BCT - BP4 Roofing - Architectural Drawings.pdf
PDF 25 MB Posted
- Attached to
- Buffalo Central Terminal - Bid Package #4 (Roofing) State and local contract opportunity
- Solicitation number
- 2119822
- Issued by
- Erie County, New York
About this file
These are architectural roofing drawings for the Buffalo Central Terminal Restoration Project, developed by Quinn Evans Architects and a team of consulting engineers for the Buffalo Central Terminal Central Terminal Restoration Corp. The project is Phase 2, Bid Package 4, focusing on roof restoration for a historically significant building listed on the National Register of Historic Places. The drawings cover multiple roof types and levels, including L1, L2, and L5 office areas, concourse, penthouse, and tower roofs, with detailed demolition and replacement plans. The scope involves removing existing roofing materials, salvaging specific architectural elements like precast concrete tiles, and installing new roofing assemblies using PVC, SBS, and metal roofing systems.
The project emphasizes preservation and historical integrity, requiring all work to meet the Secretary of the Interior's Standards for Historic Properties. The restoration includes careful removal of existing roofing materials, replacement of roof drains and hatches, and detailed membrane installation with specific attention to water drainage, insulation, and flashing. Multiple roof types (Type 1-4) are specified with variations in membrane, insulation, and drainage systems. The project acknowledges potential hazardous materials and requires contractors to verify existing conditions, protect historic elements, and coordinate closely with the architectural team. Structural repairs and masonry work are noted to be part of future bid packages (BP5), indicating this is part of a phased restoration approach for the Buffalo Central Terminal.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Package #4 Roofing Addendum #1.pdf | ||
| BCT - BP4 Roofing - Project Specification Manual.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLAN NORTH
DRAWING INDEX
DRAWN BY:PROJECT MANAGER:
QUINNEVANS.COM
4219 WOODWARD AVE
SUITE 301
DETROIT, MI 48201
v 313.462.2550
VICINITY MAPS
QUINN EVANS
4219 WOODWARD AVE
SUITE 301
DETROIT, MI 48201
v 313.462.2550
PROJECT TEAM
02/07/2025
ARCHITECT
PHASE 2 - BID PACKAGE 4
JABLONSKI BUILDING CONSERVATION, INC.
40 WEST 27TH STREET, FLOOR 12
NEW YORK, NY 10001
T: (212) 532-7775
CONSERVATION:
BURO HAPPOLD CONSULTING
ENGINEERS P.C.
100 BROADWAY
NEW YORK, NY 10006
T: (212) 334-2025
MECH/ELEC/PLUMB ENGINEER:
TREDO ENGINEERS
755 SENECA STREET, STE 202
BUFFALO, NY 14210
CIVIL:
GHD
26850 HAGGERTY RD
FARMINGTON HILLS, MI 48331
T: (248) 893-3400
LIFE SAFETY & FIRE PROTECTION:
BARBARA A. CAMPAGNA/ARCHITECTURE
+PLANNING, PLLC
2495 MAIN STREET, STE 402
BUFFALO, NY 14210
LOCAL PRESERVATION ARCHITECT:
TYLIN
1053 31ST STREET NW
WASHINGTON, DC 20007
T: (202) 333-6230
STRUCTURAL ENGINEER:
G001.4
COVER
AWAW
QEA No.42245240
495 Paderewski Dr, Buffalo, NY 14212
BUFFALO CENTRAL TERMINAL
CENTRAL TERMINAL RESTORATION CORP.
495 Paderewski Dr, Buffalo, NY 14212
BUFFALO CENTRAL
TERMINAL
CENTRAL TERMINAL
RESTORATION CORP.
BID PACKAGE 4: ROOF PACKAGE
NUMBER SHEET NAME
G001.4 COVER
G004.4 REFERENCE PLANS
G005.4 ROOF TYPES
AD106NE.4 L1 OFFICES NE DEMO PLAN
AD106NW.4 L1 OFFICES NW DEMO PLAN
AD107SW.4 L2 OFFICES SW DEMO PLAN
AD110NE.4 L5 OFFICES NE & CONCOURSE ROOF DEMO PLAN
AD110NW.4 L5 OFFICES NW & CONCOURSE ROOF DEMO PLAN
AD110SE.4 L5 OFFICES SE & CONCOURSE ROOF DEMO PLAN
AD110SW.4 L5 OFFICES SW & CONCOURSE ROOF DEMO PLAN
AD116.4 PENTHOUSE & TOWER ROOF DEMO PLANS
A106NE.4 L1 OFFICES NE ROOF PLAN
A106NW.4 L1 OFFICES NW ROOF PLAN
A107SW.4 L2 OFFICES & SW ROOF PLAN
A110NE.4 L5 OFFICES NE & CONCOURSE ROOF PLAN
A110NW.4 L5 OFFICES NW & CONCOURSE ROOF PLAN
A110SE.4 L5 OFFICES SE & CONCOURSE ROOF PLAN
A110SW.4 L5 OFFICES SW & CONCOURSE ROOF PLAN
A116.4 PENTHOUSE & TOWER ROOF PLANS
A560.4 ROOF DETAILS - LIGHTCOURT ROOF C1
A561.4 ROOF DETAILS - CONCOURSE ROOF A
A562.4 ROOF DETAILS - B2-B9 ROOFS
A563.4 ROOF DETAILS - ROOF B1 & H
A564.4 ROOF DETAILS - CANOPIES
No. Date Description
K
M
ROOF B1
10 12 13
J
N
K
M
ROOFS B2-B9
1 2 3 4 5 6 7 8 9 10 12 13 14
A
B
C
D
E
F
G
H
J
N
P
K
M
L
ROOF C:
NOT IN SCOPE
ROOF A
(L5 OFFICE)
ROOF H
(L2 OFFICE)
ROOF G:
NOT IN SCOPE
ROOF F:
NOT IN SCOPE
ROOF D:
NOT IN SCOPE
ROOF E:
NOT IN SCOPE
ROOF C1
(L1 OFFICE)
CANOPY
NW 1
(L1 OFFICE)
CANOPY
NW 2
(L1
OFFICE)
CANOPY
NE 2:
NOT IN
SCOPE
CANOPY
NE 1
(L1 OFFICE)
ROOF L1-NW
(L1 OFFICE)
NE NW
SE SW
INTERIOR SPACE
NOT IN SCOPE
ROOF A
(L5 OFFICE)
1. BUFFALO CENTRAL TERMINAL IS A BUILDING OF
NATIONAL HISTORICAL SIGNIFICANCE AND IS
LISTED ON THE REGISTER OF HISTORIC
PLACES. TREAT THE BUILDING RESPECTFULLY.
TREAT EXISTING MATERIALS AS
IRREPLACEABLE. DO NOT REMOVE, ALTER OR
DISFIGURE ANY EXISTING MATERIALS,
ELEMENTS OR FINISHES UNLESS SPECIFICALLY
INDICATED HEREIN OR DIRECTED BY THE
ARCHITECT.
2. ALL WORK CONDUCTED AS PART OF THIS
PROJECT MUST MEET THE SECRETARY OF THE
INTERIOR’S STANDARDS FOR THE TREATMENT
OF HISTORIC PROPERTIES WITH GUIDELINES
FOR PRESERVING, REHABILITATING,
RESTORING, AND RECONSTRUCTING HISTORIC
BUILDINGS.
3. ALTHOUGH INTENDED TO CONVEY
APPROPRIATE INFORMATION, ALL DRAWINGS
ARE BASED ON LIMITED FIELD INVESTIGATION
AND ARCHIVAL BUILDING INFORMATION. AS
SUCH, DRAWINGS MAY CONTAIN
DISCREPANCIES DUE TO CONCEALED
CONDITIONS, INACCURACIES IN ORIGINAL
DRAWINGS INACCESSIBLE LOCATIONS,
UNRECORDED BUILDING ALTERATIONS, AND
OTHER CONFLICTING INFORMATION.
CONTRACTOR SHALL VERIFY EXISTING
CONDITIONS AND MEASUREMENT. NOTIFY THE
ARCHITECT REGARDING ANY DISCREPANCY
BETWEEN EXISTING CONDITIONS AND THE
CONTRACT DOCUMENTS PRIOR TO
COMMENCING WORK. FAILURE TO NOTIFY THE
ARCHITECT WILL NOT RELIEVE THE
CONTRACTOR OF THE RESPONSIBILITY TO
PERFORM THE WORK AS INTENDED INTHE
CONTRACT DOCUMENTS.
4. WHERE HAZARDOUS MATERIALS ARE PRESENT
IN CONSTRUCTION AREAS AFFECTED BY
REMOVAL AND DISMANTLING WORK, NOTIFY
OWNER AND REFER TO ENVIRONMENTAL
REPORTS PROVIDED BY OWNER FOR
ADDITIONAL INFORMATION PRIOR TO
DISTURBING OR REMOVAL.
5. REFER TO STRUCTURAL DRAWINGS FOR
ADDITIONAL WORK.
6. COORDINATE ALL DEMOLITION WORK WITH
CUTTING AND PATCHING REQUIRED BY NEW
WORK.
7. PROVIDE ADEQUATE PROTECTION TO ALL
AREAS AFFECTED BY THE WORK. THE
CONTACTOR SHALL BE HELD RESPONSIBLE
FOR ANY DAMAGE TO ANY BUILDING
COMPONENTS WHICH OCCUR AS A RESULT OF
ALL PHASES OF WORK.
GENERAL NOTES
LEGEND
ROOF NOT IN SCOPE
ROOF WORK AREA
AREA OF TEMP ROOFING
REPAIR (ALTERNATE)
TOWER ROOF (B1)
PENTHOUSE
BALCONIES (B2-B9)
ROOF A
ROOF L1-NW
ROOF C1
CANOPY NW-2
CANOPY NW-1CANOPY NE-1
TOWER ROOF (B1)
PENTHOUSE
BALCONIES (B2-B9)
ROOF A
ROOF L1-NW
CANOPY NW-2
CANOPY NW-1
ROOF H
PLAN NORTH
P A
T H
F
IL
E
N A
M E
P L O
T T
IN
G
D A
T E
T
IM
E
A
DRAWN BY:PROJECT MANAGER:
1840 WEST BROAD STREET
SUITE 400
RICHMOND, VA 23220
v 804.788.4774
QUINNEVANS.COM
M
B
C
D
E
F
G
H
J
K
L
122 3 4 5 6 7 8 9 10 11
1 122 3 4 5 6 7 8 9 10 11
02/07/2025
PHASE 2 - BID PACKAGE 4
A u to d e s k D o c s
/B u ff a lo
C e n tr a l T e rm in a l/
B u ff a lo C e n lT e rm
R
.r v t
/8
/2
:2
:0
A M
G004.4
REFERENCE PLANS
AWAW
QEA No.42245240
495 Paderewski Dr, Buffalo, NY 14212
BUFFALO CENTRAL
TERMINAL
CENTRAL TERMINAL
RESTORATION CORP.
1/16" = 1'-0"G004.4
3 TOWER ROOF (ROOF B1)
1/16" = 1'-0"G004.4
2 PENTHOUSE BALCONIES (ROOFS B2-B9)
1/16" = 1'-0"G004.4
1 OVERALL PLAN - LOWER ROOFS
1/64" = 1'-0"G004.4
5 ROOF DIAGRAM - VIEW FROM NORTH
1/64" = 1'-0"G004.4
4 ROOF DIAGRAM - VIEW FROM WEST
No. Date Description
MarcusDeLeys Cloud
MarcusDeLeys Callout N.I.C
MarcusDeLeys Rectangle
MarcusDeLeys Line
MarcusDeLeys Line
MarcusDeLeys Text Box N.I.C
MarcusDeLeys Rectangle
FULLY ADHERED ROOF
MEMBRANE (PVC)
INSULATED COVER BOARD
REPLACEMENT DECK, NOT
IN SCOPE (REFER TO BP5
FOR STRUCTURAL
REPAIRS)
RIGID INSULATION,
TAPERED
ROOF TYPE 4B (PVC ROOFING ASSEMBLY)
SBS ROOFING
ROOF TYPE 1 (SBS ROOFING)
EXIST. CONCRETE SLAB
(REFER TO BP5 FOR
STRUCTURAL REPAIRS)
RIGID INSULATION
VAPOR RETARDER
FULLY ADHERED ROOF
MEMBRANE (PVC)
INSULATED COVER BOARD
EXIST. CONCRETE SLAB
(REFER TO BP5 FOR
STRUCTURAL REPAIRS)
RIGID INSULATION,
TAPERED
ROOF TYPE 4D (PVC ROOFING ASSEMBLY)
RIGID INSULATION
VAPOR RETARDER
TOPPING SLAB (NOT IN
SCOPE, REFER TO BP5)
FULLY ADHERED ROOF
MEMBRANE (PVC)
INSULATED COVER BOARD
EXIST. CONCRETE SLAB
(REFER TO BP5 FOR
STRUCTURAL REPAIRS)
RIGID INSULATION,
TAPERED
ROOF TYPE 4C (PVC ROOFING ASSEMBLY)
RIGID VACUUM
INSUALTION PANEL
VAPOR RETARDER
ROOF TYPE 2 (PVC ROOFING)
EXIST. CONCRETE SLAB
(REFER TO BP5 FOR
STRUCTURAL REPAIRS)
FULLY ADHERED ROOF
MEMBRANE (PVC)
ROOF TYPE 3 (METAL ROOFING)
EXISTING STRUCTURE TO
REMAIN
ALUMINUM SHEET METAL
EXISTING TEMP MEMBRANE
TO REMAIN
FULLY ADHERED ROOF
MEMBRANE (PVC)
INSULATED COVER BOARD
EXIST. CONCRETE SLAB
(REFER TO BP5 FOR
STRUCTURAL REPAIRS)
RIGID INSULATION,
TAPERED
ROOF TYPE 4A (PVC ROOFING ASSEMBLY)
RIGID INSULATION
VAPOR RETARDER
P A
T H
F
IL
E
N A
M E
P L O
T T
IN
G
D A
T E
T
IM
E
A
DRAWN BY:PROJECT MANAGER:
1840 WEST BROAD STREET
SUITE 400
RICHMOND, VA 23220
v 804.788.4774
QUINNEVANS.COM
M
B
C
D
E
F
G
H
J
K
L
122 3 4 5 6 7 8 9 10 11
1 122 3 4 5 6 7 8 9 10 11
02/07/2025
PHASE 2 - BID PACKAGE 4
A u to d e s k D o c s
/B u ff a lo
C e n tr a l T e rm in a l/
B u ff a lo C e n lT e rm
R
.r v t
/8
/2
:2
:1
A M
G005.4
ROOF TYPES
AWAW
QEA No.42245240
495 Paderewski Dr, Buffalo, NY 14212
BUFFALO CENTRAL
TERMINAL
CENTRAL TERMINAL
RESTORATION CORP.
3" = 1'-0"G005.4
1 ROOF TYPES
02.XXX
X - XXX
KEYNOTE
PHOTO TAG
DEMOLITION LEGEND
AREA OF DEMO (BASE SCOPE)
AREA OF DEMO (ALTERNATE)
EXISTING WALLS TO REMAIN
DEBRIS ON ROOF
1. BUFFALO CENTRAL TERMINAL IS A BUILDING OF NATIONAL HISTORICAL
SIGNIFICANCE AND IS LISTED ON THE NATIONAL REGISTER OF HISTORIC PLACES.
TREAT THE BUILDING RESPECTFULLY. TREAT EXISTING MATERIALS AS
IRREPLACEABLE. DO NOT REMOVE, ALTER, DISFIGURE, OR OTHERWISE DAMAGE
ANY EXISTING MATERIALS, ELEMENTS, OR FINISHES UNLESS SPECIFICALLY
INDICATED HEREIN OR DIRECTED BY THE ARCHITECT. CONTRACTORS SHALL BE
RESPONSIBLE FOR PROTECTING EXISTING CONSTRUCTION FROM DAMAGE DURING
CONSTRUCTION ACTIVITIES. DO NOT REMOVE SALVAGED BUILDING ELEMENTS
FROM THE SITE WITHOUT WRITTEN PERMISSION FROM THE OWNER AND
ARCHITECT.
2. ALL WORK CONDUCTED AS PART OF THIS PROJECT MUST MEET THE SECRETARY
OF THE INTERIOR'S STANDARD FOR THE TREATMENT OF HISTORIC PROPERTIES
WITH GUIDELINES FOR PRESERVING, REHABILITATING, RESTORING, AND
RECONSTRUCTING HISTORIC BUILDINGS. THE CONTRACTOR SHALL BE FAMILIAR
WITH THESE STANDARDS PRIOR TO COMMENCING WORK.
3. ALL DRAWINGS ARE BASED ON LIMITED FIELD INVESTIGATION. VARYING AND
HIDDEN CONDITIONS MAY EXIST. CONTRACTOR SHALL VERIFY ALL EXISTING
CONDITIONS AND MEASUREMENTS. NOTIFY THE ARCHITECT REGARDING ANY
DISCREPANCY BETWEEN EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS
PRIOR TO COMMENCING WORK IN A PARTICULAR AREA.
4. CONTRACTORS ARE RESPONSIBLE FOR COORDINATION OF WORK. REFER TO
SPECIFICATIONS FOR COORDINATION REQUIREMENTS.
5. CONTRACTORS ARE RESPONSIBLE FOR TEMPORARY PROTECTION OF EXISTING
AND HISTORIC CONSTRUCTION. REFER TO SPECIFICATIONS FOR REQUIREMENTS.
6. NOTIFY ARCHITECT AND OWNER IF THE REMOVAL OF EXISTING ELEMENTS WILL
RESULT IN UNSTABLE CONDITIONS OF THE EXISTING STRUCTURE OR SUBSTRATES
TO REMAIN. PROVIDE TEMPORARY SHORING AND BRACING AS REQUIRED BY
SPECIFICATIONS.
7. HAZARDOUS MATERIALS ARE PRESENT IN THE BUILDING AND MAY BE
ENCOUNTERED IN THE WORK. IF SUSPECTED HAZARDOUS MATERIALS ARE
ENCOUNTERED, DO NOT DISTURB; IMMEDIATELY NOTIFY OWNER. HAZARDOUS
MATERIALS WILL BE REMOVED BY OWNER UNDER A SEPARATE CONTRACT.
8. IN AREAS INDICATED FOR CEILING REMOVAL AND WALL DISMANTLING, EXISTING
SPACES MAY CONTAIN HISTORIC FINISHES AND ELEMENTS. PROTECT EXISTING
FLOORS, WALLS, COLUMNS, AND ALL ADJACENT FINISHES AND ELEMENTS FROM
DAMAGE. DO NOT PROCEED WITH DEMOLITION WORK IN THOSE AREAS UNTIL ALL
SALVAGE WORK HAS BEEN COMPLETED.
9. ALL SALVAGE WORK SHALL BE PERFORMED BY A PERSON EXPERIENCED IN THE
PRESERVATION OF HISTORIC MATERIALS AND IN ACCORANCE TO SPECIFICATIONS.
10. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MEANS AND METHODS TO ENSURE
SALVAGED ITEMS ARE PROPERLY DISMANTLED, PACKAGED, AND TRANSPORTED
INTACT WITHOUT DAMAGE.
11. PRIOR TO REMOVAL OF ELEMENTS FOR DISMANTLE, CONTRACTOR SHALL CONSULT
WITH ARCHITECT FOR APPROVAL OF PIECES.
12. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS, INCLUDING
EXECUTION REQUIREMENTS, PHOTOGRAPHING, QUANTIFYING AND SCHEDULING,
TAGGING, AND STORAGE OF SALVAGED ITEMS.
13. UNSTABLE CONDITIONS, INCLUDING FINISHES, WALLS, AND STRUCTURAL
ELEMENTS, EXIST INSIDE AND OUTSIDE THE BUILDING. CONTRACTOR SHALL BE
RESPONSIBLE FOR PROVIDING TEMPORARY SAFETY MEASURES TO PROTECT
WORKERS DURING CONSTRUCTION.
14. BE AWARE THAT ACTIVE UTILITIES AND SERVICES EXIST IN THE BUILDING AND MAY
INCLUDE, BUT ARE NOT LIMITED TO, POWER, LIGHTING AND ROOF DRAINAGE
SYSTEMS. THESE ARE A MIX OF NEW AND EXISTING ELEMENTS AND MAY BE
DIFFICULT TO IDENTIFY. COORDINATE WITH CONTRACTOR TO LOCATE, IDENTIFY
AND PROTECT ANY UTILITIES AND SERVICES THAT MAY BE AFFECTED DURING
DEMOLITION.
KEYNOTES
1 2 3 4 5 6 7
G
H
J
N
P
K
M
L
INTERIOR SPACE
AREA NOT IN SCOPE
02.04002.040
02.092
02.093
M A
T C
H L
IN
E
A D
N
W .4
INTERIOR SPACE
AREA NOT IN SCOPE
1/8" = 1' - 0" SCALE OF FEET
0'8' 8' 16'
PLAN NORTH
P A
T H
F
IL
E
N A
M E
P L O
T T
IN
G
D A
T E
T
IM
E
A
DRAWN BY:PROJECT MANAGER:
1840 WEST BROAD STREET
SUITE 400
RICHMOND, VA 23220
v 804.788.4774
QUINNEVANS.COM
M
B
C
D
E
F
G
H
J
K
L
122 3 4 5 6 7 8 9 10 11
1 122 3 4 5 6 7 8 9 10 11
KEY PLAN
GENERAL NOTES:
02/07/2025
PHASE 2 - BID PACKAGE 4
A u to d e s k D o c s
/B u ff a lo
C e n tr a l T e rm in a l/
B u ff a lo C e n lT e rm
R
.r v t
/8
/2
:2
:0
A M
AD106NE.4
L1 OFFICES NE DEMO
PLAN
MNAW
QEA No.42245240
495 Paderewski Dr, Buffalo, NY 14212
BUFFALO CENTRAL
TERMINAL
CENTRAL TERMINAL
RESTORATION CORP.
REFERRED FROM:1/8" = 1'-0"AD106NE.4 200
1 L1 OFFICES NE - ROOF DEMO PLAN
02.040 REMOVE EXISTING BUILT-UP ASPHALT ROOF AND INSULATION DOWN TO EXISTING
CONCRETE DECK.
02.092 REMOVE ASPHALT ROOFING.
02.093 EXISTING CANOPY SUPPORT RODS TO REMAIN.
DN
DN
02.XXX
X - XXX
KEYNOTE
PHOTO TAG
DEMOLITION LEGEND
AREA OF DEMO (BASE SCOPE)
AREA OF DEMO (ALTERNATE)
EXISTING WALLS TO REMAIN
DEBRIS ON ROOF
1. BUFFALO CENTRAL TERMINAL IS A BUILDING OF NATIONAL HISTORICAL
SIGNIFICANCE AND IS LISTED ON THE NATIONAL REGISTER OF HISTORIC PLACES.
TREAT THE BUILDING RESPECTFULLY. TREAT EXISTING MATERIALS AS
IRREPLACEABLE. DO NOT REMOVE, ALTER, DISFIGURE, OR OTHERWISE DAMAGE
ANY EXISTING MATERIALS, ELEMENTS, OR FINISHES UNLESS SPECIFICALLY
INDICATED HEREIN OR DIRECTED BY THE ARCHITECT. CONTRACTORS SHALL BE
RESPONSIBLE FOR PROTECTING EXISTING CONSTRUCTION FROM DAMAGE DURING
CONSTRUCTION ACTIVITIES. DO NOT REMOVE SALVAGED BUILDING ELEMENTS
FROM THE SITE WITHOUT WRITTEN PERMISSION FROM THE OWNER AND
ARCHITECT.
2. ALL WORK CONDUCTED AS PART OF THIS PROJECT MUST MEET THE SECRETARY
OF THE INTERIOR'S STANDARD FOR THE TREATMENT OF HISTORIC PROPERTIES
WITH GUIDELINES FOR PRESERVING, REHABILITATING, RESTORING, AND
RECONSTRUCTING HISTORIC BUILDINGS. THE CONTRACTOR SHALL BE FAMILIAR
WITH THESE STANDARDS PRIOR TO COMMENCING WORK.
3. ALL DRAWINGS ARE BASED ON LIMITED FIELD INVESTIGATION. VARYING AND
HIDDEN CONDITIONS MAY EXIST. CONTRACTOR SHALL VERIFY ALL EXISTING
CONDITIONS AND MEASUREMENTS. NOTIFY THE ARCHITECT REGARDING ANY
DISCREPANCY BETWEEN EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS
PRIOR TO COMMENCING WORK IN A PARTICULAR AREA.
4. CONTRACTORS ARE RESPONSIBLE FOR COORDINATION OF WORK. REFER TO
SPECIFICATIONS FOR COORDINATION REQUIREMENTS.
5. CONTRACTORS ARE RESPONSIBLE FOR TEMPORARY PROTECTION OF EXISTING
AND HISTORIC CONSTRUCTION. REFER TO SPECIFICATIONS FOR REQUIREMENTS.
6. NOTIFY ARCHITECT AND OWNER IF THE REMOVAL OF EXISTING ELEMENTS WILL
RESULT IN UNSTABLE CONDITIONS OF THE EXISTING STRUCTURE OR SUBSTRATES
TO REMAIN. PROVIDE TEMPORARY SHORING AND BRACING AS REQUIRED BY
SPECIFICATIONS.
7. HAZARDOUS MATERIALS ARE PRESENT IN THE BUILDING AND MAY BE
ENCOUNTERED IN THE WORK. IF SUSPECTED HAZARDOUS MATERIALS ARE
ENCOUNTERED, DO NOT DISTURB; IMMEDIATELY NOTIFY OWNER. HAZARDOUS
MATERIALS WILL BE REMOVED BY OWNER UNDER A SEPARATE CONTRACT.
8. IN AREAS INDICATED FOR CEILING REMOVAL AND WALL DISMANTLING, EXISTING
SPACES MAY CONTAIN HISTORIC FINISHES AND ELEMENTS. PROTECT EXISTING
FLOORS, WALLS, COLUMNS, AND ALL ADJACENT FINISHES AND ELEMENTS FROM
DAMAGE. DO NOT PROCEED WITH DEMOLITION WORK IN THOSE AREAS UNTIL ALL
SALVAGE WORK HAS BEEN COMPLETED.
9. ALL SALVAGE WORK SHALL BE PERFORMED BY A PERSON EXPERIENCED IN THE
PRESERVATION OF HISTORIC MATERIALS AND IN ACCORANCE TO SPECIFICATIONS.
10. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MEANS AND METHODS TO ENSURE
SALVAGED ITEMS ARE PROPERLY DISMANTLED, PACKAGED, AND TRANSPORTED
INTACT WITHOUT DAMAGE.
11. PRIOR TO REMOVAL OF ELEMENTS FOR DISMANTLE, CONTRACTOR SHALL CONSULT
WITH ARCHITECT FOR APPROVAL OF PIECES.
12. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS, INCLUDING
EXECUTION REQUIREMENTS, PHOTOGRAPHING, QUANTIFYING AND SCHEDULING,
TAGGING, AND STORAGE OF SALVAGED ITEMS.
13. UNSTABLE CONDITIONS, INCLUDING FINISHES, WALLS, AND STRUCTURAL
ELEMENTS, EXIST INSIDE AND OUTSIDE THE BUILDING. CONTRACTOR SHALL BE
RESPONSIBLE FOR PROVIDING TEMPORARY SAFETY MEASURES TO PROTECT
WORKERS DURING CONSTRUCTION.
14. BE AWARE THAT ACTIVE UTILITIES AND SERVICES EXIST IN THE BUILDING AND MAY
INCLUDE, BUT ARE NOT LIMITED TO, POWER, LIGHTING AND ROOF DRAINAGE
SYSTEMS. THESE ARE A MIX OF NEW AND EXISTING ELEMENTS AND MAY BE
DIFFICULT TO IDENTIFY. COORDINATE WITH CONTRACTOR TO LOCATE, IDENTIFY
AND PROTECT ANY UTILITIES AND SERVICES THAT MAY BE AFFECTED DURING
DEMOLITION.
KEYNOTES
8 9 10 12 13 14
G
H
J
N
P
K
M
L
02.04002.040
02.040
02.092
02.093
02.092
02.093OPEN TO
BELOW
M A
T C
H L
IN
E
A D
N
E .4
INTERIOR SPACE
AREA NOT IN SCOPE
INTERIOR SPACE
AREA NOT IN SCOPE
INTERIOR SPACE
AREA NOT IN SCOPE
02.098
1/8" = 1' - 0" SCALE OF FEET
0'8' 8' 16'
PLAN NORTH
P A
T H
F
IL
E
N A
M E
P L O
T T
IN
G
D A
T E
T
IM
E
A
DRAWN BY:PROJECT MANAGER:
1840 WEST BROAD STREET
SUITE 400
RICHMOND, VA 23220
v 804.788.4774
QUINNEVANS.COM
M
B
C
D
E
F
G
H
J
K
L
122 3 4 5 6 7 8 9 10 11
1 122 3 4 5 6 7 8 9 10 11
KEY PLAN
GENERAL NOTES:
02/07/2025
PHASE 2 - BID PACKAGE 4
A u to d e s k D o c s
/B u ff a lo
C e n tr a l T e rm in a l/
B u ff a lo C e n lT e rm
R
.r v t
/8
/2
:2
:1
A M
AD106NW.4
L1 OFFICES NW
DEMO PLAN
MNAW
QEA No.42245240
495 Paderewski Dr, Buffalo, NY 14212
BUFFALO CENTRAL
TERMINAL
CENTRAL TERMINAL
RESTORATION CORP.
REFERRED FROM:1/8" = 1'-0"AD106NW.4 200
1 L1 OFFICES NW - ROOF DEMO PLAN
02.040 REMOVE EXISTING BUILT-UP ASPHALT ROOF AND INSULATION DOWN TO EXISTING
CONCRETE DECK.
02.092 REMOVE ASPHALT ROOFING.
02.093 EXISTING CANOPY SUPPORT RODS TO REMAIN.
02.098 SALVAGE EXISTING EXTERIOR LIGHT FOR REINSTALLATION.
KEYNOTE
PHOTO TAG
DEMOLITION LEGEND
AREA OF DEMO (BASE SCOPE)
AREA OF DEMO (ALTERNATE)
EXISTING WALLS TO REMAIN
DEBRIS ON ROOF
1. BUFFALO CENTRAL TERMINAL IS A BUILDING OF NATIONAL HISTORICAL
SIGNIFICANCE AND IS LISTED ON THE NATIONAL REGISTER OF HISTORIC PLACES.
TREAT THE BUILDING RESPECTFULLY. TREAT EXISTING MATERIALS AS
IRREPLACEABLE. DO NOT REMOVE, ALTER, DISFIGURE, OR OTHERWISE DAMAGE
ANY EXISTING MATERIALS, ELEMENTS, OR FINISHES UNLESS SPECIFICALLY
INDICATED HEREIN OR DIRECTED BY THE ARCHITECT. CONTRACTORS SHALL BE
RESPONSIBLE FOR PROTECTING EXISTING CONSTRUCTION FROM DAMAGE DURING
CONSTRUCTION ACTIVITIES. DO NOT REMOVE SALVAGED BUILDING ELEMENTS
FROM THE SITE WITHOUT WRITTEN PERMISSION FROM THE OWNER AND
ARCHITECT.
2. ALL WORK CONDUCTED AS PART OF THIS PROJECT MUST MEET THE SECRETARY
OF THE INTERIOR'S STANDARD FOR THE TREATMENT OF HISTORIC PROPERTIES
WITH GUIDELINES FOR PRESERVING, REHABILITATING, RESTORING, AND
RECONSTRUCTING HISTORIC BUILDINGS. THE CONTRACTOR SHALL BE FAMILIAR
WITH THESE STANDARDS PRIOR TO COMMENCING WORK.
3. ALL DRAWINGS ARE BASED ON LIMITED FIELD INVESTIGATION. VARYING AND
HIDDEN CONDITIONS MAY EXIST. CONTRACTOR SHALL VERIFY ALL EXISTING
CONDITIONS AND MEASUREMENTS. NOTIFY THE ARCHITECT REGARDING ANY
DISCREPANCY BETWEEN EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS
PRIOR TO COMMENCING WORK IN A PARTICULAR AREA.
4. CONTRACTORS ARE RESPONSIBLE FOR COORDINATION OF WORK. REFER TO
SPECIFICATIONS FOR COORDINATION REQUIREMENTS.
5. CONTRACTORS ARE RESPONSIBLE FOR TEMPORARY PROTECTION OF EXISTING
AND HISTORIC CONSTRUCTION. REFER TO SPECIFICATIONS FOR REQUIREMENTS.
6. NOTIFY ARCHITECT AND OWNER IF THE REMOVAL OF EXISTING ELEMENTS WILL
RESULT IN UNSTABLE CONDITIONS OF THE EXISTING STRUCTURE OR SUBSTRATES
TO REMAIN. PROVIDE TEMPORARY SHORING AND BRACING AS REQUIRED BY
SPECIFICATIONS.
7. HAZARDOUS MATERIALS ARE PRESENT IN THE BUILDING AND MAY BE
ENCOUNTERED IN THE WORK. IF SUSPECTED HAZARDOUS MATERIALS ARE
ENCOUNTERED, DO NOT DISTURB; IMMEDIATELY NOTIFY OWNER. HAZARDOUS
MATERIALS WILL BE REMOVED BY OWNER UNDER A SEPARATE CONTRACT.
8. IN AREAS INDICATED FOR CEILING REMOVAL AND WALL DISMANTLING, EXISTING
SPACES MAY CONTAIN HISTORIC FINISHES AND ELEMENTS. PROTECT EXISTING
FLOORS, WALLS, COLUMNS, AND ALL ADJACENT FINISHES AND ELEMENTS FROM
DAMAGE. DO NOT PROCEED WITH DEMOLITION WORK IN THOSE AREAS UNTIL ALL
SALVAGE WORK HAS BEEN COMPLETED.
9. ALL SALVAGE WORK SHALL BE PERFORMED BY A PERSON EXPERIENCED IN THE
PRESERVATION OF HISTORIC MATERIALS AND IN ACCORANCE TO SPECIFICATIONS.
10. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MEANS AND METHODS TO ENSURE
SALVAGED ITEMS ARE PROPERLY DISMANTLED, PACKAGED, AND TRANSPORTED
INTACT WITHOUT DAMAGE.
11. PRIOR TO REMOVAL OF ELEMENTS FOR DISMANTLE, CONTRACTOR SHALL CONSULT
WITH ARCHITECT FOR APPROVAL OF PIECES.
12. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS, INCLUDING
EXECUTION REQUIREMENTS, PHOTOGRAPHING, QUANTIFYING AND SCHEDULING,
TAGGING, AND STORAGE OF SALVAGED ITEMS.
13. UNSTABLE CONDITIONS, INCLUDING FINISHES, WALLS, AND STRUCTURAL
ELEMENTS, EXIST INSIDE AND OUTSIDE THE BUILDING. CONTRACTOR SHALL BE
RESPONSIBLE FOR PROVIDING TEMPORARY SAFETY MEASURES TO PROTECT
WORKERS DURING CONSTRUCTION.
14. BE AWARE THAT ACTIVE UTILITIES AND SERVICES EXIST IN THE BUILDING AND MAY
INCLUDE, BUT ARE NOT LIMITED TO, POWER, LIGHTING AND ROOF DRAINAGE
SYSTEMS. THESE ARE A MIX OF NEW AND EXISTING ELEMENTS AND MAY BE
DIFFICULT TO IDENTIFY. COORDINATE WITH CONTRACTOR TO LOCATE, IDENTIFY
AND PROTECT ANY UTILITIES AND SERVICES THAT MAY BE AFFECTED DURING
DEMOLITION.
KEYNOTES
8 9 10 12 13 14
A
B
C
D
E
F
G
F O
R P
A R
A P
E T
W O
R K
R E
F E
R T
O R
E P
A
IR
W O
R K
: TREE
02.059
02.062
02.063
INTERIOR SPACE
AREA NOT IN SCOPE
INTERIOR SPACE
AREA NOT IN SCOPE
ROOFING AREA
AREA NOT IN SCOPE
ROOFING AREA
AREA NOT IN SCOPE
NOT IN SCOPE
1/8" = 1' - 0" SCALE OF FEET
0'8' 8' 16'
PLAN NORTH
P A
T H
F
IL
E
N A
M E
P L O
T T
IN
G
D A
T E
T
IM
E
A
DRAWN BY:PROJECT MANAGER:
1840 WEST BROAD STREET
SUITE 400
RICHMOND, VA 23220
v 804.788.4774
QUINNEVANS.COM
M
B
C
D
E
F
G
H
J
K
L
122 3 4 5 6 7 8 9 10 11
1 122 3 4 5 6 7 8 9 10 11
KEY PLAN
GENERAL NOTES:
02/07/2025
PHASE 2 - BID PACKAGE 4
A u to d e s k D o c s
/B u ff a lo
C e n tr a l T e rm in a l/
B u ff a lo C e n lT e rm
R
.r v t
/8
/2
:2
:2
A M
AD107SW.4
L2 OFFICES SW
DEMO PLAN
MNAW
QEA No.42245240
495 Paderewski Dr, Buffalo, NY 14212
BUFFALO CENTRAL
TERMINAL
CENTRAL TERMINAL
RESTORATION CORP.
REFERRED FROM:1/8" = 1'-0"AD107SW.4 200
1 L2 OFFICES SW ROOF DEMO PLAN
02.059 REMOVE ALL BIOLOGICAL GROWTH.
02.062 REMOVE EXISTING ROOFING AND CONCRETE ROOF DECK, REFER TO STRUCTURAL
IN FUTURE BID PACKAGE 5.
02.063 REMOVE ALL EXISTING DEBRIS.
KEYNOTE
PHOTO TAG
DEMOLITION LEGEND
AREA OF DEMO (BASE SCOPE)
AREA OF DEMO (ALTERNATE)
EXISTING WALLS TO REMAIN
DEBRIS ON ROOF
1. BUFFALO CENTRAL TERMINAL IS A BUILDING OF NATIONAL HISTORICAL
SIGNIFICANCE AND IS LISTED ON THE NATIONAL REGISTER OF HISTORIC PLACES.
TREAT THE BUILDING RESPECTFULLY. TREAT EXISTING MATERIALS AS
IRREPLACEABLE. DO NOT REMOVE, ALTER, DISFIGURE, OR OTHERWISE DAMAGE
ANY EXISTING MATERIALS, ELEMENTS, OR FINISHES UNLESS SPECIFICALLY
INDICATED HEREIN OR DIRECTED BY THE ARCHITECT. CONTRACTORS SHALL BE
RESPONSIBLE FOR PROTECTING EXISTING CONSTRUCTION FROM DAMAGE DURING
CONSTRUCTION ACTIVITIES. DO NOT REMOVE SALVAGED BUILDING ELEMENTS
FROM THE SITE WITHOUT WRITTEN PERMISSION FROM THE OWNER AND
ARCHITECT.
2. ALL WORK CONDUCTED AS PART OF THIS PROJECT MUST MEET THE SECRETARY
OF THE INTERIOR'S STANDARD FOR THE TREATMENT OF HISTORIC PROPERTIES
WITH GUIDELINES FOR PRESERVING, REHABILITATING, RESTORING, AND
RECONSTRUCTING HISTORIC BUILDINGS. THE CONTRACTOR SHALL BE FAMILIAR
WITH THESE STANDARDS PRIOR TO COMMENCING WORK.
3. ALL DRAWINGS ARE BASED ON LIMITED FIELD INVESTIGATION. VARYING AND
HIDDEN CONDITIONS MAY EXIST. CONTRACTOR SHALL VERIFY ALL EXISTING
CONDITIONS AND MEASUREMENTS. NOTIFY THE ARCHITECT REGARDING ANY
DISCREPANCY BETWEEN EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS
PRIOR TO COMMENCING WORK IN A PARTICULAR AREA.
4. CONTRACTORS ARE RESPONSIBLE FOR COORDINATION OF WORK. REFER TO
SPECIFICATIONS FOR COORDINATION REQUIREMENTS.
5. CONTRACTORS ARE RESPONSIBLE FOR TEMPORARY PROTECTION OF EXISTING
AND HISTORIC CONSTRUCTION. REFER TO SPECIFICATIONS FOR REQUIREMENTS.
6. NOTIFY ARCHITECT AND OWNER IF THE REMOVAL OF EXISTING ELEMENTS WILL
RESULT IN UNSTABLE CONDITIONS OF THE EXISTING STRUCTURE OR SUBSTRATES
TO REMAIN. PROVIDE TEMPORARY SHORING AND BRACING AS REQUIRED BY
SPECIFICATIONS.
7. HAZARDOUS MATERIALS ARE PRESENT IN THE BUILDING AND MAY BE
ENCOUNTERED IN THE WORK. IF SUSPECTED HAZARDOUS MATERIALS ARE
ENCOUNTERED, DO NOT DISTURB; IMMEDIATELY NOTIFY OWNER. HAZARDOUS
MATERIALS WILL BE REMOVED BY OWNER UNDER A SEPARATE CONTRACT.
8. IN AREAS INDICATED FOR CEILING REMOVAL AND WALL DISMANTLING, EXISTING
SPACES MAY CONTAIN HISTORIC FINISHES AND ELEMENTS. PROTECT EXISTING
FLOORS, WALLS, COLUMNS, AND ALL ADJACENT FINISHES AND ELEMENTS FROM
DAMAGE. DO NOT PROCEED WITH DEMOLITION WORK IN THOSE AREAS UNTIL ALL
SALVAGE WORK HAS BEEN COMPLETED.
9. ALL SALVAGE WORK SHALL BE PERFORMED BY A PERSON EXPERIENCED IN THE
PRESERVATION OF HISTORIC MATERIALS AND IN ACCORANCE TO SPECIFICATIONS.
10. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MEANS AND METHODS TO ENSURE
SALVAGED ITEMS ARE PROPERLY DISMANTLED, PACKAGED, AND TRANSPORTED
INTACT WITHOUT DAMAGE.
11. PRIOR TO REMOVAL OF ELEMENTS FOR DISMANTLE, CONTRACTOR SHALL CONSULT
WITH ARCHITECT FOR APPROVAL OF PIECES.
12. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS, INCLUDING
EXECUTION REQUIREMENTS, PHOTOGRAPHING, QUANTIFYING AND SCHEDULING,
TAGGING, AND STORAGE OF SALVAGED ITEMS.
13. UNSTABLE CONDITIONS, INCLUDING FINISHES, WALLS, AND STRUCTURAL
ELEMENTS, EXIST INSIDE AND OUTSIDE THE BUILDING. CONTRACTOR SHALL BE
RESPONSIBLE FOR PROVIDING TEMPORARY SAFETY MEASURES TO PROTECT
WORKERS DURING CONSTRUCTION.
14. BE AWARE THAT ACTIVE UTILITIES AND SERVICES EXIST IN THE BUILDING AND MAY
INCLUDE, BUT ARE NOT LIMITED TO, POWER, LIGHTING AND ROOF DRAINAGE
SYSTEMS. THESE ARE A MIX OF NEW AND EXISTING ELEMENTS AND MAY BE
DIFFICULT TO IDENTIFY. COORDINATE WITH CONTRACTOR TO LOCATE, IDENTIFY
AND PROTECT ANY UTILITIES AND SERVICES THAT MAY BE AFFECTED DURING
DEMOLITION.
1 2 3 4 5 6 7
G
H
J
N
P
K
M
L
02.06602.066
02.094
02.097
:TYP. AT PERIMETER
GUTTER
02.097
:ROOF C
02.097
:TYP. AT
PERIMETER
GUTTER
M A
T C
H L
IN
E
A D
N
W .4
MATCHLINE
1 / AD110SE.4
LIGHT WELL,
OPEN TO
ROOF BELOW
BASE SCOPE: NO WORK IN THIS AREA
ALTERNATE 1: KEYNOTES 02.066, 02.094
BASE SCOPE: NO WORK IN THIS AREA
ALTERNATE 2: KEYNOTES 02.066, 02.094
NOT IN SCOPE
NOT IN
SCOPE
5 PANELS
~ 6' - 8"
P
A N
E L S
KEYNOTES
1/8" = 1' - 0" SCALE OF FEET
0'8' 8' 16'
PLAN NORTH
P A
T H
F
IL
E
N A
M E
P L O
T T
IN
G
D A
T E
T
IM
E
A
DRAWN BY:PROJECT MANAGER:
1840 WEST BROAD STREET
SUITE 400
RICHMOND, VA 23220
v 804.788.4774
QUINNEVANS.COM
M
B
C
D
E
F
G
H
J
K
L
122 3 4 5 6 7 8 9 10 11
1 122 3 4 5 6 7 8 9 10 11
KEY PLAN
GENERAL NOTES:
02/07/2025
PHASE 2 - BID PACKAGE 4
A u to d e s k D o c s
/B u ff a lo
C e n tr a l T e rm in a l/
B u ff a lo C e n lT e rm
R
.r v t
/8
/2
:2
:2
A M
AD110NE.4
L5 OFFICES NE &
CONCOURSE ROOF
DEMO PLAN
MNAW
QEA No.42245240
495 Paderewski Dr, Buffalo, NY 14212
BUFFALO CENTRAL
TERMINAL
CENTRAL TERMINAL
RESTORATION CORP.
1/8" = 1'-0"AD110NE.4
1 L5 OFFICES NE & CONCOURSE - ROOF DEMO PLAN
02.066 REMOVE ALL EXISTING PRECAST CONCRETE TILE, SALVAGE (12) TILES.
02.094 REMOVE EXISTING MODIFIED BITUMINOUS BUILT-UP ROOFING DOWN TO EXISTING
CONCRETE DECK.
02.097 EXISTING FLUID APPLIED MEMBRANE TO REMAIN.
X - XXX
KEYNOTE
PHOTO TAG
DEMOLITION LEGEND
AREA OF DEMO (BASE SCOPE)
AREA OF DEMO (ALTERNATE)
EXISTING WALLS TO REMAIN
DEBRIS ON ROOF
1. BUFFALO CENTRAL TERMINAL IS A BUILDING OF NATIONAL HISTORICAL
SIGNIFICANCE AND IS LISTED ON THE NATIONAL REGISTER OF HISTORIC PLACES.
TREAT THE BUILDING RESPECTFULLY. TREAT EXISTING MATERIALS AS
IRREPLACEABLE. DO NOT REMOVE, ALTER, DISFIGURE, OR OTHERWISE DAMAGE
ANY EXISTING MATERIALS, ELEMENTS, OR FINISHES UNLESS SPECIFICALLY
INDICATED HEREIN OR DIRECTED BY THE ARCHITECT. CONTRACTORS SHALL BE
RESPONSIBLE FOR PROTECTING EXISTING CONSTRUCTION FROM DAMAGE DURING
CONSTRUCTION ACTIVITIES. DO NOT REMOVE SALVAGED BUILDING ELEMENTS
FROM THE SITE WITHOUT WRITTEN PERMISSION FROM THE OWNER AND
ARCHITECT.
2. ALL WORK CONDUCTED AS PART OF THIS PROJECT MUST MEET THE SECRETARY
OF THE INTERIOR'S STANDARD FOR THE TREATMENT OF HISTORIC PROPERTIES
WITH GUIDELINES FOR PRESERVING, REHABILITATING, RESTORING, AND
RECONSTRUCTING HISTORIC BUILDINGS. THE CONTRACTOR SHALL BE FAMILIAR
WITH THESE STANDARDS PRIOR TO COMMENCING WORK.
3. ALL DRAWINGS ARE BASED ON LIMITED FIELD INVESTIGATION. VARYING AND
HIDDEN CONDITIONS MAY EXIST. CONTRACTOR SHALL VERIFY ALL EXISTING
CONDITIONS AND MEASUREMENTS. NOTIFY THE ARCHITECT REGARDING ANY
DISCREPANCY BETWEEN EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS
PRIOR TO COMMENCING WORK IN A PARTICULAR AREA.
4. CONTRACTORS ARE RESPONSIBLE FOR COORDINATION OF WORK. REFER TO
SPECIFICATIONS FOR COORDINATION REQUIREMENTS.
5. CONTRACTORS ARE RESPONSIBLE FOR TEMPORARY PROTECTION OF EXISTING
AND HISTORIC CONSTRUCTION. REFER TO SPECIFICATIONS FOR REQUIREMENTS.
6. NOTIFY ARCHITECT AND OWNER IF THE REMOVAL OF EXISTING ELEMENTS WILL
RESULT IN UNSTABLE CONDITIONS OF THE EXISTING STRUCTURE OR SUBSTRATES
TO REMAIN. PROVIDE TEMPORARY SHORING AND BRACING AS REQUIRED BY
SPECIFICATIONS.
7. HAZARDOUS MATERIALS ARE PRESENT IN THE BUILDING AND MAY BE
ENCOUNTERED IN THE WORK. IF SUSPECTED HAZARDOUS MATERIALS ARE
ENCOUNTERED, DO NOT DISTURB; IMMEDIATELY NOTIFY OWNER. HAZARDOUS
MATERIALS WILL BE REMOVED BY OWNER UNDER A SEPARATE CONTRACT.
8. IN AREAS INDICATED FOR CEILING REMOVAL AND WALL DISMANTLING, EXISTING
SPACES MAY CONTAIN HISTORIC FINISHES AND ELEMENTS. PROTECT EXISTING
FLOORS, WALLS, COLUMNS, AND ALL ADJACENT FINISHES AND ELEMENTS FROM
DAMAGE. DO NOT PROCEED WITH DEMOLITION WORK IN THOSE AREAS UNTIL ALL
SALVAGE WORK HAS BEEN COMPLETED.
9. ALL SALVAGE WORK SHALL BE PERFORMED BY A PERSON EXPERIENCED IN THE
PRESERVATION OF HISTORIC MATERIALS AND IN ACCORANCE TO SPECIFICATIONS.
10. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MEANS AND METHODS TO ENSURE
SALVAGED ITEMS ARE PROPERLY DISMANTLED, PACKAGED, AND TRANSPORTED
INTACT WITHOUT DAMAGE.
11. PRIOR TO REMOVAL OF ELEMENTS FOR DISMANTLE, CONTRACTOR SHALL CONSULT
WITH ARCHITECT FOR APPROVAL OF PIECES.
12. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS, INCLUDING
EXECUTION REQUIREMENTS, PHOTOGRAPHING, QUANTIFYING AND SCHEDULING,
TAGGING, AND STORAGE OF SALVAGED ITEMS.
13. UNSTABLE CONDITIONS, INCLUDING FINISHES, WALLS, AND STRUCTURAL
ELEMENTS, EXIST INSIDE AND OUTSIDE THE BUILDING. CONTRACTOR SHALL BE
RESPONSIBLE FOR PROVIDING TEMPORARY SAFETY MEASURES TO PROTECT
WORKERS DURING CONSTRUCTION.
14. BE AWARE THAT ACTIVE UTILITIES AND SERVICES EXIST IN THE BUILDING AND MAY
INCLUDE, BUT ARE NOT LIMITED TO, POWER, LIGHTING AND ROOF DRAINAGE
SYSTEMS. THESE ARE A MIX OF NEW AND EXISTING ELEMENTS AND MAY BE
DIFFICULT TO IDENTIFY. COORDINATE WITH CONTRACTOR TO LOCATE, IDENTIFY
AND PROTECT ANY UTILITIES AND SERVICES THAT MAY BE AFFECTED DURING
DEMOLITION.
8 9 10 12 13 14
G
H
J
N
P
: AT PARAPET
K
M
L
02.065
02.066 02.096
02.094
02.097
:TYP. AT PERIMETER
GUTTER
02.097
02.097
:TYP. AT
PERIMETER
GUTTER
:ROOF C
EXISTING ACCESS TO
ROOF THRU WINDOW
M A
T C
H L
IN
E
A D
N
E .4
MATCHLINE
1 / AD110SW.4
INTERIOR SPACE
AREA NOT IN SCOPE
OPEN TO
BELOW
EXISTING SBS
ROOFING TO REMAIN
02.065
: ~18" BAND
ALONG PARAPET
BASE SCOPE: NO WORK IN THIS AREA
ALTERNATE 1: KEYNOTES 02.066, 02.094
KEYNOTES
1/8" = 1' - 0" SCALE OF FEET
0'8' 8' 16'
PLAN NORTH
P A
T H
F
IL
E
N A
M E
P L O
T T
IN
G
D A
T E
T
IM
E
A
DRAWN BY:PROJECT MANAGER:
1840 WEST BROAD STREET
SUITE 400
RICHMOND, VA 23220
v 804.788.4774
QUINNEVANS.COM
M
B
C
D
E
F
G
H
J
K
L
122 3 4 5 6 7 8 9 10 11
1 122 3 4 5 6 7 8 9 10 11
KEY PLAN
GENERAL NOTES:
02/07/2025
PHASE 2 - BID PACKAGE 4
A u to d e s k D o c s
/B u ff a lo
C e n tr a l T e rm in a l/
B u ff a lo C e n lT e rm
R
.r v t
/8
/2
:2
:2
A M
AD110NW.4
L5 OFFICES NW &
CONCOURSE ROOF
DEMO PLAN
MNAW
QEA No.42245240
495 Paderewski Dr, Buffalo, NY 14212
BUFFALO CENTRAL
TERMINAL
CENTRAL TERMINAL
RESTORATION CORP.
1/8" = 1'-0"AD110NW.4
1 L5 OFFICES NW & CONCOURSE - ROOF DEMO PLAN
02.065 REMOVE EXISTING FLUID APPLIED MEMBRANE.
02.066 REMOVE ALL EXISTING PRECAST CONCRETE TILE, SALVAGE (12) TILES.
02.094 REMOVE EXISTING MODIFIED BITUMINOUS BUILT-UP ROOFING DOWN TO EXISTING
CONCRETE DECK.
02.096 REMOVE ALL LOOSE AND DAMAGED CONCRETE FILL.
KEYNOTE
PHOTO TAG
DEMOLITION LEGEND
AREA OF DEMO (BASE SCOPE)
AREA OF DEMO (ALTERNATE)
EXISTING WALLS TO REMAIN
DEBRIS ON ROOF
1. BUFFALO CENTRAL TERMINAL IS A BUILDING OF NATIONAL HISTORICAL
SIGNIFICANCE AND IS LISTED ON THE NATIONAL REGISTER OF HISTORIC PLACES.
TREAT THE BUILDING RESPECTFULLY. TREAT EXISTING MATERIALS AS
IRREPLACEABLE. DO NOT REMOVE, ALTER, DISFIGURE, OR OTHERWISE DAMAGE
ANY EXISTING MATERIALS, ELEMENTS, OR FINISHES UNLESS SPECIFICALLY
INDICATED HEREIN OR DIRECTED BY THE ARCHITECT. CONTRACTORS SHALL BE
RESPONSIBLE FOR PROTECTING EXISTING CONSTRUCTION FROM DAMAGE DURING
CONSTRUCTION ACTIVITIES. DO NOT REMOVE SALVAGED BUILDING ELEMENTS
FROM THE SITE WITHOUT WRITTEN PERMISSION FROM THE OWNER AND
ARCHITECT.
2. ALL WORK CONDUCTED AS PART OF THIS PROJECT MUST MEET THE SECRETARY
OF THE INTERIOR'S STANDARD FOR THE TREATMENT OF HISTORIC PROPERTIES
WITH GUIDELINES FOR PRESERVING, REHABILITATING, RESTORING, AND
RECONSTRUCTING HISTORIC BUILDINGS. THE CONTRACTOR SHALL BE FAMILIAR
WITH THESE STANDARDS PRIOR TO COMMENCING WORK.
3. ALL DRAWINGS ARE BASED ON LIMITED FIELD INVESTIGATION. VARYING AND
HIDDEN CONDITIONS MAY EXIST. CONTRACTOR SHALL VERIFY ALL EXISTING
CONDITIONS AND MEASUREMENTS. NOTIFY THE ARCHITECT REGARDING ANY
DISCREPANCY BETWEEN EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS
PRIOR TO COMMENCING WORK IN A PARTICULAR AREA.
4. CONTRACTORS ARE RESPONSIBLE FOR COORDINATION OF WORK. REFER TO
SPECIFICATIONS FOR COORDINATION REQUIREMENTS.
5. CONTRACTORS ARE RESPONSIBLE FOR TEMPORARY PROTECTION OF EXISTING
AND HISTORIC CONSTRUCTION. REFER TO SPECIFICATIONS FOR REQUIREMENTS.
6. NOTIFY ARCHITECT AND OWNER IF THE REMOVAL OF EXISTING ELEMENTS WILL
RESULT IN UNSTABLE CONDITIONS OF THE EXISTING STRUCTURE OR SUBSTRATES
TO REMAIN. PROVIDE TEMPORARY SHORING AND BRACING AS REQUIRED BY
SPECIFICATIONS.
7. HAZARDOUS MATERIALS ARE PRESENT IN THE BUILDING AND MAY BE
ENCOUNTERED IN THE WORK. IF SUSPECTED HAZARDOUS MATERIALS ARE
ENCOUNTERED, DO NOT DISTURB; IMMEDIATELY NOTIFY OWNER. HAZARDOUS
MATERIALS WILL BE REMOVED BY OWNER UNDER A SEPARATE CONTRACT.
8. IN AREAS INDICATED FOR CEILING REMOVAL AND WALL DISMANTLING, EXISTING
SPACES MAY CONTAIN HISTORIC FINISHES AND ELEMENTS. PROTECT EXISTING
FLOORS, WALLS, COLUMNS, AND ALL ADJACENT FINISHES AND ELEMENTS FROM
DAMAGE. DO NOT PROCEED WITH DEMOLITION WORK IN THOSE AREAS UNTIL ALL
SALVAGE WORK HAS BEEN COMPLETED.
9. ALL SALVAGE WORK SHALL BE PERFORMED BY A PERSON EXPERIENCED IN THE
PRESERVATION OF HISTORIC MATERIALS AND IN ACCORANCE TO SPECIFICATIONS.
10. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MEANS AND METHODS TO ENSURE
SALVAGED ITEMS ARE PROPERLY DISMANTLED, PACKAGED, AND TRANSPORTED
INTACT WITHOUT DAMAGE.
11. PRIOR TO REMOVAL OF ELEMENTS FOR DISMANTLE, CONTRACTOR SHALL CONSULT
WITH ARCHITECT FOR APPROVAL OF PIECES.
12. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS, INCLUDING
EXECUTION REQUIREMENTS, PHOTOGRAPHING, QUANTIFYING AND SCHEDULING,
TAGGING, AND STORAGE OF SALVAGED ITEMS.
13. UNSTABLE CONDITIONS, INCLUDING FINISHES, WALLS, AND STRUCTURAL
ELEMENTS, EXIST INSIDE AND OUTSIDE THE BUILDING. CONTRACTOR SHALL BE
RESPONSIBLE FOR PROVIDING TEMPORARY SAFETY MEASURES TO PROTECT
WORKERS DURING CONSTRUCTION.
14. BE AWARE THAT ACTIVE UTILITIES AND SERVICES EXIST IN THE BUILDING AND MAY
INCLUDE, BUT ARE NOT LIMITED TO, POWER, LIGHTING AND ROOF DRAINAGE
SYSTEMS. THESE ARE A MIX OF NEW AND EXISTING ELEMENTS AND MAY BE
DIFFICULT TO IDENTIFY. COORDINATE WITH CONTRACTOR TO LOCATE, IDENTIFY
AND PROTECT ANY UTILITIES AND SERVICES THAT MAY BE AFFECTED DURING
DEMOLITION.
1 2 3 4 5 6 7
A
B
C
D
E
F
G
02.066
02.094
02.097
:TYP. AT PERIMETER
GUTTER
02.097
:TYP. AT
PERIMETER
GUTTER
24' - 2" 21' - 4" 26' - 4" 21' - 4 1/2" 15' - 9" 26' - 6"
/2
/2
MATCHLINE
1 / AD110NE.4
M A
T C
H L
IN
E
A D
S
W .4
NOT IN SCOPE
NOT IN
SCOPE
BASE SCOPE: NO WORK IN THIS AREA
ALTERNATE 1: KEYNOTES 02.066, 02.094
KEYNOTES
1/8" = 1' - 0" SCALE OF FEET
0'8' 8' 16'
PLAN NORTH
P A
T H
F
IL
E
N A
M E
P L O
T T
IN
G
D A
T E
T
IM
E
A
DRAWN BY:PROJECT MANAGER:
1840 WEST BROAD STREET
SUITE 400
RICHMOND, VA 23220
v 804.788.4774
QUINNEVANS.COM
M
B
C
D
E
F
G
H
J
K
L
122 3 4 5 6 7 8 9 10 11
1 122 3 4 5 6 7 8 9 10 11
KEY PLAN
GENERAL NOTES:
02/07/2025
PHASE 2 - BID PACKAGE 4
A u to d e s k D o c s
/B u ff a lo
C e n tr a l T e rm in a l/
B u ff a lo C e n lT e rm
R
.r v t
/8
/2
:2
:3
A M
AD110SE.4
L5 OFFICES SE &
CONCOURSE ROOF
DEMO PLAN
MNAW
QEA No.42245240
495 Paderewski Dr, Buffalo, NY 14212
BUFFALO CENTRAL
TERMINAL
CENTRAL TERMINAL
RESTORATION CORP.
1/8" = 1'-0"AD110SE.4
1 L5 OFFICES SE & CONCOURSE - ROOF DEMO PLAN
02.066 REMOVE ALL EXISTING PRECAST CONCRETE TILE, SALVAGE (12) TILES.
02.094 REMOVE EXISTING MODIFIED BITUMINOUS BUILT-UP ROOFING DOWN TO EXISTING
CONCRETE DECK.
KEYNOTE
PHOTO TAG
DEMOLITION LEGEND
AREA OF DEMO (BASE SCOPE)
AREA OF DEMO (ALTERNATE)
EXISTING WALLS TO REMAIN
DEBRIS ON ROOF
1. BUFFALO CENTRAL TERMINAL IS A BUILDING OF NATIONAL HISTORICAL
SIGNIFICANCE AND IS LISTED ON THE NATIONAL REGISTER OF HISTORIC PLACES.
TREAT THE BUILDING RESPECTFULLY. TREAT EXISTING MATERIALS AS
IRREPLACEABLE. DO NOT REMOVE, ALTER, DISFIGURE, OR OTHERWISE DAMAGE
ANY EXISTING MATERIALS, ELEMENTS, OR FINISHES UNLESS SPECIFICALLY
INDICATED HEREIN OR DIRECTED BY THE ARCHITECT. CONTRACTORS SHALL BE
RESPONSIBLE FOR PROTECTING EXISTING CONSTRUCTION FROM DAMAGE DURING
CONSTRUCTION ACTIVITIES. DO NOT REMOVE SALVAGED BUILDING ELEMENTS
FROM THE SITE WITHOUT WRITTEN PERMISSION FROM THE OWNER AND
ARCHITECT.
2. ALL WORK CONDUCTED AS PART OF THIS PROJECT MUST MEET THE SECRETARY
OF THE INTERIOR'S STANDARD FOR THE TREATMENT OF HISTORIC PROPERTIES
WITH GUIDELINES FOR PRESERVING, REHABILITATING, RESTORING, AND
RECONSTRUCTING HISTORIC BUILDINGS. THE CONTRACTOR SHALL BE FAMILIAR
WITH THESE STANDARDS PRIOR TO COMMENCING WORK.
3. ALL DRAWINGS ARE BASED ON LIMITED FIELD INVESTIGATION. VARYING AND
HIDDEN CONDITIONS MAY EXIST. CONTRACTOR SHALL VERIFY ALL EXISTING
CONDITIONS AND MEASUREMENTS. NOTIFY THE ARCHITECT REGARDING ANY
DISCREPANCY BETWEEN EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS
PRIOR TO COMMENCING WORK IN A PARTICULAR AREA.
4. CONTRACTORS ARE RESPONSIBLE FOR COORDINATION OF WORK. REFER TO
SPECIFICATIONS FOR COORDINATION REQUIREMENTS.
5. CONTRACTORS ARE RESPONSIBLE FOR TEMPORARY PROTECTION OF EXISTING
AND HISTORIC CONSTRUCTION. REFER TO SPECIFICATIONS FOR REQUIREMENTS.
6. NOTIFY ARCHITECT AND OWNER IF THE REMOVAL OF EXISTING ELEMENTS WILL
RESULT IN UNSTABLE CONDITIONS OF THE EXISTING STRUCTURE OR SUBSTRATES
TO REMAIN. PROVIDE TEMPORARY SHORING AND BRACING AS REQUIRED BY
SPECIFICATIONS.
7. HAZARDOUS MATERIALS ARE PRESENT IN THE BUILDING AND MAY BE
ENCOUNTERED IN THE WORK. IF SUSPECTED HAZARDOUS MATERIALS ARE
ENCOUNTERED, DO NOT DISTURB; IMMEDIATELY NOTIFY OWNER. HAZARDOUS
MATERIALS WILL BE REMOVED BY OWNER UNDER A SEPARATE CONTRACT.
8. IN AREAS INDICATED FOR CEILING REMOVAL AND WALL DISMANTLING, EXISTING
SPACES MAY CONTAIN HISTORIC FINISHES AND ELEMENTS. PROTECT EXISTING
FLOORS, WALLS, COLUMNS, AND ALL ADJACENT FINISHES AND ELEMENTS FROM
DAMAGE. DO NOT PROCEED WITH DEMOLITION WORK IN THOSE AREAS UNTIL ALL
SALVAGE WORK HAS BEEN COMPLETED.
9. ALL SALVAGE WORK SHALL BE PERFORMED BY A PERSON EXPERIENCED IN THE
PRESERVATION OF HISTORIC MATERIALS AND IN ACCORANCE TO SPECIFICATIONS.
10. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MEANS AND METHODS TO ENSURE
SALVAGED ITEMS ARE PROPERLY DISMANTLED, PACKAGED, AND TRANSPORTED
INTACT WITHOUT DAMAGE.
11. PRIOR TO REMOVAL OF ELEMENTS FOR DISMANTLE, CONTRACTOR SHALL CONSULT
WITH ARCHITECT FOR APPROVAL OF PIECES.
12. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS, INCLUDING
EXECUTION REQUIREMENTS, PHOTOGRAPHING, QUANTIFYING AND SCHEDULING,
TAGGING, AND STORAGE OF SALVAGED ITEMS.
13. UNSTABLE CONDITIONS, INCLUDING FINISHES, WALLS, AND STRUCTURAL
ELEMENTS, EXIST INSIDE AND OUTSIDE THE BUILDING. CONTRACTOR SHALL BE
RESPONSIBLE FOR PROVIDING TEMPORARY SAFETY MEASURES TO PROTECT
WORKERS DURING CONSTRUCTION.
14. BE AWARE THAT ACTIVE UTILITIES AND SERVICES EXIST IN THE BUILDING AND MAY
INCLUDE, BUT ARE NOT LIMITED TO, POWER, LIGHTING AND ROOF DRAINAGE
SYSTEMS. THESE ARE A MIX OF NEW AND EXISTING ELEMENTS AND MAY BE
DIFFICULT TO IDENTIFY. COORDINATE WITH CONTRACTOR TO LOCATE, IDENTIFY
AND PROTECT ANY UTILITIES AND SERVICES THAT MAY BE AFFECTED DURING
DEMOLITION.
8 9 10 12 13 14
A
B
C
D
E
F
G
: AT PARAPET
02.065
02.066 02.096
02.094
02.097
02.097
:TYP. AT
PERIMETER
GUTTER
:TYP. AT
PERIMETER
GUTTER
MATCHLINE
1 / AD110NW.4
M A
T C
H L
IN
E
A D
S
E .4
NOT IN SCOPE
02.065
: ~18" BAND ALONG
PARAPET
EXISTING SBS
ROOFING TO REMAIN
BASE SCOPE: NO WORK IN THIS AREA
ALTERNATE 1: KEYNOTES 02.066, 02.094
KEYNOTES
1/8" = 1' - 0" SCALE OF FEET
0'8' 8' 16'
PLAN NORTH
P A
T H
F
IL
E
N A
M E
P L O
T T
IN
G
D A
T E
T
IM
E
A
DRAWN BY:PROJECT MANAGER:
1840 WEST BROAD STREET
SUITE 400
RICHMOND, VA 23220
v 804.788.4774
QUINNEVANS.COM
M
B
C
D
E
F
G
H
J
K
L
122 3 4 5 6 7 8 9 10 11
1 122 3 4 5 6 7 8 9 10 11
KEY PLAN
GENERAL NOTES:
02/07/2025
PHASE 2 - BID PACKAGE 4
A u to d e s k D o c s
/B u ff a lo
C e n tr a l T e rm in a l/
B u ff a lo C e n lT e rm
R
.r v t
/8
/2
:2
:3
A M
AD110SW.4
L5 OFFICES SW &
CONCOURSE ROOF
DEMO PLAN
MNAW
QEA No.42245240
495 Paderewski Dr, Buffalo, NY 14212
BUFFALO CENTRAL
TERMINAL
CENTRAL TERMINAL
RESTORATION CORP.
REFERRED FROM:1/8" = 1'-0"AD110SW.4 200
1 L5 OFFICES SW & CONCOURSE - ROOF DEMO PLAN
02.065 REMOVE EXISTING FLUID APPLIED MEMBRANE.
02.066 REMOVE ALL EXISTING PRECAST CONCRETE TILE, SALVAGE (12) TILES.
02.094 REMOVE EXISTING MODIFIED BITUMINOUS BUILT-UP ROOFING DOWN TO EXISTING
CONCRETE DECK.
02.096 REMOVE ALL LOOSE AND DAMAGED CONCRETE FILL.
UP
02.XXX
X - XXX
KEYNOTE
PHOTO TAG
DEMOLITION LEGEND
AREA OF DEMO (BASE SCOPE)
AREA OF DEMO (ALTERNATE)
EXISTING WALLS TO REMAIN
DEBRIS ON ROOF
1. BUFFALO CENTRAL TERMINAL IS A BUILDING OF NATIONAL HISTORICAL
SIGNIFICANCE AND IS LISTED ON THE NATIONAL REGISTER OF HISTORIC PLACES.
TREAT THE BUILDING RESPECTFULLY. TREAT EXISTING MATERIALS AS
IRREPLACEABLE. DO NOT REMOVE, ALTER, DISFIGURE, OR OTHERWISE DAMAGE
ANY EXISTING MATERIALS, ELEMENTS, OR FINISHES UNLESS SPECIFICALLY
INDICATED HEREIN OR DIRECTED BY THE ARCHITECT. CONTRACTORS SHALL BE
RESPONSIBLE FOR PROTECTING EXISTING CONSTRUCTION FROM DAMAGE DURING
CONSTRUCTION ACTIVITIES. DO NOT REMOVE SALVAGED BUILDING ELEMENTS
FROM THE SITE WITHOUT WRITTEN PERMISSION FROM THE OWNER AND
ARCHITECT.
2. ALL WORK CONDUCTED AS PART OF THIS PROJECT MUST MEET THE SECRETARY
OF THE INTERIOR'S STANDARD FOR THE TREATMENT OF HISTORIC PROPERTIES
WITH GUIDELINES FOR PRESERVING, REHABILITATING, RESTORING, AND
RECONSTRUCTING HISTORIC BUILDINGS. THE CONTRACTOR SHALL BE FAMILIAR
WITH THESE STANDARDS PRIOR TO COMMENCING WORK.
3. ALL DRAWINGS ARE BASED ON LIMITED FIELD INVESTIGATION. VARYING AND
HIDDEN CONDITIONS MAY EXIST. CONTRACTOR SHALL VERIFY ALL EXISTING
CONDITIONS AND MEASUREMENTS. NOTIFY THE ARCHITECT REGARDING ANY
DISCREPANCY BETWEEN EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS
PRIOR TO COMMENCING WORK IN A PARTICULAR AREA.
4. CONTRACTORS ARE RESPONSIBLE FOR COORDINATION OF WORK. REFER TO
SPECIFICATIONS FOR COORDINATION REQUIREMENTS.
5. CONTRACTORS ARE RESPONSIBLE FOR TEMPORARY PROTECTION OF EXISTING
AND HISTORIC CONSTRUCTION. REFER TO SPECIFICATIONS FOR REQUIREMENTS.
6. NOTIFY ARCHITECT AND OWNER IF THE REMOVAL OF EXISTING ELEMENTS WILL
RESULT IN UNSTABLE CONDITIONS OF THE EXISTING STRUCTURE OR SUBSTRATES
TO REMAIN. PROVIDE TEMPORARY SHORING AND BRACING AS REQUIRED BY
SPECIFICATIONS.
7. HAZARDOUS MATERIALS ARE PRESENT IN THE BUILDING AND MAY BE
ENCOUNTERED IN THE WORK. IF SUSPECTED HAZARDOUS MATERIALS ARE
ENCOUNTERED, DO NOT DISTURB; IMMEDIATELY NOTIFY OWNER. HAZARDOUS
MATERIALS WILL BE REMOVED BY OWNER UNDER A SEPARATE CONTRACT.
8. IN AREAS INDICATED FOR CEILING REMOVAL AND WALL DISMANTLING, EXISTING
SPACES MAY CONTAIN HISTORIC FINISHES AND ELEMENTS. PROTECT EXISTING
FLOORS, WALLS, COLUMNS, AND ALL ADJACENT FINISHES AND ELEMENTS FROM
DAMAGE. DO NOT PROCEED WITH DEMOLITION WORK IN THOSE AREAS UNTIL ALL
SALVAGE WORK HAS BEEN COMPLETED.
9. ALL SALVAGE WORK SHALL BE PERFORMED BY A PERSON EXPERIENCED IN THE
PRESERVATION OF HISTORIC MATERIALS AND IN ACCORANCE TO SPECIFICATIONS.
10. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MEANS AND METHODS TO ENSURE
SALVAGED ITEMS ARE PROPERLY DISMANTLED, PACKAGED, AND TRANSPORTED
INTACT WITHOUT DAMAGE.
11. PRIOR TO REMOVAL OF ELEMENTS FOR DISMANTLE, CONTRACTOR SHALL CONSULT
WITH ARCHITECT FOR APPROVAL OF PIECES.
12. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS, INCLUDING
EXECUTION REQUIREMENTS, PHOTOGRAPHING, QUANTIFYING AND SCHEDULING,
TAGGING, AND STORAGE OF SALVAGED ITEMS.
13. UNSTABLE CONDITIONS, INCLUDING FINISHES, WALLS, AND STRUCTURAL
ELEMENTS, EXIST INSIDE AND OUTSIDE THE BUILDING. CONTRACTOR SHALL BE
RESPONSIBLE FOR PROVIDING TEMPORARY SAFETY MEASURES TO PROTECT
WORKERS DURING CONSTRUCTION.
14. BE AWARE THAT ACTIVE UTILITIES AND SERVICES EXIST IN THE BUILDING AND MAY
INCLUDE, BUT ARE NOT LIMITED TO, POWER, LIGHTING AND ROOF DRAINAGE
SYSTEMS. THESE ARE A MIX OF NEW AND EXISTING ELEMENTS AND MAY BE
DIFFICULT TO IDENTIFY. COORDINATE WITH CONTRACTOR TO LOCATE, IDENTIFY
AND PROTECT ANY UTILITIES AND SERVICES THAT MAY BE AFFECTED DURING
DEMOLITION.
10 12 13
J
N
P
: TYP (8) BALCONIES
K
M
02.040
27' - 5 1/2" VIF
V
IF
27' - 9 1/2" V
IF
" V
IF
INTERIOR SPACE
AREA NOT IN SCOPE
KEYNOTES
N
K
M
02.040
02.067
45' - 5" VIF
V
IF
1/8" = 1' - 0" SCALE OF FEET
0'8' 8' 16'
PLAN NORTH
P A
T H
F
IL
E
N A
M E
P L O
T T
IN
G
D A
T E
T
IM
E
A
DRAWN BY:PROJECT MANAGER:
1840 WEST BROAD STREET
SUITE 400
RICHMOND, VA 23220
v 804.788.4774
QUINNEVANS.COM
M
B
C
D
E
F
G
H
J
K
L
122 3 4 5 6 7 8 9 10 11
1 122 3 4 5 6 7 8 9 10 11
KEY PLAN
GENERAL NOTES:
02/07/2025
PHASE 2 - BID PACKAGE 4
A u to d e s k D o c s
/B u ff a lo
C e n tr a l T e rm in a l/
B u ff a lo C e n lT e rm
R
.r v t
/8
/2
:2
:3
A M
AD116.4
PENTHOUSE &
TOWER ROOF DEMO
PLANS
MNAW
QEA No.42245240
495 Paderewski Dr, Buffalo, NY 14212
BUFFALO CENTRAL
TERMINAL
CENTRAL TERMINAL
RESTORATION CORP.
1/8" = 1'-0"AD116.4
1 PENTHOUSE ROOFS DEMO PLAN
1/8" = 1'-0"AD116.4
2 TOWER ROOF DEMO PLAN
02.040 REMOVE EXISTING BUILT-UP ASPHALT ROOF AND INSULATION DOWN TO EXISTING
CONCRETE DECK.
02.067 REMOVE EXISTING ROOF HATCH AND CURB
1 2 3 4 5 6 7
G
H
J
N
P
REPLACEMENT DRAIN WITH
OVERFLOW, REFER TO BP5 FOR
CONNECTION TO PLUMBING.
ROOF TYPE 4A
A560.4
A560.4
A564.4
K
M L
ROOF TYPE 3
A560.4
RD
E X
IS
T
S L O
P E
ROOF TYPE 2
/A
N
W .4
INTERIOR SPACE
AREA NOT IN SCOPE
INTERIOR SPACE
AREA NOT IN SCOPE
S L O
P E
A560.4
S L O
P E
EXISTING DRAIN AND
DOWNLEADER TO REMAIN,
REPLACE STRAINER BASKET,
REFER TO BP5 FOR CONNECTION
TO PLUMBING.
A560.4
VIF
39' - 10 1/2"
V
IF
/4
A564.4
PVC ROOFING ASSEMBLY
(ROOF TYPES 2 & 4, REFER TO G005.4)
SBS ROOFING ASSEMBLY
(ROOF TYPE 1, REFER TO G005.4)
LEGEND
ROOF/OVERFLOW DRAIN
EXIST SCUPPER LOCATION
SC
METAL ROOFING ASSEMBLY
(ROOF TYPE 3, REFER TO G005.4)
REPLACEMENT ROOFING (ALTERNATE)
ROOF DRAIN
1. THE BUFFALO CENTRAL TERMINAL IS A BUILDING OF NATIONAL HISTORICAL
SIGNIFICANCE AND IS LISTED ON THE NATIONAL REGISTER OF HISTORIC PLACES.
TREAT THE BUILDING RESPECTFULLY. TREAT EXISTING MATERIALS AS
IRREPLACEABLE. DO NOT REMOVE, ALTER, DISFIGURE, OR OTHERWISE DAMAGE
ANY EXISTING MATERIALS, ELEMENTS, OR FINISHES UNLESS SPECIFICALLY
INDICATED HEREIN OR DIRECTED BY THE ARCHITECT. CONTRACTORS SHALL BE
RESPONSIBLE FOR PROTECTING EXISTING CONSTRUCTION FROM DAMAGE
DURING CONSTRUCTION ACTIVITIES. DO NOT REMOVE SALVAGED BUILDING
ELEMENTS FROM THE SITE WITHOUT WRITTEN PERMISSION FROM THE OWNER
AND ARCHITECT.
2. ALL WORK CONDUCTED AS PART OF THIS PROJECT MUST MEET THE SECRETARY
OF THE INTERIOR'S STANDARD FOR THE TREATMENT OF HISTORIC PROPERTIES
WITH GUIDELINES FOR PRESERVING, REHABILITATING, RESTORING, AND
RECONSTRUCTING HISTORIC BUILDINGS. THE CONTRACTOR SHALL BE FAMILIAR
WITH THESE STANDARDS PRIOR TO COMMENCING WORK.
3. ALL DRAWINGS ARE BASED ON LIMITED FIELD INVESTIGATION. VARYING AND
HIDDEN CONDITIONS MAY EXIST. CONTRACTOR SHALL VERIFY ALL EXISTING
CONDITIONS AND MEASUREMENTS. NOTIFY THE ARCHITECT REGARDING ANY
DISCREPANCY BETWEEN EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS
PRIOR TO COMMENCING WORK IN A PARTICULAR AREA.
4. CONTRACTORS ARE RESPONSIBLE FOR COORDINATION OF WORK. REFER TO
SPECIFICATIONS FOR COORDINATION REQUIREMENTS.
5. CONTRACTORS ARE RESPONSIBLE FOR TEMPORARY PROTECTION OF EXISTING
AND HISTORIC CONSTRUCTION. REFER TO SPECIFICATIONS FOR REQUIREMENTS.
6. NOTIFY ARCHITECT AND OWNER IF THE REMOVAL OF EXISTING ELEMENTS WILL
RESULT IN UNSTABLE CONDITIONS OF THE EXISTING STRUCTURE OR SUBSTRATES
TO REMAIN. PROVIDE TEMPORARY SHORING AND BRACING AS REQUIRED BY
SPECIFICATIONS.
7. HAZARDOUS MATERIALS ARE PRESENT IN THE BUILDING AND MAY BE
ENCOUNTERED IN THE WORK. IF SUSPECTED HAZARDOUS MATERIALS ARE
ENCOUNTERED, DO NO DISTURB; IMMEDIATELY NOTIFY OWNER. HAZARDOUS
MATERIALS WILL BE REMOVED BY OWNER UNDER A SEPARATE CONTRACT.
KEYNOTES
1/8" = 1' - 0" SCALE OF FEET
0'8' 8' 16'
PLAN NORTH
P A
T H
F
IL
E
N A
M E
P L O
T T
IN
G
D A
T E
T
IM
E
A
DRAWN BY:PROJECT MANAGER:
1840 WEST BROAD STREET
SUITE 400
RICHMOND, VA 23220
v 804.788.4774
QUINNEVANS.COM
M
B
C
D
E
F
G
H
J
K
L
122 3 4 5 6 7 8 9 10 11
1 122 3 4 5 6 7 8 9 10 11
KEY PLAN
GENERAL NOTES:
02/07/2025
PHASE 2 - BID PACKAGE 4
A u to d e s k D o c s
/B u ff a lo
C e n tr a l T e rm in a l/
B u ff a lo C e n lT e rm
R
.r v t
/8
/2
:2
:3
A M
A106NE.4
L1 OFFICES NE ROOF
PLAN
MNAW
QEA No.42245240
495 Paderewski Dr, Buffalo, NY 14212
BUFFALO CENTRAL
TERMINAL
CENTRAL TERMINAL
RESTORATION CORP.
1/8" = 1'-0"A106NE.4
1 L1 OFFICES NE - ROOF PLAN
DN
8 9 10 12 13 14
G
H
J
N
P
ROOF TYPE 4A
A560.4
A560.4
A560.4
A564.4
K
M
L
REPLACEMENT ROOF DRAIN
CONNECTED TO EXISTING PIPING,
REFER TO BP5 FOR CONNECTION
TO PLUMBING.REPLACEMENT DRAIN WITH
OVERFLOW, REFER TO BP5 FOR
CONNECTION TO PLUMBING.
ROOF TYPE 4A
ROOF TYPE 3
RD
E X
IS
T
S L O
P E
ROOF TYPE 2
RD
EXIST SLOPE
ROOF TYPE 2
A564.4
V
IF
VIF
20' - 4 1/2"
M A
T C
H L
IN
E
A N
E .4
INTERIOR SPACE
AREA NOT IN SCOPE
INTERIOR SPACE
AREA NOT IN SCOPE
A560.4
A560.4
S L O
P E
S L O
P E
EXISTING DRAIN AND
DOWNLEADER TO REMAIN,
REPLACE STRAINER BASKET,
REFER TO BP5 FOR
CONNECTION TO PLUMBING.
EXISTING DRAIN AND DOWNLEADER
TO REMAIN, REPLACE STRAINER
BASKET, REFER TO BP5 FOR
CONNECTION TO PLUMBING.
A560.4
REINSTALL EXISTING
EXTERIOR LIGHT
REINSTALL EXISTING
EXTERIOR LIGHT
VIF
32' - 10"
V
IF
/4
1. THE BUFFALO CENTRAL TERMINAL IS A BUILDING OF NATIONAL HISTORICAL
SIGNIFICANCE AND IS LISTED ON THE NATIONAL REGISTER OF HISTORIC PLACES.
TREAT THE BUILDING RESPECTFULLY. TREAT EXISTING MATERIALS AS
IRREPLACEABLE. DO NOT REMOVE, ALTER, DISFIGURE, OR OTHERWISE DAMAGE
ANY EXISTING MATERIALS, ELEMENTS, OR FINISHES UNLESS SPECIFICALLY
INDICATED HEREIN OR DIRECTED BY THE ARCHITECT. CONTRACTORS SHALL BE
RESPONSIBLE FOR PROTECTING EXISTING CONSTRUCTION FROM DAMAGE
DURING CONSTRUCTION ACTIVITIES. DO NOT REMOVE SALVAGED BUILDING
ELEMENTS FROM THE SITE WITHOUT WRITTEN PERMISSION FROM THE OWNER
AND ARCHITECT.
2. ALL WORK CONDUCTED AS PART OF THIS PROJECT MUST MEET THE SECRETARY
OF THE INTERIOR'S STANDARD FOR THE TREATMENT OF HISTORIC PROPERTIES
WITH GUIDELINES FOR PRESERVING, REHABILITATING, RESTORING, AND
RECONSTRUCTING HISTORIC BUILDINGS. THE CONTRACTOR SHALL BE FAMILIAR
WITH THESE STANDARDS PRIOR TO COMMENCING WORK.
3. ALL DRAWINGS ARE BASED ON LIMITED FIELD INVESTIGATION. VARYING AND
HIDDEN CONDITIONS MAY EXIST. CONTRACTOR SHALL VERIFY ALL EXISTING
CONDITIONS AND MEASUREMENTS. NOTIFY THE ARCHITECT REGARDING ANY
DISCREPANCY BETWEEN EXISTING CONDITIONS AND THE CONTRACT DOCUMENTS
PRIOR TO COMMENCING WORK IN A PARTICULAR AREA.
4. CONTRACTORS ARE RESPONSIBLE FOR COORDINATION OF WORK. REFER TO
SPECIFICATIONS FOR COORDINATION REQUIREMENTS.
5. CONTRACTORS ARE RESPONSIBLE FOR TEMPORARY PROTECTION OF EXISTING
AND HISTORIC CONSTRUCTION. REFER TO SPECIFICATIONS FOR REQUIREMENTS.
6. NOTIFY ARCHITECT AND OWNER IF THE REMOVAL OF EXISTING ELEMENTS WILL
RESULT IN UNSTABLE CONDITIONS OF THE EXISTING STRUCTURE OR SUBSTRATES
TO REMAIN. PROVIDE TEMPORARY SHORING AND BRACING AS REQUIRED BY
SPECIFICATIONS.
7. HAZARDOUS MATERIALS ARE PRESENT IN THE BUILDING AND MAY BE
ENCOUNTERED IN THE WORK. IF SUSPECTED HAZARDOUS MATERIALS ARE
ENCOUNTERED, DO NO DISTURB; IMMEDIATELY NOTIFY OWNER. HAZARDOUS
MATERIALS WILL BE REMOVED BY OWNER UNDER A SEPARATE CONTRACT.
PVC ROOFING ASSEMBLY
(ROOF TYPES 2 & 4, REFER TO G005.4)
SBS ROOFING ASSEMBLY
(ROOF TYPE 1, REFER TO G005.4)
LEGEND
ROOF/OVERFLOW DRAIN
EXIST SCUPPER LOCATION
SC
METAL ROOFING ASSEMBLY
(ROOF TYPE 3, REFER TO G005.4)
REPLACEMENT ROOFING (ALTERNATE)
ROOF DRAIN
KEYNOTES
1/8" = 1' - 0" SCALE OF FEET
0'8' 8' 16'
PLAN NORTH
P A
T H
F
IL
E
N A
M E
P L O
T T
IN
G
D A
T E
T
IM
E
A
DRAWN BY:PROJECT MANAGER:
1840 WEST BROAD STREET
SUITE 400
RICHMOND, VA 23220
v 804.788.4774
QUINNEVANS.COM
M
B
C
D
E
F
G
H
J
K
L
122…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .