This document is a Statement of Work (SOW) for renewing canvas awnings on the CGC Harold Miller, a United States Coast Guard vessel. The work involves removing existing canvas awnings from the Main Deck Fantail and 01 Deck, and installing new royal blue, marine-grade Top Gun canvas awnings. Specific requirements include a 750 square foot awning for the aft main deck and a 476 square foot awning for the 01 deck, both to be secured with 3/16" black, braided nylon cordage. The expected installation is scheduled during the vessel's July 2025 Operational Deployment Maintenance System (ODMS) period, specifically from June 9th to June 20th, at the vessel's location in St. Petersburg, Florida.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Ship Drawing Canvas 154-WPC_613_201_1_-_C (003).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S16_000_61300_DFM_0216_1106
WORK ITEM 1: Canvas Awning, Renew
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew the canvas awnings on the 01 Deck and the Fantail.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 154 WPC-613-201, Rev C, Rigging & Covers A&D
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Awning and track removal. The Contractor shall remove the existing canvas awnings and the starboard 01 Deck awning track attaching the awning to the pilothouse. Turn over removed canvas and track to the Coast Guard inspector for disposal.
3.3 Renew awning canvas. The Contractor shall provide materials, fabricate and install new awning canvases on the Main Deck Fantail area and the 01 Deck aft of the Pilothouse using Coast Guard Drawing 154 WPC-613-201 as guidance.
3.3.1 The aft main deck awning requires 750 (approx.. 31’ x 24’) square feet of royal blue, marine grade, Top Gun canvas, secured to the ship’s awning frame with 3/16” black, braided nylon cordage.
3.3.2 The 01 deck awning requires 476 (approx.. 23.5’ x 20.5’) square feet of royal blue, marine grade, Top Gun canvas, secured to the ship’s awning frame with 3/16” black, braided nylon cordage.
4. NOTES
4.1 This Scope of Work was generated by and is applicable to:
CGC HAROLD MILLER
600 8th Ave SE St Petersburg FL, 33710
(727) 621-4215
4.2 Expected installation dates are during CGC HAROLD MILLER’s 2025 July ODMS period. Those dates inclusive are June 9th – June 20th.