C05-05_Combined_Synopsis_06_16_26.pdf
PDF 775 KB Posted
- Attached to
- Heavy Equipment IDIQ Federal contract opportunity
- Solicitation number
- 140R4026R0017
About this file
This is a Request for Proposal (RFP) for an Independent Delivery Indefinite Quantity (IDIQ) contract for heavy equipment rental services issued by the U.S. Department of the Interior, Bureau of Reclamation, Upper Colorado Region. The solicitation number is 140R4026R0017, with proposals due by July 16, 2026 at 12:00 PM Mountain Time. The contract will support the Provo Area Office Force Account and other Bureau regions across the 17 western states, with a 5-year ordering period from award through July 22, 2031. The NAICS code is 532412 with a $40 million small business size standard, and the solicitation includes a reserve for one or more small business concerns.
The Government will award Seed Delivery Order 2 immediately following IDIQ award and guarantees minimum orders of $500 to each awardee over the contract's full performance period. Offerors may submit pricing for Sample Delivery Order 1 (Slab Lake HER project in Utah, July–October 2026 with 4 Cat 745 Rock Trucks and 1 John Deere 400D Water Truck) and/or Seed Delivery Order 2 (YMCA Overburden HER project in Arizona, October 2026–May 2027 with identical equipment). Evaluation criteria prioritize technical capability (responsiveness and repair support, management capability, and prior experience), past performance via CPARS, and price. Technical capability must demonstrate ability to respond to equipment repairs within 6 hours or provide replacement within 24 hours, deliver equipment within 300 miles, maintain equipment in excellent condition with less than 3,000 hours, and provide Trimble Earthworks-ready units where specified. The contractor must establish a maintenance yard within 300 miles of project locations and provide all repair costs, backup equipment, and freight delivery at no additional Government cost. Future delivery orders will be awarded on lowest evaluated price basis with firm fixed pricing invoiced monthly after completion. Contractors must submit proposals electronically to Timothy Leff (Contract Specialist) and Lisa Vance (Contracting Officer), with all pricing and technical documentation required within five days of delivery order issuance.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Number: 140R4026R0017
2026 HER IDIQ
Solicitation No.
140R4026R0017
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF RECLAMATION
UPPER COLORADO REGION
REGIONAL OFFICE
SALT LAKE CITY, UTAH
COMBINED SYNOPSIS/SOLICITATION 2026 HER IDIQ (FAR 12.202)
This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with FAR Part 12 and in conjunction with FAR Part 15 This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued.
Solicitation number 140R4026R0017 is issued as a Request for Proposal (RFP) for providing heavy equipment rental needs for the Upper Colorado Basin Region, particularly the Provo Area Office Force Account operational team.
This solicitation contains a reserve for one or more small business concerns identified at RFO FAR 19.000(a)(3). The small business program eligibility requirements apply. The small business concern(s) eligible for participation in the reserve shall submit one offer that addresses each portion of the solicitation for which it wants to compete. Award of the contract will be based on criteria identified in FAR Provision 52.212-2 Evaluation.
This solicitation incorporates provisions and clauses by reference. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2026-01. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov and https://www.acquisition.gov/diar.
The associated North American Industrial Classification System (NAICS) code for this procurement is 532412 with an associated small business size standard of $40 Million.
Proposal submittal information:
1. Offerors will be considered for award of the Independent Delivery Indefinite Quantity (IDIQ) contract by submitting pricing for the Sample Delivery Order 1 and/or the Seed Delivery Order 2. Offerors must also provide Technical Capability support for the delivery orders as identified under Provision 52.212-2 Evaluation. Not providing pricing and technical capability support for both will not be viewed negatively but the proposal must include Technical Capability support and Pricing for at least one.
2. For the purposes of pricing and technical evaluation of the IDIQ, offerors should attend to the instructions provided in Provision 52.212-1 Instructions to Offerors—Commercial Products and Commercial Services (DEVIATION MAR 2026) and Provision 52.212-2 Evaluation—Commercial Products and Commercial Services (Deviation MAR 2026) as well as the requirements as specified in the Statement of Work (SOW) found within this solicitation.
3. Offerors should provide sufficient information to demonstrate their technical capability for their planned approach to deliver, service, maintain, and support the equipment to meet the government’s needs at the various locations throughout the http://www.acquisition.gov/ ordering period utilizing the Sample and/or Seed Delivery Order.
Delivery Order Instruction
4. The Government intends to award Seed Delivery Order 2 immediately following the award of the IDIQ contractors.
Future delivery orders awarded will be made on the basis of the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-cost factors. Delivery orders will result in Firm Fixed Price (FFP) orders to be invoiced equally each month after performance is completed. Delivery orders for incidental T&M may be needed for repairs, servicing etc.
5. For the Seed Delivery Order 2 being evaluated for the IDIQ award and award of the delivery order, factors being evaluated are identified in 52.212-2 Evaluation.
6. The Government guarantees it will order at least one delivery order with a minimum value of $500.00 to each awardee of the IDIQ contract over the full period of performance.
7. The total price for each delivery order shall be inclusive of all applicable fees and taxes. The contractor shall not be compensated for any changes or updates to equipment or the purchase of new equipment for the life of this contract.
Project Name Slab Lake HER Project Location Fruitland, Utah Latitude: 40.115862 Degrees
Longitude: -110.813149 Degrees
Project Description Equipment Delivery Instructions
Qty/Unit Delivery Date
Pick up Date
Rental period in Months Freight
Delivery Distance
Total Freight
Rental Rate Sub Total
ITEM Description Date Date $/mile Miles $ $ $ 003 Cat 745 Articulated Rock Truck, or Equal 1/EA 7/14/2026 10/15/2026 3.5 003 Cat 745 Articulated Rock Truck, or Equal 1/EA 7/14/2026 10/15/2026 3.5 003 Cat 745 Articulated Rock Truck, or Equal 1/EA 7/14/2026 10/15/2026 3.5 003 Cat 745 Articulated Rock Truck, or Equal 1/EA 7/14/2026 10/15/2026 3.5
John Deere 400 D 8,000 Gallon Water Truck or equivalent. 1/EA 7/14/2026 10/15/2026 3.5
Sample Delivery Order 1
Construct riprap aremoring across channel of Slab Lake to prevent erosion and loss of lake.
This project is located near Strawberry Pinnacles. Drop the equipment at or near the coordinates. The excavator and trucks will need to be walked into the project site from there. Contact Project Manager with questions regarding delivery.
EQUIPMENT REQUIRED
Total
Written, signed proposals with contact information are due no later than 16 July 2026 at 12:00 PM (Noon) MT by email to Timothy Leff, Contract Specialist tleff@ios.doi.gov and Lisa Vance, Contracting Officer at lvance@ios.doi.gov
DELIVERY ORDERS
Service Wage Determinations will be included in delivery order requests that contain incidental time and materials (T&M) items based on place of performance. T&M delivery orders will include a ceiling price and contractors who exceed this ceiling will do so at their own risk.
Delivery orders will define the equipment needed, the location of the work, and the period of performance.
Only Upper Colorado Basin Wasatch Team, Contracting Officers can issue delivery orders against this contract. Other area offices must go through the Provo Area Office to coordinate Delivery Orders.
End of Section
Project Name YMCA Overburden HER Project Location Approximately 20 Miles Norty of Yuma, AZ Latitude: 32.858699 Degrees
Longitude: -114.483469 Degrees
Project Description Equipment Delivery Instructions
Qty/Unit Delivery Date
Pick up Date
Rental period in Months Freight
Delivery Distance
Total Freight
Rental Rate Sub Total
ITEM Description Date Date $/mile Miles $ $ $ 003 Cat 745 Articulated Rock Truck, or Equal 1/EA 10/5/2026 5/14/2027 8 003 Cat 745 Articulated Rock Truck, or Equal 1/EA 10/5/2026 5/14/2027 8 003 Cat 745 Articulated Rock Truck, or Equal 1/EA 10/5/2026 5/14/2027 8 003 Cat 745 Articulated Rock Truck, or Equal 1/EA 10/5/2026 5/14/2027 8
John Deere 400 D 8,000 Gallon Water Truck or equivalent. 1/EA 10/5/2026 5/14/2027 8
EQUIPMENT REQUIRED
Seed Delivery Order 2
Total
This project is adjacent to the Yuma Dredge Yard. Contact Project Manager with any delivery questions or issues.
This equipment supports the Yuma crew in excavating the overburden from the Regugia pond portion of the Yuma Meadows Conservation Area project.
mailto:tleff@ios.doi.gov mailto:lvance@ios.doi.gov
CLAUSES
52.252-2, Clauses Incorporated by Reference (FEB 1998). Any Clauses incorporated by Reference can be found in full text at: https://www.acquisition.gov/far
Clause Title Date 52.203-3 Gratuities APR 1984 52.203-6
ALT 1
Restrictions on Subcontractor Sales to the Government NOV 2021
52.203-11 Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions
SEP 2024
52.203-13 Contractor Code of Business Ethics and Conduct NOV 2021 52.204-13 System for Award Management Maintenance OCT 2018 52.209-6 Protecting the Governments Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment
JAN 2025
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations
NOV 2015
52.212-4 Contract Terms and Conditions – Commercial Products and Commercial Services
Deviation
MAR 2026
52.219-8 Utilization of Small Business Concerns JAN 2025 52.219-9
ALT II
Small Business Subcontracting Plan – ALT II NOV 2016
52.219-14 Limitations on Subcontracting OCT 2022 52.219-16 Liquidated Damages – Subcontracting Plan SEP 2021 52.219-28 Post-Award Small Business Program Representation JAN 2025 52.222-3 Convict Labor – Deviation MAY 2026 52.222-19 Child Labor – Cooperation with Authorities and Remedies MAR 2026 52.222-35 Equal Opportunity for Veterans JUN 2020 52.222-36 Equal Opportunity for Workers with Disabilities JUN 2020 52.222-37 Employment Reports on Veterans JUN 2020 52.222-40 Notification of Employee Rights Under the National Labor
Relations Act
DEC 2010
52.222-50 Combating Trafficking in Persons OCT 2025 52.222-54 Employment Eligibility Verification - Deviation MAY 2026 52.222-90 Addressing DEI Discrimination by Federal Contractors Deviation
MAY 2026
52.226-8 Encouraging Contractor Policies to Ban Text Messaging
While Driving
MAY 2024
52.232-33 Payment by Electronic Funds Transfer- System for Award Management
OCT 2018
52.232-40 Providing Accelerated Payments to Small Business Subcontractors
MAR 2023
52.233-3 Protest After Award AUG 1996 https://www.acquisition.gov/far
52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.240-91 Security Prohibitions and Exclusions DEC 2025 52.242-5 Payments to Small Business Subcontractors JAN 2017 52.242-15 Stop-Work Order AUG 1989 52.244-6 Subcontracts for Commercial Products and Commercial
Services Deviation
MAR 2025
52.246-2 Inspection of Supplies-Fixed-Price AUG 1996 52.246-16 Responsibility for Supplies APR 1984
DOI-AAAP-0028 ELECTRONIC INVOICING AND PAYMENT
REQUIREMENTS-INVOICE PROCESSING PLATFORM (IPP) (FEB 2021)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
'Payment request' means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial Item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice: vendor invoice (signed and approved by the COR).
The Contractor shall also submit an electronic copy of the IPP invoice to Timothy Leff tleff@ios.doi.gov and Lisa Vance lvance@ios.doi.gov once the invoice has been submitted to IPP. Failure to email the invoice may cause significant delay or possible rejection of your payment request.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Local Clause)
WBR 1452.201-80 CONTRACTING OFFICER’S REPRESENTATIVE’S
AUTHORITIES AND LIMITATIONS -- BUREAU OF RECLAMATION (MAY
2018)
a) Performance of the work under this contract shall be subject to the technical direction of the Reclamation Contracting Officer's Representative (COR). The term “technical direction” is defined to include, without limitation:
(1) Inspecting and accepting or rejecting work performed under the contract.
(2) Representing the Government in technical phases of the work. The COR is responsible for the technical administration of the contract and will provide instructions and interpretations to the Contractor on all technical matters relating to the contract. The COR will supervise or oversee all Government technical and administrative personnel assigned to assist the COR.
(3) Reviewing and, where required by the contract, approving submittals of technical data, shop drawings, samples, literature, plans, or other data required to be delivered by the Contractor to the Government.
(b) The Contractor will receive a copy of the written COR designation from the Contracting Officer. It will specify the extent of the COR's authority to act on behalf of the Contracting Officer.
(c) Technical direction must be within the scope of work stated in the contract. Only the Contracting Officer is authorized to determine if a change is within the scope of the contract; therefore, the COR does not have the authority to, and may not, issue any technical direction that -
(1) Constitutes a direction of additional work outside the Contract requirements;
(2) Constitutes a change as defined in the contract clause entitled “Changes;”
(3) In any manner causes an increase or decrease in the total contract cost, or the time required for contract performance;
(4) Changes any of the expressed terms, conditions or specifications of the contract; or
(5) Interferes with the Contractor's right to perform the terms and conditions of the contract.
(d) All technical direction shall be issued in writing by the COR.
(e) The Contractor must proceed promptly with the performance of technical direction duly issued by the COR in the manner prescribed by this clause and within its authority under the provisions of this clause. If, in the opinion of the Contractor, any instruction or direction by the COR falls within one of the categories defined in (c)(1) through (c)(5) of this clause, the Contractor must not proceed and must notify the Contracting Officer in writing within five (5) working days after receipt of any such instruction or direction and must request the Contracting Officer to modify the contract accordingly. Upon receiving the notification from the Contractor, the Contracting Officer must -
(1) Advise the Contractor in writing after receipt of the Contractor's letter that the technical direction is within the scope of the contract effort and does not constitute a change under the Changes clause of the contract; or
(2) Advise the Contractor that the Government will issue a written change order.
(f) A failure of the Contractor and Contracting Officer either to agree that the technical direction is within the scope of the contract or to agree upon the contract action to be taken with respect to the technical direction will be subject to the provisions of the clause entitled “Disputes.”
(End of clause)
DOI-AAAP-0050 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING
SYSTEM (DEC 2015)
FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.
1) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.
2) We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.
3) When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions.
Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.
4) Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.
a) Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment.
b) Your comments should focus on objective facts in the AO's narrative and should provide your views on the causes and ramifications of the assessed performance.
c) All information provided should be reviewed for accuracy prior to submission.
d) If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.
e) Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.
f) If you do not sign and submit the CPAR within 60 days, it will automatically https://www.cpars.gov/ https://www.cpars.gov/ be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."
5) The following guidelines apply concerning your use of the past performance evaluation:
a) Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.
b) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
c) Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.
6) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period.
7) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
--- End of Addendum to 52.212-4---
52.216-18 Ordering (Oct 2020) a)Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from 07/22/2026 through 07/22/2031.
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c) A delivery order or task order is considered "issued" when—
(1) If sent by mail (includes transmittal by U.S. mail or private delivery service), the Government deposits the order in the mail;
(2) If sent by fax, the Government transmits the order to the Contractor's fax number; or
(3) If sent electronically, the Government either—
(i) Posts a copy of the delivery order or task order to a Government document access system, and notice is sent to the Contractor; or
(ii) Distributes the delivery order or task order via email to the Contractor's email address.
(d) Orders may be issued by methods other than those enumerated in this clause only if authorized in the contract.
(End of clause)
52.216-19 Order Limitations (Oct 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $10,000, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor-
(1) Any order for a single Item in excess of $1,500,000.00 ;
(2) Any order for a combination of Items in excess of $3,500,000.00 ; or
(3) A series of orders from the same ordering office within 180 days that together call for quantities exceeding the limitation in paragraph (b)(1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 3 days after issuance, with written notice stating the Contractor’s intent not to ship the Item (or Items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
52.216-22 Indefinite Quantity (Oct 1995)
(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum." The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum."
(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor’s and Government’s rights and obligations with respect to that order to the same extent as if the order were completed during the contract’s effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after 07/22/2032.
52.216-32 Task-Order and Delivery-Order Ombudsman (Sept 2019)
(a) In accordance with 41 U.S.C. 4106(g), the Agency has designated the following task-order and delivery-order Ombudsman for this contract. The Ombudsman must review complaints from the Contractor concerning all task-order and delivery-order actions for this contract and ensure the Contractor is afforded a fair opportunity for consideration in the award of orders, consistent with the procedures in the contract.
Kaprice Tucker Office of Acquisition and Property Management Department of the Interior 1849 C Street, NW Washington, DC 20240 kaprice_tucker@ios.doi.gov 202-208-3466
(b) Consulting an ombudsman does not alter or postpone the timeline for any other process (e.g., protests).
(c) Before consulting with the Ombudsman, the Contractor is encouraged to first address complaints with the Contracting Officer for resolution. When requested by the Contractor, the Ombudsman may keep the identity of the concerned party or entity confidential, unless prohibited by law or agency procedure.
DIAR 1452.201-70 Authorities and Delegations. (SEP 2011)
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section4106&num=0&edition=prelim mailto:kaprice_tucker@ios.doi.gov
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
END OF CLAUSES
Statement of Work
1.0 Background
1.1 Background: Provo Area Office Force Account (PAO FA) provide in-house construction services on Reclamation facilities, and on facilities of other federal agencies. These services vary widely from embankment dam repair work to wetland construction and restoration. The location of construction also varies and may be located anywhere in the 17 western states. The purpose of this contract is to provide for the heavy equipment rental needs of the Upper Colorado Region, particularly the PAO FA. Award of contract may be to a single Contractor, or to multiple Contractors.
In addition to the Provo Force Account, other regions in the Bureau employ Engineering Equipment Operators for various tasks associated with their regional missions. This includes maintaining the levees and roads along the Lower Colorado and Rio Grande Rivers. Other tasks within the Bureau may include snow removal at high mountain facilities or road maintenance on remote sites. The intent of this contract is to have one or multiple contractors fulfill the heavy equipment rental needs of the Provo Force Account, along with the needs of the various other offices who will have equipment rental requirements. The Contracting Officer’s Representative, who will be the supervisor for the Provo Force Account, will manage workflow for the entire contract, unless otherwise delegated. This includes preparing and submitting delivery orders for other regions within the Bureau.
Examples of work locations over the past 5 years include the following:
Planet Ranch, Planet, AZ DUCA, Blythe, CA
MVCA, Needles, CA Provo River Delta, Provo, UT Stewart Lake, Jensen, UT Grand Coulee Dam, WA Jordan River, South Jordan, UT Fontenelle Dam, Wyoming Ochoco Dam, OR Folsom Dam,Sacramento, CA Echo Dam, UT Seminoe Dam, WY LDRWM, Myton, UT Jackson Lake Dam, WY Minidoka Dam, ID McKay Dam, Pendleton, OR Prosser Dam, Truckee, CA Red Fleet Dam, UT
Las Vegas Wash, Henderson, NV Moapa, NV Parker Dam, CA/AZ Blythe, CA Imperial Dam, CA/AZ Beal Lake, AZ Yuma Meadows, Yuma, AZ Chama, NM Canyon Ferry, MT Cook Lake Dam, WY Davis Dam, NV/AZ Santa Clara Pueblo, NM
2.0 Objectives
2.1 Heavy Equipment Rental and Delivery: The contractor shall be responsible for furnishing all materials, labor and equipment necessary to deliver, set-up and lease equipment listed in the bid schedule. The Government will pay fully loaded freight charges for delivery and return of any single piece of equipment up to 300 miles, (600 loaded miles total – 300 miles delivery and 300 miles return), where the need is determined fair, reasonable, and necessary to meet the requirements of this document – Meaning it is not fair or reasonable for the Government to pay for 300 miles of a shipment of a piece of equipment, when the Contractor has, or has access to, a comparable piece of equipment 50 miles away.
If a Delivery Order is issued for equipment delivery beyond 300 miles from the
Contractor’s equipment source, it will be the responsibility of the prime contractor to coordinate supply, and delivery of requested equipment, per requirements contained herein, at the rates prescribed in the bid schedule. This may result in the need for the prime Contractor to subcontract portion of work requirement under this contract. Subcontractor shall meet all requirements under this contract.
The situation may arise where the contractor is able to deliver equipment from beyond 300 miles for a smaller freight charge than local sources. As part of the Delivery Order process, the contractor shall submit to the government documentation that verifies local and long-distance freight charges.
2.2 Heavy Equipment Repair: The Government regularly provides some
Government owned equipment (see Attachment 2), in conjunction with leased equipment. On occasion Government equipment requires maintenance and repair work. As the need arises, the contractor shall, upon issuance of a Delivery Order, be responsible for repair services of Government fleet equipment. This may include onsite repair work, or equipment repair in the shop. Replacement parts will be paid by the Government and shall be OEM or certified equal.
3.0 Scope
3.1 Due to the nature of construction and staging, the required rental periods may vary slightly. In the event the equipment is returned earlier than indicated in a Delivery Order, the Government shall not be charged – i.e. the Government shall be charged only for time equipment is “on rent”. Equipment is considered “off rent” when the Contractor receives a call from the COR requesting termination of rental period for a specific piece of equipment, and equipment pick-up.
Force Account crews work a schedule consisting of 10 days on, followed by 4 days off. This amounts to 20 working days per month (4 weeks). Consequently, it is implied that the monthly (4-week) rate shall only include 20 working days.
For Delivery Orders greater than 1 month (4 weeks) that include a partial month, contractor shall prorate the partial month at the monthly (4 week) rate, not the higher weekly rate. For Delivery Orders less than 1 month (4 weeks), the contractor shall prorate the partial week at the higher weekly rate. Formulas for calculating prorated amounts are shown below:
Monthly Prorate = �𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀ℎ𝑙𝑙𝑙𝑙 𝑟𝑟𝑟𝑟𝑟𝑟𝑟𝑟
20 𝑑𝑑𝑑𝑑𝑑𝑑𝑑𝑑 � × (𝑛𝑛𝑛𝑛𝑛𝑛𝑛𝑛𝑛𝑛𝑛𝑛 𝑜𝑜𝑜𝑜 𝑑𝑑𝑑𝑑𝑑𝑑𝑑𝑑)
Weekly Prorate = �𝑊𝑊𝑊𝑊𝑊𝑊𝑊𝑊𝑊𝑊𝑊𝑊 𝑟𝑟𝑟𝑟𝑟𝑟𝑟𝑟
5 𝑑𝑑𝑑𝑑𝑑𝑑𝑑𝑑 � × (𝑛𝑛𝑛𝑛𝑛𝑛𝑛𝑛𝑛𝑛𝑛𝑛 𝑜𝑜𝑜𝑜 𝑑𝑑𝑑𝑑𝑑𝑑𝑑𝑑)
Freight Cost shall include Cost per Mile for Delivery and Pick-up (up to 300 miles each way) of all equipment, except in cases as described in paragraph 2.1 of the SOW.
3.2 The configuration of equipment rental needs, and number of each piece of equipment, varies by project. Similarly, the rental duration varies by project. The list of equipment included in the bid schedule is potential equipment that may be required upon issuing a Delivery Order. Salient characteristics of each piece of equipment are included in Section 5 of this document
3.3 Where expenses related to haul permitting and pilot car services may be incurred, the Government will negotiate payment of such, prior to issuance of each Delivery Order.
4.0 Equipment Requirements and Contractor Responsibilities
4.1 Equipment Safety
Each Item of equipment or property furnished under this contract shall be in safe operating condition and shall comply with all guidelines applicable to this equipment or property per the Federal Safety Standards, State Safety Regulations, and Reclamation Health and Safety Manual. If the Contracting Officers Representative (COR) determines that any Item of the equipment or property furnished is not suitable for performance under Section 4.2 of this SOW, the COR shall promptly inform the contractor verbally with a follow-up notification in writing. The contractor and COR (or representative) will conduct joint inspection of the equipment to ensure that equipment is serviceable prior to implementation of Governmental service.
Equipment considered unacceptable, under Section 4.2 of this SOW by the COR shall be removed from the site and replaced with equipment meeting the standards outlined in this document at no additional charge to the Government. Rental will not begin until all inspections have been made and the equipment is approved by the Government supervisor onsite. Inspection of equipment will be conducted within 24 hours of the delivery date required by the Delivery order, beginning at 11:00AM of the required delivery date.
4.2 Contractor Requirements
The contractor shall be capable of responding to calls for onsite repair of any piece of leased equipment included as part of the subject contract within 6 hours of a service call, or replace the piece of equipment within 24 hours of the service call, unless otherwise specified greater in issued Delivery Order.
4.2.1 Equipment shall be in excellent condition with all components in excellent working order. “Excellent” working order implies all equipment features, including the unit’s intended design function systems, environmental control system (heating, air conditioning), hydraulic systems, mechanical systems, etc., shall fully perform to their intended and corresponding function.
4.2.2 Equipment shall have less than 3,000 hours on the original meter and engine.
Equipment shall be models no older than 5 years, unless otherwise approved by the COR. Equipment shall meet all Federal, State and Local emission requirements for the location it will be operated, as well as any other site-specific regulations. If this information is not included in the equipment service records, it shall be included with submittal 4.2.4A.
4.2.3 Upon request, the contractor shall provide the Government with service records for each corresponding unit of equipment offered for lease (Submittal 4.2.4A).
4.2.4 Contractor shall take outbound photos of each piece of equipment detailing front, rear, and both profile views, prior to delivery. Outbound photo documentation shall be transmitted to the COR within 5 days of delivery.
4.2.5 The contractor shall have an established equipment and maintenance yard no further than 300 miles from the project location to provide necessary services within the timeframes designated in this document. This requirement may be subcontracted to other dealers or franchises in the local area, provided the equipment service and maintenance meets the timeframes required in this document.
4.3 After equipment has been delivered, the Government will provide fuel and required daily maintenance per manufacturers’ recommendations.
4.4 All repair costs and costs associated with providing replacement equipment shall be included in the bid schedule price. Backup units utilized in the event of primary failure shall be at no additional cost to the Government. If equipment is not repaired within 24 hours, it shall be taken off rent, and the Government will not be charged rent on the inoperable unit until all repairs have been made.
4.5 Each piece of equipment shall include, upon delivery, a full tank of fuel and all necessary equipment essential for performance of the equipment per its intended function and use.
4.6 Equipment must have been serviced prior to delivery. Upon request, contractor shall provide proof that this has taken place according to the operators’ manual and/or supplier, per Table - Item 4.2.4A of Section 6.0.
4.7 Equipment must be pressure washed and have no oil and/or fuel leaks, any damaged hoses; fittings, etc. Any damage and/or leaks must be repaired prior to delivery.
4.8 All wear Items, upon delivery, such as bucket teeth, tires, cutting edges, etc., shall be in “like-new” condition, showing signs of minimal wear, upon delivery.
4.9 Contractor shall provide scheduled (250, 500 hour) servicing of equipment, per manufacturers’ recommendations. If the equipment is onsite, the Contractor shall coordinate servicing of equipment such that the government operators experience no lost production time, i.e. provide substitute equipment while maintenance is performed.
4.10 All equipment requiring an operator shall be provided with an enclosed cab. The cab shall be clean, and devoid of any defects that can impact operation of the equipment, i.e. all components within cab shall be fitted with original parts and pieces, or manufacturer original parts. Exceptions for soil compactors or similar pieces of equipment with unenclosed cabs may be made on a case-by-case basis on approval by the COR.
4.11 The contractor shall take and store “outbound” photos of all equipment prior to delivering to the jobsite. Photos shall be used as a basis in determining responsibility for damage incurred while the equipment is on rent to the government. The government shall also take and store photos of any equipment damage that occurs while the equipment is on rent to the government, as well as noticeable damage that may be present on the equipment when it is delivered, but prior to use.
4.12 The Provo Force Account group owns and uses the Trimble Earthworks grade control platform, marketed and serviced by Sitech. Sitech is a company jointly owned by Caterpillar and Trimble. Earthworks is primarily marketed and distributed through Caterpillar brand equipment and may have compatibility/integration issues with competing equipment manufacturers and grade control software. Most of the government owned Trimble/Earthworks equipment is permanently installed in government owned machines. However, we do own additional hardware, referred to as “cab kits” that can be easily installed in tech ready Caterpillar equipment. There will be occasions when the government will require a piece of equipment to be delivered tech ready for immediate plug and play with the Trimble TD520 Control Box/Display and the Trimble MS995 Receivers. This would require the contractor to provide tech ready Caterpillar or equal equipment in that instance or demonstrate that a piece of equipment from a competing manufacturer can readily accept the Trimble
Earthworks hardware. This generally would be limited to a D6 Dozer, a 325 Excavator, a 336 Excavator, a 352 Excavator, and a 140M AWD Grader. This list represents most used equipment but does not preclude the future requirement of Trimble grade control equipment on scrapers, tracked loaders, or other equipment capable of utilizing the system.
5.0 Description of Equipment and Service Requirement
5.1 General Information: Delivery orders will be individually competed among all contractors on the multiple award IDIQ. The base year, or first year of the contract will be referred to as year 1 or base year.
5.2 The following list identifies equipment commonly required for projects. Each item includes a description outlining key information about the equipment, and all delivery order requests will be based on this list:
Item 001: Cat 623K Elevating Scraper, or Equal.
Salient characteristics include: 23 CY scraper bowl, capable of self-loading with material elevator. Scraper operation must be controlled from tractor operating station. Scraper shall be no greater than 12 feet in width. Operating weight shall be approximately 88,000 lbs.
Item 002: Cat 627K Open Bowl Scraper, or Equal.
Salient Characteristics include: 24 cubic yard scraper bowl, capable of being pushed or pulled in tandem, capable direct loading and top loading, scraper operation must be controlled from tractor operator station. Scraper shall be no greater than 12 feet in width.
Operating weight shall be approximately 93,000 lbs.
Item 003: Cat 745 Articulated Rock Truck, or Equal.
Salient Characteristics: 45-ton capacity, 6-wheel articulated frame, 430 horsepower or greater. Truck shall be provided with or without a tailgate upon request.
Item 004: Cat 740 Articulated Rock Truck, or Equal.
Salient Characteristics: 40-ton capacity, 6-wheel articulated frame, 430 horsepower or greater. Truck shall be provided with or without a tailgate upon request.
Item 005: Cat 735 Articulated Rock Truck, or Equal.
Salient Characteristics: 35-ton capacity, 6-wheel articulated frame, 420 horsepower or greater. Truck shall be provided with or without a tailgate upon request.
Item 006: Cat 730 Articulated Rock Truck, or Equal.
Salient Characteristics: 30-ton capacity, 6-wheel articulated frame, 320 horsepower or greater. Truck shall be provided with or without a tailgate upon request.
Item 007: Cat 725 Articulated Rock Truck, or Equal.
Salient Characteristics: 25-ton capacity, 6-wheel articulated frame, 300 horsepower or greater. Truck shall be provided with or without a tailgate upon request.
Item 008: Dump Truck 6yd.
Salient Characteristics: On-Highway, Diesel Powered 10’ Dump Bed.
Item 009: Dump Truck 10yd.
Salient Characteristics: On-Highway, Diesel Powered 15’ Dump Bed.
Item 010: John Deere 250 D 5,000 gallon Water Truck, or equal.
Salient Characteristics: 5,000 gallon water tank, two side sprayer, three rear sprayers, hose reel, water cannon. 6-wheel articulated frame.
Item 011: John Deere 300 D 6,000 gallon Water Truck, or equal.
Salient Characteristics: 6,000 gallon water tank, two side sprayer, three rear sprayers, hose reel, water cannon. 6-wheel articulated frame.
Item 012: John Deere 400 D 8,000 gallon Water Truck, or equal.
Salient Characteristics: 8,000 gallon water tank, two side sprayer, three rear sprayers, hose reel, water cannon. 6-wheel articulated frame.
Item 013: 12000 gal Stand Tank.
Salient Characteristics: 12,000 gal, Single axle, Hydraulic Raise.
Item 014: Cat 613 Water Wagon, or equal.
Salient Characteristics: 5,000 gallon water tank, two side sprayer, three rear sprayers, hose reel, water cannon.
Item 015: Cat 611 Water Wagon, or equal.
Salient Characteristics: 6,500 gallon water tank, two side sprayer, three rear sprayers, hose reel, water cannon.
Item 016: Cat 621 Water Wagon, or equal.
Salient Characteristics: 8,000 gallon water tank, two side sprayer, three rear sprayers, water cannon.
Item 017: 2000-Gal Water Truck.
Salient Characteristics: 2,000 gallon, Street legal, two side sprayer, three rear sprayers, water cannon.
Item 018: 4000-Gal Water Truck.
Salient Characteristics: 4,000 gallon, Street legal, two side sprayer, three rear sprayers, hose reel, water cannon.
Item 019: 54” Krypto Klaw Bucket and Thumb Excavator Attachment. Salient
Characteristics include hydraulic wrist and thumb action.
Item 020: Thompson 6’ Trailer Mounted Trash Pump or equal.
Salient Characteristics: Trailer Mounted, 1400GPM minimum,20 Gallon fuel tank minimum, Diesel Powered Engine.
Item 021: Cat 120 Motor Grader, or Equal.
Salient Characteristics: 145 horsepower or greater, 12-ft blade. Rippers
Item 022: Cat 140M AWD Motor Grader, or Equal.
Salient Characteristics: 193 horsepower or greater, 14-ft blade, Rippers, All Wheel Drive.
Item 023: Cat 140M AWD Motor Grader, or Equal.
Salient Characteristics: Machine must be fully compatible with the Trimble Earthworks grade control hardware and come installed with the appropriate sensor modules and mast kit with GNSS cables. Capable of plug and play functionality with government owned Trimble TD520 Control Box/Display, Trimble MS995 Receivers, and Trimble SNR900 Radio. Salient Characteristics: 193 horsepower or greater, 14-ft blade, Rippers, All Wheel Drive.
Item 024: Cat 150M AWD Motor Grader, or Equal.
Salient Characteristics: Operating weight of approximately 45,000 lbs, 200 horsepower or greater.
Item 025: Cat 160 AWD Motor Grader, or Equal.
Salient Characteristics: Operating weight of approximately 45,000 lbs, 224 horsepower or greater.
Item 026: Cat D4 Dozer, or Equal.
Salient Characteristics: Operating weight of approximately 17,000 lb, 80 horsepower or greater Semi-U, straight blade, or V-PAT blade. Blade to be determined at time of rental.
Item 027: Cat D4 LGP Dozer, or Equal.
Salient Characteristics: Operating weight of approximately 21,000, 125 horsepower or greater Semi-U, straight blade, or V-PAT blade. Blade to be determined at time of rental.
Item 028: Cat D5K Dozer, or Equal.
Salient Characteristics: Operating weight of approximately 26,000 lb, 120 horsepower or greater Semi-U, straight blade, or V-PAT blade. Blade to be determined at time of rental.
Item 029: Cat D6T LGP Dozer, or Equal.
Salient Characteristics: Operating weight of approximately 50,000 lb, 190 horsepower or greater, Semi-U or straight blade, track-pad no smaller than 31-inches in width.
Item 030: Blade Root Rake to fit D6 Dozer.
Item 031: Cat D6T Dozer, or Equal.
Salient Characteristics: Machine must be fully compatible with the Trimble Earthworks grade control hardware and come installed with the appropriate sensor modules and mast kit with GNSS cables. Capable of plug and play functionality with government owned Trimble TD520 Control Box/Display, Trimble MS995 Receivers, and Trimble SNR900 Radio. Salient Characteristics: Operating weight of approximately 42,000lb or greater, 190 horsepower or greater, Semi-U, straight blade, or V-PAT blade. Blade to be determined at time of rental.
Item 032: Cat D5 Dozer, V-Pat Blade, or Equal.
grade control hardware and come installed with the appropriate sensor modules and mast kit with GNSS cables. Capable of plug and play functionality with government owned Trimble TD520 Control Box/Display, Trimble MS995 Receivers, and Trimble SNR900
Radio. Salient Characteristics: Operating weight of approximately 42,000lb or greater, 190 horsepower or greater, Semi-U, straight blade, or V-PAT blade. Blade to be determined at time of rental.
Item 033: Cat D7 Dozer, or Equal.
Salient Characteristics: Operating weight of approximately 57,000 lbs, 235 horsepower or greater Semi-U, straight blade, or V-PAT blade. Blade to be determined at time of rental.
Item 034: Cat D8 Dozer, or Equal.
Salient Characteristics: Operating weight of approximately 87,000 lbs, 300 horsepower or greater Semi-U, straight blade, or V-PAT blade. Blade to be determined at time of rental.
Item 035: Cat 305 CR Excavator, or Equal.
Salient Characteristics: Operating weight of approximately 11,500 lb, 30 horsepower, or greater, bucket width to be determined at time of rental, counterweight shall be appropriately sized such that the machine is balanced when loaded.
Item 036: Cat 306 CR Excavator, or Equal.
Salient Characteristics: Operating weight of approximately 15,750 lbs, 55 horsepower, or
Item 037: Cat 308 Excavator, or Equal.
Salient Characteristics: Operating weight of approximately 18,500 lbs, 69 horsepower, or
Item 038: Cat 313 Excavator, or Equal.
Salient Characteristics: Operating weight of approximately 30,400 lb, 108 horsepower, or
Item 039: Cat 315 Excavator, or Equal.
Salient Characteristics: Operating weight of approximately 34,000 lb, 108 horsepower, or
Item 040: Cat 325 Excavator, or Equal.
Salient Characteristics: Operating weight of approximately 62,000, 172 horsepower, or
Item 041: Cat 326 Excavator, or Equal.
Salient Characteristics: Operating weight of approximately 57,000, 201 horsepower, or
Item 042: Cat 326 Excavator, or Equal.
grade control hardware and come installed with the appropriate sensor modules and mast kit with GNSS cables. Capable of plug and play functionality with government owned Trimble TD520 Control Box/Display, Trimble MS995 Receivers, and Trimble SNR900 Radio. Operating weight of approximately 57,000, 201 horsepower, or greater, bucket width to be determined at time of rental, counterweight shall be appropriately sized such that the machine is balanced when loaded.
Item 043: Cat 330 Excavator, or Equal.
Salient Characteristics: Operating weight of approximately 69,200 lb, 273 horsepower, or
Item 044: Cat 336 Excavator, or Equal.
Salient Characteristics: Operating weight of approximately 81,000 lbs. 300 horsepower, or greater, bucket width to be determined at time of rental, counterweight shall be
Item 045: Cat 340 Excavator, or Equal.
Salient Characteristics: Trimble Earthworks Ready. Machine must be fully compatible with the Trimble Earthworks grade control hardware and come installed with the appropriate sensor modules and mast kit with GNSS cables.
This is the start of the file's text. The full file is on GovTribe.