This document provides a template for calculating the percentage of self-performed work on a general construction contract. Offerors must perform at least 15 percent of the total personnel costs with their own employees or those of verified small business subcontractors. The template requires contractors to list the specification division, indicate if work will be self-performed or subcontracted, and provide personnel and material/equipment costs by division. Total personnel, material/equipment, overhead, profit, and bond costs should be included. Contractors must also calculate the total personnel costs for all parties, subtract non-verified small business subcontractor personnel costs, and show the remainder as the amount of self-performed work required to be at least 15 percent of total personnel costs.

The related federal contract opportunity is solicitation number 36C24924B0007 from the Department of Veterans Affairs for an oxygen system upgrade project at a Veterans Health Administration facility.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DZ--Project# 626-22-201 Upgrade Oxygen, newest first.
File Type Posted
36C24924B0007 0002.docx DOCX document
36C24924B0007 0001.docx DOCX document
Contractor EMR Certification Form.docx DOCX document
WD_TN20230178 10-13-2023.pdf PDF
UEI _ TAX ID.docx DOCX document
36C24924B0007_1.docx DOCX document
C28_ Specifications_626-22-201 Upgrade.pdf PDF
RFI Form.docx DOCX document
C27_Drawings_626-22-201 Upgrade.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK (xxx-xx-xxx)

Offerors for General Construction (NAICS code 236220) must provide at least 15 percent (25% for specialty trade NAICS codes with 237 and 238 prefix) of the cost of the contract performance incurred for personnel must be performed by the Service Disabled Veteran Owned Small Business (SDVOSB) awardee or those of a verified SDVOSB subcontractor. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead, profit/fee and bond costs shall be added after a subtotal of personnel and material/Equipment costs has been calculated. Clearly identify the personnel costs you will be performing, and the personnel costs of other eligible service disabled veteran-owned small business concerns. Below is a suggested format.

Specification Division
SDVOB Vendor (Y or N)
Personnel Cost
Material/Equipment Costs

Division 01

$
$

Division 02

$
$

Division 03

$
$

(Add additional lines as necessary for each Division applicable to this project)

$
$
$
$

Sub Total (Personnel Costs, Material/Equipment Costs)

Profit
$
Home Office Overhead
$
Bond
$
Grand Total
$

Calculation of self-performed personnel costs:

1. Total personnel costs * both prime and all subcontractors: $

2. Subtract all subcontractor personnel costs* that are not SDVOSB companies that will perform work on this contract: $

3. Remainder is ‘Total amount of work to be self-performed under the

Contract’:$
4. Self-performed work = Line 3/Line 1 x 100 =%

*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to the project (includes project manager, job superintendent, administrative, estimators, etc.)