C27_Drawings_626-22-201 Upgrade.pdf

PDF 17 MB Posted

Attached to
Z1DZ--Project# 626-22-201 Upgrade Oxygen Federal contract opportunity
Solicitation number
36C24924B0007
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9

About this file

This document outlines a federal contract opportunity from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9. The solicitation number is 36C24924B0007 for the Z1DZ--Project# 626-22-201 Upgrade Oxygen opportunity, which involves upgrading the oxygen system. The related file is a 17MB set of drawings. The opportunity type is a solicitation and the agency listed is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9. No other salient details are provided in this document.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DZ--Project# 626-22-201 Upgrade Oxygen, newest first.
File Type Posted
36C24924B0007 0002.docx DOCX document
36C24924B0007 0001.docx DOCX document
Contractor EMR Certification Form.docx DOCX document
WD_TN20230178 10-13-2023.pdf PDF
UEI _ TAX ID.docx DOCX document
36C24924B0007_1.docx DOCX document
CALCULATION OF SELF PERFORMED WORK.docx DOCX document
C28_ Specifications_626-22-201 Upgrade.pdf PDF
RFI Form.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ALTERNATE #1: BASE BID EXCEPT OMIT DEMOLITION WORK IN WING 4C SHOWN ON PG104D.

ALTERNATE #2: ALTERNATE 1 EXCEPT OMIT DEMOLITION WORK IN WING 3C SHOWN ON PG103D.

# DEDUCT ALTERNATE NOTES

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

PROJECT SITE MAP PROJECT LOCATION MAP

PROJECT IMAGE

/5

/2

:5

:0

P M

C U s e rs

\p p h if e r\ D o c u m e n ts \R e v it L o c a l\ R e v it

\P

-0

-N a s h v ill e -U p g r

O x y g e n p p h if e rP

C

.r v t

GI001

COVER SHEET

1 2PRP

UPGRADE OXYGEN

NASHVILLE VAMC

1310 24TH AVENUE S.

NASHVILLE, TN 37212 JUNE 5, 2023

BID DOCUMENTS

626-22-20122-066

UPGRADE OXYGEN

NASHVILLE VAMC

1310 24TH AVENUE S.

NASHVILLE, TN 37212

VA PROJECT #: 626-22-201

SPG

DRAWING LIST

NO. DESCRIPTION DWG OF DWG

GENERAL

GI001 COVER SHEET 1 2

GI002 ICRA MATRIX AND DETAILS 2 2

PLUMBING

P-001 PLUMBING GENERAL INFORMATION 1 20

PG010B SUB-BASEMENT MEDICAL GAS PLAN AREA B 2 20

PG010D SUB-BASEMENT MEDICAL GAS PLAN AREA D 3 20

PG100A BASEMENT MEDICAL GAS PLAN AREA A 4 20

PG100B BASEMENT MEDICAL GAS PLAN AREA B 5 20

PG100C BASEMENT MEDICAL GAS PLAN AREA C 6 20

PG100D BASEMENT MEDICAL GAS PLAN AREA D 7 20

PG101A FIRST FLOOR MEDICAL GAS PLAN AREA A 8 20

PG101B FIRST FLOOR MEDICAL GAS PLAN AREA B 9 20

PG101C FIRST FLOOR MEDICAL GAS PLAN AREA C 10 20

PG101D FIRST FLOOR MEDICAL GAS PLAN AREA D 11 20

PG102A SECOND FLOOR MEDICAL GAS PLAN AREA A 12 20

PG102C SECOND FLOOR MEDICAL GAS PLAN AREA C 13 20

PG102D SECOND FLOOR MEDICAL GAS PLAN AREA D 14 20

PG103C THIRD FLOOR MEDICAL GAS PLAN AREA C 15 20

PG103D THIRD FLOOR MEDICAL GAS PLAN AREA D 16 20

PG104C FOURTH FLOOR MEDICAL GAS PLAN AREA C 17 20

PG104D FOURTH FLOOR MEDICAL GAS PLAN AREA D 18 20

PG105 SIXTH FLOOR ACRE BUILDING MEDICAL GAS PLAN 19 20

P-601 PLUMBING SCHEDULES 20 20

ELECTRICAL

E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 3

E-102C PARTIAL SECOND FLOOR ELECTRICAL PLAN - AREA C 2 3

E-103C PARTIAL THIRD FLOOR ELECTRICAL PLAN - AREA C 3 3

DocuSign Envelope ID: 5C74FF1E-A880-44CA-9DBD-1D6F1976BE9C

6/5/2023

INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF PRECAUTIONS

FOR CONSTRUCTION AND RENOVATION

PLASTIC WINDOW

SWIVEL CASTERS

WITH TWO

LOCKING BRAKES

MOBILE CART

A D

J U

S T

A B

L E

H E

IG

H

T

HEPA NEGATIVE

AIR UNIT

EXISTING WALL

EXISTING CEILING

FLEX DUCT

3 5/8" INSULATED

WALL WITH 16

GAUGE METAL

STUDS @ 16" O.C.

WALL TO EXTEND

TO UNDERSIDE OF

DECK

5/8" FIRE

RESISTANT

GYPSUM BOARD -

BOTH SIDES

EXISTING CEILING

SYSTEM

BASE - TO MATCH

EXISTING AREA

EXISTING FLOOR

UNDERSIDE OF

EXISTING DECK

W A

L L

H E

IG

H

T V

A R

IE

S

F

IE

L D

V E

R

IF

Y

A

FIRE RESISTANT

SEALANT, BOTH

SIDES

1-HR RATED AND SMOKE

RATED

U.L. DESIGN NO. UL419

E X

IS

T

IN

G

N E

W

C O

N S

T R

U C

T

IO

N

EXISTING FLOOR

B

STARC

WALLA'

NON-RATED

3 5/8" INSULATED

WALL WITH 16

GAUGE METAL

STUDS @ 16" O.C.

WALL TO EXTEND

TO UNDERSIDE OF

DECK

5/8" GYPSUM

BOARD

EXISTING CEILING

SYSTEM

BASE - TO MATCH

EXISTING AREA

EXISTING FLOOR

UNDERSIDE OF

EXISTING DECK

W A

L L

H E

IG

H

T V

A R

IE

S

F

IE

L D

V E

R

IF

Y

E X

IS

T

IN

G

N

N S

T R

U C

T

IO

N

EXISTING

FLOOR

C

EXTENSION

POLE

PLASTIC

SHEET

N

N S

T R

U C

T

IO

N

E X

IS

T

IN

G

F

IE

L D

V E

R

IF

Y

HEPA

NEGATIVE AIR

UNIT

FINISHED FLOORING TO BE KEPT

CLEAN. FLOORS NOT BEING REPLACED

MUST BE PROTECTED. COVER WITH

ROSIN PAPER / FIRE RATED PLYWOOD.

FIRE RATED PLYWOOD,

TEMPORARY. SALVAGE

PROTECT AND STORE

EXISTING WINDOW TO

BE RE-INSTALLED

AFTER CONSTRUCTION

IS COMPLETE.

V .I .F

E X

IS

T

IN

G

W A

L L

V .I .F

E X

IS

T

IN

G

W A

L L

FLOOR SLAB ABOVE

CEILING

ISLM TEMPORARY BARRIER TAG

PROJECT:

PRIME CONTRACTOR:

SUB CONTRACTOR:

EMERGENCY CONTACT NO.:

BARRIER INSTALLATION DATE:

BARRIER EXPIRATION DATE:

F L E

X D

U C

T

FIRE EXTINGUISHER ON

PORTABLE FLOOR

BRACKET (ILSM MAY

REQUIRE MORE THAN

ONE).

PROVIDE STICKY

MATS (CHANGED END

OF SHIFT OR MORE IF

NECESSARY TO

MAINTAIN

CLEANLINESS).

HEPA NEGATIVE

AIR UNIT

SUPPLY DUCTS EITHER

KEEP RUNNING OR

COVER WHEN RUNNING

TO KEEP DUST OUT

COVER ALL RETURNS

AT THE

GRATE/DIFFUSERS

SUSPENDED PLASTIC

ZIPPER WALL

CURTAIN BARRIER

POST ICRA, ILSM, FIRE

INPECTION SHEETS

VISIBLE TO PUBLIC

FIRE PULL

STATION WITH

AUDIO / VISUAL

EXISTING WALL

BARRIER

NOTE:

A. TURN UP EXHAUST ON EXTERIOR ON SIDE.

CONTRACTOR SHALL VERIFY LOCATION OF AIR

INTAKES ARE AT THE PROPER DISTANCE FROM

EXHAUST. VERIFY LOCAL JURISDICATION CODE

AND VA REQUIREMENTS FOR DISTANCE PRIOR

TO STARTING WORK.

EXHAUST LOCATION

- SEE NOTE A

GI002

_____2

GI002

ILSM SIGNAGE

INTERIM LIFE SAFETY MEASURES IN EFFECT

FOR UPGRADE OXYGEN IN BUILDING 1,

FIRST FLOOR

THIS EXIT IS CLOSED AND LEADS TO A

CONSTRUCTION AREA.

PLEASE USE ALL ALTERNATE EXITS AS MARKED.

1' - 5"

1/2"1/2"

/2

/2

/2

/2

/2

/2

EQ.EQ.

NOTE:

REFER TO ARCHITECTURAL DRAWINGS FOR THE CORRESPONDING

BUILDING AND FLOOR WHERE ILSM SIGNAGE WILL BE LOCATED.

ICRA NOTES

DUST CONTROL PLAN NOTES

1. THE VAMC INFECTION CONTROL GROUP HAS CONFIRMED THE

DESIGNATION FOR THIS PROJECT IS LEVEL (?) FOR THE CLASS OF

PRECAUTIONS OR LEVEL OF INFECTION CONTROL ACTIVITIES. HARD

SURFACE BARRIERS SHALL BE USED EXCEPT IN THE AREA INDICATED ON

THE PHASING PLAN WITH PLASTIC BARRIERS (MINIMUM 4MIL) TO SEAL AREA

FROM NON-WORK AREA AS LONG AS THE SPRINKLER SYSTEM IS INTACT AND

ACTIVE.

1A. THIS PROJECT MAY NEED AN ENTRY VESTIBULE FOR CLOTHING

CHANGES (PROVIDE AND LOCATE A STAGING AREA FOR HAZMAT SUITS NEAR

THE PLASTIC BARRIER ENTRANCE SPACES - CONSTRUCTION ANTEROOM.

THEY SHALL BE USED WHEN GOING INTO CONSTRUCTION AREA AND

LEAVING THE CONSTRUCTION AREA) AND TOOL STORAGE AND TIGHT SEALS

SHALL BE MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL

PENETRATIONS. ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED

OUTSIDE OF THE CONSTRUCTION BARRIER. UPON COMPLETION OF THE

CONSTRUCTION PHASE, DUST BARRIERS SHALL BE REMOVED CAREFULLY

TO MINIMIZE SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE

TEMPORARY DUST PROTECTION IN PLACE BEFORE REMOVAL OF A

PERMANENT BARRIER.

AFTER EACH PHASE, PERFORM TASKS STATED IN NOTE 6A. (COORDINATE

DESIGNATION WITH COR.)

2. PROVIDE STICKY MATS AND BLANKET AT THE PLASTIC BARRIER

ENTRANCE SPACES (CONSTRUCTION ANTEROOM) AND CHANGE DAILY OR

MORE OFTEN AS NEEDED TO PREVENT THE SPREAD OF DUST AND DEBRIS

INTO ADJACENT CLEAN SPACE.

INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS

CONTROL

3. USE CORRIDORS AS PRIMARY CONSTRUCTION ACCESS.

3A. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES

SHALL BE DEFINED. EGRESS PATHS SHALL BE FREE OF DEBRIS;

DESIGNATED ELEVATORS SHALL BE USED DURING SCHEDULED TIMES; AND

ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER THE

CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN TRAFFIC

AWAY FROM THE CONSTRUCTION AREA AND MATERIALS.

4. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER CONSTRUCTION

MATERIAL IN AND OUT OF THE PROJECT - A CLEAN CART SHALL BE USED;

THE NOT-SO-CLEAN CART SHALL BE USED BETWEEN THE MAIN ENTRY AND

THE CONSTRUCTION STAGING/PREP AREA.

4A. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH

TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES. EFFORT

SHALL BE MADE TO MINIMIZE USE OF ELEVATORS WITH AN EMPHASIS ON

TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY. DEBRIS SHALL BE

REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC. IF CHUTES ARE

USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR

(HEPA) FILTERED NEGATIVE AIR MACHINES SHALL BE USED, AND THE CHUTE

OPENING SHALL BE SEALED WHEN NOT IN USE. FILTERS SHALL BE BAGGED

AND SEALED BEFORE BEING TRANSPORTED OUT OF THE CONSTRUCTION

AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE

AREAS WITHOUT PRIOR APPROVAL OF THE COR.

4B. EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO MINIMIZE

INFILTRATION FROM ANY ADJACENT EXCAVATION DEBRIS.

4C. ALL EQUIPMENT TO REMAIN SHALL BE COVERED AND PROTECTED

PRIOR STARTING EACH CONSTRUCTION PHASE.

VENTILATION AND ENVIRONMENTAL CONTROLS

5. AIR SYSTEM FLOW: CONTRACTOR SHALL ACKNOWLEDGE WITH THE

COR WHETHER THE CONSTRUCTION AREA USES FRESH/OUTSIDE OR RE-

CIRCULATED AIR; FILTERS SHALL BE ADDED OR RETURN VENTS COVERED AS

NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR MUST FLOW FROM CLEAN

TO DIRTY AREAS.

5A. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA

SHALL BE NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND WITH NO

DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE

AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO REMOVE DUST SHALL

PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER

CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE

(FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY

VAMC. IF EXHAUST SHALL BE TIED INTO A RE-CIRCULATED AIR SYSTEM, A

PRE-FILTER AND HEPA FILTER SHALL BE USED BEFORE EXHAUST TO

PREVENT CONTAMINATION OF THE DUCTS.

5B. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND

INTACT CEILING SHALL BE VERIFIED DAILY.

5C. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND

CONTRACTOR SHALL VERIFY AND MAINTAIN PROPER RATES IN CRITICAL

AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR IS NOT BEING RE-

CIRCULATED WITHOUT FILTRATION FROM THE CONSTRUCTION AREA

ELSEWHERE. PROVIDE AIR PRESSURE TESTING THROUGHOUT THE

PROJECT IN THE FREQUENCY AS IDENTIFIED BY THE COR.

CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND RELATED

AREAS

6. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL BE

FREE OF LOOSE SOIL AND DEBRIS BEFORE LEAVING THE CONSTRUCTION

AREA. IF PROTECTIVE APPAREL IS NOT WORN (E.G., COVERALLS, FOOTGEAR

AND HEADGEAR) A HEPA-FILTERED VACUUM SHALL BE USED TO REMOVE

DUST FROM CLOTHING BEFORE LEAVING THE BARRICADE. IF PROTECTIVE

APPAREL IS UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE OR

ANTEROOM FOR CHANGING CLOTHING AND STORING EQUIPMENT

(DESIGNATED AREA. ALL EQUIPMENT, TOOLS, TOOL CARTS, AND MATERIALS

TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE MADE FREE FROM

DUST AND MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR

REMOVAL FROM THE CONSTRUCTION ZONE OR WORK AREA.

6A. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL

HVAC ISOLATION UNTIL CONTRACTOR HAS CLEANED CONSTRUCTION SITE,

VA EMS STAFF HAS DONE A TERMINAL CLEANING, AND VA INFECTIOUS

DISEASE CONTROL HAS INSPECTED AND APPROVED THE CLEANING.

III/IVLOW Risk Group 1

Class III

Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that

It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation

II

I

III

MEDIUM Risk Group 2

HIGH Risk Group 3

HIGHEST Risk Group 4 IV

IV

IV

III/IV

III/IV

III

III/IV

I

III

Patient Risk Group Table

Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk

TYPE A

Construction Project Type

Major demolition and construction projects

Includes, but is not limited to:

- activities which require consecutive work shifts

- requires heavy demolition or removal of a complete ceiling system

- new construction

Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies

Includes, but is not limited to:

- sanding of walls for painting or wall covering

- removal of floor coverings, ceiling tiles and casework

- new wall construction

- minor duct work or electrical work above ceilings

- major cabling activities

- any activity which cannot be completed within a single work shift

Small scale, short duration activities which create minimal dust

Includes, but is not limited to:

- installation of telephone and computer cabling

- access to chase spaces

- cutting of walls or ceiling where dust migration can be controlled

Inspection and Non-Invasive Activities

Includes, but is not limited to:

- removal of ceiling tiles for visual inspection limited to 1 tile to 50 square feet

- painting (but not sanding), wall covering

- electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection

Type of Construction / Project Activity Table

Group 2 Medium Risk

Group 1 Low Risk

- Respiratory Therapy

- Outpatient Clinics

- CBOC's

- Mental Health Units

- VACANT AREA ADJACENT TO

OCCUPIED AREA

-Acute Nursing Units

- Office areas (non-clinical)

- Hallways

- FES/EMS areas

I

Patient Risk Group

TYPE D

TYPE C

TYPE B

TYPE A

Group 4 Highest Risk

Group 3 High Risk

- Pharmacy

- Radiology/ CT Scanner

- Urgent Care

- Laboratories

- CLCs

- SPD; AMCU;

- Respiratory Isolation Rooms

- Surgery

III

TYPE DTYPE CTYPE B

Class IVor control procedures are necessary.

C

LA

S S

IV

C

LA

S

S

II

During Construction Project

C L-

I C

LA

S

S

II

I

1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering

4. Vacuum work area with HEPA filtered vacuums.

5. Wet mop area with disinfectant after barriers are removed.

6. Remove or isolate HVAC system in areas where work was being performed.

1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering.

4. Vacuum work with HEPA-filtered vacuums.

5. Wet mop with disinfectant.

6. Remove isolation of HVAC system in areas where work is being performed.

1. Wipe surfaces to remove dust.

Upon Completion of Project

1. Wipe work surfaces with disinfectant.

2. Contain construction waste before transport in tightly covered containers.

3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.

4. Remove isolation of HVAC system in areas where work is being performed.

1. Includes all activities required by Class II

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

4. Complete all critical barriers before construction begins or implement control cube method.

5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units.

6. Contain construction waste before transport in tightly covered containers.

7. Cover transport receptacles or carts. Tape covers.

8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work areas.

9. Remove isolation of HVAC system in areas where work is being performed.

1. Execute work by methods to minimize raising dust from construction operations.

2. Immediately replace a ceiling tile displaced for visual inspection.

1. Includes all activities required by Class I

2. Provide active means to prevent airborne dust from dispersing into atmosphere.

3. Water mist work surfaces to control dust while cutting.

4. Seal unused doors with duct tape.

5. Block off and seal air vents.

6. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.

7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

1. Includes all activities required by Class III

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.

4. Complete all critical barriers or implement control cube method before construction begins.

5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.

6. Seal holes, pipes, conduits, and punctures appropriately.

7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.

8. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.

9. Place adhesive walk-off mats at entrance to work area within anteroom.

10. Replace per manufacturer's recommendations. Do not remove barriers from work area until completed project is inspected each by the Hospital Safety Officer, Facilities Management Maintenance and Engineering Department and thoroughly cleaned by the Hospital Environmental Services Department or their contracted Environmental Service Company Contain construction waste before transport in tightly covered containers.

11. Cover transport receptacles or carts. Tape covering

12. Vacuum work area with HEPA filtered vacuums.

13. Wet mop with disinfectant after barriers are removed.

14. Remove isolation of HVAC system in areas where work is being performed.

HAC

G-43

STAIR

CLOSET

G-46

CORRIDOR

CB-22

FIRE

DEPARTMENT

CONNECTION

CLOSET

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/5

/2

:5

:0

P M

C U s e rs

\l b a ja ri a s \D o c u m e n ts

\A

-0

-N a s h v ill e -U p g r

O x y g e n lb a ja ri a s S

Z L

D E

.r v t

GI002

ICRA MATRIX AND DETAILS

2 2LMB

UPGRADE OXYGEN

NASHVILLE VAMC

1310 24TH AVENUE S.

NASHVILLE, TN 37212 JUNE 5, 2023

BID DOCUMENTS

626-22-20122-066

LCW

Scale: 1/2" = 1'-0"

ICRA MOBILE CONTAINMENT CART

Scale: 3/4" = 1'-0"

ICRA BARRIER WALL TYPE

Scale: 1/2" = 1'-0"

CROSS SECTION "A" - WHEN WINDOWS ARE AVAILABLE

Scale: 1/2" = 1'-0"

TYPICAL CONSTRUCTION PLAN LAYOUT - WHEN WINDOWS ARE AVAILABLE

Scale: 3" = 1'-0"

ILSM CONSTRUCTION EGRESS SIGNAGE

Scale: 1/8" = 1'-0"

ICRA PLAN AT FIRE PROTECTION ROOM

DocuSign Envelope ID: 5C74FF1E-A880-44CA-9DBD-1D6F1976BE9C

6/5/2023

DCWR

DHW

PIPING SYSTEM

NG NATURAL GAS

ST STORM

PD PUMP DISCHARGE

OFD OVERFLOW STORM DRAIN

GW GREASE WASTE

OW OIL WASTE

SAN SANITARY WASTE

CD CONDENSATE DRAIN

CA COMPRESSED AIR

AW ACID WASTE

N2 NITROGEN

N2O NITROUS OXIDE

MA MEDICAL AIR

O2 OXYGEN

WAGD WASTE ANESTHETIC GAS DISPOSAL

VAC VACUUM

V SANITARY VENT

OV OIL VENT

AV ACID VENT

NPCW NONPOTABLE COLD WATER

DI DE-IONIZED WATER

SCW SOFTENED COLD WATER

DCW DOMESTIC COLD WATER

RO REVERSE OSMOSIS WATER

DOMESTIC CW RECIRCULATION

DOMESTIC HOT WATER

CO2 CARBON DIOXIDE

DHW 140 DOMESTIC HOT WATER (OTHER TEMP)

PG PROPANE GAS

DHWR DOMESTIC HW RECIRCULATION

NG

ST

PD

OFD

GW

OW

SAN

CD

CA

AW

N2

N2O

MA

O2

WAGD

VAC

CO2

PG

V

OV

AV

HW 140

SCW

NPCW

DI

RO

EXISTING

NEW WORK KEYNOTE

DEMOLITION KEYNOTE

NEW BOLD TEXT INDICATES NEW ITEM

ITALICIZED TEXT INDICATES EXISTING ITEM

NEW PLUMBING EQUIPMENT MARK

DETAIL OR SECTION MARK

SHOWN ON DRAWING

DETAIL MODULE NUMBER

CONNECT TO EXISTING

LIMIT OF DEMOLITION

P-###

EXISTING PLUMBING EQUIPMENT MARKP-###

3-WAY CONTROL VALVE

ANGLE GATE VALVE

ANGLE GLOBE VALVE

BALL VALVE

BUTTERFLY VALVE

CHECK VALVE

CONTROL VALVE

GATE VALVE

GLOBE VALVE

SAFETY RELIEF VALVE

TWO POSITION CONTROL VALVE

BACKFLOW PREVENTER

ECCENTRIC REDUCER

CONCENTRIC REDUCER

FLOW ARROW

HOSE BIBB / SILLCOCK

PLUG VALVE

PRESSURE REDUCING VALVE (WATER)

PRESSURE REGULATOR (GAS)

PIPE ANCHOR

PIPE GUIDES

WALL CLEANOUT

SUSPENDED CLEANOUT

WCO

WYE STRAINER

WYE STRAINER W/DRAIN VALVE

FLOOR DRAIN - ROUND OR SQUARE

FLOOR CLEANOUT

PIPE CAP

PIPE TURNING DOWN

PIPE TURNING UP

TEE UP

TEE DOWN

DROP AND RUN

DROP AND TURN

TEE OFF TOP

TEE OFF BOTTOM

CROSS AND RISER

PLAN 90° ELBOW

PIPE TEE

PIPE UNION

FLEXIBLE PIPE CONNECTOR

WATER METER

PUMP

AUTOMATIC AIR VENT

PRESSURE SWITCH

PRESSURE GAUGE

THERMOMETER

FLOW SWITCH

TEMPERATURE SWITCH

OR

CO

PIPE SLOPE ARROW

AV

F

P

T

M

CIRCUIT SETTER

F FAHRENHEIT

FA FROM ABOVE

FB FROM BELOW

FBO FURNISHED BY OTHERS

FCO FLOOR CLEANOUT

FCW FILTERED COLD WATER

FD FLOOR DRAIN

FDC FIRE DEPARTMENT (HOSE)

CONNECTION

FM FLOW METER

FOP FUEL OIL PUMP

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FOV FUEL OIL VENT

FS FLOOR SINK

FU FIXTURE UNITS

G GALLON

GC GENERAL CONTRACTOR

GCO GRADE CLEANOUTS

GD GARBAGE DISPOSAL

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GRS GAS REGULATOR STATION

GT GREASE TRAP

GVTR GAS VENT THROUGH ROOF

GWH GAS FIRED WATER HEATER

H&CW HOT AND COLD WATER

HB HOSE BIBB (INTERIOR)

HD HUB DRAIN

HEX HEAT EXCHANGER

HP HORSEPOWER

HS HAND SINK

HST HOT WATER STORAGE TANK

(DOMESTIC)

HWB HOT WATER BOILER

HWCP HOT WATER CIRCULATING PUMP

HWP HOT WATER PUMP

HYD HYDRANT

ICW INDUSTRIAL COLD WATER

INV INVERT

IPC INTERNATIONAL PLUMBING CODE

IRW IRRIGATION WATER

IW INDIRECT WASTE

IWH INSTANTANEOUS WATER HEATER

IWR INDUSTRIAL WATER RETURN

IWS INDUSTRIAL WATER SUPPLY

KW KILOWATT

KWHR KILOWATT-HOUR

L/S LITER PER SECOND

LA LABORATORY AIR

LAV LAVATORY

LBS/HR POUNDS PER HOUR

LCW LABORATORY COLD WATER

LHW LABORATORY HOT WATER

LNG LIQUID NATURAL GAS

LOX LIQUID OXYGEN

LV LABORATORY VACUUM

LW LOW WATER

M METER

MA MEDICAL AIR

MAV MANUAL AIR VENT

MBH THOUSANDS OF BTU PER HOUR

MC MECHANICAL CONTRACTOR

MED MEDICAL

MER MECHANICAL EQUIPMENT ROOM

MH MANHOLE

MOU MEMORANDUM OF UNDERSTANDING

MSB MOP SINK BASIN

MV MEDICAL VACUUM

N2 NITROGEN

N2O NITROUS OXIDE

NC NORMALLY CLOSED

NG NATURAL GAS

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NOM NOMINAL

NPW NON POTABLE WATER

NTS NOT TO SCALE

O2 OXYGEN

OC ON CENTER

OD OUTSIDE DIAMETER

OFD OVERFLOW DRAIN

OR OPERATING ROOM

OVFL OVERFLOW

PA PASCAL

PC PLUMBING CONTRACTOR

PD PRESSURE DROP

PDI PLUMBING AND DRAINAGE INSTITUTE

PG PRESSURE GAUGE

PP PLUMBING PUMP

PPM PARTS PER MILLION

PRS PRESSURE REDUCING STATION

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH -

ABSOLUTE

PSIG POUNDS PER SQUARE INCH - GAUGE

PTRV PRESSURE TEMPERATURE RELIEF

VALVE

PW POTABLE WATER

RD ROOF DRAIN

RDL ROOF DRAIN LEADER

RL ROOF LEADER

RO REVERSE OSMOSIS

RWL RAIN WATER LEADER

SAN SANITARY SEWER

SCFM STANDARD CUBIC FOOT/MIN

SCW SOFTENED COLD WATER

SDMH STORM DRAIN MANHOLE

SP SUMP PUMP

SPR SPRINKLER LINE

SQFT SQUARE FOOT

SS STAINLESS STEEL

ST STORAGE TANK

SW STORM WATER

TCV TEMPERATURE CONTROL VALVE

TD TRENCH DRAIN

TDH TOTAL DYNAMIC HEAD

TDL TEMPERATURE DIFFERENTIAL

TEMP TEMPERATURE

TMV THERMOSTATIC MIXING VALVE

TP TRAP PRIMER

TSTAT THERMOSTAT

TWR TEMPERED WATER RETURN

TWS TEMPERED WATER SUPPLY

TYP TYPICAL

UPC UNIFORM PLUMBING CODE

V SANITARY VENT

VAC VACUUM

VB VACUUM BREAKER

VCO VACUUM CLEANER OUTLET

VP VACUUM PUMP

VS VENT STACK

VTR VENT THROUGH ROOF

W WASTE

WC WATER CLOSET

WCO WALL CLEANOUT

WG WATER GAUGE

WH WATER HEATER

WHA WATER HAMMER ARRESTOR

WHD WALL HYDRANT

WL WATER LINE

WM WATER METER

WPD WATER PRESSURE DROP

WS WASTE STACK

YCO YARD CLEANOUT

YH YARD HYDRANT

A/E ARCHITECT/ENGINEER

AC ABOVE CEILING

AD AREA DRAIN

AFF ABOVE FINISHED FLOOR

AG AIR GAP

AP ACCESS PANEL

AS AUTOMATIC SPRINKLER

AFG ABOVE FINISHED GRADE

ASD ADJUSTABLE SPEED DRIVE

ASHRAE AMERICAN SOCIETY HEATING,

REFRIGERATING, AIR CONDITIONING

ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

ASPE AMERICAN SOCIETY PLUMBING

ENGINEERS

ASR AUTOMATIC SPRINKLER RISER

AV ACID VENT

AW ACID WASTE

BAS BUILDING AUTOMATION SYSTEM

BF BELOW FLOOR

BFP BACKFLOW PREVENTER

BG BELOW GRADE

BH BOOSTER HEATER

BHP BREAK HORSEPOWER

BJ BETWEEN JOISTS

BOP BOTTOM OF PIPE

BSP BLACK STEEL PIPE

BT BATHTUB

BTUH BRITISH THERMAL UNITS PER HOUR

C CELSIUS

CF COMBINATION FIXTURE

CGA COMPRESSED GAS ASSOCIATION

CI CAST IRON

CO CLEANOUT

COND CONDENSATE

CP CONDENSATE PUMP

CS CLINICAL SINK

CV CONTROL VALVE

DA DENTAL COMPRESSED AIR

DCW DOMESTIC COLD WATER

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DHWS DOMESTIC HOT WATER SUPPLY

DF DRINKING FOUNTAIN

DI DEIONIZED WATER

DN DOWN

DOE DEPARTMENT OF ENERGY

DS DOWNSPOUT

DV DENTAL VACUUM

DW DISHWASHER

DWG DRAWING

DWH DOMESTIC WATER HEATER

DWR DRINKING WATER RETURN

DWS DRINKING WATER SUPPLY

DWV DRAIN WASTE VENT

EC ELECTRICAL CONTRACTOR

EL ELEVATION

EMCS ENERGY MONOSERRAT AND CENTRAL

SYSTEM

EPA ENVIRONMENTAL PROTECTION

AGENCY

EPACT ENERGY POLICY ACT

ESC ESCUTCHEON

ESH EMERGENCY SHOWER

ET EXPANSION TANK

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EWS EYEWASH STATION

EX EXISTING

PLUMBING SYMBOLS PLUMBING SYMBOLS

ANNOTATION SYMBOLS

PLUMBING SYMBOLS & ABBREVIATIONS

ANNOTATION ABBREVIATIONS 1. VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR REGARDING CONFLICTS BEFORE PROCEEDING WITH

WORK.

2. REMOVED ITEMS REMAIN PROPERTY OF GOVERNMENT UNTIL COR DETERMINES THAT THEY ARE NOT REQUIRED. REMOVE FROM SITE ITEMS NOT BEING RETAINED BY GOVERNMENT OR REINSTALLED AS PART OF THIS WORK.

3. DO NOT DISTURB ITEMS NOT INDICATED FOR DEMOLITION.

4. VERIFY SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. RELOCATE, REMOVE AND ADJUST

MECHANICAL AND ELECTRICAL ITEMS AS NECESSARY TO COORDINATE WITH NEW WORK.

5. AFTER DEMOLITION IS COMPLETE, PATCH AND REPAIR FINISHES TO MATCH EXISTING ADJACENT CONDITIONS.

6. COORDINATE DEMOLITION WITH COR. SUBMIT SHUTDOWN PLAN AND SCHEDULE TO COR FOR REVIEW AND APPROVAL.

7. PROTECT EXISTING UTILITIES TO REMAIN FROM DAMAGE DURING DEMOLITION. REPAIR UTILITIES AND SERVICES DAMAGED AT

NO ADDITIONAL COST.

8. TEMPORARILY MOVE OR TAKE EQUIPMENT OUT OF SERVICE AS NECESSARY TO COMPLETE WORK.

9. SAWCUT CONCRETE FLOOR AS REQUIRED FOR DEMOLITION WORK INDICATED. COORDINATE WITH NEW PLUMBING WORK

AND WORK OF OTHER TRADES.

PLUMBING DEMOLITION GENERAL NOTES

1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.

2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.

3. OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.

4. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE

PURPOSES INTENDED.

5. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS ARE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT

EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.

6. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT

MAINTENANCE, REPAIRS, AND REPLACEMENT.

7. SUPPORT PIPING SYSTEM AS REQUIRED BY APPLICABLE LOCAL, STATE, AND NATIONAL CODES ALONG WITH

SPECIFICATIONS, VA STANDARDS AND MANUFACTURER'S RECOMMENDATIONS.

8. FIRESTOP AND SEAL PIPING PENETRATIONS THROUGH WALLS AND FLOORS EQUAL TO THE RATING OF WALLS AND FLOORS.

9. TEST PLUMBING SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND NATIONAL CODES AND APPLICABLE VA

STANDARDS.

10. COORDINATE PLUMBING PIPING WITH WORK OF OTHER DISCIPLINES.

11. DISINFECT DOMESTIC WATER SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND

APPLICABLE VA STANDARDS.

12. PROVIDE SHUT OFF VALVES AT BRANCH PIPING TO FIXTURES.

13. COORDINATE PLUMBING WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION. COORDINATE ROUTING OF PIPING WITH

EXISTING CONDITIONS.

14. PROVIDE ALL NECESSARY OFFSETS, TEES, ELBOWS, ETC. FOR A COMPLETE AND COORDINATED WORKING PLUMBING SYSTEM. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING

SYSTEMS.

15. CONTRACTOR SHALL COORDINATE ANY PLUMBING SYSTEM REQUIRED SHUTDOWN WITH THE COR 2 WEEK IN ADVANCE AND

CONFIRM 48 HOURS PRIOR.

16. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH PLUMBING WORK OF THIS CONTRACT, UNLESS NOTED OTHERWISE.

17. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.

18. DO NOT INSTALL PIPES ABOVE TELECOM OR ELECTRICAL EQUIPMENT.

PLUMBING GENERAL NOTES

42" OR AS SHOWN

ON ARCHITECTURAL

ELEVATION

FLOOR

ALARM PANEL

COORDINATE LOCATION

WITH PLUMBING AND

ARCHITECTURAL PLANS

AND ELEVATIONS

RECESSED ZONE VALVE

BOX AS SPECIFIED WITH

PLASTIC PULL OUT

FRONT

BALL VALVE (TYP)

PRESSURE GAUGES

CENTER OF

VALVE BOX

MEDICAL GAS

SERVICE TO ROOMS

MEDICAL GASES FROM

MAINS

SENSING LINES TO

ALARM PANEL

THIS PORTION

ASSEMBLED BY ZONE

VALVE BOX

MANUFACTURER.

1/8" NPT PORT SEAL WITH

BRASS HEX HEAD PLUG USING

TEFLON TAPE (2 PL.)

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:4

:2

A

M C

U s e rs

\p p h if e r\ D o c u m e n ts \R e v it L o c a l\ R e v it

\P

-0

-N a s h v ill e -U p g r

O x y g e n p p h if e rP

C

.r v t

P-001

PLUMBING GENERAL INFORMATION

1 20PRP

UPGRADE OXYGEN

NASHVILLE VAMC

1310 24TH AVENUE S.

NASHVILLE, TN 37212 JUNE 5, 2023

BID DOCUMENTS

626-22-20122-066

SPG

Scale: No Scale

TYPICAL MEDGAS ZONE VALVE AND ALARM DETAIL

Scale: No Scale

DUAL PORT SHUT-OFF VALVES WITH LOCKING HANDLE DETAIL

DocuSign Envelope ID: DEBE7A3C-3F5F-44DB-AFC8-31818109AE19

6/2/2023

16 17 18 19 20 21

STAIR

NO. 8

STAIR

NO. 6

P&H STORAGE

(11'x24')

HAZZARD WASTE

(8'x12')

WAITING SPACE

CB-14A

TOILET

E-18B

HONEYWELL RM

D-72

TOILET

ELECTRICAL CLOSET

PEST

CONTROL

WORK RM

E-18A

SWITCH GEAR

E-11

CORRIDOR

CB-15

BOILER RM

E-25F

RECEIVING AND SHIPPING DOCK

CORRIDOR

CB-18

STORAGE

E-23

RECEIVING & ISSUE

AREA EQUIP STORAGE

FORMS STORAGE

E-22

CORRIDOR

CB-17

STORAGE

E-09A

STAFF

TOILET

E-08

STORAGE

D-68C

E-10

E-10A

MAIL RM

E-14

ELEVATOR EQUIP

E-13

CORRIDOR

CB-16

CORRIDOR

CB-16B

CORRIDOR

CB-16C

CORRIDOR

CB-16A

MECH

E-5

BIOMED ENG

REPAIRING &

DEVELOPMENT

E-01

ELECTRICAL SHOP STORAGE

D-68A

ELECTRONICS

D-68B

KEY SHOP

D-69

MULTI PURPOSE

E-09E

E-11A

VESTIBULE

E-09

TOILET

E-12

ELEVATOR

P-9

EQUIP RM

E-19

OFFICE

E-22A

MED GAS

E-21

MED GAS

E-20

PEST

CONTROL

OFFICE

E-18ELECTRICAL

E-17

OFFICE

E-14A

SIGNAL

E-15

SIGNAL

E-16

SVC RM

E-26

GROUNDS EQUIP

E-25

CLOSET

E-25A

BOILER OPERATOR

E-25E

A/C

OPERATIONS

SHOP

E-25B

FIRE EXT

FLAM

STORAGE

E-24

E-25C

GROUNDS & TRANS

E-25D

VESTIBULE

CB-19A

EMERGENCY

GENERATOR RM

E-25G

EMERGENCY

GENERATOR RM

E-25H

MULTI PURPOSE

D-73A

ELECTRICAL ENG

D-70 OFFICE

D-71

STAFF

D-65B

STAFF

D-65A

CHEST RM

D-62

TOILET

D-63

TOILET

D-64

CONTROL RM

D-61

AUTOMATED

RADIOGRAPHIC

D-60

PROCEDURE

ROOM

D-59

ELECTRIC SHOP

D-68

SWITCHBOARD RM

D-67

D-66

OFFICE

E-09B

OFFICE

E-09C

OFFICE

E-09D OFFICE

E-09F

OFFICE

E-09G

OFFICE

E-09H

BUSINESS RM

E-09I

OFFICE

E-09J

A/C SHOP

E-27

MAINT

FOREMAN

E-07

OFFICE

E-08

OFFICE

E-08A

A/C

FOREMAN

E-06

PAINT SHOP

E-05

CARPENTER SHOP

E-04

MACH

SHOP

E-03

ELECTRICAL CLOSET

BE

E-26A

PLUMBING SHOP

E-02

OFFICE

E-01C

BIOMEDICAL

ENGG

STORAGE

E-01B

RECEIVING

& CLEANING

E-01A

BLDG

MGT

LOCKERS

B-03

ELEVATOR

P-3

ELEVATOR

P-4

ELEVATOR

P-5

BLDG

MGT

TOILET

B-03A

VESTIBULE

ENGG TOILET

B-04A

ENGG

LOCKERS

B-04

HAC

B-05

OFFICE

D-73

OFFICE

D-74

STORAGE

D-74A

OFFICE

D-73D

OFFICE

D-73C

CLERICAL OFFICE

D-73B

STAFF

D-65C

STAFF

D-65D

STAFF

D-65E

RESIDENT/ INTERN

D-65F

CONFERENCE/ CLASS RM

D-65G

SVC CHIEF

RECEPTION & SEC

D-65H

ELEVATOR

S-2

ELEVATOR

S-1

ELEVATOR LOBBY

CB-10A

ELEVATOR LOBBY

CB-16D

30KVA

112.5 KVA

OFFICE

S S

S

SS SSSSSSSSSS

S SS S S S

SS SSSSS

SS S

S S

S S

S S

SS

S S

S S

SS

S

S

S S

SS S

S S

S S

S

S

S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

SS SSSSSSSSSSSSSS

S

SS SSSS

S

SS S

S S

S S

S S

S S

S S

S S

S S

S

S

S

S S

S

S

S

S S

S S

S S

S S

S S

S SS S S S S S S

S S

S S

S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S

S S

S S

S SS S S S S S S S S S

SS

S S

S

S S

S

S S

S SS

SS S

SS SSSS

S

SS SSSSSSSSSSSSSSSSSSSSSS

S

S

SS S

S S

S

S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S SS S S S

S S

S S

S S

S S

S S

S S

S S

S

S S

S S

S

S SS S S

S SS S

S SS S S

S SS S

S S

S S

S S S

S

S S

S S

A

B

C

D

E

F

G

H

J

14 15 16 17 18 19 20 21 22 23 24

25 26 27 28

21.5

PIPE IS BELOW GRADE FROM SUB-BASEMENT TO OXYGEN TANKS.

NORMALLY CLOSED

CONTINUED ON PG010D

PS

O

3" O 2" O

O

O

2" O

O

2" O

O

2" O 3

Engineers Architects

# KEY NOTES:

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/2

/2

:4

:2

A

M C

U s e rs

\p p h if e r\ D o c u m e n ts \R e v it L o c a l\ R e v it

\P

-0

-N a s h v ill e -U p g r

O x y g e n p p h if e rP

C

.r v t

PG010B

SUB-BASEMENT MEDICAL GAS PLAN

AREA B

2 20PRP

UPGRADE OXYGEN

NASHVILLE VAMC

1310 24TH AVENUE S.

NASHVILLE, TN 37212 JUNE 5, 2023

BID DOCUMENTS

626-22-20122-066

SPG

N O

R T

H0 84 16

Scale: 3/32" = 1'-0"

SUB-BASEMENT MEDICAL GAS PLAN AREA B

A. SLEEVE ALL PENETRATIONS. FIRESTOP AND SEAL

WATER TIGHT.

B. CONTRACTOR TO COORDINATE ZONE VALVE

INSTALLATION WITH VA FOR ANY SHUT DOWN.

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

A B

C D

ACRE

1 REPLACE EXISITNG 2" PIPE WITH 3" PIPE IN

SUB-BASEMENT AT LOCATION INDICATED.

1 INSTALL NEW 3" PIPE ADJACENT TO EXISTING

PRIOR TO DEMO OF EXISTING.

2 EXISTING 2" PIPE TO REMAIN.

3 PIPE RISES FROM THE SUB BASEMENT UP TO THE

BASEMENT FLOOR HERE.

C. PIPES SHOWN ARE IN SUB-BASEMENT.

FLOORPLAN FOR BASEMENT IS SHOWN FOR

REFERENCE.

K

L

M

N

I

H

STAIR

NO. 1

STAIR

NO. 10

STAIR

NO. 8

STAIR

NO. 7

AREAWAY

STAIR

NO 9

STRETCHER ALCOVE

CB-24A

TOILET

CHASE

C-04A

TELE CLOSET

C-07E

BC

ELECTRICAL

CLOSET

C-07D

ELECTRICAL CLOSET

C-07C

CLOSET

MALE

TOILET

C-08D

FEMALE TOILET

C-08B

FEMALE STAFF TOILET

G-51

FEMALE STAFF TOILET

G-55

CLOSET

G-46

ELECTRICAL CLOSET

A-22A

ELECTRICAL CLOSET

BB

CORRIDOR

CB-23

SCRUB

UP

ALCOVE

CB-3C

CLEAN CORE

CB-3

CLEAN CORE

CB-3

MECH

RM

AHU-26

FAN RM 11

HEART

POS RM

C-07I

CLEAN

ALCOVE

C-07

MED

PREP

C-07A

POS RM

C-07J

POS RM

C-07K

NEG RM

C-07L

OFFICE

C-07M

STORAGE ALCOVE

SPD

C-07N

NEG RM

C-07O

BARIATRIC NEG RM

C-07P

STORAGE ALCOVE

SHOWER / TOILET

C-07Q

NEG RM

C-07R

POS RM

C-07S

POS RM

C-07T

POS RM

C-07U

BARIATRIC POS RM

C-07V

EMERGENCY GENERATOR

B-G124B

FAN RM 5

B-G124

ELECTRICAL

B-G124A

CORRIDOR

CB-9

CORRIDOR

CB-16E

CORRIDOR

CB-16A

CORRIDOR

CB-19

CORRIDOR

CB-22

SICU

G-56

CORRIDOR

CB-9A

CORRIDOR

CB-1

ELEVATOR LOBBY

CB-1A

CORRIDOR

CB-24

CORRIDOR

CB-21

EQUIP STORAGE & TESTING

B-01

DISPATCH AREA

B-01A

DECONTAMINATION RM

B-02

PREPARATION,

ASSEMBLY &

STERILIZATION

B-02B

STERIS RM

B-01B

OFFICE

B-02A

OFFICE

B-01D

EQUIP

B-01C

MANUAL WASH

B-01E

VESTIBULE

CB-19A

SCRUB

CB-3B

TOILET

C-02

SIGNAL CLOSET

C-01

WAITING

C-03

HEART

POS RM

C-07H

RECEIVING

& CLEANING

E-01A

ELECTRICAL RM

B-01F

BLDG

MGT

LOCKERS

B-03

ELEVATOR

P-3

ELEVATOR

P-4

ELEVATOR

P-5

BLDG

MGT

TOILET

B-03A

CONSULT/

MEDITATION

C-03A

SOILED

C-07G

SOILED UTILITY

G-56A

RECOVERY STORAGE

G-56B

OFF LINE

MONITORING

G-47

ALCOVE

G-49

TELE

G-49C

ELECRICAL CLOSET SIGNAL

G-49B

CLEAN LINEN

G-56D

SIGNAL

G-49A

RECOVERY CLEAN UTILITY

G-56E

RECOVERY NURSE STATION

RECOVERY ISOLATION BEDROOM

G-54

G-53

ANTE RM

G-56C

RECOVERY ISOLATION BEDROOM

G-52

PACU

G-50

BATH

G-48A

ON CALL

G-48

HAC

G-43

OFFICE

C-09

FEMALE LOCKER

C-08A

MALE LOCKER

C-08C

STAFF

MULTIPURPOSE

C-08

OFFICE

C-07W

HAC

C-06

CLOSET

C-07B

HEART

POS RM

C-07F

CLEAN EQUIP /

SUPPLY

C-05

ELECTRICAL CLOSET

C-04

GAS STORAGE NURSE MGR

OFFICE

B-01Q

MALE

LOCKERS

B-01O

MALE

TOILET

B-01P

FEMALE TOILET

B-01N

FEMALE

LOCKERS

B-01M

HAC

B-01L

SPD

CHIEF &

ASSIST

B-01K

LOGISTICS

SUPV

B-01J

SPD ADMIN

B-01I

LOGISTICS

ITEM MGRS

B-01H

BREAKOUT AREA

B-01G

LOGISTICS

ITEM MGRS

B-06

ENGG TOILET

B-04A

ENGG

LOCKERS

B-04

HAC

B-05

ELEVATOR

S-2

RCPT

& FILES

A-25

FEMALE TOILET

A-25A

MALE TOILET

A-25B

OFFICE HOUSE STAFF

A-25C

STAFF

LOUNGE

A-25D

EXIST

FIRE

ALARM

PANELS

A-23

STAFF

NON-PHYSICIAN

OFFICE

A-25E

STAFF

PHYSICIAN

OFFICE

A-25F

STUDY

CUBICLES

A-25G

VEST

B-01R

ANEST

WORK RM

B-07

ANEST

EQUIP STOR

SCRUB-UP ALCOVE

G-33

EXT RAD

CONTROL

G-32

NEUROSURGERY O R 9

G-36

SUB STERILE

G-37

PUMP

TECHS

PREP RM

G-36A

CARDIAC OR 8

G-38

CORRIDOR

CB-2C

CORRIDOR

CB-2B

FEMALE SHOWER

G-23B

DICTATING

G-23A

MALE LOCKERS

G-24B

MALE

TOILET &

SHOWER

G-24A

CLEAN

CORE

SUPPORT

G-34

ETO RM

B-02C

VESTIBULE

HAC

B-02F

TOILET

B-02D

TOILET

B-02E

ELEVATOR

P-6

ELEVATOR

P-7

FEMALE TOILET

G-23C

FEMALE

LOCKERS

G-23D

VESTIBULE

STAFF LOUNGE

G-23

PHYSICIAN LOUNGE

G-24

ORTHOPEDIC OR 7

G-39

OFFICE

G-28

SCRUB

UP

ALCOVE

G-29

SCRUB-UP ALCOVE

G-30

OFFICE

G-31

EQUIP

G-28A

SUB

STERILE

G-42

PLASTER

& SPLINTS

G-41

EQUIP

STORAGE

G-40

OPERATING

RM GENERAL

G-27

SUB STERILE

G-26A

OPERATING

RM GENERAL

G-26

GENERAL

OPERATING RM

G-25

SUB

STERILE

G-21A

OPERATING

RM GENERAL

G-21

REC & OR

HEAD NURSES

G-01

ELECTRICAL CLOSET

G-22

PHONE/SGNL RM

G-20A

G-20B

G-20C

CLERICAL

G-02

OFFICE

G-02E

OFFICE

G-02D

OFFICE

G-02C

ELEVATOR LOBBY

CB-10A

ELEVATOR LOBBY

CB-16D

HAZ.

HAZ.

45 & 30 KVA

45 KVA

45 & 30 KVA

45 KVA

45 KVA

KVA

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

STRETCHER ALCOVE

WC

ALCOVE

STERILE STORAGE

G-44G-35

ELECTRICAL CLOSET

G-22

K

16 17 18 19 20 21

L

M

N

I

H

STAIR

NO. 1

STAIR

NO. 10

STAIR

NO. 8

STAIR

NO. 7

AREAWAY

STAIR

NO 9

STRETCHER ALCOVE

CB-24A

TOILET

CHASE

C-04A

TELE CLOSET

C-07E

BC

ELECTRICAL

CLOSET

C-07D

ELECTRICAL CLOSET

C-07C

CLOSET

MALE

TOILET

C-08D

FEMALE TOILET

C-08B

FEMALE STAFF TOILET

G-51

FEMALE STAFF TOILET

G-55

CLOSET

G-46

ELECTRICAL CLOSET

A-22A

ELECTRICAL CLOSET

BB

CORRIDOR

CB-23

SCRUB

UP

ALCOVE

CB-3C

CLEAN CORE

CB-3

CLEAN CORE

CB-3

MECH

RM

AHU-26

FAN RM 11

HEART

POS RM

C-07I

CLEAN

ALCOVE

C-07

MED

PREP

C-07A

POS RM

C-07J

POS RM

C-07K

NEG RM

C-07L

OFFICE

C-07M

STORAGE ALCOVE

SPD

C-07N

NEG RM

C-07O

BARIATRIC NEG RM

C-07P

STORAGE ALCOVE

SHOWER / TOILET

C-07Q

NEG RM

C-07R

POS RM

C-07S

POS RM

C-07T

POS RM

C-07U

BARIATRIC POS RM

C-07V

EMERGENCY GENERATOR

B-G124B

FAN RM 5

B-G124

ELECTRICAL

B-G124A

CORRIDOR

CB-9

CORRIDOR

CB-16E

CORRIDOR

CB-16A

CORRIDOR

CB-19

CORRIDOR

CB-22

SICU

G-56

CORRIDOR

CB-9A

CORRIDOR

CB-1

ELEVATOR LOBBY

CB-1A

CORRIDOR

CB-24

CORRIDOR

CB-21

EQUIP STORAGE & TESTING

B-01

DISPATCH AREA

B-01A

DECONTAMINATION RM

B-02

PREPARATION,

ASSEMBLY &

STERILIZATION

B-02B

STERIS RM

B-01B

OFFICE

B-02A

OFFICE

B-01D

EQUIP

B-01C

MANUAL WASH

B-01E

VESTIBULE

CB-19A

SCRUB

CB-3B

TOILET

C-02

SIGNAL CLOSET

C-01

WAITING

C-03

HEART

POS RM

C-07H

RECEIVING

& CLEANING

E-01A

ELECTRICAL RM

B-01F

BLDG

MGT

LOCKERS

B-03

ELEVATOR

P-3

ELEVATOR

P-4

ELEVATOR

P-5

BLDG

MGT

TOILET

B-03A

CONSULT/

MEDITATION

C-03A

SOILED

C-07G

SOILED UTILITY

G-56A

RECOVERY STORAGE

G-56B

OFF LINE

MONITORING

G-47

ALCOVE

G-49

TELE

G-49C

ELECRICAL CLOSET SIGNAL

G-49B

CLEAN LINEN

G-56D

SIGNAL

G-49A

RECOVERY CLEAN UTILITY

G-56E

RECOVERY NURSE STATION

RECOVERY ISOLATION BEDROOM

G-54

G-53

ANTE RM

G-56C

RECOVERY ISOLATION BEDROOM

G-52

PACU

G-50

BATH

G-48A

ON CALL

G-48

HAC

G-43

OFFICE

C-09

FEMALE LOCKER

C-08A

MALE LOCKER

C-08C

STAFF

MULTIPURPOSE

C-08

OFFICE

C-07W

HAC

C-06

CLOSET

C-07B

HEART

POS RM

C-07F

CLEAN EQUIP /

SUPPLY

C-05

ELECTRICAL CLOSET

C-04

GAS STORAGE NURSE MGR

OFFICE

B-01Q

MALE

LOCKERS

B-01O

MALE

TOILET

B-01P

FEMALE TOILET

B-01N

FEMALE

LOCKERS

B-01M

HAC

B-01L

SPD

CHIEF &

ASSIST

B-01K

LOGISTICS

SUPV

B-01J

SPD ADMIN

B-01I

LOGISTICS

ITEM MGRS

B-01H

BREAKOUT AREA

B-01G

LOGISTICS

ITEM MGRS

B-06

ENGG TOILET

B-04A

ENGG

LOCKERS

B-04

HAC

B-05

ELEVATOR

S-2

RCPT

& FILES

A-25

FEMALE TOILET

A-25A

MALE TOILET

A-25B

OFFICE HOUSE STAFF

A-25C

STAFF

LOUNGE

A-25D

EXIST

FIRE

ALARM

PANELS

A-23

STAFF

NON-PHYSICIAN

OFFICE

A-25E

STAFF

PHYSICIAN

OFFICE

A-25F

STUDY

CUBICLES

A-25G

VEST

B-01R

ANEST

WORK RM

B-07

ANEST

EQUIP STOR

SCRUB-UP ALCOVE

G-33

EXT RAD

CONTROL

G-32

NEUROSURGERY O R 9

G-36

SUB STERILE

G-37

PUMP

TECHS

PREP RM

G-36A

CARDIAC OR 8

G-38

CORRIDOR

CB-2C

CORRIDOR

CB-2B

FEMALE SHOWER

G-23B

DICTATING

G-23A

MALE LOCKERS

G-24B

MALE

TOILET &

SHOWER

G-24A

CLEAN

CORE

SUPPORT

G-34

ETO RM

B-02C

VESTIBULE

HAC

B-02F

TOILET

B-02D

TOILET

B-02E

ELEVATOR

P-6

ELEVATOR

P-7

FEMALE TOILET

G-23C

FEMALE

LOCKERS

G-23D

VESTIBULE

STAFF LOUNGE

G-23

PHYSICIAN LOUNGE

G-24

ORTHOPEDIC OR 7

G-39

OFFICE

G-28

SCRUB

UP

ALCOVE

G-29

SCRUB-UP ALCOVE

G-30

OFFICE

G-31

EQUIP

G-28A

SUB

STERILE

G-42

PLASTER

& SPLINTS

G-41

EQUIP

STORAGE

G-40

OPERATING

RM GENERAL

G-27

SUB STERILE

G-26A

OPERATING

RM GENERAL

G-26

GENERAL

OPERATING RM

G-25

SUB

STERILE

G-21A

OPERATING

RM GENERAL

G-21

REC & OR

HEAD NURSES

G-01

ELECTRICAL CLOSET

G-22

PHONE/SGNL RM

G-20A

G-20B

G-20C

CLERICAL

G-02

OFFICE

G-02E

OFFICE

G-02D

OFFICE

G-02C

ELEVATOR LOBBY

CB-10A

ELEVATOR LOBBY

CB-16D

HAZ.

HAZ.

45 & 30 KVA

45 KVA

45 & 30 KVA

45 KVA

45 KVA

KVA

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

RECOVERY

BED RM

STRETCHER ALCOVE

WC

ALCOVE

STERILE STORAGE

G-44G-35

ELECTRICAL CLOSET

G-22

S S

S

S S

S S

S S

S S

SS SS

SSSSSS

SS

S

S S

S S

S S

S S

S S

S

S S

S

SS S

S S

SS SSSS

SS

S S

S S

S

SS SSS

SS SSSSSSSSSSSSSSSS

S S

S S

S S

S

SS

SS SS

S

SS SSS

S S

S S

S S

S

S S

S

SS SSSSSSSS

S S

S SS S S

S S

S S

S S

S S

S S

S S

S S

S

SS

SS SSSS

S S

SS SSSSSSSSSSSSSSSSSSSSSS

S

S

SSS

SS S

S S

S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

SS S

S S

SS

SS S

S

S

SS

S S

S S

SS SSS

S S

S S

S S

S

SS SS

S

SS

S S

S S

S S

S

SS

S S

S

S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

J

K

L

M

N

P

R

C.C

C.D

C.E

C.F

C.G

C.G1

C.H

C.I

C.11 C.12 C.13 C.14 C.15 C.16 C.17 C.18 C.19 C.20 C.20.1C.17.1C.16.2 C.16.3C.15.1C.13.1

14 15 16 17 18 19 20 21 22 23 24 25 26 27 2821.5

RISER 4

PACU

RISER 4A TO MICU

CONTINUED ON PG010B

CREATE NEW DEDICATED

RISER FOR PACU

O

2" O

SICU

1 1/2" O

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/2

/2

:4

:3

A

M C

U s e rs

\p p h if e r\ D o c u m e n ts \R e v it L o c a l\ R e v it

\P

-0

-N a s h v ill e -U p g r

O x y g e n p p h if e rP

C

.r v t

PG010D

SUB-BASEMENT MEDICAL GAS PLAN

AREA D

3 20PRP

UPGRADE OXYGEN

NASHVILLE VAMC

1310 24TH AVENUE S.

NASHVILLE, TN 37212 JUNE 5, 2023

BID DOCUMENTS

626-22-20122-066

SPG

N O

R T

H0 84 16

Scale: 3/32" = 1'-0"

SUB-BASEMENT MEDICAL GAS PLAN AREA D

A. SLEEVE ALL PENETRATIONS. FIRESTOP AND SEAL

WATER TIGHT.

B. CONTRACTOR TO COORDINATE ZONE VALVE

INSTALLATION WITH VA FOR ANY SHUT DOWN.

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

A B

C D

ACRE

1 PIPE RISES FROM THE SUB BASEMENT UP TO THE

BASEMENT FLOOR HERE.

C. PIPES SHOWN ARE IN SUB-BASEMENT.

FLOORPLAN FOR BASEMENT IS SHOWN FOR

REFERENCE.

NO. 4

DN

HISTO LAB

CRAWL SPACE

WAITING SPACE

CB-14A

DRESS

D-53A

DRESS

D-54A

TOILET

D-53B

TOILET

D-54B

TOILET

D-51B

TOILET

D-52B

DRESS

D-52A

DRESS

D-51A

BD

ELECTRICAL

CLOSET

D-30

PETT SCAN

D-40

OFFICE

F-11A

BSLE LAB

D-12D

CORRIDOR

CB-12

CORRIDOR

CB-13

MECH EQUIP

F-10

OFFICE

F-4

F-2

F-1

CONTROL RM

F-11B

F-11

COMPRESSOR RM

F-12

CLOSET

F-12A

CORRIDOR

CB-24

CORRIDOR

CB-24

CORRIDOR

CB-11

CYTO LAB

D-05

CORRIDOR

CB-10

OFFICE

D-06A

MRI

D-19

CORRIDOR

CB-12

RADIOGRAPHIC

FLUOROSCOPIC

D-54

WAITING

D-02

MALE TOILET

D-49

RADIOGRAPHIC

FLUOROSCOPIC

RM

D-51

RADIOGRAPHIC

FLUOROSCOPIC

D-52

RADIOGRAPHIC

FLUOROSCOPIC

D-53

MICRO LAB

D-12

T C LAB

D-12E

GEN WASH

D-09

READING RM

D-04

CUTTING RM

D-05A

SAW RM

MULTI PURPOSE

D-05C

SCREENIING

D-06

FEMALE

TOILET

D-07

MALE

TOILET

D-08

BLK STORAGE

D-05D

MICRO OFFICE

D-05E

WORK RM

D-12C

ANTE RM

D-12B

OFFICE

D-12A

BD2

D-11 BD1

D-10

ELECTRICAL CLOSET

D-29

CT EXAM RM

D-28E

CONTROL

D-51C

CONTROL

D-52C

CONTROL

D-53C

CONTROL

D-54C

HAC

D-55

STORAGE

D-56

ADP

D-01

SIG

CLOSET

D-02G

CHIEF TECH

D-50

SVC CHIEF

D-65

SEC

D-65I

ELEVATOR

S-2

ELEVATOR

S-1

FEMALE

TOILET

D-48

TECH

D-03A

HOT LAB

D-40D

TREAT

D-40E

TREAT

D-40F

TOILET

D-40C

CTRL RM

D-40B

MULTI

VIEWING

D-41

MULTI

VIEWING

CB-12D D-42

STORAGE

CB-12C D-43

MULTI

VIEWING

D-44

MULTI

VIEWING

D-45

OFFICE

D-46

ADP

COORD

D-47

ELECTRICAL CLOSET

D-02FOFFICE

D-02E

OFFICE

D-02D

GANTRY

D-40A

OFFICE

D-02C

OFFICE

D-02B

OFFICE

D-02A

ADP COMPUTER RM

D-03

FEC

75 KVA

R am p U p

STAIR

NO. 4

DN

HISTO LAB

CRAWL SPACE

WAITING SPACE

CB-14A

DRESS

D-53A

DRESS

D-54A

TOILET

D-53B

TOILET

D-54B

TOILET

D-51B

TOILET

D-52B

DRESS

D-52A

DRESS

D-51A

BD

ELECTRICAL

CLOSET

D-30

PETT SCAN

D-40

OFFICE

F-11A

BSLE LAB

D-12D

CORRIDOR

CB-12

CORRIDOR

CB-13

MECH EQUIP

F-10

OFFICE

F-4

F-2

F-1

CONTROL RM

F-11B

F-11

COMPRESSOR RM

F-12

CLOSET

F-12A

CORRIDOR

CB-24

CORRIDOR

CB-24

CORRIDOR

CB-11

CYTO LAB

D-05

CORRIDOR

CB-10

OFFICE

D-06A

MRI

D-19

CORRIDOR

CB-12

RADIOGRAPHIC

FLUOROSCOPIC

D-54

WAITING

D-02

MALE TOILET

D-49

RADIOGRAPHIC

FLUOROSCOPIC

RM

D-51

RADIOGRAPHIC

FLUOROSCOPIC

D-52

RADIOGRAPHIC

FLUOROSCOPIC

D-53

MICRO LAB

D-12

T C LAB

D-12E

GEN WASH

D-09

READING RM

D-04

CUTTING RM

D-05A

SAW RM

MULTI PURPOSE

D-05C

SCREENIING

D-06

FEMALE

TOILET

D-07

MALE

TOILET

D-08

BLK STORAGE

D-05D

MICRO OFFICE

D-05E

WORK RM

D-12C

ANTE RM

D-12B

OFFICE

D-12A

BD2

D-11 BD1

D-10

ELECTRICAL CLOSET

D-29

CT EXAM RM

D-28E

CONTROL

D-51C

CONTROL

D-52C

CONTROL

D-53C

CONTROL

D-54C

HAC

D-55

STORAGE

D-56

ADP

D-01

SIG

CLOSET

D-02G

CHIEF TECH

D-50

SVC CHIEF

D-65

SEC

D-65I

ELEVATOR

S-2

ELEVATOR

S-1

FEMALE

TOILET

D-48

TECH

D-03A

HOT LAB

D-40D

TREAT

D-40E

TREAT

D-40F

TOILET

D-40C

CTRL RM

D-40B

MULTI

VIEWING

D-41

MULTI

VIEWING

CB-12D D-42

STORAGE

CB-12C D-43

MULTI

VIEWING

D-44

MULTI

VIEWING

D-45

OFFICE

D-46

ADP

COORD

D-47

ELECTRICAL CLOSET

D-02FOFFICE

D-02E

OFFICE

D-02D

GANTRY

D-40A

OFFICE

D-02C

OFFICE

D-02B

OFFICE

D-02A

ADP COMPUTER RM

D-03

FEC

75 KVA

R am p U p

S S

S S

S

S S

SS SSSSS

S

S SS SS

SS SS

S S

S S

S S

S S

SS

S S

S S

S S

S S

S S

S S

S S

S

SS SSSS

SS

S S

S S

S S

S

SS

S S

SS SSSSSSSSSSSSSSSS

SS SSSSSSSSSSSS

S

S

SS

S S

S S

SS

S S S

S

SS SSSSSSSSSS

S

SS SSS

SS SSSSSS

SS

SS SSSSSSSSSS

S S

S S

S S

S S

S S

S S

S S

S S

S S

SS SSSSS

SS SSSSS

S

S

SS

SS SSSSSSSSS

S S

S S

S S

S S

SS

SS SSSSS

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

SS SSSSS

S S

S S

S

S S

S S

S

SS

SS

S S

S S

SS

SS

S S

S S

S

S S

S S

S

S

SS

S S

S S

S S

S

S S

S S

B

C

D

E

F

G

H

J

A.1 A.2 A.3 A.4 A.5 A.6 A.7 A.8 A.9 A.10 A.11

A.A

A.B

A.C

A.D

A.E

4 5 6 7 8 9 10 11 12 13

MGZVB-13

MGZVB-05

RISER 7

MGZVB-04

MGZVB-03

MGZVB-02

MGZVB-01

CONTINUED ON PG100C

C O

N T

IN

U

E D

O N

P G

B

1/ O

3/4" O

O

1/2" O 3/4" O

O

3/4" O 3/4" O

MGAB-

/8

Engineers Architects

# KEY NOTES:

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/2

/2

:4

:4

A

M C

U s e rs

\p p h if e r\ D o c u m e n ts \R e v it L o c a l\ R e v it

\P

-0

-N a s h v ill e -U p g r

O x y g e n p p h if e rP

C

.r v t

PG100A

BASEMENT MEDICAL GAS PLAN AREA A

4 20PRP

UPGRADE OXYGEN

NASHVILLE VAMC

1310 24TH AVENUE S.

NASHVILLE, TN 37212 JUNE 5, 2023

BID DOCUMENTS

626-22-20122-066

SPG

N O

R T

H0 84 16

Scale: 3/32" = 1'-0"

BASEMENT MEDICAL GAS PLAN AREA A

1 PROVIDE NEW ZONE VALVE IN EXISTING VALVE

BOX. LABEL VALVE AS INDICATED.

A. SLEEVE ALL PENETRATIONS. FIRESTOP AND SEAL

WATER TIGHT.

B. CONTRACTOR TO COORDINATE ZONE VALVE

INSTALLATION WITH VA FOR ANY SHUT DOWN.

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

A B

C D

ACRE

1 DEMOLISH EXISTING OXYGEN PIPE FROM

OUTLET TO ZONE VALVE AND CAP. PROVIDE

BLANK PLATE AT OUTLET LOCATION.

NO. 8

STAIR

NO. 6

P&H STORAGE

(11'x24')

HAZZARD WASTE

(8'x12')

WAITING SPACE

CB-14A

TOILET

E-18B

HONEYWELL RM

D-72

TOILET

ELECTRICAL CLOSET

PEST

CONTROL

WORK RM

E-18A

SWITCH GEAR

E-11

CORRIDOR

CB-15

BOILER RM

E-25F

RECEIVING AND SHIPPING DOCK

CORRIDOR

CB-18

STORAGE

E-23

RECEIVING & ISSUE

AREA EQUIP STORAGE

FORMS STORAGE

E-22

CORRIDOR

CB-17

STORAGE

E-09A

STAFF

TOILET

E-08

STORAGE

D-68C

E-10

E-10A

MAIL RM

E-14

ELEVATOR EQUIP

E-13

CORRIDOR

CB-16

CORRIDOR

CB-16B

CORRIDOR

CB-16C

CORRIDOR

CB-16A

MECH

E-5

BIOMED ENG

REPAIRING &

DEVELOPMENT

E-01

ELECTRICAL SHOP STORAGE

D-68A

ELECTRONICS

D-68B

KEY SHOP

D-69

MULTI PURPOSE

E-09E

E-11A

VESTIBULE

E-09

TOILET

E-12

ELEVATOR

P-9

EQUIP RM

E-19

OFFICE

E-22A

MED GAS

E-21

MED GAS

E-20

PEST

CONTROL

OFFICE

E-18ELECTRICAL

E-17

OFFICE

E-14A

SIGNAL

E-15

SIGNAL

E-16

SVC RM

E-26

GROUNDS EQUIP

E-25

CLOSET

E-25A

BOILER OPERATOR

E-25E

A/C

OPERATIONS

SHOP

E-25B

FIRE EXT

FLAM

STORAGE

E-24

E-25C

GROUNDS & TRANS

E-25D

VESTIBULE

CB-19A

EMERGENCY

GENERATOR RM

E-25G

EMERGENCY

GENERATOR RM

E-25H

MULTI PURPOSE

D-73A

ELECTRICAL ENG

D-70 OFFICE

D-71

STAFF

D-65B

STAFF

D-65A

CHEST RM

D-62

TOILET

D-63

TOILET

D-64

CONTROL RM

D-61

AUTOMATED

RADIOGRAPHIC

D-60

PROCEDURE

ROOM

D-59

ELECTRIC SHOP

D-68

SWITCHBOARD RM

D-67

D-66

OFFICE

E-09B

OFFICE

E-09C

OFFICE

E-09D OFFICE

E-09F

OFFICE

E-09G

OFFICE

E-09H

BUSINESS RM

E-09I

OFFICE

E-09J

A/C SHOP

E-27

MAINT

FOREMAN

E-07

OFFICE

E-08

OFFICE

E-08A

A/C

FOREMAN

E-06

PAINT SHOP

E-05

CARPENTER SHOP

E-04

MACH

SHOP

E-03

ELECTRICAL CLOSET

BE

E-26A

PLUMBING SHOP

E-02

OFFICE

E-01C

BIOMEDICAL

ENGG

STORAGE

E-01B

RECEIVING

& CLEANING

E-01A

BLDG

MGT

LOCKERS

B-03

ELEVATOR

P-3

ELEVATOR

P-4

ELEVATOR

P-5

BLDG

MGT

TOILET

B-03A

VESTIBULE

ENGG TOILET

B-04A

ENGG

LOCKERS

B-04

HAC

B-05

OFFICE

D-73

OFFICE

D-74

STORAGE

D-74A

OFFICE

D-73D

OFFICE

D-73C

CLERICAL OFFICE

D-73B

STAFF

D-65C

STAFF

D-65D

STAFF

D-65E

RESIDENT/ INTERN

D-65F

CONFERENCE/ CLASS RM

D-65G

SVC CHIEF

RECEPTION & SEC

D-65H

ELEVATOR

S-2

ELEVATOR

S-1

ELEVATOR LOBBY

CB-10A

ELEVATOR LOBBY

CB-16D

30KVA

112.5 KVA

OFFICE

S S

S

SS SSSSSSSSSS

S SS S S S

SS SSSSS

SS S

S S

S S

S S

SS

S S

S S

SS

S

S

S S

SS S

S S

S S

S

S

S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

SS SSSSSSSSSSSSSS

S

SS SSSS

S

SS S

S S

S S

S S

S S

S S

S S

S S

S

S

S

S S

S

S

S

S S

S S

S S

S S

S S

S SS S S S S S S

S S

S S

S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S

S S

S S

S SS S S S S S S S S S

SS

S S

S

S S

S

S S

S SS

SS S

SS SSSS

S

SS SSSSSSSSSSSSSSSSSSSSSS

S

S

SS S

S S

S

S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S SS S S S

S S

S S

S S

S S

S S

S S

S S

S

S S

S S

S

S SS S S

S SS S

S SS S S

S SS S

S S

S S

S S S

S

S S

S S

A

B

C

D

E

F

G

H

J

14 15 16 17 18 19 20 21 22 23 24

25 26 27 28

21.5

PIPE RISES FROM THE SUB-BASEMENT

UP TO THE BASEMENT FLOOR HERE.

PIPE IN SUB-BASEMENT

EXISTING

RISER 3 VALVE

MAIN BUILDING

ISOLATION VALVE

C O

N T

IN

U

E D

O N

P G

A

CONTINUED ON PG100D

NEW ER

RISER 3A

1 1/4" O

1/2" O

1/2" O

O

1 1/4" O

1/

O

2" O

O

3/4" O

O

1/2" O

MGZVB-10

3/4" O 1 1/4" O

O

O

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/2

/2

:4

:4

A

M C

U s e rs

\p p h if e r\ D o c u m e n ts \R e v it L o c a l\ R e v it

\P

-0

-N a s h v ill e -U p g r

O x y g e n p p h if e rP

C

.r v t

PG100B

BASEMENT MEDICAL GAS PLAN AREA B

5 20PRP

UPGRADE OXYGEN

NASHVILLE VAMC

1310 24TH AVENUE S.

NASHVILLE, TN 37212 JUNE 5, 2023

BID DOCUMENTS

626-22-20122-066

SPG

N O

R T

H0 84 16

Scale: 3/32" = 1'-0"

BASEMENT MEDICAL GAS PLAN AREA B

1 2” PIPE UP FROM SUB-BASEMENT.

2 EXISTING EMERGENCY OXYGEN SUPPLY

CONNECTION.

3 TAP INTO EXISTING OXYGEN MAIN FOR NEW

1-1/4" RISER DEDICATED TO THE ER.

A. SLEEVE ALL PENETRATIONS. FIRESTOP AND SEAL

WATER TIGHT.

B. CONTRACTOR TO COORDINATE ZONE VALVE

INSTALLATION WITH VA FOR ANY SHUT DOWN.

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

A B

C D

ACRE

NO. 2

SPECIMEN RECEIVING

TUBE

STA

URIN-

ANALYSIS

HEMATOLOGY

CLOSET

G-08A

FROZEN

SECTION

G-18 B-A118

CORRIDOR

CB-4

AREAWAY

CORRIDOR

CB-9C

CORRIDOR

CB-3

FAN RM - 4

B-B105

CORRIDOR

CB-9D

CORRIDOR

CB-9

CORRIDOR

CORRIDOR

CB-7

ELECTRICAL CLOSET

A-16

CORRIDOR

CB-8

CORRIDOR

CB-6A

STORAGE

CB-5

CORRIDOR

CB-6

FLOW CYTOMETRY

A-04

OFFICE

A-04A

OFFICE

A-04B

CORRIDOR

CB-6

EMBALMING

A-03

CHEMISTRY

A-17

BLOOD BANK

A-14

ELECTRICAL CLOSET

A-15 BA2

COMM

CLOSET

A-17A

OFFICE

A-14A

CENTRAL STORAGE

A-17G

FEMALE TOILET

A-06ELEVATOR EQUIP

A-05

ELEVATOR

S-1

AUTOPSY

A-02

A-01BA-01D

A-01C

CHEM

SUPER LEAD

TECH

A-17F

LEAD TECH

A-17E

LEAD TECH

A-17D

OFFICE

A-07

HAC

A-08

PATH CHIEF

A-09

HEMA SUPER

A-17C

FEMALE TOILET

A-10

FEMALE TOILET

A-11

MULTI PURPOSE

A-17B

MALE

TOILET

A-12

MALE

TOILET

A-13

ELECTRICAL CLOSET

A-26

ELEVATOR

P-8

OFFICE

A-19D

LAB SEC

A-19

TISSUE TYP

A-20

FLOW CYTO

A-20A

ANCILLARY LISTING

A-21

RADIATION SAFETY

& EQUIP RM

A-25P

EXIST TELEPHONE EQUIP RM

LABORATORY-LOW LEVEL IN-VITRO COUNTING

A-25K

VIEWING/

CONFERENCE

A-25J

SEC

A-25H

CHIEF

A-25I

TELE

EQUIP

EXPANS

A-22

HOT LAB

A-25O

BIOCHEMISTRY LAB

A-25N

EXAM

A-25L

LABORATORY HIGH LEVEL IN-VITRO COUNTING

A-25M

EL…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .