B08_-_SOW_-_REVISED_-_Dumpster_Contract_Luster_113021.docx
DOCX document 21 KB Posted
- Attached to
- WI UPPR MSS RIV NWFREF-MC DST DEBRIS REM Federal contract opportunity
- Solicitation number
- 140F0622Q0094
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Dumpster_Calcs_Worksheet_-_Revised.xlsx | XLSX spreadsheet | |
| Sol_140F0622Q0094.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
DUMPSTER RENTAL AND DISPOSAL
FOR
McGregor District of the Upper Mississippi River National Wildlife Refuge Luster Heights 481 Luster Heights Rd.
Harpers Ferry, Iowa 52146
PART A – GENERAL INFORMATION AND INSTRUCTIONS
GENERAL DESCRIPTION OF WORK: Provide dumpsters to aid in the disposal of demolition debris from multiple structures at the address stated above. The type of material is general demolition debris. The structures have been tested and abated for any known hazardous materials.
PART B – PERFORMANCE REQUIREMENTS
Dumpsters by material type:
General Demolition Debris (40 yds dumpsters preferred)
Pricing provided based on the following for General Construction Debris Materials:
1. Initial Delivery Fee (if applicable)
2. Per Haul Fee (Fee to include full removal and empty return – ie. swap out)
3. Per Ton Disposal Fee Dumpsters will be provided on an as needed basis, with no less than three dumpster per material type on the site(s) at one time. Pricing will include all fees and charges associated with dumpster handling - ie. hauling, disposal, permitting (if necessary), etc. The expectation is that all dumpsters necessary to complete the project will be coordinated and completed from June-July 2022. The expectation is that the removal tasks will be completed during a three-week phase (estimated at June 5 – June 25th). Although not ideal, removal can be extended past June 25th if needed to accommodate contractor dumpster availability and/or labor resources. The awarded vendor will be responsible for swapping up to 12 cans per day during select phases with possible no work periods due to operational needs or weather.
Initial estimates of material amount to be removed is approximately 41 40-yard dumpsters. Exact amount of material might be less due to salvage of sites being conducted by Habitat for Humanity prior to the beginning of the demolition. The total amount of this contract shall not exceed 65 40-yard dumpsters.
The material types are subject to change based on site needs. Coordination of deliveries and pickup will be done through refuge staff while the job is being completed. General refuge hours are 8AM – 4PM Monday – Friday. The demolition crew will work 12-hour days, 7 days a week, until completed. The demolition task is expected to take approximately three weeks.
PART C – OTHER PERFORMANCE REQUIREMENTS AND INFORMATION
DOCUMENTATION AND REPORTING: A written ticket will be provided to refuge staff as dumpsters arrive and exit to ensure load counts are accurate. The weights for disposal for general debris will not be known at the time of departure; however, refuge staff will be notified within 24 hours of disposal weights. Sorted materials will be recycled to the maximum extent possible to divert as much waste from landfills. All local and state transportation regulations apply. All materials are considered property of the contract upon pickup.
CONTACT INFORMATION: Possible contractors are encouraged to contact Clint DeMenge , Heavy Equipment Manager at cell 218-821-5608 or Clint_DeMenge@fws.gov or Kendra Pednault, District Manager at cell 608-306-2202 or Kendra_Pednault@fws.gov for additional information or site specific requirements.