the document should be delivered

7. Supplemental Data Review and Approval Process

7.1 Approval CDRLs

The letter “A” in Block 8 of the DD Form 1423 indicates that the Government must approve the data item. In addition, Block 16 of the form may contain additional directions.

Written Approval

Written approval indicates agreement or concurrence with the contractor furnished data only and shall not be construed as changing any of the terms or conditions of the subject contract. The approval authority shall be ORG 1 as outlined in section 9 of this document. Approval shall take the form of either a letter signed by the PCO/DMO or concurrence using the Contractual Document Action (CDA) form, signed and dated by the representative stated in ORG 1. Data items submitted for approvals are NOT automatically approved without government approval.

Approved with Comment or Disapproved

The Contractor shall revise data items Approved with Comments or Disapproved in accordance with the specific written comments transmitted with the CDA or PCO/DMO letter and resubmit not later than 30 calendar days (unless otherwise directed) from receipt of the Approval with Comments or Disapproval, unless otherwise directed. The resubmitted data will require a new approval cycle as indicated in Block 8 of the DD Form 1423.

Draft Versions of the CDRL

If a DD Form 1423 directs the Contractor to submit a “draft” version of an approval CDRL in advance of the final version, the draft will be considered an information only submission. However, the PCO/DMO still retains the right to disapprove a draft data item that does not comply with the contract requirements. Unless otherwise directed by the PCO, the Contractor shall incorporate the Government’s comments in the final submission and shall not resubmit the draft version of the data item.

7.2 Contractual Document Action (CDA)

After the Government receives a data item submission, a Temporary Data Identification Number (TDID), a unique identifier to that submission, will be assigned by the DMO. The Government’s review of that data item will result in a coordinated CDA form, or PCO letter, indicating the data items approval or disapproval. Should the Government have comments on the data item; the CDA will include either comments on the CDA form itself or a Comment Resolution Matrix (CRM). Comments will be provided to the submitter in accordance with the format and timeline noted in block 16. Comments will be assigned one of the following codes:

COMMENT CODE CODE DESCRIPTION

C Critical Comments of a very serious nature that will preclude final approval and publication of the document. You are willing to elevate the comment or issue to senior organization leadership (e.g., general officer) and recommend they non-concur. These are the "show-stoppers". Convincing rationale for critical comments must be provided. The individual making the comment and the document writer will reconcile the comment.

S Substantive Comments of a less serious nature that have noticeable impact on the documents quality or content. The document appears to be incorrect, misleading, confusing, or inconsistent with other sections.

A Administrative Comments that address minor items such as typographical, format and/or grammatical errors.

7.3 Information Only CDRLs

When an “A” is not indicated in Block 8 of the DD Form 1423, the PCO/DMO still retains the right to disapprove any data that does not comply with contract requirements. The Contractor shall revise the disapproved data item in accordance with the specific written comments transmitted with the CDA form or PCO letter and resubmit not later than 30 calendar days, unless otherwise directed, from receipt of the disapproval. The resubmitted data will require a new approval cycle as indicated in Block 8 of the DD

Form 1423.

8. Data Accession List (DAL) During performance of the contract, requests from the PCO for data ordered from the Data Accession List (DAL) (with the application of DID DI-MGMT-81453A) shall be provided at no increase in contract price. Requests for quantities greater than two each per document shall be honored upon receipt of PCO direction and with Contractor concurrence that such request can be filled at no increase in contract price.

9. Organizational Cross Reference List The following Organizational Cross Reference List shall be used in conjunction with the CDRLs to determine actual addressees for distribution of data. The ORG number will be entered in lieu of a address on the CDRL and will be a part of the CDRL package. Changes to the list will be identified by an asterisk next to the ORG number and a revision date to the list.

ORG#/ Name Address Attention/To Contact Info

ORG1/AFMC/GUMA 6031 Gum Ln Bldg 1227 Hill AFB UT 84056

Jerry Farkas Eddie Diehl jerry.farkas@us.af.mil eddie.diehl@us.af.mil

ORG2/AFNWC/NIAD 6014 Dogwood Ave Bldg 1258 Hill AFB UT 84056

Sean Holje Nathan Whipple sean.holje@us.af.mil nathan.whipple@us.af.mil

ORG3/AFNWC/NI N/A

ORG4/AFNWC/NIES 6054 Dogwood Ave Bldg 1255 Hill AFB UT 84056

CM afnwc.nies.icbm.conm@us.af.mil

ORG5/AFNWC/NIES N/A

ORG6/AFNWC/NIES 6054 Dogwood Ave Bldg 1255 Hill AFB UT 84056

Quality afnwc.nies.quality.office@us.af.mil

ORG7/AFNWC/NIES 6054 Dogwood Ave Bldg 1255 Hill AFB UT 84056

IUID/Parts Engineering afnwc.nies.partsengineering@us.af.mil

ORG8/AFNWC/NIES N/A

ORG9/AFNWC/NIEV N/A

ORG10/AFNWC/NIEV N/A

ORG11/AFNWC/NIEV N/A

ORG12/AFNWC/NIEV N/A

ORG13/AFNWC/NIEV N/A

ORG14/AFNWC/NIEV 6053 Elm Ln Bldg 1245 Hill AFB UT 84056

TOMA afnwc.niev.tomamodmanager@us.af.mil

ORG15/AFNWC/NIEI N/A

ORG16/AFNWC/NIEI N/A

ORG17/AFNWC/NIEI N/A

ORG18/AFNWC/NIEI N/A

ORG19/AFNWC/NIEI 6054 Dogwood Ave Bldg 1255 Hill AFB UT 84056

NHS afnwc.niei.nhs@us.af.mil

ORG20/AFNWC/NIEI N/A

ORG21/AFNWC/NIEE 6054 Dogwood Ave Bldg 1255 Hill AFB UT 84056

TE afnwc.niee.te@us.af.mil

ORG22/AFNWC/NIT N/A

ORG23/AFNWC/NIET N/A

ORG24/AFGSC/A31 N/A

ORG25/AFNWC/NILA N/A

ORG26/406 SCMS/GULAB N/A

ORG27/406 SCMS/GULAA N/A

ORG28/419 SCMS/GUBA N/A

ORG29/75 ABW/SE N/A

ORG30/DCMA/ACO N/A

ORG31/AFNWC/NIF N/A

ORG32/AFMC/PKXA 6050 Gum Ln Bldg 1215 Hill AFB UT 84056

Ruben Martinez ruben.martinez.17@us.af.mil

ORG33/AFNWC/NIES 6054 Dogwood Ave Bldg 1255 Hill AFB UT 84056

Data Management afnwc.nies.datamgmtoffice@us.af.mil

10. CDRL Master Listing Index Full 1423’s for CDRL’s applicable to this program are included in section 11 of this document.

CDRL # DID TITLE DID #

A001 Integrated Program Management Report (IPMR) DI‐MGMT‐81861

A002 Conference Agenda (Meeting Agenda) DI‐ADMN‐81249

A003 Briefing Material DI‐MGMT‐81605

A004 Report, Record of Meeting/Minutes DI‐ADMN‐81505

A008 Work Management Plan (Staffing Plan) DI‐MGMT‐81911

A014 Counterfeit Prevention Plan DI‐MISC‐81832

A015 Quality Assurance Program Plan DI‐QCIC‐81794

A027 Product Drawings/Models and Associated Lists DI‐SESS‐81000

A030 Specification Change Notice (SCN) DI‐SESS‐80643

A031 Engineering Change Proposal (ECP) DI‐SESS‐80639

A038 Technical Data Package DI‐SESS‐80776

A059‐1 Technical Report ‐ Study/Services (Verification Cross Reference Matrix) DI‐MISC‐80508/T

A059‐2 Technical Report ‐ Study/Services (Battery Pedigree Matrix) DI‐MISC‐80508/T

A059‐3 Technical Report ‐ Study/Services (Problem Report Summary) DI‐MISC‐80508/T

A059‐4 Technical Report ‐ Study/Services (Battery Lot Pedigree Report) DI‐MISC‐80508/T

A059‐5 Technical Report ‐ Study/Services (Service Life Estimate) DI‐MISC‐80508/T

A059‐6 Technical Report ‐ Study/Services (Recommendations for Major Cell Components) DI‐MISC‐80508/T

A060 Test Plan DI‐NDTI‐80566

A061 Test Procedure DI‐NDTI‐80603

A062 Test/Inspection Report DI‐NDTI‐80809

A088 Technical Report – Study/Services (Hazards of Electromagnetic Radiation to Ordnance (HERO) DI‐MISC‐80508/T

A100 Proposed Spare Parts List DI‐PSSS‐80134

A101 Failure Summary and Analysis Report DI‐SESS‐80255

A102 Failure Modes, Effects, and Criticality Analysis Report (FMECA) DI‐SESS‐81495/T

A103 Item Unique Identification (IUID) Marking Plan DI‐MGMT‐81803

A104 Item Unique Identification (IUID) Marking Activity, Validation and Verification Report DI‐MGMT‐81804

A108 Status of Government Furnished Equipment (GFE) Report DI‐MGMT‐80269

A109 Commercial Off‐the‐Shelf (COTS) Manuals and Associated Supplemental Data DI‐TMSS‐80527

A110 Technical Manual contract Requirement (TMCR) TM 86‐01

A111 Data Accession List (DAL) DI‐MGMT‐81453

A112 Certificate of Compliance DI‐MISC‐81356

A113 Software License Requirements List DI‐PSSS‐82046

A114 Report, Production or Delivery Problem(s) DI‐MGMT‐81178

11. DD Form 1423s (full 1423’s) *1423’s, block A Reference Number: CLIN number to be added at time of award **1423’s block E Reference Number: Contract and Mod/TO number to be added at time of award

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

PREMATURE STAGE

SEPARATION (PSS) BATTERY FD20202100331 EaglePicher Technologies

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A001

INTEGRATED PROGRAM MANAGEMENT

REPORT (IPMR)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MGMT-81861/T SOW Para AFNWC/NI

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION

LT MTHLY SEE BLK 16 b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

N/A EOM SEE BLK 16 Reg Repro

16. REMARKS: CHANGES TO OFFICE SYMBOLS, WHEN NECESSARY, SHALL

BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.

BLOCK 4:

Only Format 6 required

BLOCK 9:

Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices)

BLOCKS 10, 11, 12 & 13:

Initial Submittal:

Contractor shall submit initial Integrated Program Management Report (IPMR) (Format 6 only) NLT 15th day after the end of the second full accounting period following authorization to proceed (ATP).

Subsequent Submittals:

Contractor shall submit subsequent IPMR, containing the required Formats, NLT 15th day of each month thereafter. Contractor shall submit revised IPMR incorporating Government comments, if applicable, on the following month’s IPMR.

BLOCK 14:

1. Format 6 shall be submitted electronically in accordance with the

DoD-approved XML schemas and guidelines located in the EVM Central Repository (EVM-CR) http://cade.osd.mil/tools/evm-tools.

2. Format 6 shall be submitted to the EVM-CR at the DCARC Web site at https://service.cade.osd.mil/DCARCPortal.

3. A copy of the Format 6 shall also be submitted in contractor native format.

4. Contractor shall submit a letter of delivery of IPMR to TopVue https://icbm.topvue.com/topvue-icbm/

EVM-CR

ORG1 (Lt of delivery only)

ORG2 (Lt of delivery only)

ORG32 (Lt of delivery only)

ORG33 (Lt of delivery only)

15. TOTAL 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

6/25/2018

X Nancy N. Baker Nancy N. Baker, GS-12 Data Manager Signed by: BAKER.NANCY.N.1239591376

See digital signature

6/25/2018

X Jerry A. Farkas Jr.

Jeerry A. Farkas, GS-12 Program Manager Signed by: FARKAS.JERRY.A.JR.1060529643

See digital signature

DD Form 1423-1, FEB 2001 Page___1__of__2_ Page

LM 18-27

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

PREMATURE STAGE

SEPARATION (PSS) BATTERY FD20202100331 EaglePicher Technologies

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A002 CONFERENCE AGENDA Meeting Agenda

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-ADMN-81249

SOW Paras 3.1.3, 3.1.3.1, 3.1.3.2, 3.1.3.3, 3.1.3.3.1, 3.1.3.3.2, 3.1.3.3.3, 3.1.3.3.4, 3.1.3.3.5, 3.1.3.3.6

AFMC/GUMA

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION

LT ASREQ N/A b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

A N/A N/A Reg Repro

16. REMARKS: CHANGES TO OFFICE SYMBOLS, WHEN NECESSARY, SHALL

BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.

BLOCK 9:

Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices)

BLOCKS 10, 11, 12 & 13:

Contractor shall submit Conference Agenda (Meeting Agenda), if applicable, NLT 5 business days prior to scheduled meetings or meetings deemed necessary by the Government. Government will be allowed 2 days, after receipt from contractor, to review for approval/disapproval/comments. Contractor shall submit revised Meeting Agenda incorporating Government comments, if applicable, NLT 2 days after receipt from Government.

BLOCK 14: Contractor shall submit Meeting Agenda to TopVue https://icbm.topvue.com/topvue-icbm/

ORG1 (Lt of delivery only)

ORG2 (Lt of delivery only)

ORG32 (Lt of delivery only)

ORG33 (Lt of delivery only)

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

6/25/2018

X Nancy N. Baker Nancy N. Baker, GS-12 Data Manager Signed by: BAKER.NANCY.N.1239591376

See digital signature

6/25/2018

X Jerry A. Farkas Jr.

Jeerry A. Farkas, GS-12 Program Manager Signed by: FARKAS.JERRY.A.JR.1060529643

See digital signature

DD Form 1423-1, FEB 2001 Page___1__of__1_ Page

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

PREMATURE STAGE

SEPARATION (PSS) BATTERY FD20202100331 EaglePicher Technologies

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A003 BRIEFING MATERIALS

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MGMT-81605

SOW Paras 3.1.3, 3.1.3.1, 3.1.3.2, 3.1.3.3, 3.1.3.3.1, 3.1.3.3.2, 3.1.3.3.3, 3.1.3.3.4, 3.1.3.3.5, 3.1.3.3.6

AFMC/GUMA

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION

LT ASREQ SEE BLK 16 b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

N/A N/A N/A Reg Repro

16. REMARKS: CHANGES TO OFFICE SYMBOLS, WHEN NECESSARY, SHALL

BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.

BLOCK 9:

Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices)

BLOCKS 10, 11, 12 & 13:

Contractor shall submit Briefing Materials NLT 5 business days prior to each scheduled meeting and/or any other meeting deemed necessary by the Government and as requested by the Government. Government will be allowed 2 days, after receipt from contractor, to review for comments. Contractor shall present corrected Briefing Materials incorporating Government comments, if applicable, NLT 2 days after receipt from Government.

BLOCK 14:

Contractor shall submit Briefing Materials to TopVue https://icbm.topvue.com/topvue-icbm/

ORG1 (Lt of delivery only)

ORG2 (Lt of delivery only)

ORG32 (Lt of delivery only)

ORG33 (Lt of delivery only)

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

6/25/2018

X Nancy N. Baker Nancy N. Baker, GS-12 Data Manager Signed by: BAKER.NANCY.N.1239591376

See digital signature

6/25/2018

X Jerry A. Farkas Jr.

Jeerry A. Farkas, GS-12 Program Manager Signed by: FARKAS.JERRY.A.JR.1060529643

See digital signature

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

PREMATURE STAGE

SEPARATION (PSS) BATTERY FD20202100331 EaglePicher Technologies

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A004 REPORT, RECORD OF MEETING/MINUTES Meeting Minutes

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-ADMN-81505

SOW Paras 3.1.3, 3.1.3.1, 3.1.3.2, 3.1.3.3, 3.1.3.3.1, 3.1.3.3.2, 3.1.3.3.3, 3.1.3.3.4, 3.1.3.3.5, 3.1.3.3.6

AFMC/GUMA

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION

LT ASREQ SEE BLK 16 b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

A N/A SEE BLK 16 Reg Repro

16. REMARKS: CHANGES TO OFFICE SYMBOLS, WHEN NECESSARY, SHALL

BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.

BLOCK 9:

Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices)

BLOCKS 10, 11, 12 & 13:

Contractor shall submit Report, Record of Meeting Minutes (Meeting Minutes) NLT 15 days after meeting or event has been held.

Government will be allowed 5 days, after receipt from contractor, to review for approval/disapproval/comments. Contractor shall submit revised Meeting Minutes incorporating Government comments, if applicable, NLT 5 days after receipt from Government.

BLOCK 14: Contractor shall submit Meeting Minutes to TopVue https://icbm.topvue.com/topvue-icbm/

ORG1 (Lt of delivery only)

ORG2 (Lt of delivery only)

ORG32 (Lt of delivery only)

ORG33 (Lt of delivery only)

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

6/25/2018

X Nancy N. Baker Nancy N. Baker, GS-12 Data Manager Signed by: BAKER.NANCY.N.1239591376

See digital signature

6/25/2018

X Jerry A. Farkas Jr.

Jeerry A. Farkas, GS-12 Program Manager Signed by: FARKAS.JERRY.A.JR.1060529643

See digital signature

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

PREMATURE STAGE

SEPARATION (PSS) BATTERY FD20202100331 EaglePicher Technologies

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A008 WORK MANAGEMENT PLAN Staffing Plan

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MGMT-81911 SOW Para 3.1.1.3 AFMC/GUMA

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION

LT ASREQ SEE BLK 16 b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

A SEE BLK 16 SEE BLK 16 Reg Repro

16. REMARKS: CHANGES TO OFFICE SYMBOLS, WHEN NECESSARY, SHALL

BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.

BLOCK 9:

Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices)

BLOCKS 10, 11, 12 & 13:

Contractor shall submit Work Management Plan (Staffing Plan) NLT 5 business days prior to Kick-Off Meeting. Government will be allowed 20 days, after receipt from contractor, to review for approval/ disapproval/comments. Contractor shall submit revised Work Management Plan (Staffing Plan) incorporating Government comments, if applicable, NLT 20 days after receipt from Government.

BLOCK 14: Contractor shall submit Work Management Plan (Staffing Plan) to TopVue https://icbm.topvue.com/topvue-icbm/ .

ORG1 (Lt of delivery only)

ORG2 (Lt of delivery only)

ORG32 (Lt of delivery only)

ORG33 (Lt of delivery only)

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

6/25/2018

X Nancy N. Baker Nancy N. Baker, GS-12 Data Manager Signed by: BAKER.NANCY.N.1239591376

See digital signature

6/25/2018

X Jerry A. Farkas Jr.

Jeerry A. Farkas, GS-12 Program Manager Signed by: FARKAS.JERRY.A.JR.1060529643

See digital signature

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

PREMATURE STAGE

SEPARATION (PSS) BATTERY FD20202100331 EaglePicher Technologies

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A014 COUNTERFEIT PREVENTION PLAN

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MISC-81832 SOW Para 3.1.3.3.1 414 SCMS/GUEA

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION

LT 1/TIME SEE BLK 16 b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

A SEE BLK 16 Reg Repro

16. REMARKS: CHANGES TO OFFICE SYMBOLS, WHEN NECESSARY,

SHALL BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.

BLOCK 9:

Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices)

BLOCKS 10, 11, 12 & 13:

Contractor shall deliver the Counterfeit Prevention Plan NLT 30 days after contract award. Government will be allowed 14 days, after receipt from contractor, to review for approval/disapproval/comments.

Contractor shall submit revised Counterfeit Prevention Plan incorporating Government comments, if applicable, NLT 15 days after receipt from Government.

NOTE: The contractor shall provide a Counterfeit Prevention Plan to include items from section 4 of SAE AS5553, Counterfeit Electrical, Electronic, and Electromechanical (EEE) Parts: Avoidance, Detection, Mitigation, and Disposition and this CDRL

BLOCK 14: Contractor shall submit Counterfeit Prevention Plan to TopVue https://icbm.topvue.com/topvue-icbm/

Nomenclature:

NSN:6135-00-992-8750AH

P/N: 20112832 Description: Remote Activated Premature Stage Separation (PSS) Battery

ORG1 (Lt of delivery only)

ORG2 (Lt of delivery only)

ORG10 (Lt of delivery only)

ORG32 (Lt of delivery only)

ORG33 (Lt of delivery only)

414 SCMS/GUEA

6021 Gum Ln Hill AFB UT 84056 Attn: Eddie Diehl & Lt. Christian Potts

2 2

15. TOTAL 2 2

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

6/25/2018

X Nancy N. Baker Nancy N. Baker, GS-12 Data Manager Signed by: BAKER.NANCY.N.1239591376

See digital signature

6/25/2018

X Jerry A. Farkas Jr.

Jeerry A. Farkas, GS-12 Program Manager Signed by: FARKAS.JERRY.A.JR.1060529643

See digital signature

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

PREMATURE STAGE

SEPARATION (PSS) BATTERY FD20202100331 EaglePicher Technologies

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A015 QUALITY ASSURANCE PROGRAM PLAN

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-QCIC-81794

SOW Para 3.1.2.8, 3.1.3.3.1,

3.1.3.3.2 AFNWC/NIES

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION

LT ONE/R SEE BLK 16 b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

A SEE BLK 16 SEE BLK 16 Reg Repro

16. REMARKS: CHANGES TO OFFICE SYMBOLS, WHEN NECESSARY, SHALL

BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.

BLOCK 9:

Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices)

BLOCKS 10, 11, 12 & 13:

Contractor shall submit initial Quality Assurance Program Plan NLT 30 days prior to Preliminary Design Review (PDR). Government will be allowed 30 days after receipt from contractor to review for approval/disapproval/comments. Contractor shall resubmit corrected Quality Assurance Program Plan incorporating Government comments, if applicable, NLT 30 days prior to Critical Design Review (CDR). Government will be allowed 30 days, after receipt from contractor, to review for approval/disapproval/comments.

BLOCK 14: Contractor shall submit Quality Assurance Program Plan to TopVue https://icbm.topvue.com/topvue-icbm/

NOTE: Quality Assurance Program Plan shall be submitted IAW

AS 9100.

ORG1 (Lt of delivery only)

ORG2 (Lt of delivery 0nly)

ORG6 (Lt of delivery only)

ORG32 (Lt of delivery only)

ORG33 (Lt of delivery only)

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

6/25/2018

X Nancy N. Baker Nancy N. Baker, GS-12 Data Manager Signed by: BAKER.NANCY.N.1239591376

See digital signature

6/25/2018

X Jerry A. Farkas Jr.

Jeerry A. Farkas, GS-12 Program Manager Signed by: FARKAS.JERRY.A.JR.1060529643

See digital signature

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

PREMATURE STAGE

SEPARATION (PSS) BATTERY FD20202100331 EaglePicher Technologies

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A027

PRODUCT DRAWINGS/MODELS AND

ASSOCIATED LIST

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-SESS-81000/T SOW Paras 1.3, 3.1.2, 3.1.2.2 AFNWC/NIES

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION

LT SEE BLK 16 SEE BLK 16 b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

A SEE BLK 16 SEE BLK 16 Reg Repro

16. REMARKS: CHANGES TO OFFICE SYMBOLS, WHEN NECESSARY, SHALL

BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.

BLOCK 9:

Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices)

ORG1 (Lt of delivery only)

ORG2 (Lt of delivery only)

ORG4 (Lt of delivery only)

ORG32 (Lt of delivery only)

ORG33 (Lt of delivery only)

15. TOTAL 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

6/25/2018

X Nancy N. Baker Nancy N. Baker, GS-12 Data Manager Signed by: BAKER.NANCY.N.1239591376

See digital signature

6/25/2018

X Jerry A. Farkas Jr.

Jeerry A. Farkas, GS-12 Program Manager Signed by: FARKAS.JERRY.A.JR.1060529643

See digital signature

DD Form 1423-1, FEB 2001 Page___1__of__4_ Page

(1 Data Item)

Form Approved OMB No. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP X TM OTHER _____ ____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

PREMATURE STAGE

SEPARATION (PSS) BATTERY FD20202100331 EaglePicher Technologies

16. REMARKS (Continued): CDRL A027 Continued.

1. Reference documents. The applicable issue of any documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract. This CDRL is applicable to both software and hardware drawings.

2. Distribution Statement. Distribution statement, export control statement (if applicable), and Destruction Notice shall be IAW DoDD 5230.24. The following Distribution Statement shall be used for all data.

Distribution Statement D: Distribution authorized to DoD and U.S. DoD contractors only for administrative and operational use, determined (date of determination)*. Other requests for this document shall be referred to ICBM Systems Directorate, Hill AFB, UT 84056.

WARNING:

This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

Add the following statement to the bottom of every page of the report except the SF 298, Report Documentation Page: “WARNING: EXPORT CONTROLLED.”

NOTE: The CDO Program Manager (PM) may remove the “Export Control Warning” if “critical technology” is not a reason annotated in the distribution statement and if the CDO PM can verify the technical report/document is not export control.

Destruction Notice:

Documents designated as Distribution B, C, D, E, or F shall be marked with one of the following statements:

For classified documents:

DESTRUCTION NOTICE: Follow the procedures in DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, DoDM 5200.01-V3, DoD Information Security Program:

Protection of Classified Information, Enclosure 3, paragraph 17 or AFI 16-1404, Air Force Information Security Program, para 5.2.5.

For unclassified, limited documents:

DESTRUCTION NOTICE: Destroy by any method that will prevent disclosure of contents or reconstruction of the document.

*NOTE: Date of determination is the date the distribution statement is added to the document.

3. Drawing Baseline. Contractor shall maintain drawing baseline configuration for both software and hardware (current through completion of contract). Existing Drawings and Associated Lists that are updated by this effort shall also be updated to include the applicable Distribution Statement, Export Control Statement (if applicable) and Destruction Notice.

4. Engineering Changes to Air Force Drawings.

a. Contractor shall document changes to existing Air Force Drawings using AFMC Forms 3925, 3926, and 3927 (Engineering Order Forms). Final approval and release of engineering orders shall be a function of the U.S. Government.

b. Delivery of Engineering Orders – Contractor shall submit DRAFT engineering order forms to the Government as they occur. The Government requires 15 working days for review and approval. Contractor shall incorporate comments and provide corrected copies within 10 working days of receipt. Draft delivery shall be in PDF format.

c. Instructions for completing engineering orders (AFMC Forms 3925, 3926, & 3927) can be found on the form.

DD Form 1423-1, FEB 2001 Page___2__of___4__Page

(1 Data Item)

Form Approved OMB No. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP X TM OTHER _____ ____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

PREMATURE STAGE

SEPARATION (PSS) BATTERY FD20202100331 EaglePicher Technologies

16. REMARKS (Continued): CDRL A027 Continued.

5. Control Drawings. Contractor shall prepare control drawings for commercial or vendor items IAW ASME Y14.24M.

6. New drawings. For newly created Drawings and Associated Lists, DI-SESS-81000D/T and Technical Data Package Option Selection Worksheet (defined in MIL-STD-31000) are applicable. Tailoring to DID shall be per TDP Option Selection Worksheet (Atch 1).

All newly created Drawings and Associated Lists shall be IAW the following tailored documents: ASME Y14.100-2000(including Appendices B, C, D, E), AMSE Y14.3M, ASME Y14.5M, and ASME Y14.35M.

Tailoring to these documents as indicated on this DD form 1423. The following documents are used in whole:

ASME Y14.1, ASME Y14.2M, ASME Y14.24, ASME Y14.34M, ASME Y14.38 and ASME Y14.38a-2002

ADDENDA.

7. Existing Drawings. Existing Drawings and Associated Lists shall be updated IAW the drawing standards in which they were originally prepared.

8. Tailoring to ASME documents:

ASME Y14.100

(1) (Application Data) para 4.6 – Application Data is required on first sheet of Drawing and Associated List.

General use or multi-use notations is allowed.

(2) (Drawing Notes) para 4.27 – Drawing Notes shall be on first sheet of drawing.

ASME Y14.35M

(1) (Redrawn Drawings) – shall be IAW para 4.3, sub-para 4.3.2

(2) (Revision Column) – shall be IAW para 6, sub-para 6.1.2, 6.1.3(d), 6.1.7(c).

Contractor shall maintain revision history in its entirety.

(3) (Revision Letters) – Shall be IAW para 7.2, sub-para 7.2.1(a), (b), (c).

(4) (Revision History Block) – shall be IAW para 7.2.2(a), (b).

(5) (Revision Status of Sheets Block) – shall be IAW para 7.4, sub-para 7.4.2(a), (b), (c).

(6) (Adding Sheets) – shall be IAW para 7.5, sub-para 7.5.1(a)

(7) (Deleting Sheets) – shall be IAW para 7.5, sub-para 7.5.2(b)

ASME Y14.5M

(Dimensioning and Tolerancing) – shall be IAW para 1.6.2 and shall be decimal inch.

ASME Y14.3M

(Angle of Projection) – shall be IAW para 1.6.1 (Third Angle Projection)

ASME Y14.100 INVOKED APPENDICES

Appendix B – Noncommercial Drawing Practices Appendix B – for para B5 see TDP Option Selection Worksheet Appendix C – Drawing Titles Appendix D – Numbering, Coding, and Identification Appendix E – Makings on Engineering Drawings Appendix E – for para E7 see DD1423 Block 16

DD Form 1423-1, FEB 2001 Page___3__of___4__Page

(1 Data Item)

Form Approved OMB No. 0704-0188

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP X TM OTHER _____ ____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

PREMATURE STAGE

SEPARATION (PSS) BATTERY FD20202100331 EaglePicher Technologies

16. REMARKS (Continued): CDRL A027 Continued.

9. Metadata Requirements

A metadata file shall accompany each Drawing and Associated List submittal. Not all fields in the Metadata are filled in or used. Only the fields that are required to have inputs have been filled in.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .