Bid_Schedule.doc
DOC document 104 KB Posted
- Attached to
- Replace Two Chillers Federal contract opportunity
- Solicitation number
- 140P5224Q0051
About this file
This document is a Bid Schedule for a solicitation to replace two chillers at the Cairo Museum located in Vicksburg National Military Park. The solicitation number is 140P5224Q0051 and the project title is "Replace Two Chillers at Cairo Museum".
The scope of work includes the removal of the existing two HVAC chiller systems, one two-ton air handling unit, and associated piping and electrical components. It requires the installation of two twenty-ton or one forty-ton HVAC system for the main museum, and a three-ton computer-monitored system for the collections vault. The work also includes installing new control panels, updating electrical panels, and inspecting and testing the existing ductwork, line sets, straps, and hangers. The solicitation is being issued by the Department of the Interior National Park Service Southeast Region.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P5224Q0051_Amd_0001.pdf | ||
| Solicitation_140P5224Q0051_Amend_P0001_0001.pdf | ||
| Sol_140P5224Q0051.pdf | ||
| Solicitation_140P5224Q0051.pdf | ||
| SOW_Replace_Two_Chillers_at_Cairo_Museum.pdf | ||
| Past_Performance_Questionnaire.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NUMBER:
Bid Schedule PARK: Vicksburg National Military Park DEVELOPED AREAS: Cairo Museum PROJECT TITLE: Replace Two Chillers at Cairo Museum
ITEM NUMBER
Description
Labor
Materials
TOTAL PRICE
Removal of Two (2) HVAC Chiller Systems, Removal of One (1) two‐ton Air Handling Unit, Piping, Electrical
Installation of two (2) twenty‐ton or one (1) forty ton HVAC System for the main museum, one (1) three‐ton computer monitored system for the collections vault
Install all related control panels, electrical panels updates, piping, ductwork, Line sets straps
Offsite disposal of all equipment, material and waste generated or removed by Contractor
Inspection, Testing and Balance of Existing Duct Work, Line Sets, Straps, Hangers and associated Electrical
General Conditions
Profit
Overhead
TOTAL PROPOSED PRICE