C27_Drawings_626-22-201 Upgrade.pdf
PDF 17 MB Posted
- Attached to
- Z1DZ--Project# 626-22-201 Upgrade Oxygen Federal contract opportunity
- Solicitation number
- 36C24924B0007
About this file
This document outlines a federal contract opportunity from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9. The solicitation number is 36C24924B0007 for the Z1DZ--Project# 626-22-201 Upgrade Oxygen opportunity, which involves upgrading the oxygen system. The related file is a 17MB set of drawings. The opportunity type is a solicitation and the agency listed is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9. No other salient details are provided in this document.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24924B0007 0002.docx | DOCX document | |
| 36C24924B0007 0001.docx | DOCX document | |
| Contractor EMR Certification Form.docx | DOCX document | |
| WD_TN20230178 10-13-2023.pdf | ||
| UEI _ TAX ID.docx | DOCX document | |
| 36C24924B0007_1.docx | DOCX document | |
| CALCULATION OF SELF PERFORMED WORK.docx | DOCX document | |
| C28_ Specifications_626-22-201 Upgrade.pdf | ||
| RFI Form.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ALTERNATE #1: BASE BID EXCEPT OMIT DEMOLITION WORK IN WING 4C SHOWN ON PG104D.
ALTERNATE #2: ALTERNATE 1 EXCEPT OMIT DEMOLITION WORK IN WING 3C SHOWN ON PG103D.
# DEDUCT ALTERNATE NOTES
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
PROJECT IMAGE
/5
/2
:5
:0
P M
C U s e rs
\p p h if e r\ D o c u m e n ts \R e v it L o c a l\ R e v it
\P
-0
-N a s h v ill e -U p g r
O x y g e n p p h if e rP
C
.r v t
GI001
COVER SHEET
1 2PRP
UPGRADE OXYGEN
NASHVILLE VAMC
1310 24TH AVENUE S.
NASHVILLE, TN 37212 JUNE 5, 2023
BID DOCUMENTS
626-22-20122-066
UPGRADE OXYGEN
NASHVILLE VAMC
1310 24TH AVENUE S.
NASHVILLE, TN 37212
VA PROJECT #: 626-22-201
SPG
DRAWING LIST
NO. DESCRIPTION DWG OF DWG
GENERAL
GI001 COVER SHEET 1 2
GI002 ICRA MATRIX AND DETAILS 2 2
PLUMBING
P-001 PLUMBING GENERAL INFORMATION 1 20
PG010B SUB-BASEMENT MEDICAL GAS PLAN AREA B 2 20
PG010D SUB-BASEMENT MEDICAL GAS PLAN AREA D 3 20
PG100A BASEMENT MEDICAL GAS PLAN AREA A 4 20
PG100B BASEMENT MEDICAL GAS PLAN AREA B 5 20
PG100C BASEMENT MEDICAL GAS PLAN AREA C 6 20
PG100D BASEMENT MEDICAL GAS PLAN AREA D 7 20
PG101A FIRST FLOOR MEDICAL GAS PLAN AREA A 8 20
PG101B FIRST FLOOR MEDICAL GAS PLAN AREA B 9 20
PG101C FIRST FLOOR MEDICAL GAS PLAN AREA C 10 20
PG101D FIRST FLOOR MEDICAL GAS PLAN AREA D 11 20
PG102A SECOND FLOOR MEDICAL GAS PLAN AREA A 12 20
PG102C SECOND FLOOR MEDICAL GAS PLAN AREA C 13 20
PG102D SECOND FLOOR MEDICAL GAS PLAN AREA D 14 20
PG103C THIRD FLOOR MEDICAL GAS PLAN AREA C 15 20
PG103D THIRD FLOOR MEDICAL GAS PLAN AREA D 16 20
PG104C FOURTH FLOOR MEDICAL GAS PLAN AREA C 17 20
PG104D FOURTH FLOOR MEDICAL GAS PLAN AREA D 18 20
PG105 SIXTH FLOOR ACRE BUILDING MEDICAL GAS PLAN 19 20
P-601 PLUMBING SCHEDULES 20 20
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 3
E-102C PARTIAL SECOND FLOOR ELECTRICAL PLAN - AREA C 2 3
E-103C PARTIAL THIRD FLOOR ELECTRICAL PLAN - AREA C 3 3
DocuSign Envelope ID: 5C74FF1E-A880-44CA-9DBD-1D6F1976BE9C
6/5/2023
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF PRECAUTIONS
FOR CONSTRUCTION AND RENOVATION
PLASTIC WINDOW
SWIVEL CASTERS
WITH TWO
LOCKING BRAKES
MOBILE CART
A D
J U
S T
A B
L E
H E
IG
H
T
HEPA NEGATIVE
AIR UNIT
EXISTING WALL
EXISTING CEILING
FLEX DUCT
3 5/8" INSULATED
WALL WITH 16
GAUGE METAL
STUDS @ 16" O.C.
WALL TO EXTEND
TO UNDERSIDE OF
DECK
5/8" FIRE
RESISTANT
GYPSUM BOARD -
BOTH SIDES
EXISTING CEILING
SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF
EXISTING DECK
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
A
FIRE RESISTANT
SEALANT, BOTH
SIDES
1-HR RATED AND SMOKE
RATED
U.L. DESIGN NO. UL419
E X
IS
T
IN
G
N E
W
C O
N S
T R
U C
T
IO
N
EXISTING FLOOR
B
STARC
WALLA'
NON-RATED
3 5/8" INSULATED
WALL WITH 16
GAUGE METAL
STUDS @ 16" O.C.
WALL TO EXTEND
TO UNDERSIDE OF
DECK
5/8" GYPSUM
BOARD
EXISTING CEILING
SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF
EXISTING DECK
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
E X
IS
T
IN
G
N
N S
T R
U C
T
IO
N
EXISTING
FLOOR
C
EXTENSION
POLE
PLASTIC
SHEET
N
N S
T R
U C
T
IO
N
E X
IS
T
IN
G
F
IE
L D
V E
R
IF
Y
HEPA
NEGATIVE AIR
UNIT
FINISHED FLOORING TO BE KEPT
CLEAN. FLOORS NOT BEING REPLACED
MUST BE PROTECTED. COVER WITH
ROSIN PAPER / FIRE RATED PLYWOOD.
FIRE RATED PLYWOOD,
TEMPORARY. SALVAGE
PROTECT AND STORE
EXISTING WINDOW TO
BE RE-INSTALLED
AFTER CONSTRUCTION
IS COMPLETE.
V .I .F
E X
IS
T
IN
G
W A
L L
V .I .F
E X
IS
T
IN
G
W A
L L
FLOOR SLAB ABOVE
CEILING
ISLM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
F L E
X D
U C
T
FIRE EXTINGUISHER ON
PORTABLE FLOOR
BRACKET (ILSM MAY
REQUIRE MORE THAN
ONE).
PROVIDE STICKY
MATS (CHANGED END
OF SHIFT OR MORE IF
NECESSARY TO
MAINTAIN
CLEANLINESS).
HEPA NEGATIVE
AIR UNIT
SUPPLY DUCTS EITHER
KEEP RUNNING OR
COVER WHEN RUNNING
TO KEEP DUST OUT
COVER ALL RETURNS
AT THE
GRATE/DIFFUSERS
SUSPENDED PLASTIC
ZIPPER WALL
CURTAIN BARRIER
POST ICRA, ILSM, FIRE
INPECTION SHEETS
VISIBLE TO PUBLIC
FIRE PULL
STATION WITH
AUDIO / VISUAL
EXISTING WALL
BARRIER
NOTE:
A. TURN UP EXHAUST ON EXTERIOR ON SIDE.
CONTRACTOR SHALL VERIFY LOCATION OF AIR
INTAKES ARE AT THE PROPER DISTANCE FROM
EXHAUST. VERIFY LOCAL JURISDICATION CODE
AND VA REQUIREMENTS FOR DISTANCE PRIOR
TO STARTING WORK.
EXHAUST LOCATION
- SEE NOTE A
GI002
_____2
GI002
ILSM SIGNAGE
INTERIM LIFE SAFETY MEASURES IN EFFECT
FOR UPGRADE OXYGEN IN BUILDING 1,
FIRST FLOOR
THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA.
PLEASE USE ALL ALTERNATE EXITS AS MARKED.
1' - 5"
1/2"1/2"
/2
/2
/2
/2
/2
/2
EQ.EQ.
NOTE:
REFER TO ARCHITECTURAL DRAWINGS FOR THE CORRESPONDING
BUILDING AND FLOOR WHERE ILSM SIGNAGE WILL BE LOCATED.
ICRA NOTES
DUST CONTROL PLAN NOTES
1. THE VAMC INFECTION CONTROL GROUP HAS CONFIRMED THE
DESIGNATION FOR THIS PROJECT IS LEVEL (?) FOR THE CLASS OF
PRECAUTIONS OR LEVEL OF INFECTION CONTROL ACTIVITIES. HARD
SURFACE BARRIERS SHALL BE USED EXCEPT IN THE AREA INDICATED ON
THE PHASING PLAN WITH PLASTIC BARRIERS (MINIMUM 4MIL) TO SEAL AREA
FROM NON-WORK AREA AS LONG AS THE SPRINKLER SYSTEM IS INTACT AND
ACTIVE.
1A. THIS PROJECT MAY NEED AN ENTRY VESTIBULE FOR CLOTHING
CHANGES (PROVIDE AND LOCATE A STAGING AREA FOR HAZMAT SUITS NEAR
THE PLASTIC BARRIER ENTRANCE SPACES - CONSTRUCTION ANTEROOM.
THEY SHALL BE USED WHEN GOING INTO CONSTRUCTION AREA AND
LEAVING THE CONSTRUCTION AREA) AND TOOL STORAGE AND TIGHT SEALS
SHALL BE MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL
PENETRATIONS. ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED
OUTSIDE OF THE CONSTRUCTION BARRIER. UPON COMPLETION OF THE
CONSTRUCTION PHASE, DUST BARRIERS SHALL BE REMOVED CAREFULLY
TO MINIMIZE SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE
TEMPORARY DUST PROTECTION IN PLACE BEFORE REMOVAL OF A
PERMANENT BARRIER.
AFTER EACH PHASE, PERFORM TASKS STATED IN NOTE 6A. (COORDINATE
DESIGNATION WITH COR.)
2. PROVIDE STICKY MATS AND BLANKET AT THE PLASTIC BARRIER
ENTRANCE SPACES (CONSTRUCTION ANTEROOM) AND CHANGE DAILY OR
MORE OFTEN AS NEEDED TO PREVENT THE SPREAD OF DUST AND DEBRIS
INTO ADJACENT CLEAN SPACE.
INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS
CONTROL
3. USE CORRIDORS AS PRIMARY CONSTRUCTION ACCESS.
3A. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES
SHALL BE DEFINED. EGRESS PATHS SHALL BE FREE OF DEBRIS;
DESIGNATED ELEVATORS SHALL BE USED DURING SCHEDULED TIMES; AND
ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER THE
CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN TRAFFIC
AWAY FROM THE CONSTRUCTION AREA AND MATERIALS.
4. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER CONSTRUCTION
MATERIAL IN AND OUT OF THE PROJECT - A CLEAN CART SHALL BE USED;
THE NOT-SO-CLEAN CART SHALL BE USED BETWEEN THE MAIN ENTRY AND
THE CONSTRUCTION STAGING/PREP AREA.
4A. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH
TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES. EFFORT
SHALL BE MADE TO MINIMIZE USE OF ELEVATORS WITH AN EMPHASIS ON
TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY. DEBRIS SHALL BE
REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC. IF CHUTES ARE
USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR
(HEPA) FILTERED NEGATIVE AIR MACHINES SHALL BE USED, AND THE CHUTE
OPENING SHALL BE SEALED WHEN NOT IN USE. FILTERS SHALL BE BAGGED
AND SEALED BEFORE BEING TRANSPORTED OUT OF THE CONSTRUCTION
AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE
AREAS WITHOUT PRIOR APPROVAL OF THE COR.
4B. EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO MINIMIZE
INFILTRATION FROM ANY ADJACENT EXCAVATION DEBRIS.
4C. ALL EQUIPMENT TO REMAIN SHALL BE COVERED AND PROTECTED
PRIOR STARTING EACH CONSTRUCTION PHASE.
VENTILATION AND ENVIRONMENTAL CONTROLS
5. AIR SYSTEM FLOW: CONTRACTOR SHALL ACKNOWLEDGE WITH THE
COR WHETHER THE CONSTRUCTION AREA USES FRESH/OUTSIDE OR RE-
CIRCULATED AIR; FILTERS SHALL BE ADDED OR RETURN VENTS COVERED AS
NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR MUST FLOW FROM CLEAN
TO DIRTY AREAS.
5A. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA
SHALL BE NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND WITH NO
DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE
AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO REMOVE DUST SHALL
PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER
CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE
(FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY
VAMC. IF EXHAUST SHALL BE TIED INTO A RE-CIRCULATED AIR SYSTEM, A
PRE-FILTER AND HEPA FILTER SHALL BE USED BEFORE EXHAUST TO
PREVENT CONTAMINATION OF THE DUCTS.
5B. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND
INTACT CEILING SHALL BE VERIFIED DAILY.
5C. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND
CONTRACTOR SHALL VERIFY AND MAINTAIN PROPER RATES IN CRITICAL
AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR IS NOT BEING RE-
CIRCULATED WITHOUT FILTRATION FROM THE CONSTRUCTION AREA
ELSEWHERE. PROVIDE AIR PRESSURE TESTING THROUGHOUT THE
PROJECT IN THE FREQUENCY AS IDENTIFIED BY THE COR.
CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND RELATED
AREAS
6. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL BE
FREE OF LOOSE SOIL AND DEBRIS BEFORE LEAVING THE CONSTRUCTION
AREA. IF PROTECTIVE APPAREL IS NOT WORN (E.G., COVERALLS, FOOTGEAR
AND HEADGEAR) A HEPA-FILTERED VACUUM SHALL BE USED TO REMOVE
DUST FROM CLOTHING BEFORE LEAVING THE BARRICADE. IF PROTECTIVE
APPAREL IS UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE OR
ANTEROOM FOR CHANGING CLOTHING AND STORING EQUIPMENT
(DESIGNATED AREA. ALL EQUIPMENT, TOOLS, TOOL CARTS, AND MATERIALS
TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE MADE FREE FROM
DUST AND MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR
REMOVAL FROM THE CONSTRUCTION ZONE OR WORK AREA.
6A. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL
HVAC ISOLATION UNTIL CONTRACTOR HAS CLEANED CONSTRUCTION SITE,
VA EMS STAFF HAS DONE A TERMINAL CLEANING, AND VA INFECTIOUS
DISEASE CONTROL HAS INSPECTED AND APPROVED THE CLEANING.
III/IVLOW Risk Group 1
Class III
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
II
I
III
MEDIUM Risk Group 2
HIGH Risk Group 3
HIGHEST Risk Group 4 IV
IV
IV
III/IV
III/IV
III
III/IV
I
III
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk
TYPE A
Construction Project Type
Major demolition and construction projects
Includes, but is not limited to:
- activities which require consecutive work shifts
- requires heavy demolition or removal of a complete ceiling system
- new construction
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies
Includes, but is not limited to:
- sanding of walls for painting or wall covering
- removal of floor coverings, ceiling tiles and casework
- new wall construction
- minor duct work or electrical work above ceilings
- major cabling activities
- any activity which cannot be completed within a single work shift
Small scale, short duration activities which create minimal dust
Includes, but is not limited to:
- installation of telephone and computer cabling
- access to chase spaces
- cutting of walls or ceiling where dust migration can be controlled
Inspection and Non-Invasive Activities
Includes, but is not limited to:
- removal of ceiling tiles for visual inspection limited to 1 tile to 50 square feet
- painting (but not sanding), wall covering
- electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection
Type of Construction / Project Activity Table
Group 2 Medium Risk
Group 1 Low Risk
- Respiratory Therapy
- Outpatient Clinics
- CBOC's
- Mental Health Units
- VACANT AREA ADJACENT TO
OCCUPIED AREA
-Acute Nursing Units
- Office areas (non-clinical)
- Hallways
- FES/EMS areas
I
Patient Risk Group
TYPE D
TYPE C
TYPE B
TYPE A
Group 4 Highest Risk
Group 3 High Risk
- Pharmacy
- Radiology/ CT Scanner
- Urgent Care
- Laboratories
- CLCs
- SPD; AMCU;
- Respiratory Isolation Rooms
- Surgery
III
TYPE DTYPE CTYPE B
Class IVor control procedures are necessary.
C
LA
S S
IV
C
LA
S
S
II
During Construction Project
C L-
I C
LA
S
S
II
I
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant after barriers are removed.
6. Remove or isolate HVAC system in areas where work was being performed.
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering.
4. Vacuum work with HEPA-filtered vacuums.
5. Wet mop with disinfectant.
6. Remove isolation of HVAC system in areas where work is being performed.
1. Wipe surfaces to remove dust.
Upon Completion of Project
1. Wipe work surfaces with disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.
4. Remove isolation of HVAC system in areas where work is being performed.
1. Includes all activities required by Class II
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
4. Complete all critical barriers before construction begins or implement control cube method.
5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units.
6. Contain construction waste before transport in tightly covered containers.
7. Cover transport receptacles or carts. Tape covers.
8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work areas.
9. Remove isolation of HVAC system in areas where work is being performed.
1. Execute work by methods to minimize raising dust from construction operations.
2. Immediately replace a ceiling tile displaced for visual inspection.
1. Includes all activities required by Class I
2. Provide active means to prevent airborne dust from dispersing into atmosphere.
3. Water mist work surfaces to control dust while cutting.
4. Seal unused doors with duct tape.
5. Block off and seal air vents.
6. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
1. Includes all activities required by Class III
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.
4. Complete all critical barriers or implement control cube method before construction begins.
5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
6. Seal holes, pipes, conduits, and punctures appropriately.
7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.
8. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
9. Place adhesive walk-off mats at entrance to work area within anteroom.
10. Replace per manufacturer's recommendations. Do not remove barriers from work area until completed project is inspected each by the Hospital Safety Officer, Facilities Management Maintenance and Engineering Department and thoroughly cleaned by the Hospital Environmental Services Department or their contracted Environmental Service Company Contain construction waste before transport in tightly covered containers.
11. Cover transport receptacles or carts. Tape covering
12. Vacuum work area with HEPA filtered vacuums.
13. Wet mop with disinfectant after barriers are removed.
14. Remove isolation of HVAC system in areas where work is being performed.
HAC
G-43
STAIR
CLOSET
G-46
CORRIDOR
CB-22
FIRE
DEPARTMENT
CONNECTION
CLOSET
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/5
/2
:5
:0
P M
C U s e rs
\l b a ja ri a s \D o c u m e n ts
\A
-0
-N a s h v ill e -U p g r
O x y g e n lb a ja ri a s S
Z L
D E
.r v t
GI002
ICRA MATRIX AND DETAILS
2 2LMB
UPGRADE OXYGEN
NASHVILLE VAMC
1310 24TH AVENUE S.
NASHVILLE, TN 37212 JUNE 5, 2023
BID DOCUMENTS
626-22-20122-066
LCW
Scale: 1/2" = 1'-0"
ICRA MOBILE CONTAINMENT CART
Scale: 3/4" = 1'-0"
ICRA BARRIER WALL TYPE
Scale: 1/2" = 1'-0"
CROSS SECTION "A" - WHEN WINDOWS ARE AVAILABLE
Scale: 1/2" = 1'-0"
TYPICAL CONSTRUCTION PLAN LAYOUT - WHEN WINDOWS ARE AVAILABLE
Scale: 3" = 1'-0"
ILSM CONSTRUCTION EGRESS SIGNAGE
Scale: 1/8" = 1'-0"
ICRA PLAN AT FIRE PROTECTION ROOM
DocuSign Envelope ID: 5C74FF1E-A880-44CA-9DBD-1D6F1976BE9C
6/5/2023
DCWR
DHW
PIPING SYSTEM
NG NATURAL GAS
ST STORM
PD PUMP DISCHARGE
OFD OVERFLOW STORM DRAIN
GW GREASE WASTE
OW OIL WASTE
SAN SANITARY WASTE
CD CONDENSATE DRAIN
CA COMPRESSED AIR
AW ACID WASTE
N2 NITROGEN
N2O NITROUS OXIDE
MA MEDICAL AIR
O2 OXYGEN
WAGD WASTE ANESTHETIC GAS DISPOSAL
VAC VACUUM
V SANITARY VENT
OV OIL VENT
AV ACID VENT
NPCW NONPOTABLE COLD WATER
DI DE-IONIZED WATER
SCW SOFTENED COLD WATER
DCW DOMESTIC COLD WATER
RO REVERSE OSMOSIS WATER
DOMESTIC CW RECIRCULATION
DOMESTIC HOT WATER
CO2 CARBON DIOXIDE
DHW 140 DOMESTIC HOT WATER (OTHER TEMP)
PG PROPANE GAS
DHWR DOMESTIC HW RECIRCULATION
NG
ST
PD
OFD
GW
OW
SAN
CD
CA
AW
N2
N2O
MA
O2
WAGD
VAC
CO2
PG
V
OV
AV
HW 140
SCW
NPCW
DI
RO
EXISTING
NEW WORK KEYNOTE
DEMOLITION KEYNOTE
NEW BOLD TEXT INDICATES NEW ITEM
ITALICIZED TEXT INDICATES EXISTING ITEM
NEW PLUMBING EQUIPMENT MARK
DETAIL OR SECTION MARK
SHOWN ON DRAWING
DETAIL MODULE NUMBER
CONNECT TO EXISTING
LIMIT OF DEMOLITION
P-###
EXISTING PLUMBING EQUIPMENT MARKP-###
3-WAY CONTROL VALVE
ANGLE GATE VALVE
ANGLE GLOBE VALVE
BALL VALVE
BUTTERFLY VALVE
CHECK VALVE
CONTROL VALVE
GATE VALVE
GLOBE VALVE
SAFETY RELIEF VALVE
TWO POSITION CONTROL VALVE
BACKFLOW PREVENTER
ECCENTRIC REDUCER
CONCENTRIC REDUCER
FLOW ARROW
HOSE BIBB / SILLCOCK
PLUG VALVE
PRESSURE REDUCING VALVE (WATER)
PRESSURE REGULATOR (GAS)
PIPE ANCHOR
PIPE GUIDES
WALL CLEANOUT
SUSPENDED CLEANOUT
WCO
WYE STRAINER
WYE STRAINER W/DRAIN VALVE
FLOOR DRAIN - ROUND OR SQUARE
FLOOR CLEANOUT
PIPE CAP
PIPE TURNING DOWN
PIPE TURNING UP
TEE UP
TEE DOWN
DROP AND RUN
DROP AND TURN
TEE OFF TOP
TEE OFF BOTTOM
CROSS AND RISER
PLAN 90° ELBOW
PIPE TEE
PIPE UNION
FLEXIBLE PIPE CONNECTOR
WATER METER
PUMP
AUTOMATIC AIR VENT
PRESSURE SWITCH
PRESSURE GAUGE
THERMOMETER
FLOW SWITCH
TEMPERATURE SWITCH
OR
CO
PIPE SLOPE ARROW
AV
F
P
T
M
CIRCUIT SETTER
F FAHRENHEIT
FA FROM ABOVE
FB FROM BELOW
FBO FURNISHED BY OTHERS
FCO FLOOR CLEANOUT
FCW FILTERED COLD WATER
FD FLOOR DRAIN
FDC FIRE DEPARTMENT (HOSE)
CONNECTION
FM FLOW METER
FOP FUEL OIL PUMP
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FS FLOOR SINK
FU FIXTURE UNITS
G GALLON
GC GENERAL CONTRACTOR
GCO GRADE CLEANOUTS
GD GARBAGE DISPOSAL
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GRS GAS REGULATOR STATION
GT GREASE TRAP
GVTR GAS VENT THROUGH ROOF
GWH GAS FIRED WATER HEATER
H&CW HOT AND COLD WATER
HB HOSE BIBB (INTERIOR)
HD HUB DRAIN
HEX HEAT EXCHANGER
HP HORSEPOWER
HS HAND SINK
HST HOT WATER STORAGE TANK
(DOMESTIC)
HWB HOT WATER BOILER
HWCP HOT WATER CIRCULATING PUMP
HWP HOT WATER PUMP
HYD HYDRANT
ICW INDUSTRIAL COLD WATER
INV INVERT
IPC INTERNATIONAL PLUMBING CODE
IRW IRRIGATION WATER
IW INDIRECT WASTE
IWH INSTANTANEOUS WATER HEATER
IWR INDUSTRIAL WATER RETURN
IWS INDUSTRIAL WATER SUPPLY
KW KILOWATT
KWHR KILOWATT-HOUR
L/S LITER PER SECOND
LA LABORATORY AIR
LAV LAVATORY
LBS/HR POUNDS PER HOUR
LCW LABORATORY COLD WATER
LHW LABORATORY HOT WATER
LNG LIQUID NATURAL GAS
LOX LIQUID OXYGEN
LV LABORATORY VACUUM
LW LOW WATER
M METER
MA MEDICAL AIR
MAV MANUAL AIR VENT
MBH THOUSANDS OF BTU PER HOUR
MC MECHANICAL CONTRACTOR
MED MEDICAL
MER MECHANICAL EQUIPMENT ROOM
MH MANHOLE
MOU MEMORANDUM OF UNDERSTANDING
MSB MOP SINK BASIN
MV MEDICAL VACUUM
N2 NITROGEN
N2O NITROUS OXIDE
NC NORMALLY CLOSED
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM NOMINAL
NPW NON POTABLE WATER
NTS NOT TO SCALE
O2 OXYGEN
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OR OPERATING ROOM
OVFL OVERFLOW
PA PASCAL
PC PLUMBING CONTRACTOR
PD PRESSURE DROP
PDI PLUMBING AND DRAINAGE INSTITUTE
PG PRESSURE GAUGE
PP PLUMBING PUMP
PPM PARTS PER MILLION
PRS PRESSURE REDUCING STATION
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH -
ABSOLUTE
PSIG POUNDS PER SQUARE INCH - GAUGE
PTRV PRESSURE TEMPERATURE RELIEF
VALVE
PW POTABLE WATER
RD ROOF DRAIN
RDL ROOF DRAIN LEADER
RL ROOF LEADER
RO REVERSE OSMOSIS
RWL RAIN WATER LEADER
SAN SANITARY SEWER
SCFM STANDARD CUBIC FOOT/MIN
SCW SOFTENED COLD WATER
SDMH STORM DRAIN MANHOLE
SP SUMP PUMP
SPR SPRINKLER LINE
SQFT SQUARE FOOT
SS STAINLESS STEEL
ST STORAGE TANK
SW STORM WATER
TCV TEMPERATURE CONTROL VALVE
TD TRENCH DRAIN
TDH TOTAL DYNAMIC HEAD
TDL TEMPERATURE DIFFERENTIAL
TEMP TEMPERATURE
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TSTAT THERMOSTAT
TWR TEMPERED WATER RETURN
TWS TEMPERED WATER SUPPLY
TYP TYPICAL
UPC UNIFORM PLUMBING CODE
V SANITARY VENT
VAC VACUUM
VB VACUUM BREAKER
VCO VACUUM CLEANER OUTLET
VP VACUUM PUMP
VS VENT STACK
VTR VENT THROUGH ROOF
W WASTE
WC WATER CLOSET
WCO WALL CLEANOUT
WG WATER GAUGE
WH WATER HEATER
WHA WATER HAMMER ARRESTOR
WHD WALL HYDRANT
WL WATER LINE
WM WATER METER
WPD WATER PRESSURE DROP
WS WASTE STACK
YCO YARD CLEANOUT
YH YARD HYDRANT
A/E ARCHITECT/ENGINEER
AC ABOVE CEILING
AD AREA DRAIN
AFF ABOVE FINISHED FLOOR
AG AIR GAP
AP ACCESS PANEL
AS AUTOMATIC SPRINKLER
AFG ABOVE FINISHED GRADE
ASD ADJUSTABLE SPEED DRIVE
ASHRAE AMERICAN SOCIETY HEATING,
REFRIGERATING, AIR CONDITIONING
ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
ASPE AMERICAN SOCIETY PLUMBING
ENGINEERS
ASR AUTOMATIC SPRINKLER RISER
AV ACID VENT
AW ACID WASTE
BAS BUILDING AUTOMATION SYSTEM
BF BELOW FLOOR
BFP BACKFLOW PREVENTER
BG BELOW GRADE
BH BOOSTER HEATER
BHP BREAK HORSEPOWER
BJ BETWEEN JOISTS
BOP BOTTOM OF PIPE
BSP BLACK STEEL PIPE
BT BATHTUB
BTUH BRITISH THERMAL UNITS PER HOUR
C CELSIUS
CF COMBINATION FIXTURE
CGA COMPRESSED GAS ASSOCIATION
CI CAST IRON
CO CLEANOUT
COND CONDENSATE
CP CONDENSATE PUMP
CS CLINICAL SINK
CV CONTROL VALVE
DA DENTAL COMPRESSED AIR
DCW DOMESTIC COLD WATER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DHWS DOMESTIC HOT WATER SUPPLY
DF DRINKING FOUNTAIN
DI DEIONIZED WATER
DN DOWN
DOE DEPARTMENT OF ENERGY
DS DOWNSPOUT
DV DENTAL VACUUM
DW DISHWASHER
DWG DRAWING
DWH DOMESTIC WATER HEATER
DWR DRINKING WATER RETURN
DWS DRINKING WATER SUPPLY
DWV DRAIN WASTE VENT
EC ELECTRICAL CONTRACTOR
EL ELEVATION
EMCS ENERGY MONOSERRAT AND CENTRAL
SYSTEM
EPA ENVIRONMENTAL PROTECTION
AGENCY
EPACT ENERGY POLICY ACT
ESC ESCUTCHEON
ESH EMERGENCY SHOWER
ET EXPANSION TANK
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EWS EYEWASH STATION
EX EXISTING
PLUMBING SYMBOLS PLUMBING SYMBOLS
ANNOTATION SYMBOLS
PLUMBING SYMBOLS & ABBREVIATIONS
ANNOTATION ABBREVIATIONS 1. VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR REGARDING CONFLICTS BEFORE PROCEEDING WITH
WORK.
2. REMOVED ITEMS REMAIN PROPERTY OF GOVERNMENT UNTIL COR DETERMINES THAT THEY ARE NOT REQUIRED. REMOVE FROM SITE ITEMS NOT BEING RETAINED BY GOVERNMENT OR REINSTALLED AS PART OF THIS WORK.
3. DO NOT DISTURB ITEMS NOT INDICATED FOR DEMOLITION.
4. VERIFY SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. RELOCATE, REMOVE AND ADJUST
MECHANICAL AND ELECTRICAL ITEMS AS NECESSARY TO COORDINATE WITH NEW WORK.
5. AFTER DEMOLITION IS COMPLETE, PATCH AND REPAIR FINISHES TO MATCH EXISTING ADJACENT CONDITIONS.
6. COORDINATE DEMOLITION WITH COR. SUBMIT SHUTDOWN PLAN AND SCHEDULE TO COR FOR REVIEW AND APPROVAL.
7. PROTECT EXISTING UTILITIES TO REMAIN FROM DAMAGE DURING DEMOLITION. REPAIR UTILITIES AND SERVICES DAMAGED AT
NO ADDITIONAL COST.
8. TEMPORARILY MOVE OR TAKE EQUIPMENT OUT OF SERVICE AS NECESSARY TO COMPLETE WORK.
9. SAWCUT CONCRETE FLOOR AS REQUIRED FOR DEMOLITION WORK INDICATED. COORDINATE WITH NEW PLUMBING WORK
AND WORK OF OTHER TRADES.
PLUMBING DEMOLITION GENERAL NOTES
1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.
2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.
3. OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.
4. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE
PURPOSES INTENDED.
5. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS ARE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT
EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.
6. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT
MAINTENANCE, REPAIRS, AND REPLACEMENT.
7. SUPPORT PIPING SYSTEM AS REQUIRED BY APPLICABLE LOCAL, STATE, AND NATIONAL CODES ALONG WITH
SPECIFICATIONS, VA STANDARDS AND MANUFACTURER'S RECOMMENDATIONS.
8. FIRESTOP AND SEAL PIPING PENETRATIONS THROUGH WALLS AND FLOORS EQUAL TO THE RATING OF WALLS AND FLOORS.
9. TEST PLUMBING SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND NATIONAL CODES AND APPLICABLE VA
STANDARDS.
10. COORDINATE PLUMBING PIPING WITH WORK OF OTHER DISCIPLINES.
11. DISINFECT DOMESTIC WATER SYSTEM IN ACCORDANCE WITH APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND
APPLICABLE VA STANDARDS.
12. PROVIDE SHUT OFF VALVES AT BRANCH PIPING TO FIXTURES.
13. COORDINATE PLUMBING WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION. COORDINATE ROUTING OF PIPING WITH
EXISTING CONDITIONS.
14. PROVIDE ALL NECESSARY OFFSETS, TEES, ELBOWS, ETC. FOR A COMPLETE AND COORDINATED WORKING PLUMBING SYSTEM. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING
SYSTEMS.
15. CONTRACTOR SHALL COORDINATE ANY PLUMBING SYSTEM REQUIRED SHUTDOWN WITH THE COR 2 WEEK IN ADVANCE AND
CONFIRM 48 HOURS PRIOR.
16. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH PLUMBING WORK OF THIS CONTRACT, UNLESS NOTED OTHERWISE.
17. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.
18. DO NOT INSTALL PIPES ABOVE TELECOM OR ELECTRICAL EQUIPMENT.
PLUMBING GENERAL NOTES
42" OR AS SHOWN
ON ARCHITECTURAL
ELEVATION
FLOOR
ALARM PANEL
COORDINATE LOCATION
WITH PLUMBING AND
ARCHITECTURAL PLANS
AND ELEVATIONS
RECESSED ZONE VALVE
BOX AS SPECIFIED WITH
PLASTIC PULL OUT
FRONT
BALL VALVE (TYP)
PRESSURE GAUGES
CENTER OF
VALVE BOX
MEDICAL GAS
SERVICE TO ROOMS
MEDICAL GASES FROM
MAINS
SENSING LINES TO
ALARM PANEL
THIS PORTION
ASSEMBLED BY ZONE
VALVE BOX
MANUFACTURER.
1/8" NPT PORT SEAL WITH
BRASS HEX HEAD PLUG USING
TEFLON TAPE (2 PL.)
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:4
:2
A
M C
U s e rs
\p p h if e r\ D o c u m e n ts \R e v it L o c a l\ R e v it
\P
-0
-N a s h v ill e -U p g r
O x y g e n p p h if e rP
C
.r v t
P-001
PLUMBING GENERAL INFORMATION
1 20PRP
UPGRADE OXYGEN
NASHVILLE VAMC
1310 24TH AVENUE S.
NASHVILLE, TN 37212 JUNE 5, 2023
BID DOCUMENTS
626-22-20122-066
SPG
Scale: No Scale
TYPICAL MEDGAS ZONE VALVE AND ALARM DETAIL
Scale: No Scale
DUAL PORT SHUT-OFF VALVES WITH LOCKING HANDLE DETAIL
DocuSign Envelope ID: DEBE7A3C-3F5F-44DB-AFC8-31818109AE19
6/2/2023
16 17 18 19 20 21
STAIR
NO. 8
STAIR
NO. 6
P&H STORAGE
(11'x24')
HAZZARD WASTE
(8'x12')
WAITING SPACE
CB-14A
TOILET
E-18B
HONEYWELL RM
D-72
TOILET
ELECTRICAL CLOSET
PEST
CONTROL
WORK RM
E-18A
SWITCH GEAR
E-11
CORRIDOR
CB-15
BOILER RM
E-25F
RECEIVING AND SHIPPING DOCK
CORRIDOR
CB-18
STORAGE
E-23
RECEIVING & ISSUE
AREA EQUIP STORAGE
FORMS STORAGE
E-22
CORRIDOR
CB-17
STORAGE
E-09A
STAFF
TOILET
E-08
STORAGE
D-68C
E-10
E-10A
MAIL RM
E-14
ELEVATOR EQUIP
E-13
CORRIDOR
CB-16
CORRIDOR
CB-16B
CORRIDOR
CB-16C
CORRIDOR
CB-16A
MECH
E-5
BIOMED ENG
REPAIRING &
DEVELOPMENT
E-01
ELECTRICAL SHOP STORAGE
D-68A
ELECTRONICS
D-68B
KEY SHOP
D-69
MULTI PURPOSE
E-09E
E-11A
VESTIBULE
E-09
TOILET
E-12
ELEVATOR
P-9
EQUIP RM
E-19
OFFICE
E-22A
MED GAS
E-21
MED GAS
E-20
PEST
CONTROL
OFFICE
E-18ELECTRICAL
E-17
OFFICE
E-14A
SIGNAL
E-15
SIGNAL
E-16
SVC RM
E-26
GROUNDS EQUIP
E-25
CLOSET
E-25A
BOILER OPERATOR
E-25E
A/C
OPERATIONS
SHOP
E-25B
FIRE EXT
FLAM
STORAGE
E-24
E-25C
GROUNDS & TRANS
E-25D
VESTIBULE
CB-19A
EMERGENCY
GENERATOR RM
E-25G
EMERGENCY
GENERATOR RM
E-25H
MULTI PURPOSE
D-73A
ELECTRICAL ENG
D-70 OFFICE
D-71
STAFF
D-65B
STAFF
D-65A
CHEST RM
D-62
TOILET
D-63
TOILET
D-64
CONTROL RM
D-61
AUTOMATED
RADIOGRAPHIC
D-60
PROCEDURE
ROOM
D-59
ELECTRIC SHOP
D-68
SWITCHBOARD RM
D-67
D-66
OFFICE
E-09B
OFFICE
E-09C
OFFICE
E-09D OFFICE
E-09F
OFFICE
E-09G
OFFICE
E-09H
BUSINESS RM
E-09I
OFFICE
E-09J
A/C SHOP
E-27
MAINT
FOREMAN
E-07
OFFICE
E-08
OFFICE
E-08A
A/C
FOREMAN
E-06
PAINT SHOP
E-05
CARPENTER SHOP
E-04
MACH
SHOP
E-03
ELECTRICAL CLOSET
BE
E-26A
PLUMBING SHOP
E-02
OFFICE
E-01C
BIOMEDICAL
ENGG
STORAGE
E-01B
RECEIVING
& CLEANING
E-01A
BLDG
MGT
LOCKERS
B-03
ELEVATOR
P-3
ELEVATOR
P-4
ELEVATOR
P-5
BLDG
MGT
TOILET
B-03A
VESTIBULE
ENGG TOILET
B-04A
ENGG
LOCKERS
B-04
HAC
B-05
OFFICE
D-73
OFFICE
D-74
STORAGE
D-74A
OFFICE
D-73D
OFFICE
D-73C
CLERICAL OFFICE
D-73B
STAFF
D-65C
STAFF
D-65D
STAFF
D-65E
RESIDENT/ INTERN
D-65F
CONFERENCE/ CLASS RM
D-65G
SVC CHIEF
RECEPTION & SEC
D-65H
ELEVATOR
S-2
ELEVATOR
S-1
ELEVATOR LOBBY
CB-10A
ELEVATOR LOBBY
CB-16D
30KVA
112.5 KVA
OFFICE
S S
S
SS SSSSSSSSSS
S SS S S S
SS SSSSS
SS S
S S
S S
S S
SS
S S
S S
SS
S
S
S S
SS S
S S
S S
S
S
S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
SS SSSSSSSSSSSSSS
S
SS SSSS
S
SS S
S S
S S
S S
S S
S S
S S
S S
S
S
S
S S
S
S
S
S S
S S
S S
S S
S S
S SS S S S S S S
S S
S S
S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S
S S
S S
S SS S S S S S S S S S
SS
S S
S
S S
S
S S
S SS
SS S
SS SSSS
S
SS SSSSSSSSSSSSSSSSSSSSSS
S
S
SS S
S S
S
S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S SS S S S
S S
S S
S S
S S
S S
S S
S S
S
S S
S S
S
S SS S S
S SS S
S SS S S
S SS S
S S
S S
S S S
S
S S
S S
A
B
C
D
E
F
G
H
J
14 15 16 17 18 19 20 21 22 23 24
25 26 27 28
21.5
PIPE IS BELOW GRADE FROM SUB-BASEMENT TO OXYGEN TANKS.
NORMALLY CLOSED
CONTINUED ON PG010D
PS
O
3" O 2" O
O
O
2" O
O
2" O
O
2" O 3
Engineers Architects
# KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/2
/2
:4
:2
A
M C
U s e rs
\p p h if e r\ D o c u m e n ts \R e v it L o c a l\ R e v it
\P
-0
-N a s h v ill e -U p g r
O x y g e n p p h if e rP
C
.r v t
PG010B
SUB-BASEMENT MEDICAL GAS PLAN
AREA B
2 20PRP
UPGRADE OXYGEN
NASHVILLE VAMC
1310 24TH AVENUE S.
NASHVILLE, TN 37212 JUNE 5, 2023
BID DOCUMENTS
626-22-20122-066
SPG
N O
R T
H0 84 16
Scale: 3/32" = 1'-0"
SUB-BASEMENT MEDICAL GAS PLAN AREA B
A. SLEEVE ALL PENETRATIONS. FIRESTOP AND SEAL
WATER TIGHT.
B. CONTRACTOR TO COORDINATE ZONE VALVE
INSTALLATION WITH VA FOR ANY SHUT DOWN.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
A B
C D
ACRE
1 REPLACE EXISITNG 2" PIPE WITH 3" PIPE IN
SUB-BASEMENT AT LOCATION INDICATED.
1 INSTALL NEW 3" PIPE ADJACENT TO EXISTING
PRIOR TO DEMO OF EXISTING.
2 EXISTING 2" PIPE TO REMAIN.
3 PIPE RISES FROM THE SUB BASEMENT UP TO THE
BASEMENT FLOOR HERE.
C. PIPES SHOWN ARE IN SUB-BASEMENT.
FLOORPLAN FOR BASEMENT IS SHOWN FOR
REFERENCE.
K
L
M
N
I
H
STAIR
NO. 1
STAIR
NO. 10
STAIR
NO. 8
STAIR
NO. 7
AREAWAY
STAIR
NO 9
STRETCHER ALCOVE
CB-24A
TOILET
CHASE
C-04A
TELE CLOSET
C-07E
BC
ELECTRICAL
CLOSET
C-07D
ELECTRICAL CLOSET
C-07C
CLOSET
MALE
TOILET
C-08D
FEMALE TOILET
C-08B
FEMALE STAFF TOILET
G-51
FEMALE STAFF TOILET
G-55
CLOSET
G-46
ELECTRICAL CLOSET
A-22A
ELECTRICAL CLOSET
BB
CORRIDOR
CB-23
SCRUB
UP
ALCOVE
CB-3C
CLEAN CORE
CB-3
CLEAN CORE
CB-3
MECH
RM
AHU-26
FAN RM 11
HEART
POS RM
C-07I
CLEAN
ALCOVE
C-07
MED
PREP
C-07A
POS RM
C-07J
POS RM
C-07K
NEG RM
C-07L
OFFICE
C-07M
STORAGE ALCOVE
SPD
C-07N
NEG RM
C-07O
BARIATRIC NEG RM
C-07P
STORAGE ALCOVE
SHOWER / TOILET
C-07Q
NEG RM
C-07R
POS RM
C-07S
POS RM
C-07T
POS RM
C-07U
BARIATRIC POS RM
C-07V
EMERGENCY GENERATOR
B-G124B
FAN RM 5
B-G124
ELECTRICAL
B-G124A
CORRIDOR
CB-9
CORRIDOR
CB-16E
CORRIDOR
CB-16A
CORRIDOR
CB-19
CORRIDOR
CB-22
SICU
G-56
CORRIDOR
CB-9A
CORRIDOR
CB-1
ELEVATOR LOBBY
CB-1A
CORRIDOR
CB-24
CORRIDOR
CB-21
EQUIP STORAGE & TESTING
B-01
DISPATCH AREA
B-01A
DECONTAMINATION RM
B-02
PREPARATION,
ASSEMBLY &
STERILIZATION
B-02B
STERIS RM
B-01B
OFFICE
B-02A
OFFICE
B-01D
EQUIP
B-01C
MANUAL WASH
B-01E
VESTIBULE
CB-19A
SCRUB
CB-3B
TOILET
C-02
SIGNAL CLOSET
C-01
WAITING
C-03
HEART
POS RM
C-07H
RECEIVING
& CLEANING
E-01A
ELECTRICAL RM
B-01F
BLDG
MGT
LOCKERS
B-03
ELEVATOR
P-3
ELEVATOR
P-4
ELEVATOR
P-5
BLDG
MGT
TOILET
B-03A
CONSULT/
MEDITATION
C-03A
SOILED
C-07G
SOILED UTILITY
G-56A
RECOVERY STORAGE
G-56B
OFF LINE
MONITORING
G-47
ALCOVE
G-49
TELE
G-49C
ELECRICAL CLOSET SIGNAL
G-49B
CLEAN LINEN
G-56D
SIGNAL
G-49A
RECOVERY CLEAN UTILITY
G-56E
RECOVERY NURSE STATION
RECOVERY ISOLATION BEDROOM
G-54
G-53
ANTE RM
G-56C
RECOVERY ISOLATION BEDROOM
G-52
PACU
G-50
BATH
G-48A
ON CALL
G-48
HAC
G-43
OFFICE
C-09
FEMALE LOCKER
C-08A
MALE LOCKER
C-08C
STAFF
MULTIPURPOSE
C-08
OFFICE
C-07W
HAC
C-06
CLOSET
C-07B
HEART
POS RM
C-07F
CLEAN EQUIP /
SUPPLY
C-05
ELECTRICAL CLOSET
C-04
GAS STORAGE NURSE MGR
OFFICE
B-01Q
MALE
LOCKERS
B-01O
MALE
TOILET
B-01P
FEMALE TOILET
B-01N
FEMALE
LOCKERS
B-01M
HAC
B-01L
SPD
CHIEF &
ASSIST
B-01K
LOGISTICS
SUPV
B-01J
SPD ADMIN
B-01I
LOGISTICS
ITEM MGRS
B-01H
BREAKOUT AREA
B-01G
LOGISTICS
ITEM MGRS
B-06
ENGG TOILET
B-04A
ENGG
LOCKERS
B-04
HAC
B-05
ELEVATOR
S-2
RCPT
& FILES
A-25
FEMALE TOILET
A-25A
MALE TOILET
A-25B
OFFICE HOUSE STAFF
A-25C
STAFF
LOUNGE
A-25D
EXIST
FIRE
ALARM
PANELS
A-23
STAFF
NON-PHYSICIAN
OFFICE
A-25E
STAFF
PHYSICIAN
OFFICE
A-25F
STUDY
CUBICLES
A-25G
VEST
B-01R
ANEST
WORK RM
B-07
ANEST
EQUIP STOR
SCRUB-UP ALCOVE
G-33
EXT RAD
CONTROL
G-32
NEUROSURGERY O R 9
G-36
SUB STERILE
G-37
PUMP
TECHS
PREP RM
G-36A
CARDIAC OR 8
G-38
CORRIDOR
CB-2C
CORRIDOR
CB-2B
FEMALE SHOWER
G-23B
DICTATING
G-23A
MALE LOCKERS
G-24B
MALE
TOILET &
SHOWER
G-24A
CLEAN
CORE
SUPPORT
G-34
ETO RM
B-02C
VESTIBULE
HAC
B-02F
TOILET
B-02D
TOILET
B-02E
ELEVATOR
P-6
ELEVATOR
P-7
FEMALE TOILET
G-23C
FEMALE
LOCKERS
G-23D
VESTIBULE
STAFF LOUNGE
G-23
PHYSICIAN LOUNGE
G-24
ORTHOPEDIC OR 7
G-39
OFFICE
G-28
SCRUB
UP
ALCOVE
G-29
SCRUB-UP ALCOVE
G-30
OFFICE
G-31
EQUIP
G-28A
SUB
STERILE
G-42
PLASTER
& SPLINTS
G-41
EQUIP
STORAGE
G-40
OPERATING
RM GENERAL
G-27
SUB STERILE
G-26A
OPERATING
RM GENERAL
G-26
GENERAL
OPERATING RM
G-25
SUB
STERILE
G-21A
OPERATING
RM GENERAL
G-21
REC & OR
HEAD NURSES
G-01
ELECTRICAL CLOSET
G-22
PHONE/SGNL RM
G-20A
G-20B
G-20C
CLERICAL
G-02
OFFICE
G-02E
OFFICE
G-02D
OFFICE
G-02C
ELEVATOR LOBBY
CB-10A
ELEVATOR LOBBY
CB-16D
HAZ.
HAZ.
45 & 30 KVA
45 KVA
45 & 30 KVA
45 KVA
45 KVA
KVA
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
STRETCHER ALCOVE
WC
ALCOVE
STERILE STORAGE
G-44G-35
ELECTRICAL CLOSET
G-22
K
16 17 18 19 20 21
L
M
N
I
H
STAIR
NO. 1
STAIR
NO. 10
STAIR
NO. 8
STAIR
NO. 7
AREAWAY
STAIR
NO 9
STRETCHER ALCOVE
CB-24A
TOILET
CHASE
C-04A
TELE CLOSET
C-07E
BC
ELECTRICAL
CLOSET
C-07D
ELECTRICAL CLOSET
C-07C
CLOSET
MALE
TOILET
C-08D
FEMALE TOILET
C-08B
FEMALE STAFF TOILET
G-51
FEMALE STAFF TOILET
G-55
CLOSET
G-46
ELECTRICAL CLOSET
A-22A
ELECTRICAL CLOSET
BB
CORRIDOR
CB-23
SCRUB
UP
ALCOVE
CB-3C
CLEAN CORE
CB-3
CLEAN CORE
CB-3
MECH
RM
AHU-26
FAN RM 11
HEART
POS RM
C-07I
CLEAN
ALCOVE
C-07
MED
PREP
C-07A
POS RM
C-07J
POS RM
C-07K
NEG RM
C-07L
OFFICE
C-07M
STORAGE ALCOVE
SPD
C-07N
NEG RM
C-07O
BARIATRIC NEG RM
C-07P
STORAGE ALCOVE
SHOWER / TOILET
C-07Q
NEG RM
C-07R
POS RM
C-07S
POS RM
C-07T
POS RM
C-07U
BARIATRIC POS RM
C-07V
EMERGENCY GENERATOR
B-G124B
FAN RM 5
B-G124
ELECTRICAL
B-G124A
CORRIDOR
CB-9
CORRIDOR
CB-16E
CORRIDOR
CB-16A
CORRIDOR
CB-19
CORRIDOR
CB-22
SICU
G-56
CORRIDOR
CB-9A
CORRIDOR
CB-1
ELEVATOR LOBBY
CB-1A
CORRIDOR
CB-24
CORRIDOR
CB-21
EQUIP STORAGE & TESTING
B-01
DISPATCH AREA
B-01A
DECONTAMINATION RM
B-02
PREPARATION,
ASSEMBLY &
STERILIZATION
B-02B
STERIS RM
B-01B
OFFICE
B-02A
OFFICE
B-01D
EQUIP
B-01C
MANUAL WASH
B-01E
VESTIBULE
CB-19A
SCRUB
CB-3B
TOILET
C-02
SIGNAL CLOSET
C-01
WAITING
C-03
HEART
POS RM
C-07H
RECEIVING
& CLEANING
E-01A
ELECTRICAL RM
B-01F
BLDG
MGT
LOCKERS
B-03
ELEVATOR
P-3
ELEVATOR
P-4
ELEVATOR
P-5
BLDG
MGT
TOILET
B-03A
CONSULT/
MEDITATION
C-03A
SOILED
C-07G
SOILED UTILITY
G-56A
RECOVERY STORAGE
G-56B
OFF LINE
MONITORING
G-47
ALCOVE
G-49
TELE
G-49C
ELECRICAL CLOSET SIGNAL
G-49B
CLEAN LINEN
G-56D
SIGNAL
G-49A
RECOVERY CLEAN UTILITY
G-56E
RECOVERY NURSE STATION
RECOVERY ISOLATION BEDROOM
G-54
G-53
ANTE RM
G-56C
RECOVERY ISOLATION BEDROOM
G-52
PACU
G-50
BATH
G-48A
ON CALL
G-48
HAC
G-43
OFFICE
C-09
FEMALE LOCKER
C-08A
MALE LOCKER
C-08C
STAFF
MULTIPURPOSE
C-08
OFFICE
C-07W
HAC
C-06
CLOSET
C-07B
HEART
POS RM
C-07F
CLEAN EQUIP /
SUPPLY
C-05
ELECTRICAL CLOSET
C-04
GAS STORAGE NURSE MGR
OFFICE
B-01Q
MALE
LOCKERS
B-01O
MALE
TOILET
B-01P
FEMALE TOILET
B-01N
FEMALE
LOCKERS
B-01M
HAC
B-01L
SPD
CHIEF &
ASSIST
B-01K
LOGISTICS
SUPV
B-01J
SPD ADMIN
B-01I
LOGISTICS
ITEM MGRS
B-01H
BREAKOUT AREA
B-01G
LOGISTICS
ITEM MGRS
B-06
ENGG TOILET
B-04A
ENGG
LOCKERS
B-04
HAC
B-05
ELEVATOR
S-2
RCPT
& FILES
A-25
FEMALE TOILET
A-25A
MALE TOILET
A-25B
OFFICE HOUSE STAFF
A-25C
STAFF
LOUNGE
A-25D
EXIST
FIRE
ALARM
PANELS
A-23
STAFF
NON-PHYSICIAN
OFFICE
A-25E
STAFF
PHYSICIAN
OFFICE
A-25F
STUDY
CUBICLES
A-25G
VEST
B-01R
ANEST
WORK RM
B-07
ANEST
EQUIP STOR
SCRUB-UP ALCOVE
G-33
EXT RAD
CONTROL
G-32
NEUROSURGERY O R 9
G-36
SUB STERILE
G-37
PUMP
TECHS
PREP RM
G-36A
CARDIAC OR 8
G-38
CORRIDOR
CB-2C
CORRIDOR
CB-2B
FEMALE SHOWER
G-23B
DICTATING
G-23A
MALE LOCKERS
G-24B
MALE
TOILET &
SHOWER
G-24A
CLEAN
CORE
SUPPORT
G-34
ETO RM
B-02C
VESTIBULE
HAC
B-02F
TOILET
B-02D
TOILET
B-02E
ELEVATOR
P-6
ELEVATOR
P-7
FEMALE TOILET
G-23C
FEMALE
LOCKERS
G-23D
VESTIBULE
STAFF LOUNGE
G-23
PHYSICIAN LOUNGE
G-24
ORTHOPEDIC OR 7
G-39
OFFICE
G-28
SCRUB
UP
ALCOVE
G-29
SCRUB-UP ALCOVE
G-30
OFFICE
G-31
EQUIP
G-28A
SUB
STERILE
G-42
PLASTER
& SPLINTS
G-41
EQUIP
STORAGE
G-40
OPERATING
RM GENERAL
G-27
SUB STERILE
G-26A
OPERATING
RM GENERAL
G-26
GENERAL
OPERATING RM
G-25
SUB
STERILE
G-21A
OPERATING
RM GENERAL
G-21
REC & OR
HEAD NURSES
G-01
ELECTRICAL CLOSET
G-22
PHONE/SGNL RM
G-20A
G-20B
G-20C
CLERICAL
G-02
OFFICE
G-02E
OFFICE
G-02D
OFFICE
G-02C
ELEVATOR LOBBY
CB-10A
ELEVATOR LOBBY
CB-16D
HAZ.
HAZ.
45 & 30 KVA
45 KVA
45 & 30 KVA
45 KVA
45 KVA
KVA
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
RECOVERY
BED RM
STRETCHER ALCOVE
WC
ALCOVE
STERILE STORAGE
G-44G-35
ELECTRICAL CLOSET
G-22
S S
S
S S
S S
S S
S S
SS SS
SSSSSS
SS
S
S S
S S
S S
S S
S S
S
S S
S
SS S
S S
SS SSSS
SS
S S
S S
S
SS SSS
SS SSSSSSSSSSSSSSSS
S S
S S
S S
S
SS
SS SS
S
SS SSS
S S
S S
S S
S
S S
S
SS SSSSSSSS
S S
S SS S S
S S
S S
S S
S S
S S
S S
S S
S
SS
SS SSSS
S S
SS SSSSSSSSSSSSSSSSSSSSSS
S
S
SSS
SS S
S S
S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
SS S
S S
SS
SS S
S
S
SS
S S
S S
SS SSS
S S
S S
S S
S
SS SS
S
SS
S S
S S
S S
S
SS
S S
S
S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
J
K
L
M
N
P
R
C.C
C.D
C.E
C.F
C.G
C.G1
C.H
C.I
C.11 C.12 C.13 C.14 C.15 C.16 C.17 C.18 C.19 C.20 C.20.1C.17.1C.16.2 C.16.3C.15.1C.13.1
14 15 16 17 18 19 20 21 22 23 24 25 26 27 2821.5
RISER 4
PACU
RISER 4A TO MICU
CONTINUED ON PG010B
CREATE NEW DEDICATED
RISER FOR PACU
O
2" O
SICU
1 1/2" O
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/2
/2
:4
:3
A
M C
U s e rs
\p p h if e r\ D o c u m e n ts \R e v it L o c a l\ R e v it
\P
-0
-N a s h v ill e -U p g r
O x y g e n p p h if e rP
C
.r v t
PG010D
SUB-BASEMENT MEDICAL GAS PLAN
AREA D
3 20PRP
UPGRADE OXYGEN
NASHVILLE VAMC
1310 24TH AVENUE S.
NASHVILLE, TN 37212 JUNE 5, 2023
BID DOCUMENTS
626-22-20122-066
SPG
N O
R T
H0 84 16
Scale: 3/32" = 1'-0"
SUB-BASEMENT MEDICAL GAS PLAN AREA D
A. SLEEVE ALL PENETRATIONS. FIRESTOP AND SEAL
WATER TIGHT.
B. CONTRACTOR TO COORDINATE ZONE VALVE
INSTALLATION WITH VA FOR ANY SHUT DOWN.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
A B
C D
ACRE
1 PIPE RISES FROM THE SUB BASEMENT UP TO THE
BASEMENT FLOOR HERE.
C. PIPES SHOWN ARE IN SUB-BASEMENT.
FLOORPLAN FOR BASEMENT IS SHOWN FOR
REFERENCE.
NO. 4
DN
HISTO LAB
CRAWL SPACE
WAITING SPACE
CB-14A
DRESS
D-53A
DRESS
D-54A
TOILET
D-53B
TOILET
D-54B
TOILET
D-51B
TOILET
D-52B
DRESS
D-52A
DRESS
D-51A
BD
ELECTRICAL
CLOSET
D-30
PETT SCAN
D-40
OFFICE
F-11A
BSLE LAB
D-12D
CORRIDOR
CB-12
CORRIDOR
CB-13
MECH EQUIP
F-10
OFFICE
F-4
F-2
F-1
CONTROL RM
F-11B
F-11
COMPRESSOR RM
F-12
CLOSET
F-12A
CORRIDOR
CB-24
CORRIDOR
CB-24
CORRIDOR
CB-11
CYTO LAB
D-05
CORRIDOR
CB-10
OFFICE
D-06A
MRI
D-19
CORRIDOR
CB-12
RADIOGRAPHIC
FLUOROSCOPIC
D-54
WAITING
D-02
MALE TOILET
D-49
RADIOGRAPHIC
FLUOROSCOPIC
RM
D-51
RADIOGRAPHIC
FLUOROSCOPIC
D-52
RADIOGRAPHIC
FLUOROSCOPIC
D-53
MICRO LAB
D-12
T C LAB
D-12E
GEN WASH
D-09
READING RM
D-04
CUTTING RM
D-05A
SAW RM
MULTI PURPOSE
D-05C
SCREENIING
D-06
FEMALE
TOILET
D-07
MALE
TOILET
D-08
BLK STORAGE
D-05D
MICRO OFFICE
D-05E
WORK RM
D-12C
ANTE RM
D-12B
OFFICE
D-12A
BD2
D-11 BD1
D-10
ELECTRICAL CLOSET
D-29
CT EXAM RM
D-28E
CONTROL
D-51C
CONTROL
D-52C
CONTROL
D-53C
CONTROL
D-54C
HAC
D-55
STORAGE
D-56
ADP
D-01
SIG
CLOSET
D-02G
CHIEF TECH
D-50
SVC CHIEF
D-65
SEC
D-65I
ELEVATOR
S-2
ELEVATOR
S-1
FEMALE
TOILET
D-48
TECH
D-03A
HOT LAB
D-40D
TREAT
D-40E
TREAT
D-40F
TOILET
D-40C
CTRL RM
D-40B
MULTI
VIEWING
D-41
MULTI
VIEWING
CB-12D D-42
STORAGE
CB-12C D-43
MULTI
VIEWING
D-44
MULTI
VIEWING
D-45
OFFICE
D-46
ADP
COORD
D-47
ELECTRICAL CLOSET
D-02FOFFICE
D-02E
OFFICE
D-02D
GANTRY
D-40A
OFFICE
D-02C
OFFICE
D-02B
OFFICE
D-02A
ADP COMPUTER RM
D-03
FEC
75 KVA
R am p U p
STAIR
NO. 4
DN
HISTO LAB
CRAWL SPACE
WAITING SPACE
CB-14A
DRESS
D-53A
DRESS
D-54A
TOILET
D-53B
TOILET
D-54B
TOILET
D-51B
TOILET
D-52B
DRESS
D-52A
DRESS
D-51A
BD
ELECTRICAL
CLOSET
D-30
PETT SCAN
D-40
OFFICE
F-11A
BSLE LAB
D-12D
CORRIDOR
CB-12
CORRIDOR
CB-13
MECH EQUIP
F-10
OFFICE
F-4
F-2
F-1
CONTROL RM
F-11B
F-11
COMPRESSOR RM
F-12
CLOSET
F-12A
CORRIDOR
CB-24
CORRIDOR
CB-24
CORRIDOR
CB-11
CYTO LAB
D-05
CORRIDOR
CB-10
OFFICE
D-06A
MRI
D-19
CORRIDOR
CB-12
RADIOGRAPHIC
FLUOROSCOPIC
D-54
WAITING
D-02
MALE TOILET
D-49
RADIOGRAPHIC
FLUOROSCOPIC
RM
D-51
RADIOGRAPHIC
FLUOROSCOPIC
D-52
RADIOGRAPHIC
FLUOROSCOPIC
D-53
MICRO LAB
D-12
T C LAB
D-12E
GEN WASH
D-09
READING RM
D-04
CUTTING RM
D-05A
SAW RM
MULTI PURPOSE
D-05C
SCREENIING
D-06
FEMALE
TOILET
D-07
MALE
TOILET
D-08
BLK STORAGE
D-05D
MICRO OFFICE
D-05E
WORK RM
D-12C
ANTE RM
D-12B
OFFICE
D-12A
BD2
D-11 BD1
D-10
ELECTRICAL CLOSET
D-29
CT EXAM RM
D-28E
CONTROL
D-51C
CONTROL
D-52C
CONTROL
D-53C
CONTROL
D-54C
HAC
D-55
STORAGE
D-56
ADP
D-01
SIG
CLOSET
D-02G
CHIEF TECH
D-50
SVC CHIEF
D-65
SEC
D-65I
ELEVATOR
S-2
ELEVATOR
S-1
FEMALE
TOILET
D-48
TECH
D-03A
HOT LAB
D-40D
TREAT
D-40E
TREAT
D-40F
TOILET
D-40C
CTRL RM
D-40B
MULTI
VIEWING
D-41
MULTI
VIEWING
CB-12D D-42
STORAGE
CB-12C D-43
MULTI
VIEWING
D-44
MULTI
VIEWING
D-45
OFFICE
D-46
ADP
COORD
D-47
ELECTRICAL CLOSET
D-02FOFFICE
D-02E
OFFICE
D-02D
GANTRY
D-40A
OFFICE
D-02C
OFFICE
D-02B
OFFICE
D-02A
ADP COMPUTER RM
D-03
FEC
75 KVA
R am p U p
S S
S S
S
S S
SS SSSSS
S
S SS SS
SS SS
S S
S S
S S
S S
SS
S S
S S
S S
S S
S S
S S
S S
S
SS SSSS
SS
S S
S S
S S
S
SS
S S
SS SSSSSSSSSSSSSSSS
SS SSSSSSSSSSSS
S
S
SS
S S
S S
SS
S S S
S
SS SSSSSSSSSS
S
SS SSS
SS SSSSSS
SS
SS SSSSSSSSSS
S S
S S
S S
S S
S S
S S
S S
S S
S S
SS SSSSS
SS SSSSS
S
S
SS
SS SSSSSSSSS
S S
S S
S S
S S
SS
SS SSSSS
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
SS SSSSS
S S
S S
S
S S
S S
S
SS
SS
S S
S S
SS
SS
S S
S S
S
S S
S S
S
S
SS
S S
S S
S S
S
S S
S S
B
C
D
E
F
G
H
J
A.1 A.2 A.3 A.4 A.5 A.6 A.7 A.8 A.9 A.10 A.11
A.A
A.B
A.C
A.D
A.E
4 5 6 7 8 9 10 11 12 13
MGZVB-13
MGZVB-05
RISER 7
MGZVB-04
MGZVB-03
MGZVB-02
MGZVB-01
CONTINUED ON PG100C
C O
N T
IN
U
E D
O N
P G
B
1/ O
3/4" O
O
1/2" O 3/4" O
O
3/4" O 3/4" O
MGAB-
/8
Engineers Architects
# KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/2
/2
:4
:4
A
M C
U s e rs
\p p h if e r\ D o c u m e n ts \R e v it L o c a l\ R e v it
\P
-0
-N a s h v ill e -U p g r
O x y g e n p p h if e rP
C
.r v t
PG100A
BASEMENT MEDICAL GAS PLAN AREA A
4 20PRP
UPGRADE OXYGEN
NASHVILLE VAMC
1310 24TH AVENUE S.
NASHVILLE, TN 37212 JUNE 5, 2023
BID DOCUMENTS
626-22-20122-066
SPG
N O
R T
H0 84 16
Scale: 3/32" = 1'-0"
BASEMENT MEDICAL GAS PLAN AREA A
1 PROVIDE NEW ZONE VALVE IN EXISTING VALVE
BOX. LABEL VALVE AS INDICATED.
A. SLEEVE ALL PENETRATIONS. FIRESTOP AND SEAL
WATER TIGHT.
B. CONTRACTOR TO COORDINATE ZONE VALVE
INSTALLATION WITH VA FOR ANY SHUT DOWN.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
A B
C D
ACRE
1 DEMOLISH EXISTING OXYGEN PIPE FROM
OUTLET TO ZONE VALVE AND CAP. PROVIDE
BLANK PLATE AT OUTLET LOCATION.
NO. 8
STAIR
NO. 6
P&H STORAGE
(11'x24')
HAZZARD WASTE
(8'x12')
WAITING SPACE
CB-14A
TOILET
E-18B
HONEYWELL RM
D-72
TOILET
ELECTRICAL CLOSET
PEST
CONTROL
WORK RM
E-18A
SWITCH GEAR
E-11
CORRIDOR
CB-15
BOILER RM
E-25F
RECEIVING AND SHIPPING DOCK
CORRIDOR
CB-18
STORAGE
E-23
RECEIVING & ISSUE
AREA EQUIP STORAGE
FORMS STORAGE
E-22
CORRIDOR
CB-17
STORAGE
E-09A
STAFF
TOILET
E-08
STORAGE
D-68C
E-10
E-10A
MAIL RM
E-14
ELEVATOR EQUIP
E-13
CORRIDOR
CB-16
CORRIDOR
CB-16B
CORRIDOR
CB-16C
CORRIDOR
CB-16A
MECH
E-5
BIOMED ENG
REPAIRING &
DEVELOPMENT
E-01
ELECTRICAL SHOP STORAGE
D-68A
ELECTRONICS
D-68B
KEY SHOP
D-69
MULTI PURPOSE
E-09E
E-11A
VESTIBULE
E-09
TOILET
E-12
ELEVATOR
P-9
EQUIP RM
E-19
OFFICE
E-22A
MED GAS
E-21
MED GAS
E-20
PEST
CONTROL
OFFICE
E-18ELECTRICAL
E-17
OFFICE
E-14A
SIGNAL
E-15
SIGNAL
E-16
SVC RM
E-26
GROUNDS EQUIP
E-25
CLOSET
E-25A
BOILER OPERATOR
E-25E
A/C
OPERATIONS
SHOP
E-25B
FIRE EXT
FLAM
STORAGE
E-24
E-25C
GROUNDS & TRANS
E-25D
VESTIBULE
CB-19A
EMERGENCY
GENERATOR RM
E-25G
EMERGENCY
GENERATOR RM
E-25H
MULTI PURPOSE
D-73A
ELECTRICAL ENG
D-70 OFFICE
D-71
STAFF
D-65B
STAFF
D-65A
CHEST RM
D-62
TOILET
D-63
TOILET
D-64
CONTROL RM
D-61
AUTOMATED
RADIOGRAPHIC
D-60
PROCEDURE
ROOM
D-59
ELECTRIC SHOP
D-68
SWITCHBOARD RM
D-67
D-66
OFFICE
E-09B
OFFICE
E-09C
OFFICE
E-09D OFFICE
E-09F
OFFICE
E-09G
OFFICE
E-09H
BUSINESS RM
E-09I
OFFICE
E-09J
A/C SHOP
E-27
MAINT
FOREMAN
E-07
OFFICE
E-08
OFFICE
E-08A
A/C
FOREMAN
E-06
PAINT SHOP
E-05
CARPENTER SHOP
E-04
MACH
SHOP
E-03
ELECTRICAL CLOSET
BE
E-26A
PLUMBING SHOP
E-02
OFFICE
E-01C
BIOMEDICAL
ENGG
STORAGE
E-01B
RECEIVING
& CLEANING
E-01A
BLDG
MGT
LOCKERS
B-03
ELEVATOR
P-3
ELEVATOR
P-4
ELEVATOR
P-5
BLDG
MGT
TOILET
B-03A
VESTIBULE
ENGG TOILET
B-04A
ENGG
LOCKERS
B-04
HAC
B-05
OFFICE
D-73
OFFICE
D-74
STORAGE
D-74A
OFFICE
D-73D
OFFICE
D-73C
CLERICAL OFFICE
D-73B
STAFF
D-65C
STAFF
D-65D
STAFF
D-65E
RESIDENT/ INTERN
D-65F
CONFERENCE/ CLASS RM
D-65G
SVC CHIEF
RECEPTION & SEC
D-65H
ELEVATOR
S-2
ELEVATOR
S-1
ELEVATOR LOBBY
CB-10A
ELEVATOR LOBBY
CB-16D
30KVA
112.5 KVA
OFFICE
S S
S
SS SSSSSSSSSS
S SS S S S
SS SSSSS
SS S
S S
S S
S S
SS
S S
S S
SS
S
S
S S
SS S
S S
S S
S
S
S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
SS SSSSSSSSSSSSSS
S
SS SSSS
S
SS S
S S
S S
S S
S S
S S
S S
S S
S
S
S
S S
S
S
S
S S
S S
S S
S S
S S
S SS S S S S S S
S S
S S
S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S
S S
S S
S SS S S S S S S S S S
SS
S S
S
S S
S
S S
S SS
SS S
SS SSSS
S
SS SSSSSSSSSSSSSSSSSSSSSS
S
S
SS S
S S
S
S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S SS S S S
S S
S S
S S
S S
S S
S S
S S
S
S S
S S
S
S SS S S
S SS S
S SS S S
S SS S
S S
S S
S S S
S
S S
S S
A
B
C
D
E
F
G
H
J
14 15 16 17 18 19 20 21 22 23 24
25 26 27 28
21.5
PIPE RISES FROM THE SUB-BASEMENT
UP TO THE BASEMENT FLOOR HERE.
PIPE IN SUB-BASEMENT
EXISTING
RISER 3 VALVE
MAIN BUILDING
ISOLATION VALVE
C O
N T
IN
U
E D
O N
P G
A
CONTINUED ON PG100D
NEW ER
RISER 3A
1 1/4" O
1/2" O
1/2" O
O
1 1/4" O
1/
O
2" O
O
3/4" O
O
1/2" O
MGZVB-10
3/4" O 1 1/4" O
O
O
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/2
/2
:4
:4
A
M C
U s e rs
\p p h if e r\ D o c u m e n ts \R e v it L o c a l\ R e v it
\P
-0
-N a s h v ill e -U p g r
O x y g e n p p h if e rP
C
.r v t
PG100B
BASEMENT MEDICAL GAS PLAN AREA B
5 20PRP
UPGRADE OXYGEN
NASHVILLE VAMC
1310 24TH AVENUE S.
NASHVILLE, TN 37212 JUNE 5, 2023
BID DOCUMENTS
626-22-20122-066
SPG
N O
R T
H0 84 16
Scale: 3/32" = 1'-0"
BASEMENT MEDICAL GAS PLAN AREA B
1 2” PIPE UP FROM SUB-BASEMENT.
2 EXISTING EMERGENCY OXYGEN SUPPLY
CONNECTION.
3 TAP INTO EXISTING OXYGEN MAIN FOR NEW
1-1/4" RISER DEDICATED TO THE ER.
A. SLEEVE ALL PENETRATIONS. FIRESTOP AND SEAL
WATER TIGHT.
B. CONTRACTOR TO COORDINATE ZONE VALVE
INSTALLATION WITH VA FOR ANY SHUT DOWN.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
A B
C D
ACRE
NO. 2
SPECIMEN RECEIVING
TUBE
STA
URIN-
ANALYSIS
HEMATOLOGY
CLOSET
G-08A
FROZEN
SECTION
G-18 B-A118
CORRIDOR
CB-4
AREAWAY
CORRIDOR
CB-9C
CORRIDOR
CB-3
FAN RM - 4
B-B105
CORRIDOR
CB-9D
CORRIDOR
CB-9
CORRIDOR
CORRIDOR
CB-7
ELECTRICAL CLOSET
A-16
CORRIDOR
CB-8
CORRIDOR
CB-6A
STORAGE
CB-5
CORRIDOR
CB-6
FLOW CYTOMETRY
A-04
OFFICE
A-04A
OFFICE
A-04B
CORRIDOR
CB-6
EMBALMING
A-03
CHEMISTRY
A-17
BLOOD BANK
A-14
ELECTRICAL CLOSET
A-15 BA2
COMM
CLOSET
A-17A
OFFICE
A-14A
CENTRAL STORAGE
A-17G
FEMALE TOILET
A-06ELEVATOR EQUIP
A-05
ELEVATOR
S-1
AUTOPSY
A-02
A-01BA-01D
A-01C
CHEM
SUPER LEAD
TECH
A-17F
LEAD TECH
A-17E
LEAD TECH
A-17D
OFFICE
A-07
HAC
A-08
PATH CHIEF
A-09
HEMA SUPER
A-17C
FEMALE TOILET
A-10
FEMALE TOILET
A-11
MULTI PURPOSE
A-17B
MALE
TOILET
A-12
MALE
TOILET
A-13
ELECTRICAL CLOSET
A-26
ELEVATOR
P-8
OFFICE
A-19D
LAB SEC
A-19
TISSUE TYP
A-20
FLOW CYTO
A-20A
ANCILLARY LISTING
A-21
RADIATION SAFETY
& EQUIP RM
A-25P
EXIST TELEPHONE EQUIP RM
LABORATORY-LOW LEVEL IN-VITRO COUNTING
A-25K
VIEWING/
CONFERENCE
A-25J
SEC
A-25H
CHIEF
A-25I
TELE
EQUIP
EXPANS
A-22
HOT LAB
A-25O
BIOCHEMISTRY LAB
A-25N
EXAM
A-25L
LABORATORY HIGH LEVEL IN-VITRO COUNTING
A-25M
EL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .