CDRL-DD1423-1_A001_thru_A009.pdf
PDF 544 KB Posted
- Attached to
- F-15 Ammunition Container Depot-level Overhaul Federal contract opportunity
- Solicitation number
- FA8554-21-R-0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA8554-21-R-0002-01.pdf | ||
| FA8554-21-R-0002.pdf | ||
| Solicitation.pdf | ||
| SPI_No_01-298-2522.pdf | ||
| AFMC-807_Quality_Assurance_Provisions.pdf | ||
| DD-1653_Transportation.pdf | ||
| AFMC-158_Packaging.pdf | ||
| PWS.pdf | ||
| QASP.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 of 1DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page Pages Adobe Professional 7.0Reset
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACTDATAREQUIREMENTSLIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government IssuingContracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B.EXHIBIT
A
C.CATEGORY:
TDP TM OTHER MGMT
SYSTEM/ITEM E. CONTRACT/PR NO.
FD2060-20-00
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Item Unique Identification (IUID) Marking Plan
3. SUBTITLE
IUID Marking Plan
AUTHORITY (Data Acquisition Document No.)
MGMT-81803
5. CONTRACT REFERENCE
PWS Paragraph
6. REQUIRING OFFICE
AFSC 409 SCMS/GUME
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
See BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
See BLK 16
Draft Final
Reg Repro
16. REMARKS
Changes to office symbols and/or e-mail addresses, when necessary, shall be made by letter through the PCO/ACO without further revision to this CDRL.
BLK 7 :
Submit invoice in WAWF, DoDAAC FA8554 <https://wawf.eb.mil/>, submittal of final Marking Plan
BLK 9: DISTRIBUTION . Distribution authorized to U.S. Government Agencies due to critical technology as . Other requests for this document shall be referred to , 235 Byron Street, Suite
19A, RAFB, GA 31098-1670.
BLK 14:
1 0 0
0 1 1 See BLK 16
15. TOTAL 1 1
G. PREPARED BY
Ronald Brigmond
H. DATE
I. APPROVEDBY
TraceeSealy
J. DATE
BRIGMOND.RONALD.L.138186443
Digitally signed by
BRIGMOND.RONALD.L.1381864436
Date: 2020.07.01 09:49:38 -04'00'
SEALY.TRACEE.A.1229963
Digitally signed by
SEALY.TRACEE.A.1229963011
Date: 2020.07.01 11:04:27 -04'00'
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACTDATAREQUIREMENTSLIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government IssuingContracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B.EXHIBIT
A
C.CATEGORY:
TDP TM OTHER MGMT
SYSTEM/ITEM E. CONTRACT/PR NO.
FD2060-20-00
F. CONTRACTOR
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Item Unique Identification (IUID) Marking Activity, Validation and Verification Report
3. SUBTITLE
Validation and Verification Report
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81804A
5. CONTRACT REFERENCE
PWS Paragraph
6. REQUIRING OFFICE
AFSC 409 SCMS/GUME
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
See BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
See BLK 16
Draft Final
Reg Repro
16. REMARKS
Changes to office symbols and/or e-mail addresses, when necessary, shall be made by letter through the PCO/ACO without further revision to this CDRL.
BLK 12 and 13: Initial submission shall be due at 90 days prior to the end of the Contract Period of Performance. The government has 15 days to accept/reject and provide comments. The contractor shall have 10 days to incorporate changes.
1 0 0
WAWF 0 1 1
See BLK 16
15. TOTAL 1 1
G. PREPARED BY
Ronald Brigmond
H. DATE
I. APPROVEDBY
TraceeSealy
J. DATE
See BLK 16
SEALY.TRACEE.A.122996301
Digitally signed by
SEALY.TRACEE.A.1229963011
Date: 2020.07.01 10:54:44 -04'00'
BRIGMOND.RONALD.L.138
1864436
Digitally signed by
BRIGMOND.RONALD.L.1381864436
Date: 2020.07.01 09:50:33 -04'00'
Page 1 of 1DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Pages
Reset
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACTDATAREQUIREMENTSLIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B.EXHIBIT
A
C.CATEGORY: QCIC
TDP TM OTHER
SYSTEM/ITEM E. CONTRACT/PR NO.
FD2060-20-00
F. CONTRACTOR
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Government Industry Data Exchange Program (GIDEP) Alert/Safe-Alert Report
3. SUBTITLE
Alert/Safe-Alert Report
4. AUTHORITY (Data Acquisition Document No.)
DI-QCIC-80125B
5. CONTRACT REFERENCE
PWS Paragraph
6. REQUIRING OFFICE
AFSC 409 SCMS/GUME
7. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
B
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
See Block 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
See BLK 16
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION Draft
Final
Reg Repro
16. REMARKS
Changes to office symbols and/or e-mail addresses, when necessary, shall be made by letter through the PCO/ACO without further revision to this CDRL.
BLK 7: The contractor shall submit each report with a letter of transmittal.
Submit invoice in WAWF, DoDAAC FA8554 <https://wawf.eb.mil/>, after submittal of final report to account for all previously submitted.
BLK 8: WAWF requirement for inspection and acceptance is applicable only to the first addressee in Block 14. A letter of transmittal will be used to send to other addressees.
Block 9:
BLK 12: The contractor shall prepare an ALERT (DD Form 1938) to notify the Government of Material Deficiencies which have adversely impacted or have the potential to adversely impact the program during the duration of the contract.
0 1 0
GIDEP OPS CT 0 1 0
P.O. Box 8000 Corona, CA 91718-8000
WAWF 0 1 0
See BLK 16
15. TOTAL 0 3 0
G. PREPARED BY
Ronald Brigmond
H. DATE
I. APPROVED BY
Tracee Sealy
J. DATE
See BLK 16
SEALY.TRACEE.A.122996301
Digitally signed by
SEALY.TRACEE.A.1229963011
Date: 2020.07.01 11:07:56 -04'00'
BRIGMOND.RONALD.L.13818
64436
Digitally signed by
Date: 2020.07.01 09:51:31 -04'00'
Page 1 of 1DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Pages
Reset
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACTDATAREQUIREMENTSLIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B.EXHIBIT
A
C.CATEGORY: QCIC
TDP TM OTHER
SYSTEM/ITEM E. CONTRACT/PR NO.
FD2060-20-00
F. CONTRACTOR
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
Government Industry Data Exchange Program (GIDEP) Alert/Safe-Alert Response
3. SUBTITLE
Alert/Safe-Alert Response
4. AUTHORITY (Data Acquisition Document No.)
DI-QCIC-80126B
5. CONTRACT REFERENCE
PWS Paragraph .1
6. REQUIRING OFFICE
AFSC 409 SCMS/GUME
7. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
B
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
BLK 16
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
Draft Final
Reg Repro
16. REMARKS
Changes to office symbols and/or e-mail addresses, when necessary, shall be made by letter through the PCO/ACO without further revision to this CDRL.
Block 7: The contractor shall submit each report with a letter of transmittal.
Submit invoice in WAWF, DoDAAC FA8554 <https://wawf.eb.mil/>, after submittal of final report to account for all previously submitted.
BLK 8: WAWF requirement for inspection and acceptance is applicable only to the first addressee in Block 14. A letter of transmittal will be used to send to other addressees.
BLK 12: The contractor shall prepare an ALERT/SAFE-ALERT to provide the Government with information on the applicability, impact, and corrective action or disposition of Alerted parts, assemblies, and units containing Alerted parts.
0 1 0
GIDEP OPS CT 0 1 0
P.O. Box 8000 Corona, CA 91718-8000
WAWF 0 1 0
See BLK 16
15. TOTAL 0 3 0
G. PREPARED BY
Ronald Brigmond
H. DATE
I. APPROVED BY
Tracee Sealy
J. DATE
SEALY.TRACEE.A.1229963011
Digitally signed by
SEALY.TRACEE.A.1229963011
Date: 2020.07.01 10:52:43 -04'00'
BRIGMOND.RONALD.L.1381864436 Digitally signed by BRIGMOND.RONALD.L.1381864436 Date: 2020.07.01 09:51:14 -04'00'
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACTDATAREQUIREMENTSLIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government IssuingContracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B.EXHIBIT
A
C.CATEGORY:
TDP TM OTHER MGMT
SYSTEM/ITEM E. CONTRACT/PR NO.
FD2060-20-00
F. CONTRACTOR
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
Commercial Asset Visibility Air Force (CAVAF)/Government Furnished Material Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81634C
5. CONTRACT REFERENCE
PWS Paragraphs
6. REQUIRING OFFICE
AFSC 409 SCMS/GUME
7. DD 250 REQ
LT**
9. DIST STATEMENT
REQUIRED
N/A
10. FREQUENCY
See BLK 16
12. DATE OF FIRST SUBMISSION
See BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
See BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
See BLK 16
Draft Final
Reg Repro
16. REMARKS
** Block 7: DD Form 250 shall be required for Price Data. When required, DD Form 250 will be submitted to
Changes to office symbols and/or e-mail addresses, when necessary, shall be made by letter through the PCO/ACO without further revision to this CDRL.
Blocks 7 and 14: The contractor shall submit each report with a letter of transmittal. Submit invoice in WAWF, DoDAAC FA8554 <https://wawf.eb.mil/>, after submittal of final report to account for all previously submitted.
The contractor will report end item and Government-Furnished Material (GFM) data through electronic submission in CAV II using the CAV II web site IAW CAV II SOW. This information will be accessed by the program office PMS and by 409 SCMS/GUBA in order to ascertain production status and GFM inventories.
Data will be submitted by the contractor daily IAW CAV II User's Guide, Version 6.0. and Appendix B for GFM contracts.
Training will be provided by 409 SCMS/GUBA.
This DD Form 1423-1 applies to both Contractor-Furnished Material (CFM) and
Government-Furnished Material (GFM) type contracts.
NOTE: DELIVERY ORDER REPORTING APPLIES.
Blocks 10 13:
1. Updates to the CAV II system shall be accomplished daily or when a supply or maintenance transaction occurs. IAW CAV II Contractor User's Guide, Version 6.0. and Appendix B for GFM contracts.
2. The method of communication from the contractor to the Air Logistics Center (ALC) will be mechanized, IAW CAV II Contractor User's Guide, Version 6.0. and Appendix B for GFM contracts.
3. The contractor will use CAV II for reporting all end item GFM transactions on day the specific action occurred. Weekends are exceptions. (NOTE: Certain actions such as receipts, inductions to work, production, shipments, issues, etc., require a transaction to be input to CAV II. However when there is no action it is not necessary to access the system.
Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified IAW CAV II User's Guide, Version 6.0. and Appendix B for GFM contracts.
WAWF
See BLK 16
15. TOTAL 0 0
G. PREPARED BY
Ronald Brigmond
H. DATE
I. APPROVEDBY
Tracee Sealy
J. DATE
SEALY.TRACEE.A.1229963011 Digitally signed by SEALY.TRACEE.A.1229963011
Date: 2020.07.07 14:25:41 -04'00'
BRIGMOND.RONALD.L.138186443
Digitally signed by
Date: 2020.07.01 11:36:16 -04'00'
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACTDATAREQUIREMENTSLIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government IssuingContracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B.EXHIBIT
A
C.CATEGORY:
TDP TM OTHER MGMT
SYSTEM/ITEM E. CONTRACT/PR NO.
FD2060-20-00
F. CONTRACTOR
1. DATA ITEM NO.
A00
2. TITLE OF DATA ITEM
Status Report
3. SUBTITLE
Monthly Status Report (MSR)
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80368A (See BKL 16)
5. CONTRACT REFERENCE
PWS Paragraph .1
6. REQUIRING OFFICE
AFSC 409 SCMS/GUME
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
C
10. FREQUENCY
See BLK 16
12. DATE OF FIRST SUBMISSION
See BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
See BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
See BLK 16
Draft Final
Reg Repro
16. REMARKS
Changes to office symbols and/or e-mail addresses, when necessary, shall be made by letter through the PCO/ACO without further revision to this CDRL.
Block 4: At a minimum the following data shall be included in each MSR:
Contract #, CLIN, DO #, P/N, NSN, Serial #, Contract Repair $, Date in for Repair, Ship Data, Status/Comments, and the activities of the subject month
Block 7: The contractor shall submit each report with a letter of transmittal. Submit invoice in WAWF, DoDAAC FA8554 <https://wawf.eb.mil/>, after submittal of final report to account for all previously submitted.
lock 9:
Blocks 10-13: After receipt of first delivery order, the Contractor shall submit the first MSR no later than the 15th of the next month. For the life of the contract, for all months with active delivery order(s) a MSR is due no later than the 15th of the following month.
1 0 0
WAWF 0 1 0
See BLK 16
15. TOTAL 1 0
G. PREPARED BY
Ronald Brigmond
H. DATE
I. APPROVEDBY
TraceeSealy
J. DATE
See BLK 16
SEALY.TRACEE.A.12299630
Digitally signed by
SEALY.TRACEE.A.1229963011
Date: 2020.07.01 11:12:49 -04'00'
BRIGMOND.RONALD.L.138186
Digitally signed by
Date: 2020.07.01 09:51:48 -04'00'
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACTDATAREQUIREMENTSLIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government IssuingContracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B.EXHIBIT
A
C.CATEGORY:
TDP TM OTHER SAFT
SYSTEM/ITEM E. CONTRACT/PR NO.
FD2060-20-00
F. CONTRACTOR
1. DATA ITEM NO.
A00
2. TITLE OF DATA ITEM
Accident/Incident Report
3. SUBTITLE
Mishap Notification
4. AUTHORITY (Data Acquisition Document No.)
DI-SAFT-81563
5. CONTRACT REFERENCE
PWS Paragraph 1
6. REQUIRING OFFICE
AFSC 409 SCMS/GUME
7. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
B
10. FREQUENCY
See BLK 16
12. DATE OF FIRST SUBMISSION
See BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
See BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
See BLK 16
Draft Final
Reg Repro
16. REMARKS
Changes to office symbols and/or e-mail addresses, when necessary, shall be made by letter through the PCO/ACO without further revision to this CDRL.
Block 4: Contractor shall submit a report on ALL mishaps, damage to DoD property, and employee injury, to the Installation Safety Office by telephone within four (4) hours after initial notification. Written report shall be submitted within three (3) calendar days of mishap.
Electronic submissions are acceptable. Information that is not available at the time of the initial notification shall be provided within 20 calendar days of mishap.
Block 7: The contractor shall submit each report with a letter of transmittal. Submit invoice in WAWF, DoDAAC FA8554 <https://wawf.eb.mil/>, after submittal of final report to account for all previously submitted.
1 0 0
See BLK 16
WAWF 0 1 0
See BLK 16
15. TOTAL 1 0
G. PREPARED BY
Ronald Brigmond
H. DATE
I. APPROVEDBY
TraceeSealy
J. DATE
BRIGMOND.RONALD.L.138186443
Digitally signed by
BRIGMOND.RONALD.L.1381864436
Date: 2020.07.01 09:50:14 -04'00'
SEALY.TRACEE.A.122996301
Digitally signed by
SEALY.TRACEE.A.1229963011
Date: 2020.07.01 11:09:56 -04'00'
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACTDATAREQUIREMENTSLIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government IssuingContracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B.EXHIBIT
A
C.CATEGORY:
TDP TM
SYSTEM/ITEM E. CONTRACT/PR NO.
FD2060-20-
F. CONTRACTOR
1. DATA ITEM NO.
A00
2. TITLE OF DATA ITEM 3. SUBTITLE
AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Paragraph 4.8.2
6. REQUIRING OFFICE
AFSC 409 SCMS/GUME
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
See BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
See BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
See BLK 16
Draft Final
Reg Repro
15. TOTAL 0
G. PREPARED BY
Ronald Brigmond
H. DATE
I. APPROVEDBY
TraceeSealy
J. DATE
OTHER
RINGLEY.JONATHAN.R.126
4500881
Digitally signed by
RINGLEY.JONATHAN.R.1264500881
Date: 2020.08.18 13:01:18 -04'00'
BRIGMOND.RONALD.L.138186
Digitally signed by
BRIGMOND.RONALD.L.1381864436
Date: 2020.08.17 10:13:53 -04'00'
FISKE.ROBERT.R.
1260632872
Digitally signed by
FISKE.ROBERT.R.1260632872
Date: 2020.08.17 10:43:01 -04'00'
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
CONTRACTDATAREQUIREMENTSLIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government IssuingContracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B.EXHIBIT
A
C.CATEGORY:
TDP TM
SYSTEM/ITEM E. CONTRACT/PR NO.
FD2060-20-
F. CONTRACTOR
1. DATA ITEM NO.
A00
2. TITLE OF DATA ITEM 3. SUBTITLE
AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Paragraph 4.8.3
6. REQUIRING OFFICE
AFSC 409 SCMS/GUME
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
See B 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
See B 16
13. DATE OF SUBSEQUENT
SUBMISSION
See B 16
Draft Final
Reg Repro
15. TOTAL 0
G. PREPARED BY
Ronald Brigmond
H. DATE
I. APPROVEDBY
TraceeSealy
J. DATE
OTHER
RINGLEY.JONATHAN.R.126
4500881
Digitally signed by
RINGLEY.JONATHAN.R.1264500881
Date: 2020.08.18 13:05:24 -04'00'
BRIGMOND.RONALD.L.138186
Digitally signed by
BRIGMOND.RONALD.L.1381864436
Date: 2020.08.17 10:15:03 -04'00'
FISKE.ROBERT.
R.1260632872
Digitally signed by
FISKE.ROBERT.R.1260632872
Date: 2020.08.17 10:41:52 -04'00'
| PR20-00730_CDRL_A001_IUID Marking Plan |
| PR20-00730_CDRL_A002_IUID Marking Activity and Verification Report |
| PR20-00730_CDRL_A003_GIDEP Alert Report |
| PR20-00730_CDRL_A004_GIDEP Alert Response_13Aug2020 |
| PR20-00730_CDRL_A005_CAVAF |
| PR20-00730_CDRL_A006_Monthly_Status_Report |
| PR20-00730_CDRL_A007_Mishap Notification_13Aug2020 |
| PR20-00730_CDRL_A008_Government_Property_Inventory_Report |
| PR20-00730_CDRL_A009_Contract_Depot_Maintenance_(CDM)_Production_Report |
File details come from the government source that posted it. Updated .