About this file

This document is a Bid Schedule for a solicitation to replace two chillers at the Cairo Museum located in Vicksburg National Military Park. The solicitation number is 140P5224Q0051 and the project title is "Replace Two Chillers at Cairo Museum".

The scope of work includes the removal of the existing two HVAC chiller systems, one two-ton air handling unit, and associated piping and electrical components. It requires the installation of two twenty-ton or one forty-ton HVAC system for the main museum, and a three-ton computer-monitored system for the collections vault. The work also includes installing new control panels, updating electrical panels, and inspecting and testing the existing ductwork, line sets, straps, and hangers. The solicitation is being issued by the Department of the Interior National Park Service Southeast Region.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Two Chillers, newest first.
File Type Posted
Sol_140P5224Q0051_Amd_0001.pdf PDF
Solicitation_140P5224Q0051_Amend_P0001_0001.pdf PDF
Sol_140P5224Q0051.pdf PDF
Solicitation_140P5224Q0051.pdf PDF
SOW_Replace_Two_Chillers_at_Cairo_Museum.pdf PDF
Past_Performance_Questionnaire.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NUMBER:

Bid Schedule PARK: Vicksburg National Military Park DEVELOPED AREAS: Cairo Museum PROJECT TITLE: Replace Two Chillers at Cairo Museum

ITEM NUMBER

Description

Labor

Materials

TOTAL PRICE

Removal of Two (2) HVAC Chiller Systems, Removal of One (1) two‐ton Air Handling Unit, Piping, Electrical

Installation of two (2) twenty‐ton or one (1) forty ton HVAC System for the main museum, one (1) three‐ton computer monitored system for the collections vault

Install all related control panels, electrical panels updates, piping, ductwork, Line sets straps

Offsite disposal of all equipment, material and waste generated or removed by Contractor

Inspection, Testing and Balance of Existing Duct Work, Line Sets, Straps, Hangers and associated Electrical

General Conditions

Profit

Overhead

TOTAL PROPOSED PRICE