BCT - BP4 Roofing - Project Specification Manual.pdf
PDF 14 MB Posted
- Attached to
- Buffalo Central Terminal - Bid Package #4 (Roofing) State and local contract opportunity
- Solicitation number
- 2119822
- Issued by
- Erie County, New York
About this file
This is a project specification manual for the Buffalo Central Terminal Roofing Package (Bid Package #4), involving the Central Terminal Restoration Corporation, Buffalo Construction Consultants, Inc., and Quinn Evans Architects. The project is located at 495 Paderewski Drive in Buffalo, NY, and focuses on roofing renovation work. A mandatory pre-bid walkthrough is scheduled for March 17th, 2025, at 10:00 AM, with electronic bids due by 3:00 PM on March 26th, 2025. The roofing contract (Contract 701) will cover demolition, salvage, and replacement of roofing across multiple sections of the terminal, with specific alternate scopes identified for different roof areas.
The project includes several key financial and compliance elements, including prevailing wage requirements, sales tax exemption, and Minority and Women-owned Business Enterprise (M/WBE) participation goals. Performance and labor & material payment bonds are available as an alternate bid item. The project is partially funded through a grant from the NYS Office of Parks, Recreation and Historic Preservation, and requires contractors to register with the New York State Department of Labor. Asbestos sampling has been conducted, revealing the presence of asbestos-containing materials in various roof sections, which will need to be addressed during the renovation process.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Package #4 Roofing Addendum #1.pdf | ||
| BCT - BP4 Roofing - Architectural Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
496 Kennedy Road | Buffalo, NY | 14227 | 716.302.4040 | buffaloconstruct.com
Buffalo Central Terminal Bid Package #4 – Roofing Package
Project Specification Manual Volume 1 of 1 February 14th, 2025
Bid Package: Owner:
BP 4 – Roofing Package Central Terminal Restoration Corp.
PO Box 51 Buffalo, NY 14212
Architect of Record:
Quinn Evans Architects 4219 Woodware Ave, Suite 301 Detroit, MI 48201
Buffalo Central Terminal Buffalo Construction Consultants, Inc.
BP4 – Roofing Package February 2025
TABLE OF CONTENTS 00 0100-1
SECTION 00 0100 – TABLE OF CONTENTS
PROJECT MANUAL VOLUME 1 OF 1
DIVISION 00 BIDDING & CONTRACT REQUIREMENTS
SECTION 00 0100 TABLE OF CONTENTS
SECTION 00 0200 NOTICE TO BIDDERS
SECTION 00 0210 INSTRUCTION TO BIDDERS
SECTION 00 0220 .1 BID FORM CHECK LIST
.2 BID FORM
.3 OFFERERS DISCLOSURE – BIDDER ACKOWLEDGEMENT
.4 NON-COLLUSIVE BIDDING CERTIFICATE
.5 CERTIFIED CORPORATE RESOLUTION
.6 SUBSTITUTION FORM
.7 TAX EXEMPT CERTIFICATE
SECTION 00 0310 AVAILABLE PROJECT INFORMATION
.1 BUFFALO CENTRAL TERMINAL ASBESTOS & PCB CAULK SAMPLING FEBRUARY
.2 NYS OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION BIDDING
REQUIREMENTS (Requirement of Lightwell Roof Grant Funding)
SECTION 00 0520 STANDARD FORM OF SUBCONTRACT
.1 INSURANCE REQUIREMENTS
.2 SAMPLE INSURANCE CERTIFICATE
.2.1 POLLUTION/ENVIRONMENTAL REQUIREMENTS
.2.2 GENERAL LIABILITY REQUIREMENTS
SECTION 00 0600 PERFORMANCE, LABOR AND MATERIAL PAYMENT BOND
SECTION 00 0800 ENUMERATION OF CONTRACT DOCUMENTS
SECTION 00 0900 PREVAILING WAGE RATE
.1 PREVAILING WAGE RATES 2024 - 2025
SECTION 00 0940 OPPORTUNITY PROGRAM REQUIREMENTS
.1 OCSD-4-MWBE UTILIZATION PLAN
DIVISION 01 GENERAL REQUIREMENTS
SECTION 01 11 00 SUMMARY OF WORK
.1 INTERIM WAIVER OF LIEN AND CLAIM
.2 FINAL WAIVER OF LIEN AND CLAIM
.3 LABOR RATE BREAKDOWN
.4 DAILY MANPOWER REPORT
.5 SAFETY FORMS
SECTION 01 21 00 ALLOWANCES
SECTION 01 23 00 ALTERNATES
SECTION 01 25 00 SUBSTITION PROCEDURES
SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION
SECTION 01 32 33 PHOTOGRAPHIC DOCUMENTATION
SECTION 01 33 00 SUBMITTAL PROCEDURES
SECTION 01 35 91 HISTORIAL TREATMENT PROCEDURES
SECTION 01 50 00 TEMPORARY FACILITIES AND CONTROLS
SECTION 01 73 00 EXECUTION REQUIREMENTS
SECTION 01 77 00 CLOSEOUT PROCEDURES
TABLE OF CONTENTS 00 0100-2
DIVISION 02 EXISTING CONDITIONS
SECTION 02 4119 SELECTIVE DEMOLITION
DIVISION 03 CONCRETE
SECTION 03 0130 MAINTENANCE OF CONCRETE (not issued)
DIVISION 06 WOOD, PLASTICS, AND COMPOSITES
SECTION 06 1053 MISCELLANEOUS ROUGH CARPENTRY
DIVISION 07 THERMAL AND MOISTURE PROTECTION
SECTION 07 0150.19 PREPARATION FOR RE-ROOFING
SECTION 07 5216 SBS MODIFIED BITUMINOUS MEMBRANE ROOFING
SECTION 07 5400 THERMOPLASTIC MEMBRANE ROOFING
SECTION 07 6100 SHEET METAL ROOFING
SECTION 07 8200 ROOF ACCESSORIES
SECTION 07 9200 JOINT SEALANTS
END OF SECTION 00 0100
NOTICE TO BIDDERS
SECTION 00 0200 - NOTICE TO BIDDERS
1.1 PROJECT INFORMATION
A. Buffalo Central Terminal
B. Bid Package: BP #4 – Roofing Package
C. Project Location: 495 Paderewski Dr. Buffalo, NY 14212
D. Construction Manager (CM) or Contractor:
Buffalo Construction Consultants, Inc
496 Kennedy Road
Buffalo, NY 14227
As used herein and in the contract documents, the terms Construction Manager, CM and/or Contractor shall each refer to Buffalo Construction Consultants, Inc.
1.2 SUBCONTRACTS
The Project will be constructed using a multiple subcontract format. The following subcontracts will be bid now:
• Contract 701 - Roofing
1.3 BIDDING DOCUMENTS
A. Bidders can access the bid documents via iSqFt invitation.
1.4 BONDS
A. As set forth in the Instructions to Bidders, a Performance Bond and Labor and Material Payment Bond is required from the Subcontractors and to be provided as an add alternate on the bid form.
1.5 M/WBE PARTICIPATION GOALS
A. Refer to Specification Section 00 0940 – Opportunity Program Requirements, and the OCSD-4 M/WBE
Utilization Plan attachment for the projects M/WBE goals.
1.6 EQUAL EMPLOYMENT OPPORTUNITY (EEO) / WORKFORCE GOALS
A. Refer to Specification Section 00 0940 Opportunity Program Requirements.
1.7 INSURANCE REQUIREMENTS
A. Refer to Specification Section 00 0520 Insurance Requirements for Subcontract.
1.8 SALES TAX EXEMPTION
A. The project is exempt from payment of sales and compensating use taxes of the State of New York and of cities, counties and all other subdivisions of the State on all materials and supplies that are permanently incorporated into the Project. Upon award, Subcontractors shall be provided with a copy of the applicable sales and use tax exemption letter or other suitable proof of such exemption.
1.9 PREVAILING WAGES
A. State of New York Department of Labor Prevailing Wage Rate is posted for this project, and the
Prevailing Wage Rate Schedule is provided within specification section 00 0900.
1.10 PROJECT LABOR AGREEMENT (PLA)
A. Not Applicable.
1.11 PRE-BID MEETING
A. A Mandatory pre-bid walkthrough will be held at the site on March 17th, 2025 at 10:00AM. It is required for all bidders to attend. Follow-up site visits may be scheduled with the Construction Manager.
1.12 BIDS
A. Electronic bids for this contract, shall be received until 3:00 pm on March 26th, 2025. Bids are to be emailed to Tyler Mekus at tmekus@buffaloconstruct.com.
1.13 OPENING OF BIDS
A. At the date and time noted for the receipt of bids, the bids will be privately opened.
1.14 CONSIDERATION OF BIDS
A. Buffalo Construction Consultants, Inc. reserves the right to qualify all Bids, waive any informality or irregularity in the bid proposals, to reject any or all bids, or to award any Subcontract, which Buffalo
Construction Consultants, Inc. deems to be in the best interest of the Owner, Construction Manager and the Project.
1.15 WORKFORCE AND BUSINESS DIVERSIFICATION
A. It is the policy of Buffalo Construction Consultants, Inc. to provide equal opportunity for all qualified individuals and businesses, to prohibit discrimination, and to promote full realization of equal opportunity.
1.16 FURTHER IDENTIFICATIONS
A. Owner:
Buffalo Central Terminal Restoration Corporation
PO Box 51, Buffalo, NY 14212
B. Architect of Record:
Quinn-Evans
4219 Woodward Avenue, Detroit, MI 48201 mailto:tmekus@buffaloconstruct.com
1.17 REQUESTS FOR INFORMATION
A. Requests for Information (RFI) regarding the Bid Documents shall be submitted in writing, via email, to the attention of Buffalo Construction Consultants, Tyler Mekus tmekus@buffaloconstruct.com. All requests for information shall include the following information:
1. Buffalo Central Terminal
2. Bid Package #4 – Roofing Package
3. Company Name submitting the RFI
4. Drawings and/or Specification Sections that the RFI refers to.
B. Buffalo Construction Consultants, Inc. reserves the right to provide all prospective Bidders with such RFI and the response to such RFI.
C. All RFI shall be submitted by end of business on March 19th 2025, to allow for appropriate responses to be issued via addendum.
1.18 NYDOL REGISTRATION REQUIREMENTS
A. All bidding contractors must register with the New York State Department of Labor. The link for contractors & subcontractors to register is: https://dol.ny.gov/how-register-contractor-and-subcontractor-registry
1. Submit certified payrolls online on a monthly basis directly to the NYSDOL website.
2. Provide documentation via the DOL website of each fund, plan, or program where any supplement has been paid or provided for.
3. Provide copies of payment bonds via the DOL website.
END OF SECTION 00 0200
https://dol.ny.gov/how-register-contractor-and-subcontractor-registry https://dol.ny.gov/how-register-contractor-and-subcontractor-registry
BP4 - Roofing Package February 2025
INSTRUCTIONS TO BIDDERS 00 0210-1
SECTION 00 0210 – INSTRUCTIONS TO BIDDERS
PART 1 GENERAL
1.01 RELATED DOCUMENTS
A. Drawings and general provision of the Contract, including Division 00 and Division 01 Specification
Sections, apply to this Section.
1.02 DEFINITIONS
A. Owner:
Central Terminal Restoration Corp.
PO Box 51
Buffalo, NY 14212
B. Construction Manager (CM) or Contractor:
Buffalo Construction Consultants, Inc.
496 Kennedy Road
Buffalo, NY 14227
As used herein and in the contract documents, the terms Construction Manager, CM and/or Contractor shall each refer to Buffalo Construction Consultants, Inc.
C. Architect of Record: Quinn Evans Architects
D. Project: Buffalo Central Terminal 495 Paderewski Dr. Buffalo, NY 14212
E. Bidding Documents: The Bidding Documents consist of the Construction Manager's Notice to Bidders, these Instructions to Bidders, Supplementary Instructions to Bidders (if any), the Bid Form provided by the Construction Manager, and other sample bidding and contract forms provided by the Construction
Manager. The Bidding Documents include the form of the Contract between the Owner and the
Construction Manager (which may have pricing information omitted), the proposed form of Subcontract between the Construction Manager and the Subcontractor that will be entered into by the successful
Bidder and all requirements of the Contract and Subcontract, General and Supplementary Conditions, Drawings, Specifications and all Addenda issued prior to execution of the Contract and Subcontract and
Modifications to the Contract. Copies of each of the foregoing documents are included in the Bidding
Documents.
F. Addenda: Documents issued prior to execution of the Contract and Subcontract, which amend and/or modify the Bidding Documents.
G. Bid: A complete and properly executed proposal of a Bidder consistent with the requirements of Bidding
Documents and which sets forth the scope of the Work that the Bidder will undertake on behalf of the
Construction Manager with respect to the Project in accordance with the terms of the Subcontract.
H. Base Bid: The sum stated in the bid form for which the Bidder offers to perform the Work in the Bidding
Documents not inclusive of alternate bids.
I. Alternate Bid: The amount to be added or deducted from the Base Bid based on the Bidders Bid with respect to an alternate identified in the Bidding Documents as defined in Specification Section 01 2300.
INSTRUCTIONS TO BIDDERS 00 0210-2
J. Unit Price: The amount stated in the bid form for a portion of Work as described in Specification Section
01 2200.
K. Bidder: A person or entity submitting a Bid to the Construction Manager to perform a portion of the
Work for the Project pursuant to the Subcontract with the Construction Manager in accordance with the
Bidding Documents.
L. Subcontract: The Subcontract to be executed by the successful Bidder with the Construction Manager pursuant to which the successful Bidder will perform a portion of the Work for the Construction Manager.
Referenced Specification Section 00 0520 Standard Form of Subcontract will be executed.
M. Subcontractor: The person or entity entering a Subcontract agreement for a portion of the Work for the
Construction Manager.
N. Vendor: The person or entity entering a Purchase Order agreement for a portion of the Work for the
Construction Manager.
PART 2 – BIDDING PROCEDURES AND INFORMATION
2.1 BIDDER’S REPRESENTATIONS
A. The Bidder, by making a Bid, represents the following:
1. The Bidder has read, understands and submits a Bid in compliance with the Bidding Documents.
The Bidder has studied and compared the Bidding Documents with each other and with other portions of the Work being bid.
2. The Bidder has visited and inspected the Project to thoroughly familiarize itself with, and has evaluated Project conditions, examined areas affected by the Work, investigated any, and all possible conditions that may affect its costs, complicate, delay or otherwise obstruct the progress of its Work.
Bidder’s proposal shall include the effect of all such conditions in its Bid. The Bidder shall report to the Construction Manager any errors, inconsistencies or ambiguities in the Bidding Documents that are observed by the Bidder. Requests for Information must be submitted in writing to Buffalo
Construction Consultants a minimum of five (5) days prior to the date set for receipt of bids. The
Construction Manager reserves the right to respond to such RFI and make the contents of the RFI and its response available to all Bidders.
3. The Bidder has examined and used a complete set of Bidding Documents in preparing its Bid. The
Bidder further acknowledges that the Construction Manager, Owner and Architect assume no responsibility for errors, misinterpretations or assumptions made by the Bidder that arises from the failure of the Bidder to use a complete set of Bidding Documents.
2.2 ALTERNATES
A. Design and Bid Alternates must be bid by the Bidder. If an alternate does not change or does not pertain, enter “no change”. The Owner shall have the right to accept or reject alternates in the Owner's sole and absolute discretion.
2.3 INTERPRETATION OR CORRECTION OF BIDDING DOCUMENTS
A. Interpretations, corrections and changes of the Bidding Documents shall be made only by Addenda issued by the Construction Manager. Interpretations, corrections and changes of the Bidding Documents made in any other manner (including, but not limited to, any claimed oral changes) will not be binding, and
Bidders shall not rely upon them.
INSTRUCTIONS TO BIDDERS 00 0210-3
2.4 SUBSTITUTIONS
A. The materials, products and equipment items described in the Contract Documents establish the standard of required quality, function, dimension and appearance expected. Unless the phrase “or approved equal” is stated, the Bidder must base his Bid on the use of one or more of these items. When permitted and if substitutions are to be proposed, the Bid must contain a list of all proposed substitutions drawn in the form of sample “Substitution Sheet” included in the Bid forms issued to all Bidders. Each Bidder shall list, in accordance with Specification Sections, all materials, products or equipment he proposes to offer as possible substitutions for specific items.
B. After receipt of Bids, the Construction Manager may request that one or more Bidders submit required backup data including "Request for Substitution Form," issued with Bid or Proposal sample forms, for each proposed substitution for consideration by the Architect. Backup data must be submitted to the
Construction Manager within three (3) business days after receipt of the request by such Bidders.
C. Except as set forth herein, no additional substitutions will be considered, unless substitution is required due to a specified material, product or equipment being removed from or made unavailable in the marketplace. Upon such circumstances, additional substitutions will be considered by the Architect, but only at no change to, or at a reduction/credit, to the Subcontract amount unless otherwise agreed by the
Architect.
D. The Bidder hereby acknowledges that the Architect's determination with respect to a proposed substitution shall be final.
2.5 PERFORMANCE AND PAYMENT BOND
A. A Performance Bond and a Labor and Material Payment Bond may be required, and the cost thereof shall be indicated on the bid form as an add Alternate. The successful Bidder shall provide such bonds, on the
Construction Manager's form furnished by a surety company acceptable to the Construction Manager equal to 100% of the Subcontract amount. The surety company providing the bonds must meet the following qualifications:
1. The surety must be on the US Treasury List with a limit of at least equal to the penal sum of the bond.
2. The surety must be licensed in the State of New York.
3. The surety must have a Best Guide Rating of A- or better.
B. The Construction Manager reserves the right to waive performance, and labor and material payment bonds, and cover the subcontract default risk. Such election does not change the contractual obligations of the Subcontractor or in any way impact the rights of the Construction Manager to recover damages resulting from the Subcontractor’s default. At the Construction Manager's election, a performance bond and a labor and material payment bond in the full amount of the Subcontract Sum (plus any change order increases or decreases at the time of furnishing), naming the Construction Manager as the bond obligee.
Such bonds shall be issued by a surety in the form and content, and from such surety or sureties thereon, satisfactory to the Construction Manager and the Owner. In the event that the Subcontractor should fail to comply with this obligation, the Construction Manager, at its election, may (a) withhold such amounts from the Subcontractor’s progress billings, change order payments, claim payments, retention release, and/or final payments, in such amounts as the Construction Manager may, in its sole and absolute discretion, deems necessary to protect the interest of the Construction Manager and/or the Owner in connection with the Work; or (b) terminate the Subcontract, which shall be a termination for cause, with
INSTRUCTIONS TO BIDDERS 00 0210-4
all of the Construction Manager's rights and remedies under the Subcontract and/or at law and equity being available to the Construction Manager for such termination for cause; or (c) terminate the
Subcontract for convenience of the Construction Manager and/or the Owner, upon terms and conditions agreeable to the Construction Manager in its sole and absolute discretion.
C. The Bidder shall deliver the required bonds to the Construction Manager prior to or at the time of execution of the Subcontract. The Work shall be commenced in response to a "Notice to Proceed", and the Bidder shall certify on an executed copy of the "Notice to Proceed" that the Bidder can and will provide the required bonds.
2.6 INSURANCE REQUIREMENTS
A. Refer to Project Manual Specification Section 00 0520.1 – Insurance Requirements for project specific insurance requirements.
2.7 SAFETY
A. Refer to Project Manual Specification Section 01 1100 – Summary of Work for site specific safety.
2.8 SALES AND USE TAX EXEMPTION
A. The project is exempt from payment of sales and compensating use taxes of the State of New York and of cities, counties and all other subdivisions of the State on all materials and supplies that are permanently incorporated into the Project.
2.9 PREVAILING WAGE RATE
A. Refer to Project Manual Specification Section 00 0900 – Prevailing Wage Rate for requirements and prevailing wage rate schedule.
2.10 PROJECT LABOR AGREEMENT (PLA)
A. Not required.
2.11 OPPORTUNITY PROGRAMS REQUIREMENTS
A. Refer to Specification Section 00 0940 – Opportunity Program Requirements.
2.12 STANDARD FORM OF SUBCONTRACT
A. Refer to Specification Section 00 0520 – Standard Form of Subcontract, modifications to the terms and conditions of the standard form of subcontract will not be accepted.
2.13 SUBMISSION OF BIDS
A. Bids shall be submitted electronically by email to Tyler Mekus at tmekus@buffaloconstruct.com prior to the date and time stipulated in the Notice to Bidders.
B. All sections of the Bid Form are to be completed with no exceptions, and the form returned together with all other required attachments. “None”, “Not Applicable”, or a similar statement shall be used where a section does not apply. Incomplete bids may be cause for rejection. Sums shall be expressed in both words and figures. In case of a discrepancy, the amount written in words shall govern. All requested alternates shall be bid. If no change in the Base Bid is required, enter “No Change”.
INSTRUCTIONS TO BIDDERS 00 0210-5
C. The Bid shall set forth and be made in the legal name of the Bidder, the type of organization (e.g., corporation, partnership or limited liability company) and its state of incorporation or organization, whichever the case may be. The Bid shall be signed by an authorized representative of the Bidder.
D. The Construction Manager reserves the right to require proof of the Bidder's name and organization and legal authority to perform its Work in the location of the Project.
E. At the time and date noted for the receipt of Bids, the Bids will be opened privately.
F. Prior to the due date and time for the submission of Bids, Bidders may withdraw or modify their Bids.
To be effective, written notice thereof must be received by the Construction Manager prior to the date and time that Bids are required to be submitted. Withdrawn Bids may be re-submitted prior to the date and time that Bids are due. Bidders may not withdraw or modify their Bid within forty-five (45) days after actual opening thereof. The stipulated time period within which alternates may not be withdrawn by the successful Bidder is ninety (90) says after award of Subcontract.
G. The Construction Manager shall have the right to reject any or all Bids in its sole and absolute discretion.
A Bid not accompanied by required attachments or a Bid which is in any way incomplete or irregular may be subject to rejection at the sole and absolute discretion of the Construction Manager.
H. The Construction Manager shall also have the right to qualify all Bids, waive informalities and irregularities in its sole and absolute discretion and to act in the best interests of the Construction Manager, the Owner and the Project.
END OF SECTION 00 0210
BID FORM CHECKLIST 00 0220.1-1
SECTION 00 0220.1 - BID FORM CHECKLIST
PROJECT: Buffalo Central Terminal
BID PACKAGE: BP #4 – Contract 701 – Roofing
BIDDER: ______________________________________________________________________
SUBCONTRACT NO. ____________________________________________________________
Bid Form
Offerers Disclosure – Bidder Acknowledgement
Non-Collusive Bidding Certificate
Certified Corporate Resolution
Substitution Form (if applicable)
Tax Exempt Form
END OF SECTION 00 0220.1
BID FORM 00 0220.2-1
SECTION 00 0220.2 – BID FORM
1.01 BID SUBMISSION:
A. Submit Bid to:
Buffalo Construction Consultants, Inc.
496 Kennedy Road
Buffalo, NY 14227
1.02 BIDDER INFORMATION:
Name: ______________________________________________________
Title: ______________________________________________________
Address: ______________________________________________________
Phone: ______________________________________________________
Email: ______________________________________________________
1.03 PROJECT INFORMATION:
A. Buffalo Central Terminal
B. Project Location:
495 Paderewski Drive
Buffalo, NY 14212
1.04 SUBCONTRACT INFORMATION:
A. Subcontract No. and Description: __________________________________________________
1.05 PROPOSAL:
We have examined and fully understand the requirements and intent of the Bidding and Contract Documents and all subsequent addenda as listed below, and propose to provide all materials, and all plant, labor, supplies, equipment, transportation and other facilities necessary or proper for, or incidental to, the Work, to complete all Work in strict accord with the contract documents and as assigned in the Summary of Work for the base bid lump sum of:
Base Bid:
Total Lump Sum Base Bid (numeric): $_____________________________________________________
Total Lump Sum Base Bid (in words): _____________________________________________________
BID FORM 00 0220.2-2
Submission of a bid shall represent the company submitting the bid has accepted the terms and conditions of the Subcontract and appendixes, without modifications, as provided in Volume 1 of the Project Manual;
Specification Section 00 0520 – BUFFALO CONSTRUCTION CONSULTANTS, INC. STANDARD FORM
OF SUBCONTRACT.
1.06 ALLOWANCES
A. Refer to Specification Section 01 2100 for a detailed description of all Allowances.
1.07 UNIT PRICES
A. Not Applicable.
1.08 ALTERNATES
The Bidder hereby offers to modify the above Lump Sum Base Bid based on the following alternates according to the Bidder’s Contract Scope of Work. Refer to Specification Section 01 2300 Alternates for descriptions and other requirements for alternates.
A. Alternate #1: Provide Demo, Salvage, and Replacement of Roofing as noted as Alternate Scope on
Drawings AD110NE.4, AD110NW.4, AD110SE.4, AD110SW.4, A110NE.4, A110NW.4, A110SE.4, A110SW.4
Add Amount (numeric): $________________________________________________________
Add Amount (in words): _________________________________________________________
B. Alternate #2: Provide Demo, Salvage, and Replacement of Roofing as noted as Alternate Scope on
Drawings AD110NE.4 and A110NE.4
Add Amount (numeric): $________________________________________________________
Add Amount (in words): _________________________________________________________
C. Alternate #3: Provide Performance and Labor & Material Bonds
Add Amount (numeric): $________________________________________________________
Add Amount (in words): _________________________________________________________
1.09 VOLUNTARY ALTERNATES
A. Voluntary Alternate #1: Enter Alternate Description
Deduct Amount (numeric): $________________________________________________________
Deduct Amount (in words): _________________________________________________________
B. Voluntary Alternate #2: Enter Alternate Description
Deduct Amount (numeric): $________________________________________________________
Deduct Amount (in words): _________________________________________________________
BID FORM 00 0220.2-3
1.10 ADDENDA RECEIVED
A. Addendum No. _______ Date: ___________________
B. Addendum No. _______ Date: ___________________
C. Addendum No. _______ Date: ___________________
D. Addendum No. _______ Date: ___________________
1.11 ATTACHMENTS
A. We have enclosed with this proposal the following attachments, fully executed. These documents are at the end of all the various Subcontract Bid Forms:
1. Attachment #1: Offerers Disclosure – Bidder Acknowledgement
2. Attachment #2: Non-Collusive Bidding Certificate
3. Attachment #3: Certified Corporate Resolutions
4. Attachment #4: Substitution Sheet]
1.12 SIGNATURE
Firm: _________________________________________ Corporate Seal:
By: _________________________________________
(signature)
(printed name)
Title: _________________________________________
Dated: _________________________________________
END OF SECTION 00 0220.2
Offerer’s Affirmation of Understanding of and Agreement pursuant to New York
State Finance Law §139-j (3) and §139-j (6) (b)
New York State Finance Law §139-j(6)(b) provides that:
Every Governmental Entity shall seek written affirmations from all
Offerers as to the Offerer’s understanding of and agreement to comply with the Governmental Entity’s procedures relating to permissible contacts during a Governmental Procurement pursuant to subdivision three of this section.
Offerer affirms that it understands and agrees to comply with the procedures of the
Government Entity relative to permissible contacts as required by New York State
Finance Law §139-j (3) and §139-j (6) (b).
By: ___________________________________ Date:____________________
Name: ________________________________
Title: _________________________________
Contractor Name: _______________________________________________________
Contractor Address: _____________________________________________________
ADM-325 Page 1 of 5
ATTACHMENT E
PaulinaMazurek Text Box
SECTION 00 0220.3 - OFFERERS DISCLOSURE
Offerer Disclosure of Prior
Non-Responsibility Determinations
Background:
New York State Finance Law §139-k(2) obligates a Governmental Entity to obtain specific information regarding prior non-responsibility determinations with respect to
State Finance Law §139-j. This information must be collected in addition to the information that is separately obtained pursuant to State Finance Law §163(9). In accordance with State Finance Law §139-k, an Offerer must be asked to disclose whether there has been a finding of non-responsibility made within the previous four (4) years by any Governmental Entity due to: (a) a violation of State Finance Law §139-j or (b) the intentional provision of false or incomplete information to a Governmental Entity. The terms “Offerer” and “Governmental Entity” are defined in State Finance Law § 139-k(1).
State Finance Law §139-j sets forth detailed requirements about the restrictions on
Contacts during the procurement process. A violation of State Finance Law
§139-j includes, but is not limited to, an impermissible Contact during the restricted period (for example, contacting a person or entity other than the designated contact person, when such contact does not fall within one of the exemptions).
As part of its responsibility determination, State Finance Law §139-k(3) mandates consideration of whether an Offerer fails to timely disclose accurate or complete information regarding the above non-responsibility determination. In accordance with law, no Procurement Contract shall be awarded to any Offerer that fails to timely disclose accurate or complete information under this section, unless a finding is made that the award of the Procurement Contract to the Offerer is necessary to protect public property or public health safety, and that the Offerer is the only source capable of supplying the required Article of Procurement within the necessary timeframe. See State Finance Law
§§139-j (10)(b) and 139-k(3).
Instructions:
A Governmental Entity must include a disclosure request regarding prior non-responsibility determinations in accordance with State Finance Law §139-k in its solicitation of proposals or bid documents or specifications or contract documents, as applicable, for procurement contracts. The attached form is to be completed and submitted by the individual or entity seeking to enter into a Procurement Contract. It shall be submitted to the Governmental Entity conducting the Governmental
Procurement.
ADM-325 Page 2 of 5
Offerer Disclosure of Prior Non-Responsibility Determinations
Name of Individual or Entity Seeking to Enter into the Procurement Contract:
Address: _______________________________________________________________
Name and Title of Person Submitting this Form: ________________________________
Contract Procurement Number: __________________
Date:________________________
1. Has any Governmental Entity made a finding of non-responsibility regarding the individual or entity seeking to enter into the Procurement Contract in the previous four years? (Please circle):
No Yes If yes, please answer the next questions:
2. Was the basis for the finding of non-responsibility due to a violation of State Finance Law
§139-j (Please circle):
No Yes
3. Was the basis for the finding of non-responsibility due to the intentional provision of false or incomplete information to a Governmental Entity? (Please circle):
No Yes
4. If you answered yes to any of the above questions, please provide details regarding the finding of non-responsibility below.
Governmental Entity: ___________________________________________________________
Date of Finding of Non-responsibility: ______________________________________________
Basis of Finding of Non-Responsibility: _____________________________________________
(Add additional pages as necessary)
5. Has any Governmental Entity or other governmental agency terminated or withheld a
Procurement Contract with the above-named individual or entity due to the intentional provision of false or incomplete information? (Please circle):
No Yes
ADM-325 Page 3 of 5
6. If yes, please provide details below.
Governmental Entity: ______________________________________________
Date of Termination or Withholding of Contract: _______________________________________
Basis of Termination or Withholding: ____________________________________________
(Add additional pages as necessary)
Offerer certifies that all information provided to the Governmental Entity with respect to State
Finance Law §139-k is complete, true and accurate.
By: Date:
Signature
ADM-325 Page 4 of 5
Offerer’s Certification of Compliance with State Finance Law §139-k(5)
New York State Finance Law §139-k(5) requires that every Procurement Contract award subject to the provisions of State Finance Law §§139-k or 139-j shall contain a certification by the Offerer that all information provided to the Office of General Services with respect to State Finance Law §139-k is complete, true and accurate.
Offerer Certification:
I certify that all information provided to the Office of General Services with respect to State Finance Law §139-k is complete, true and accurate.
By: ___________________________________ Date:____________________
Name: ________________________________
Title: _________________________________
Contractor Name: _______________________________________________________________
Contractor Address: _____________________________________________________________
Procurement Lobbying Termination
The Office of General Services reserves the right to terminate this contract in the event it is found that the certification filed by the Offerer in accordance with New York State
Finance Law §139-k was intentionally false or intentionally incomplete. Upon such finding, the Office of General Services may exercise its termination right by providing written notification to the Offerer in accordance with the written notification terms of this contract.
ADM-325
PaulinaMazurek Text Box
END OF SECTION 00 0220.3
NON-COLLUSIVE BIDDING CERTIFICATE 00 0220.4-1
SECTION 00 0220.4 – NON-COLLUSIVE BIDDING CERTIFICATE
ATTACHMENT #2
No bid will be accepted that does not have this form completely executed.
1. By submission of this Bid, each Bidder and each person signing on behalf of any Bidder certifies and in the case of a joint bid, each party thereto certifies as to its own organization, under penalty of perjury, that to the best of his/her knowledge and belief:
a) The prices in this bid have been arrived at independently without collusion, consultation, communication or agreement, for the purpose of restricting competition, as to any matter relating to such prices with any other
Bidder or any competitor.
b) Unless otherwise required by law, the prices which have been quoted in this Bid have not been knowingly disclosed by the Bidder and will not knowingly be disclosed by the Bidder prior to opening, directly or indirectly, to any other Bidder or competitor; and
c) No attempt has been made or will be made by the Bidder to induce any other person, partnership or corporation to submit or not to submit a bid for the purpose of restricting competition.
d) If the Bidder is a corporation, this certificate is and shall be deemed to have been authorized by the Board of
Directors of the Bidder, and such authorization is and shall be deemed to include the signing and submission of the Bid and the inclusion therein of this certificate of non-collusion as the act and deed of the corporation.
e) The attached hereto (if a corporate bidder) is a certified copy of a resolution authorizing the execution of this certification by the signature of this Bid or proposal on behalf of the corporate bidder.
(Individual)
(Corporation)
(Signature of Officer)
(Date)
END OF SECTION 00 0220.4
CERTIFIED CORPORATE RESOLUTION 00 0220.5-1
SECTION 00 0220.5 – CERTIFIED CORPORATE RESOLUTION
ATTACHMENT #3
RESOLVED THAT ________________________________________ be authorized to sign and submit the bid or proposal of this corporation for the following project:
(Project Name) and to include in such bid the Non-Collusive Bidding Certificate as to the act and deed of such corporation, and for any inaccuracies or misstatements in such certificate this corporate bidder shall be liable under the penalties of perjury.
The foregoing is a true and correct copy of the resolution and adopted by
_______________________________________________________ at a meeting of its board of directors held on the ________________________ day of _________________________ 20 ___.
(Secretary)
END OF SECTION 00 0220.5
REQUEST FOR SUBSTITUTION FORM 00 0220.6-1
SECTION 00 0220.6 – REQUEST FOR SUBSTITUTION FORM
Buffalo Central Terminal – BP#4 Roofing Package
CONTRACTOR’S NAME AND ADDRESS:
The following materials, products or equipment are proposed as substitutions for specified items indicated. Required back-up data will be submitted within three (3) working days of receipt of request for same as one of the three (3) lowest bidders. We agree to abide by Architect’s decision as to acceptability of the proposed substitutions.
1. SPECIFICATION SECTION NO.:
SECTION ARTICLE OR PARAGRAPH NO.:
SPECIFIED ITEM:
PROPOSED SUBSTITUTION:
2. SPECIFICATION SECTION NO.:
3. SPECIFICATION SECTION NO.:
4. SPECIFICATION SECTION NO.:
REQUEST FOR SUBSTITUTION FORM 00 0220.6-2
REQUEST FOR SUBSTITUTION FORM
Note: Use separate form for each material, product or equipment item.
Date: Request No.:
Project:
Location:
Name of material, product or equipment item submitted as substitution:
Name of material, product or equipment item specified:
Specification Section , Article , Paragraph
Qualities that differ from specified product or system:
Name of Manufacturer/(Fabricator):
Address
City, State and Zip Telephone
Name of Vendor/Supplier
City, State and Zip Telephone
Reason for requesting substitution:
REQUEST FOR SUBSTITUTION FORM 00 0220.6-3
Substitution affects other materials or systems, such as dimensional revisions, redesign of structure or modification to other work:
No
Yes; describe requirements:
Savings or credit to Contract Amount for accepting substitute:
Dollars ($ )
Written Amount Amount in Figures
The attached data is furnished herewith for evaluation of the substitution:
Product Data Drawings Samples Test Reports
Other information
The undersigned hereby certifies:
1. The proposed substitution has been fully investigated and is equal to or superior to specified product.
2. The same or better warranty will be furnished for the proposed substitution as for specified material, product or equipment.
3. The proposed substitution complies with the requirements in the contract documents and is appropriate for the applications indicated.
4. If any of the following conditions occur due to the substitutions, the Contractor making the substitution shall bear the cost of such conditions, including but not limited to payment for additional services and/or Work provided by the Owner, CM, Architect and/or other subcontractors.
• Redesign required for any of the Work
• Material or quantity changes for any of the Work.
• Delays in any of the Work.
• Requests for information generated due to substitutions.
Contractor Signature
END OF SECTION 00 0220.6
AVAILABLE PROJECT INFORMATION 00 0310-1
SECTION 00 0310 – AVAILABLE PROJECT INFORMATION
PART 1 GENERAL
1.1 RELATED DOCUMENTS
A. See the Buffalo Central Terminal asbestos and PCB caulk sampling report conducted in February 2025, prepared by Advance Contracting Services, (forthcoming via addendum).
B. See the NYS Office of Parks, Recreation and Historic Preservation Bidding Requirements, attached to this section.
PART 2 – PRODUCTS (Not Used)
PART 3 – EXECUTION (Not Used)
END OF SECTION 00 0310
ACS, Inc.
PO Box 986 Grand Island NY 14072 (716) 480-2125 advancedcss1976@gmail.com
ASBESTOS SAMPLING – Roofing Materials
Location:
The Buffalo Central Terminal
455 Paderewski Drive
Buffalo NY 14212 Conditions as of March 2025
Prepared For:
Central Terminal Restoration Corp.
455 Paderewski Drive
Buffalo NY 14212
Prepared by:
Advance Contracting Services
PO Box 986
Grand Island NY 14072 advancedcss1976@gmail.com
NYSDOL Asbestos License # 115026
NYS ELAP # 12161
mailto:advancedcss1976@gmail.com
EXECUTIVE SUMMARY
1.0 General Conditions of Inspection
2.0 Field Sampling Procedures and Sample Analysis Methods
3.0 Asbestos Containing Materials - Site Wide Summary
Appendix
Appendix A: Site Drawings
Appendix B: Personnel Certifications and Firm License
Appendix C: Asbestos Sample Results
EXECUTIVE SUMMARY
ASBESTOS CONTAINING MATERIALS
The purpose of the sampling was to determine the presence, location and quantity of ACM (asbestos containing materials), at the above referenced location. As defined by the property owners’ specific scope of work for the project. The site has had numerous asbestos testing on the site previously. ACS has incorporated the previous sample results in a chart for reference. ACM is throughout the facility in both accessible and inaccessible areas.
In total 47. non-friable samples for this Phase of the asbestos project were from accessible areas within the scope of work were analyzed. Numerous building material sampled contained asbestos containing materials. Most all materials are in poor condition and have caused numerous areas of the building to be contaminated. The Chain of
Custody identifies the specific unit that was sampled for asbestos. Analysis was completed by ACS Labs NYS
ELAP#121161
1.0 GENERAL CONDITIONS OF INSPECTION
Please refer to the general notes section of this report for additional comments on materials at this location. Not all identified materials may be listed in each building summary but will instead be listed in the general notes for the entire site.
Any reported quantities found in this report, if applicable, are field approximations of materials in readily accessible areas only and should be field verified prior to abatement. This report is not designed to serve as a specification for abatement. Please, find enclosed the laboratory analytical results and chain of custody documentation, if applicable. Drawings, if provided, are for reference purposes only and are not to scale.
Any suspect materials found within the scope of work and not specifically accounted for with applicable sampling in this report should be presumed to contain asbestos and treated accordingly until sampled and proven otherwise, including but not limited to; below grade materials, sub- flooring under installed existing flooring and materials and insulation within walls, above fixed and suspended ceiling systems, interiors of fire doors, if applicable.
Any included laboratory results, if applicable, are submitted pursuant to ACS current terms and conditions of sale, including the company’s standard warrant and limitation of liability provisions. No responsibility or liability is assumed for the manner in which the results are used or interpreted.
This report is based on the condition and contents present at the above referenced location at the time of sampling.
Any listed asbestos containing or presumed asbestos containing materials should only be handled and/or disturbed by licensed individuals, adhering to both state and federal regulations for abatement.
2.0 RECOMMENDED FIELD SAMPLING PROCEDURES AND SAMPLE METHODS
Guidelines used for the visual inspection were established by the Environmental Protection Agency (EPA) in the
“Guidance for Controlling Asbestos Containing Materials in Buildings, Office of Pesticides and Toxic Substances, Doc 560/5-85-024”.
Field information was organized in accordance with the AHERA methodology of homogenous area (HAN). During the visual inspection, reasonable effort was made to identify all locations and types of ACM associated with the scope of work. Sampling, when applicable, should included multiple samples of the same materials chosen at random. However, due to inconsistencies of a manufacturer's processes and the contractor’s installation methods, materials of similar construction may contain various amounts of asbestos. Furthermore, some materials that were not originally specified to contain asbestos may in fact contain this mineral. For example, cementitious pipe insulation and plaster were frequently mixed with asbestos at the construction site for ease of application.
Locating all asbestos materials can only be definitively achieved by conducting exploratory demolition and sampling every section of pipe insulation, fitting or valve covering, fireproofing, and other suspect ACM.
Bulk samples of suspect ACM may be analyzed using polarized light microscopy (PLM) coupled with dispersion staining, as described in 40 CFR Part 763 and the National Emissions Standard for Hazardous Air Pollutants
(NESHAPS). NESHAPS is the standard industry protocol for the determination of asbestos in building materials. A suspect material is immersed in a solution of known refractive index and subjected to illumination by polarized light.
The color displays that result are compared to a standardized atlas whereby the specific variety of asbestos is determined. It should also be recognized that PLM is primarily a qualitative identification method whereby asbestos percentage, if any, is estimated. EPA and New York State regulations governing ACM consider materials containing greater than 1-percent as asbestos containing materials.
For jobs performed in New York State, The New York State Department of Health has revised the PLM Stratified
Point Counting Method. The method, "Polarized Light Microscopy Methods for Identifying and Quantifying
Asbestos in Bulk Samples" can be found as item 198.1 in the Environmental Laboratory Approval program (ELAP)
Certification manual. The method specifies a procedure of analysis for bulk samples that fall into the category of
"Non-friable Organically Bound" (NOB). This category includes any sample in a flexible to rigid asphalt or vinyl matrix (floor tiles, mastic, roofing shingles, roofing felt, etc.). Additional materials that may fall into this category are textured paints and stucco, pipe valve and joint packing, and a variety of other applications. These samples must be “ashed” in a muffle furnace at 480-degrees Celsius (to remove organic matrix), treated with acid (to remove any mineral carbonate), and filtered through a 0.4-micron filter before being analyzed by PLM. The sample must be weighed between each of these steps to track the percent loss of organic matrix.
ELAP has determined that analysis of NOB materials is not reliably performed by PLM. Therefore, if PLM yields results of 1-percent asbestos or less, the result must be confirmed by TEM. Bulk samples that undergo TEM analysis use the sample reduction methodology stated above for NOB analysis by PLM. ELAP certified laboratories must include the following statement with their PLM analysis results for each “negative” (1-percent or less asbestos) NOB sample: "Polarized-light microscopy is not consistently reliable in detecting asbestos in floor coverings and similar non-friable organically bound materials. Before this material can be considered or treated as non-ACM, confirmation must be made by quantitative transmission electron microscopy".
Some samples are initially analyzed by Polarized Light Microscopy. Samples which yield a negative PLM result and which are classified as a "non-friable" material should then re-analyzed utilizing Transmission Electron Microscopy methods both these analysis procedures shall be ELAP accredited.
3.0 Asbestos Containing Materials – Materials by Area:
Location Material Asbestos Friability Approx. SF Approx. LF
Tower Roof and
Penthouse
Roofing Materials YES Non-friable 3500 SF -
Repair tar YES Non-friable 500 SF -
L1 NW
Roof Top
NO
Non-friable
Roof Top
NO
Non-friable
Roof Bottom
Non-friable
Non-friable
Tar
YES
Non-friable
<100sf
YES
Non-friable
Canopy NW-2
REMOVED
Canopy NE-1 Roof
NO
Non-friable
Roof
Non-friable
Roof bottom
Non-friable
Non-friable
Non-friable
Non-friable
Canopy NW-1 Roof
NO
Non-friable
Non-friable
Non-friable
Non-friable
Non-friable
Non-friable
Canopy South Roof
NO
Non-friable
Non-friable
Non-friable
Non-friable
Non-friable
NO Non-friable -
Roof A Roof NO Non-friable -
Roof NO Non-friable -
NO Non-friable
No Non-friable -
Silver Coating
YES Non-friable 200sf
Silver Coating
YES Non-friable -
Roof A Roof
No Non-friable -
Concrete Section Roof
No Non-friable -
South Section Roof
Silver Tar
YES Non-friable <50sf
Silver Tar
North Roof Caulk
YES Non-friable <25sf
Caulk
Caulk-Windows
Caulk Windows
NO Non-Friable -
East Roof
YES Non-friable 4500sf -
YES Non-friable - -
Silver Coat-Flashing
YES Non-friable >100sf -
Silver Coat-Flashing
YES Non-friable - -
Grey Coating on Parapit
NO Non-friable - -
Grey Coat on Parapit
NO Non-friable - -
Roof H
Non-friable - -
ASBESTOS LICENSES AND CERTIFICATIONS
ROOF A
Concrete Section Non Asbestos
NON
ASBESTO
S Grey Coating
ROOF A
Asbestos
Kathy Hochul Governor
Randy Simons Commissioner Pro Tempore
BIDDING REQUIREMENTS
Program Information – Required OPRHP bid language
NOTICE: Contractors, Subcontractors, Suppliers & Vendors Attachment A-1 – Agency Specific Terms and Conditions A-2 – Program Specific Terms and Conditions
Legal Notice for Bidders Required Language and/or Statements
Required Forms to be submitted with bid
Non-Collusive Bidding Certification to be submitted within seven days of award notification
Equal Employment Opportunity Policy Statement Contractor’s Solicitation Log (MWBE tracking)
Sample Vendor Responsibility Questionnaire For information only. Must be submitted after award notification for contracts that equal or exceed $100,000. VRQ can be completed Online, and verification page must be submitted prior to executing contract.
Vendor Responsibility Questionnaire For-Profit Construction
Notice to Contractors, Subcontractors, Suppliers and Vendors (Revised March 8, 2024) 1 | 1
NOTICE TO CONTRACTORS, SUBCONTRACTORS, SUPPLIERS AND VENDORS
This project is funded in part by a grant from the NYS Office of Parks, Recreation and Historic Preservation through Title
9 of the Environmental Protection Act of 1993. All contracts and subcontracts for the project are subject to the terms of the State of New York Contract for Grants (SNYCG) -- Standard Terms and Conditions, which can be found online at https://grantsmanagement.ny.gov/state-agency-resources, Appendix A (A), Attachment A-1 (A1) and Attachment A-2
(A2), attached hereto. If any other funding sources are involved in the project, the grantee is responsible for compliance with the program requirements for those funding sources.
Note particularly the following requirements:
• The State’s right to review and approve every subcontract in excess of $100,000. SNYCG III (B)(2)
• The requirement that subcontracts contain provisions specifying (1) that work accord with the terms of the State of
New York Contract for Grants, (2) that nothing in the subcontract shall impair the rights of the State under the State of
New York Contract for Grants, and (3) that nothing in the subcontract, nor under the State of New York Contract for
Grants creates any contractual relationship between the subcontractor and the State. SNYCG III (B)(2)
• Contractor’s responsibility to submit vendor responsibility information to the State, including a Vendor Responsibility
Questionnaire for subcontracts that equal or exceed $100,000. SNYCG III (B)(4)
• Non-discrimination requirements A(5) and A1(F)
• Equal Opportunity provisions, including a requirement that the following…