BREAKDOWN OF PRICE BY DIVISIONS OF SPECIFICATIONS Form.pdf
PDF 98 KB Posted
- Attached to
- Residence Chimney Restoration Federal contract opportunity
- Solicitation number
- 19BE2025
- Issued by
- Department of State US Embassy Brussels
About this file
This is a pricing breakdown template form from the U.S. Embassy Brussels (solicitation 19BE2025R0001) used for contractors to itemize costs for a chimney restoration project. The form requires offerors to break down costs across 16 construction divisions including labor, materials, overhead, and profit columns for each category: General Requirements, Site Work, Concrete, Masonry, Metals, Wood and Plastic, Thermal and Moisture, Doors and Windows, Finishes, Specialties, Equipment, Furnishings, Special Construction, Conveying Systems, Mechanical, and Electrical.
The form must be completed in Euros (EUR) and includes spaces for allowance items, total proposal price, and alternates (to be listed separately without totaling). The bottom of the form requires the offeror's information and signature date. This pricing template is part of a broader solicitation package for restoration work on a residence building's brick chimney in Brussels, which includes paint removal, masonry repairs, and exhaust system replacement.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF-30 Solicitation 19BE2025R0001-0002.pdf | ||
| SF-30 Solicitation 19BE2025R0001-0001 (1).pdf | ||
| 19BE2025R0001 - Question Submission Form.pdf | ||
| 19BE2025R0001 - RFP.pdf | ||
| 19BE2025R0001 - Site Visit Registration Form.pdf | ||
| EXPERIENCE AND PAST PERFORMANCE Form - Construction.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Embassy Brussels 19BE2025R0001
ATTACHMENT #1
UNITED STATES DEPARTMENT OF STATE
BREAKDOWN OF PRICE BY DIVISIONS OF SPECIFICATIONS
(1)DIVISION/DESCRIPTION (2)LABOR (3)MATERIALS (4)OVERHEAD (5)PROFIT (6)TOTAL
1. General Requirements
2. Site Work
3. Concrete
4. Masonry
5. Metals
6. Wood and Plastic
7. Thermal and Moisture
8. Doors and Windows
9. Finishes
10. Specialties
11. Equipment
12 Furnishings
13. Special Construction
14. Conveying Systems
15. Mechanical
16. Electrical
Allowance Items:
PROPOSAL PRICE: EUR ____________________________
TOTAL: EUR
Alternates (list separately; do not total):
Offeror: _____________________________ Date ________________
| 2LABOR1 General Requirements: |
| 3MATERIALS1 General Requirements: |
| 4OVERHEAD1 General Requirements: |
| 5PROFIT1 General Requirements: |
| 6TOTAL1 General Requirements: |
| 2LABOR2 Site Work: |
| 3MATERIALS2 Site Work: |
| 4OVERHEAD2 Site Work: |
| 5PROFIT2 Site Work: |
| 6TOTAL2 Site Work: |
| 2LABOR3 Concrete: |
| 3MATERIALS3 Concrete: |
| 4OVERHEAD3 Concrete: |
| 5PROFIT3 Concrete: |
| 6TOTAL3 Concrete: |
| 2LABOR4 Masonry: |
| 3MATERIALS4 Masonry: |
| 4OVERHEAD4 Masonry: |
| 5PROFIT4 Masonry: |
| 6TOTAL4 Masonry: |
| 2LABOR5 Metals: |
| 3MATERIALS5 Metals: |
| 4OVERHEAD5 Metals: |
| 5PROFIT5 Metals: |
| 6TOTAL5 Metals: |
| 2LABOR6 Wood and Plastic: |
| 3MATERIALS6 Wood and Plastic: |
| 4OVERHEAD6 Wood and Plastic: |
| 5PROFIT6 Wood and Plastic: |
| 6TOTAL6 Wood and Plastic: |
| 2LABOR7 Thermal and Moisture: |
| 3MATERIALS7 Thermal and Moisture: |
| 4OVERHEAD7 Thermal and Moisture: |
| 5PROFIT7 Thermal and Moisture: |
| 6TOTAL7 Thermal and Moisture: |
| 2LABOR8 Doors and Windows: |
| 3MATERIALS8 Doors and Windows: |
| 4OVERHEAD8 Doors and Windows: |
| 5PROFIT8 Doors and Windows: |
| 6TOTAL8 Doors and Windows: |
| 2LABOR9 Finishes: |
| 3MATERIALS9 Finishes: |
| 4OVERHEAD9 Finishes: |
| 5PROFIT9 Finishes: |
| 6TOTAL9 Finishes: |
| 2LABOR10 Specialties: |
| 3MATERIALS10 Specialties: |
| 4OVERHEAD10 Specialties: |
| 5PROFIT10 Specialties: |
| 6TOTAL10 Specialties: |
| 2LABOR11 Equipment: |
| 3MATERIALS11 Equipment: |
| 4OVERHEAD11 Equipment: |
| 5PROFIT11 Equipment: |
| 6TOTAL11 Equipment: |
| 2LABOR12 Furnishings: |
| 3MATERIALS12 Furnishings: |
| 4OVERHEAD12 Furnishings: |
| 5PROFIT12 Furnishings: |
| 6TOTAL12 Furnishings: |
| 2LABOR13 Special Construction: |
| 3MATERIALS13 Special Construction: |
| 4OVERHEAD13 Special Construction: |
| 5PROFIT13 Special Construction: |
| 6TOTAL13 Special Construction: |
| 2LABOR14 Conveying Systems: |
| 3MATERIALS14 Conveying Systems: |
| 4OVERHEAD14 Conveying Systems: |
| 5PROFIT14 Conveying Systems: |
| 6TOTAL14 Conveying Systems: |
| 2LABOR15 Mechanical: |
| 3MATERIALS15 Mechanical: |
| 4OVERHEAD15 Mechanical: |
| 5PROFIT15 Mechanical: |
| 6TOTAL15 Mechanical: |
| 2LABOR16 Electrical: |
| 3MATERIALS16 Electrical: |
| 4OVERHEAD16 Electrical: |
| 5PROFIT16 Electrical: |
| 6TOTAL16 Electrical: |
| PROPOSAL PRICE EUR: |
| Date: |
| Offeror: |
File details come from the government source that posted it. Updated .