B08_-_SolicitationAtch1_Education_Center_HVAC_Specs.pdf

PDF 1 MB Posted

Attached to
Replace Multiple HVAC Systems at Lincoln Home Nati Federal contract opportunity
Solicitation number
140P6221Q0022
Issued by
Department of the Interior National Park Service Midwest Region

View the file

Other files for this federal contract opportunity

Other files attached to Replace Multiple HVAC Systems at Lincoln Home Nati, newest first.
File Type Posted
B08_-_SolicitationAtch6_HVAC_Replacemet_Site_Visit_Sign-in_0001.pdf PDF
Sol_140P6221Q0022_Amd_0001.pdf PDF
B08_-_SolicitationAtch4_Lincoln_Home_Carriage_House_HVAC_Specs.pdf PDF
Sol_140P6221Q0022.pdf PDF
B08_-_SolicitationAtch5_WD.pdf PDF
B08_-_SolicitationAtch2_Education_Center_Drawing_set.pdf PDF
B08_-_SolicitationAtch3_Henson_Robinson_HVAC_Specs.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LINCOLN HOME NATIONAL HISTORIC SITE

EDUCATION CENTER

413 S 8th St, Springfield, IL 62701

HVAC SYSTEM REPLACEMENT

PMIS 206748

PROJECT SPECIFICATIONS

NATIONAL PARK SERVICE

4/30/2021

140P6221Q0022 Attachment 1 Page 1 of 31

TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

Section 01 10 00 - Division 01 Short Form General Requirements

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

Section 23 23 00 REFRIGERANT PIPING

Section 23 54 16.13 - GAS-FIRED FURNACES

Section 23 81 19 SELF-CONTAINED AIR-CONDITIONERS

140P6221Q0022 Attachment 1 Page 2 of 31

SECTION 01 10 00

PART 1 – GENERAL

ITEM 1 - DESCRIPTION OF WORK

1.1 Background: This project is located at the Conference Center within Lincoln Home National Historic Site, Springfield Illinois. The project is to remove and replace Three (3) outdated HVAC split system. The current units were installed in 2000; the expected life span is 10-15 years after installation. Replacing current units at the maximum end of the expected service life will reduce repair costs and provide for a more efficient operation and uninterrupted service. New HVAC units and components are to be installed in existing footprints.

The current systems in the Conference Center are:

Manufacturer Equipment Type Model Number Serial Number

Trane

Ruud

Trane

Gas Furnace

Gas Furnace

Tandem Gas Furnace

TUD100C972K2

UGLH – 05EAUER

TUX100C948D2

2423JMF1G

DF7D302F42

9805696

3084WJB7G

Trane Condenser 2TTA0072A3000AA 3095U372F

Ruud

Trane

Condenser

Condenser

UAKA-018JAZ

TTA090A300EA

5881 M1199 07510

30747XJAD

1.2 Work Covered by the Contract Documents:

A. Project Location: Lincoln Home National Historic Site, 413 S 8th St, Springfield, IL 62701.

B. Work consists of: The contractor shall furnish all personnel, equipment, tools, materials, supervision, and other items and services necessary to decommission, dispose of and replace 4 existing furnaces, 3 condensing units, 3 condenser line sets, and 4 evaporator coils. All work required by the project documents shall be accomplished by the contractor even though minor items required may not be specifically mentioned. The system shall be designed to maintain temperature and relative humidity conditions within the building.

C. All work will be performed under a single contract.

D. Period of performance: Work shall be completed within approximately 120 calendar days of notice to proceed issuance. 30 days for shop drawings, material delivery as verified with

140P6221Q0022 Attachment 1 Page 3 of 31 manufacturer material suppliers, and 60 days on site for active installation of the new system to substantial completion (POP is inclusive of 3 weather days), 7 days for final completion. Work on site shall not commence until critical equipment and materials required to complete the work are in the Contractor’s possession in order to minimize period of inactivity to the project’s progress once commencing. The Contractor shall obtain the CO’s written approval to proceed with active removals and construction within the Education Center upon confirmation that critical equipment and materials have been physically received.

a. The Contractor is expected to commence and remain actively progressing with the project work once issued the Notice to Proceed. The Period of Performance 120 calendar days are intended to account for extended equipment and material lead times to delivery and Contractor monitoring the seasonal winter weather forecasting to attempt to minimize periods of severe cold during active installation when the HVAC system is disconnected and temporary heating and protecting infrastructure is required (see Part 3.8 B of this document for temporary climate control requirements.) These two occurrences are recognized to be largely outside the control of the Contractor or NPS and therefore incorporated into the extended duration of the Period of Performance noted. The Contractor shall provide all reasonable efforts to commence and complete the project in the most efficient timeframe possible to the duration of disruption of HVAC service to the Education Center facility.

ITEM 2 - EXISTING UTILITIES

2.1 Existing Utilities: Notify Contracting Officer and utility companies of proposed locations and times for excavation.

2.2 Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.

2.3 Water service shall be maintained throughout construction.

2.4 Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:

2.4.1 Notify Contracting Officer not less than two days in advance of proposed utility interruptions.

2.4.2 Hours for Utility Shutdowns: Shutdowns shall not exceed 2 to 3 hours. Temporary provisions will be needed by the Contractor for periods longer than stated allowance.

ITEM 3 - CONTRACTOR’S USE OF PREMISES

3.1 Conduct of Operations: At all times the contractor shall conduct his operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the Park Superintendent. Laws & Policies - Lincoln Home National Historic Site (U.S. National Park Service) (nps.gov)

140P6221Q0022 Attachment 1 Page 4 of 31 https://www.nps.gov/liho/learn/management/lawsandpolicies.htm https://www.nps.gov/liho/learn/management/lawsandpolicies.htm

A. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.

B. Smoking is not permitted within any Federal building or within 25 feet of entrances, operable windows, or outdoor air intakes.

C. Pubic Use of Site: Contractor shall at all times conduct operations to ensure the least inconvenience to the public.

3.2 On-site work hours: Work shall be generally performed during park maintenance working hours of 7 a.m. to 3:30 p.m., Monday through Friday, except when otherwise indicated.

A. Work on Saturdays, Sundays, Federal holidays, early morning, or at night may not be performed without prior consent from the Contracting Officer. Submit requests for work outside of the stated normal business hours to the Contracting Officer for approval at least 48 hours in advance of the work.

3.3 Contractor Use of Site:

A. General: Contractor shall have limited use of the site for construction operations. Limit use of premises to the Visitors Center and Bus Parking Lot. Do not disturb portions of Project site beyond areas in which the Work is indicated. See Attachment map

B. Limits: N/A

C. Driveways and Entrances: Keep driveways, access roads, and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials except where indicated on attachment map. Schedule deliveries to minimize use of driveways and entrances.

D. Limit site disturbance, including earthwork and clearing of vegetation, to:

a. No site disturbance permitted

E. Security and Protection facilities installation:

1. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.

1. Cleaning of Equipment: The Contractor shall ensure that prior to moving on to the Project Area, all equipment, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Ensure that all equipment has been pressure washed and is free of exotic species prior to start-up of operations and moving of equipment to Project Area. Equipment shall be considered free of soil, seeds, and other debris when a visual inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools are not required.

2. Tree and Plant Protection: Provide Tree Protection fence at drip line of trees impacted in construction area. Coordinate with COR.

140P6221Q0022 Attachment 1 Page 5 of 31

3. Pest Control: Follow NPS requirements and practices to minimize attraction and harboring of rodents, roaches, and other pests and to perform extermination and control procedures at regular intervals so Project will be free of pests and their residues at Substantial Completion.

Perform control operations lawfully, using environmentally safe materials.

4. Site Enclosure Fence: Before construction operations begin, furnish and install portable chain link fencing in a manner that will prevent people and animals from easily entering site and or storage areas except by entrance gates.

a. Extent of Fence: As required to enclose portion determined sufficient to accommodate construction operations and storage

b. Locate vehicular gates to avoid interference with traffic on public thoroughfares.

c. Locate pedestrian entrance gates as required to provide controlled personnel entry.

d. Maintain security by limiting number of keys and restricting distribution to authorized personnel. Provide Contracting Officer with one set of keys.

5. Security Enclosure and Lockup: Install substantial temporary enclosure around partially completed areas of construction. Provide lockable entrances to prevent unauthorized entrance, vandalism, theft, and similar violations of security.

6. Temporary Enclosures: Provide temporary enclosures for protection of construction, in progress and completed, from exposure, foul weather, other construction operations, and similar activities. Provide temporary weathertight enclosure for building exterior.

3.4 Storage - Staging Areas:

A. Confine Storage of materials and equipment to the project area specified in the attachment

3.5 Preservation of Natural Features: N/A

3.6 Hauling Restrictions: Match State and County road requirements for all park work/access.

3.7 Housekeeping:

A. Keep project neat, orderly, and in a safe condition at all times. Store and use equipment, tools, and materials in a manner that does not present a hazard. Immediately remove all hazardous rubbish at the end of each workday. Do not allow rubbish to accumulate.

B. Dispose of waste and recycled materials legally. Contractor shall not use park dumpsters.

C. Recycle all removed equipment, wire, piping and packing materials.

3.8 Occupancy Requirements for Buildings:

A. Existing Buildings:

1. Full Government Occupancy: Government will occupy buildings that will be under construction during the entire contract period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's day-to-day operations. Maintain existing exits, unless otherwise indicated.

140P6221Q0022 Attachment 1 Page 6 of 31

a. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the CO.

b. Maintain existing building in a weather tight condition throughout construction period. Repair damage caused by construction operations. Protect building and its occupants during construction period.

B. Temporary Climate Control Equipment:

1. The Contractor shall be responsible for providing any necessary temporary heating equipment and protection of Education Center infrastructure (including but not limited domestic water piping and fire suppression piping) by methods approved by the CO. This may include electric space heaters, insulative covers and sleeves, or methods as proposed by the Contractor and approved by the CO.

2. The Contractor shall be allowed to utilize NPS electricity for temporary heading measures at no cost to the Contractor. The Contractor shall verify with the CO/COR that their proposed methods are within the electrical capacities of the Education Center facility to avoid a disruption or damage to existing utility and retain daily Education Center operations. The Contractor shall be required to implement measures that do not create a fire hazard, overload the facility’s electrical system, or employ methods that subject equipment to function outside of its intended use as per the manufacturer. Equipment employed for providing temporary climate control (heating) shall be in proper working order. The CO/COR reserves the right to reject and require removal of any equipment that is not in proper functioning order. The CO/COR retains the right to require the Contractor to adjust their means and methods of providing temporary heating equipment and insulative measures should measures employed demonstrate insufficiency to providing protection, climate control, and utility infrastrucure operation.

3. The Contractor shall be responsible for monitoring the long range weather forecast, with severe low temperatures specifically monitored and make decisions regarding removal and replacement of HVAC system based on minimizing risk to freezing impacts to the facility infrastructure. The Contractor shall maintain clear communication with the CO/COR as to forecast monitoring and intended scheduling of work progress.

3.9 Photo Documentation:

All photos shall be in focus, show maximum range of depth of field general photo and then close up detail photo as needed. Shall be in JPEG digital form and submitted via CD-R Archival Gold or DVD-R Archival Gold media with printed labels and 8 mega pixels minimum within 7 days from time of taken or as approved by COR.

A. Existing Condition Images: Before starting construction, take color, dated, digital images of project site and adjacent property/roads/etc. that may be impacted by construction activity/traffic.

Include existing items to remain or be salvaged from different vantage points and with context for location identification.

D. Construction Images:

140P6221Q0022 Attachment 1 Page 7 of 31

1. Document all sub-surface work/ trenches etc. prior to backfill with enough overall field view to show location and then details.

2. Maintain organized index for photos with date, description, etc..

3. Additional images as needed when questions or emergency situations occur. Submit within 24 hours.

3.10 Fire and Life Safety:

As a minimum, conduct one weekly 15-minute "toolbox" safety meetings. These meetings shall be conducted by a foreman or supervisor and attended by all construction personnel at the worksite. Topics need to coincide with work scheduled for the following week. Document and submit meeting minutes to the Contracting Officer within one day after the meeting.

A. Comply with the requirements of NFPA 241 (Standard for Safeguarding Construction, Alteration, and Demolition Operations).

B. Store and handle hazardous materials in accordance with manufacturer’s and OSHA 29CFR1926 Subpart D requirements. Maintain readily available, on site, MSDS/Safety Data Sheets (SDS) for each chemical.

i. Immediately report all spills of hazardous materials to the park.

ii. Maintain a spill emergency response kit.

iii. Train employees how to respond to a spill and use the emergency response kit.

3.11 Noise and Acoustics Management:

A. Noise Control: Perform demolition and re-roof operations to minimize noise. Perform noise-producing work in less sensitive hours of the day or week as directed by the Contracting Officer.

B. Repetitive and/or intermittent, high-level noise: Permitted only during Daytime.

1. Do not exceed the following dB(A) limitations at 50 feet:

Sound Level in dB(A) Time Duration of Impact Noise 70 More than 12 minutes in any hour 80 More than 3 minutes in any hour

2. Maximum permissible construction equipment noise levels at 50 feet:

EARTHMOVING dB(A) MATERIALS HANDLING dB(A) Compressors 75 Pneumatic Tools 80 Pumps 75 Saws 75 Generators 75 Vibrators 75

C. Ambient Noise:

1. Maximum noise levels (dB) for receiving noise area at property line shall be as follows:

a. Residential receiving area :

Daytime: 65 dB Nighttime: 45 dB

b. Commercial/Industrial receiving area:

Daytime: 67 dB Nighttime: 65 dB

140P6221Q0022 Attachment 1 Page 8 of 31

ITEM 4 - COMMENCEMENT, PROSECUTION, AND COMPLETION

4.1 The Contractor shall commence work in accordance with the terms and conditions of the contract.

(Block 11 of the SF 1442 or relevant section of the award document)

ITEM 5 - EXAMINATION OF THE SITE

5.1 All bidders are urged to visit the job site and examine existing conditions before submitting bids. All bidders will be held to have the same knowledge concerning the site and the on ground conditions as if they had inspected the job site. No change orders will be approved for work obvious during a site visit.

Please see FAR 52.236-27 - Site Visit (Construction).

ITEM 6 - ABBREVIATIONS

6.1 The list of abbreviations, which may be used in the Construction Specifications or Special Provisions, refer to the organizations and specifications of the organizations may be found at the below location via a link ‘NPS Reference Standards.’ Noted in the ‘Contracting and Procurement’ paragraph.

https://www.nps.gov/orgs/1671/do-business-with-us.htm

ITEM 7 - ACCIDENT PREVENTION

7.1 Description: The work of this section consists of establishing and implementing an effective accident prevention program and providing a safe environment for all personnel and visitors.

A. It is the Contractor's responsibility to require all those working on or visiting the site to wear hard hats and other necessary personal protective equipment in good repair at all times. As a minimum, maintain four hard hats and all other APP required equipment.

7.2 Submittals:

A. Accident Prevention Program: At the preconstruction conference submit for approval an accident prevention program. The program shall include:

1. Name of responsible supervisor to carry out the program

2. First aid procedures

3. Training, both initial and continuing

4. Planning for possible emergency situations

5. Contractor to identify nearest location of medical facility for emergencies

6. Recognition that work will be performed in remote areas with limited communication or cell phone coverage

B. Meeting and Inspection Reports: Safety Meetings: As a minimum, conduct 15 minute "toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite. Submit a report of safety meetings and inspections.

The Contractor shall document the “toolbox” meetings through the daily logs.

7.3 Qualification of Employees:

140P6221Q0022 Attachment 1 Page 9 of 31 https://www.nps.gov/orgs/1671/do-business-with-us.htm

A. Ensure that employees are physically qualified to perform their assigned duties in a safe manner to include operators of vehicles and equipment. .Provide operating instructions for all equipment. .

B. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.

7.4 Accident Reporting: The Contractor shall report all accidents to the Contracting Officer or designee as soon as possible and assist the Contracting Officer and other officials as required in the investigation of the accident.

7.5 First Aid Facilities: Provide adequate facilities for the number of employees and the type of construction at the site.

7.6 Emergency Instructions: Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.

7.7 Protective Equipment: It is the Contractor's responsibility to require all those working on or visiting the site to wear necessary protective equipment at all times.

7.8 Hazardous Materials: It shall be the responsibility of all operators and contractors, functioning within the park to properly cleanup, mitigate and remediate if necessary, all unauthorized discharges of hazardous materials or non-hazardous chemical and biological products released from fleet and/or other support vehicles or stationary sources. Response shall be consistent with guidelines established by federal, state and local regulations, and as outlined within the operator's Safety or Hazardous Materials Business Plan. All Hazardous Materials must be removed from the site by the contractor.

A. If a spill, leak or other release occurs, the operator shall as soon as possible, without impeding cleanup, notify the National Park Service Emergency Dispatch.

ITEM 8 - PRECONSTRUCTION CONFERENCE: See FAR 52.236-26

ITEM 9 - SUBMITTALS

9.1 General Submittal Procedures:

A. General: Prepare and submit submittals required by individual Specification Sections. Types of submittals are indicated in individual specific sections.

1. CM-16 Transmittal Form: All submittals shall be transmitted via electronic email using

National Park Service form CM-16 form. The form will be provided by the Contracting Officer. No action will be taken on a submittal item unless accompanied by the CM-16 transmittal form.

B. Submittal List: The intent is to provide an overall summary of submittal requirements and not a comprehensive list. The requirements of the individual Specification Sections, terms and conditions of the Contract still apply regardless of what is shown on the drawings.

140P6221Q0022 Attachment 1 Page 10 of 31

C. Preconstruction Conference Submittal: The following items shall be submitted a minimum of one week prior to the Preconstruction Conference. If all of these documents have not been received one week prior to the scheduled Pre-Construction Conference date, the conference will be cancelled, Notice to Proceed will not be issued, and the Contracting Officer will consider other contractual remedies. Work shall not commence until written Notice to Proceed has been issued. Contracting Officer will notify Contractor of tentative date for the Pre- Construction Conference:

1. Letter designating Project Superintendent.

2. Construction Schedule.

3. A comprehensive breakdown of the Schedule of Values.

4. Accident Prevention Plan (see section 7 of this document).

5. A list of Subcontractors for this project.

6. Written statements from subcontractors certifying compliance with applicable labor standard clauses (SF1413).

7. Satisfactory evidence of liability insurance coverage and workman’s compensation for the

Contactor and all subcontractors.

8. Waste Management Plan.

9. Quality Control Plan.

10. Temporary Storm Water Pollution Prevention Plan (SWPP or UPPP).

11. Indoor Air Quality (IAQ) Management Plan.

12. Contractors Commissioning Plan.

13. Historic Preservation Treatment Plan.

14. List of Required Construction Permits. Include the following information for each permit:

a. Name of Permit.

b. The Agency(ies) with Jurisdiction issuing the permit.

c. Information required from the Government to complete the permit application.

9.2 Shop Drawings, Product Data, and Samples: Contracting Officer will provide sample cover sheet.

A. Shop Drawings: Indicate waterproofing and electrical materials, connection details, anchorage spacing, hardware locations, and installation details.

1. Submit Shop Drawings according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and two full size hardcopy documents to COR.

B. Product Data: Provide component construction, anchorage method, hardware, etc.

1. Submit Product Data according to Part 9.1 of this section to include one digital file (.PDF or .TIF) to COR.

C. Samples: Submit 2 color samples 4” x 6” in size of actual paint finish color selected on steel.

1. Submit Samples CM-16 Transmittal Form according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and physical samples of actual material to COR.

D. For submittals specified above, forward submittals to Contracting Officer at least 15 days before need for approval (depends on length of project).

E. After approving submittals, Contracting Officer will return one copy to the Contractor. If submittals are not approved, Contracting Officer will return all copies to Contractor with reasons

140P6221Q0022 Attachment 1 Page 11 of 31 for rejection. Resubmit, identifying changes. Any work done before approval shall be at Contractor's own risk.

9.3 Approved Equals: Refer to FAR 52.211-6 - If an item in this solicitation is identified as “brand name or equal” or lists more than 3 manufacturers, the purchase description reflects the characteristics and level of quality that will satisfy the Government’s needs. The salient physical, functional, or performance characteristics that “equal” products must meet are specified in the solicitation or relevant specification.

A. For each item proposed as an “approved equal,” submit supporting data, including:

1. Drawings and samples as appropriate.

2. Comparison of the characteristics of the proposed item with that specified.

3. Changes required in other elements of the work because of the substitution.

4. Name, address, and telephone number of vendor.

5. Manufacturer’s literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists. Describe availability of maintenance service, and state source of replacement materials.

B. A request for approval constitutes a representation that Contractor:

1. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.

2. Will provide the same warranties for the proposed item as for the item specified.

3. Has determined that the proposed item is compatible with interfacing items.

4. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.

5. Waives all claims for additional expenses that may be incurred as a result of the substitution.

C. Approved Equals will be evaluated and approved/disapproved during the submittal process.

9.4 Progress Schedules: As soon as possible after Notice of Award and before beginning any work, submit Progress Schedule. Contracting Officer will review the Progress Schedule for format and content.

Submit two copies of Progress Schedule (normally in bar chart form) showing estimated starting and completion dates for each part of the work. The first progress payment will not be issued until an acceptable progress schedule is submitted. The following information must accompany submission of progress schedules prior to processing any pay application:

A. Daily/weekly progress reports during construction as part of the administration process.

B. Schedule of Values: Breakdown each lump-sum item into component work activities used in the schedule, for which progress payments may be requested. The Schedule of Values will form the basis for payment. The work activities broken out within the schedule of values shall be integrated into and made a logical part of the construction baseline schedule submitted under this specification. The total costs for the component work activities shall equal the contract price for that lump-sum item. The Contracting Officer may request data to verify accuracy of dollar values.

A sample Schedule of Values will be provided by the Contracting Officer.

140P6221Q0022 Attachment 1 Page 12 of 31

ITEM 10 – TEMPORARY SERVICES

10.1 Description: The work of this section consists of providing temporary services required for Contractor's performance of the work of this Contract.

10.2 Fire Prevention and Protection:

A. Hazard Control: Take all necessary precautions to prevent fire during construction. Provide adequate ventilation during use of volatile or noxious substances.

ITEM 11 - PROJECT CLOSEOUT

11.1 Description: The work of this section consists of final cleanup, closeout submittals, final inspection procedures, and safety precautions.

11.2 Cleaning: Remove all tools, equipment, surplus materials, and rubbish. At time of final inspection, project shall be thoroughly clean and ready for use.

11.3 Substantial Completion and Final Inspection: Submit written certification that project is substantially complete, and a final inspection must be requested to the Contracting Officer in writing. The Contracting Officer or designee will make an inspection within 10 days of receipt of request or at a mutually agreeable time.

A. If the work is determined to be substantially complete, following the final inspection, the.

Contracting Officer will prepare a Punch List and issue a Letter of Substantial Completion.

B. If the work is not determined to be substantially complete following the final inspection, the Contracting Officer will notify Contractor in writing. Contractor shall request a new final inspection after completing the work. Re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction contract clause.

C. Contractor shall complete the Punch List within 10 calendar days, documented weather permitting.

D. If Contracting Officer determines that the work is not substantially complete; he will immediately notify Contractor in writing, stating reasons. After completing work, Contractor shall resubmit certification and request a new final inspection. Re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction contract clause.

E. If Contractor completes all items of work on the Punch List and all contractually required items, Contracting Officer will issue Letter of final acceptance of work.

F. If the Contractor fails to complete the work within the time frame, the Contracting Officer may correct the work with an appropriate reduction in contract price or charge for re-inspection costs in accordance with the Inspection of Construction contract clause.

G. Disposition of any permits and warranties required by the specifications in this section.

140P6221Q0022 Attachment 1 Page 13 of 31

11.4 Acceptance of the Work: After all deficiencies have been corrected, a Letter of Acceptance will be issued. A Release of Claims document must be executed and submitted to the Contracting Officer before final payment can occur.

11.5 Warranties

A. Construction Warranty shall be based on date of Substantial Completion.

B. Provide All Warranty information of products installed organized by Division. All contact information, extents and conditions shall be clearly noted as well as date of overall project Substantial Completion.

C. Information shall include operation and maintenance manuals for each warranted material.

PART 2 – PRODUCTS (NOT USED)

PART 3 – EXCUTION (NOT USED)

END OF SECTION

140P6221Q0022 Attachment 1 Page 14 of 31

SECTION 232300 - REFRIGERANT PIPING

PART 2 - GENERAL

2.1 SUMMARY

A. Section Includes:

1. Refrigerant pipes and fittings.

2. Refrigerant piping valves and specialties.

3. Refrigerants.

2.2 ACTION SUBMITTALS

A. Product Data: For each type of valve, refrigerant piping, and refrigerant piping specialty.

B. Field quality-control reports.

2.3 CLOSEOUT SUBMITTALS

A. Operation and Maintenance Data: For refrigerant valves and piping specialties to include in maintenance manuals.

2.4 QUALITY ASSURANCE

A. Comply with ASHRAE 15, "Safety Code for Refrigeration Systems."

B. Comply with ASME B31.5, "Refrigeration Piping and Heat Transfer Components."

PART 3 - PRODUCTS

3.1 PERFORMANCE REQUIREMENTS

A. Line Test Pressure for Refrigerant R-410A:

1. Suction Lines for Air-Conditioning Applications: 300 psig (2068 kPa).

2. Suction Lines for Heat-Pump Applications: 535 psig (3689 kPa).

3. Hot-Gas and Liquid Lines: 535 psig (3689 kPa).

3.2 COPPER TUBE AND FITTINGS

A. Copper Tube: ASTM B 88, Type K or L (ASTM B 88M, Type A or B).

140P6221Q0022 Attachment 1 Page 15 of 31

B. Wrought-Copper Fittings: ASME B16.22.

C. Wrought-Copper Unions: ASME B16.22.

D. Brazing Filler Metals: AWS A5.8/A5.8M.

E. Flexible Connectors:

1. Body: Tin-bronze bellows with woven, flexible, tinned-bronze-wire-reinforced protective jacket.

2. End Connections: Socket ends.

3. Offset Performance: Capable of minimum 3/4-inch (20-mm) misalignment in minimum 7-inch- (180-mm-) long assembly.

4. Working Pressure Rating: Factory test at minimum 500 psig (3450 kPa).

5. Maximum Operating Temperature: 250 deg F (121 deg C).

F. Copper Pressure-Seal Fitting for Refrigerant Piping:

1. Standard: UL 207; certified by UL for field installation. Certification as a UL-recognized component alone is unacceptable.

2. Housing: Copper.

3. O-Rings: HNBR or compatible with specific refrigerant.

4. Tools: Manufacturer's approved special tools.

5. Minimum Rated Pressure: 700 psig (48 bar).

3.3 VALVES AND SPECIALTIES

A. Diaphragm Packless Valves:

1. Body and Bonnet: Forged brass or cast bronze; globe design with straight-through or angle pattern.

2. Diaphragm: Phosphor bronze and stainless steel with stainless-steel spring.

3. Operator: Rising stem and hand wheel.

4. Seat: Nylon.

5. End Connections: Socket, union, or flanged.

6. Working Pressure Rating: 500 psig (3450 kPa).

7. Maximum Operating Temperature: 275 deg F (135 deg C).

B. Packed-Angle Valves:

1. Body and Bonnet: Forged brass or cast bronze.

2. Packing: Molded stem, back seating, and replaceable under pressure.

3. Operator: Rising stem.

4. Seat: Nonrotating, self-aligning polytetrafluoroethylene.

5. Seal Cap: Forged-brass or valox hex cap.

6. End Connections: Socket, union, threaded, or flanged.

7. Working Pressure Rating: 500 psig (3450 kPa).

8. Maximum Operating Temperature: 275 deg F (135 deg C).

C. Check Valves:

1. Body: Ductile iron, forged brass, or cast bronze; globe pattern.

2. Bonnet: Bolted ductile iron, forged brass, or cast bronze; or brass hex plug.

3. Piston: Removable polytetrafluoroethylene seat.

140P6221Q0022 Attachment 1 Page 16 of 31

4. Closing Spring: Stainless steel.

5. Manual Opening Stem: Seal cap, plated-steel stem, and graphite seal.

6. End Connections: Socket, union, threaded, or flanged.

7. Maximum Opening Pressure: 0.50 psig (3.4 kPa).

8. Working Pressure Rating: 500 psig (3450 kPa).

9. Maximum Operating Temperature: 275 deg F (135 deg C).

D. Service Valves:

1. Body: Forged brass with brass cap including key end to remove core.

2. Core: Removable ball-type check valve with stainless-steel spring.

3. Seat: Polytetrafluoroethylene.

4. End Connections: Copper spring.

5. Working Pressure Rating: 500 psig (3450 kPa).

E. Solenoid Valves: Comply with AHRI 760 and UL 429; listed and labeled by a National Recognized Testing Laboratory (NRTL).

1. Body and Bonnet: Plated steel.

2. Solenoid Tube, Plunger, Closing Spring, and Seat Orifice: Stainless steel.

3. Seat: Polytetrafluoroethylene.

4. End Connections: Threaded.

5. Electrical: Molded, watertight coil in NEMA 250 enclosure of type required by location with 1/2-inch (16-GRC) conduit adapter, and [24] [115] [208]-V ac coil.

6. Working Pressure Rating: 400 psig (2760 kPa).

7. Maximum Operating Temperature: 240 deg F (116 deg C).

F. Safety Relief Valves: Comply with 2010 ASME Boiler and Pressure Vessel Code; listed and labeled by an NRTL.

1. Body and Bonnet: Ductile iron and steel, with neoprene O-ring seal.

2. Piston, Closing Spring, and Seat Insert: Stainless steel.

3. Seat: Polytetrafluoroethylene.

4. End Connections: Threaded.

5. Working Pressure Rating: 400 psig (2760 kPa).

6. Maximum Operating Temperature: 240 deg F (116 deg C).

G. Thermostatic Expansion Valves: Comply with AHRI 750.

1. Body, Bonnet, and Seal Cap: Forged brass or steel.

2. Diaphragm, Piston, Closing Spring, and Seat Insert: Stainless steel.

3. Packing and Gaskets: Non-asbestos.

4. Capillary and Bulb: Copper tubing filled with refrigerant charge.

5. Suction Temperature: 40 deg F (4.4 deg C) <Insert temperature>.

6. Superheat: Adjustable.

7. End Connections: Socket, flare, or threaded union.

8. Working Pressure Rating: 700 psig (4820 kPa).

H. Straight-Type Strainers:

1. Body: Welded steel with corrosion-resistant coating.

2. Screen: 100-mesh stainless steel.

3. End Connections: Socket or flare.

4. Working Pressure Rating: 500 psig (3450 kPa).

5. Maximum Operating Temperature: 275 deg F (135 deg C).

140P6221Q0022 Attachment 1 Page 17 of 31

I. Angle-Type Strainers:

1. Body: Forged brass or cast bronze.

2. Drain Plug: Brass hex plug.

3. Screen: 100-mesh monel.

4. End Connections: Socket or flare.

5. Working Pressure Rating: 500 psig (3450 kPa).

6. Maximum Operating Temperature: 275 deg F (135 deg C).

J. Moisture/Liquid Indicators:

1. Body: Forged brass.

2. Window: Replaceable, clear, fused glass window with indicating element protected by filter screen.

3. Indicator: Color coded to show moisture content in parts per million (ppm).

4. Minimum Moisture Indicator Sensitivity: Indicate moisture above 60 ppm.

5. End Connections: Socket or flare.

6. Working Pressure Rating: 500 psig (3450 kPa).

7. Maximum Operating Temperature: 240 deg F (116 deg C).

K. Replaceable-Core Filter Dryers: Comply with AHRI 730.

1. Body and Cover: Painted-steel shell with ductile-iron cover, stainless-steel screws, and neoprene gaskets.

2. Filter Media: 10 micron, pleated with integral end rings; stainless-steel support.

3. Desiccant Media: Activated [alumina] [charcoal].

4. Designed for reverse flow (for heat-pump applications).

5. End Connections: Socket.

6. Access Ports: NPS 1/4 (DN 8) connections at entering and leaving sides for pressure differential measurement.

7. Maximum Pressure Loss: 2 psig (14 kPa).

8. Working Pressure Rating: 500 psig (3450 kPa).

9. Maximum Operating Temperature: 240 deg F (116 deg C).

L. Permanent Filter Dryers: Comply with AHRI 730.

1. Body and Cover: Painted-steel shell.

2. Filter Media: 10 micron, pleated with integral end rings; stainless-steel support.

3. Desiccant Media: Activated alumina or charcoal.

4. End Connections: Socket.

5. Access Ports: NPS 1/4 (DN 8) connections at entering and leaving sides for pressure differential measurement.

6. Maximum Pressure Loss: 2 psig (14 kPa).

7. Working Pressure Rating: 500 psig (3450 kPa).

8. Maximum Operating Temperature: 240 deg F (116 deg C).

3.4 REFRIGERANTS

A. ASHRAE 34, R-410A: Pentafluoroethane/Difluoromethane.

140P6221Q0022 Attachment 1 Page 18 of 31

PART 4 - EXECUTION

4.1 PIPING APPLICATIONS FOR REFRIGERANT R-410A

A. Suction Lines: Copper, Type ACR, annealed-temper tubing and wrought-copper fittings with brazed joints.

B. Safety-Relief-Valve Discharge Piping: Copper, annealed- or drawn-temper tubing and wrought-copper fittings with brazed joints.

C. Safety-Relief-Valve Discharge Piping: Copper, Type K (A), annealed- or drawn-temper tubing and wrought-copper fittings with brazed joints.

4.2 VALVE AND SPECIALTY APPLICATIONS

A. Install a check valve at the compressor discharge and a liquid accumulator at the compressor suction connection.

B. Except as otherwise indicated, install diaphragm packless valves on inlet and outlet side of filter dryers.

C. Install a full-size, three-valve bypass around filter dryers.

D. Install solenoid valves upstream from each expansion valve and hot-gas bypass valve. Install solenoid valves in horizontal lines with coil at top.

E. Install thermostatic expansion valves as close as possible to distributors on evaporators.

1. Install valve so diaphragm case is warmer than bulb.

2. Secure bulb to clean, straight, horizontal section of suction line using two bulb straps. Do not mount bulb in a trap or at bottom of the line.

3. If external equalizer lines are required, make connection where it will reflect suction-line pressure at bulb location.

F. Install moisture/liquid indicators in liquid line at the inlet of the thermostatic expansion valve or at the inlet of the evaporator coil capillary tube.

G. Install strainers upstream from and adjacent to the following unless they are furnished as an integral assembly for the device being protected:

1. Solenoid valves.

2. Thermostatic expansion valves.

3. Compressor.

H. Install receivers sized to accommodate pump-down charge.

I. Install flexible connectors at compressors.

140P6221Q0022 Attachment 1 Page 19 of 31

4.3 PIPING INSTALLATION

A. Drawing plans, schematics, and diagrams indicate general location and arrangement of piping systems; indicated locations and arrangements were used to size pipe and calculate friction loss, expansion, pump sizing, and other design considerations. Install piping as indicated unless deviations to layout are approved on Shop Drawings.

B. Install refrigerant piping according to ASHRAE 15.

C. Install piping in concealed locations unless otherwise indicated and except in equipment rooms and service areas.

D. Install piping indicated to be exposed and piping in equipment rooms and service areas at right angles or parallel to building walls. Diagonal runs are prohibited unless specifically indicated otherwise.

E. Install piping above accessible ceilings to allow sufficient space for ceiling panel removal.

F. Install piping adjacent to machines to allow service and maintenance.

G. Install piping free of sags and bends.

H. Install fittings for changes in direction and branch connections.

I. Select system components with pressure rating equal to or greater than system operating pressure.

J. Install piping as short and direct as possible, with a minimum number of joints, elbows, and fittings.

K. Install refrigerant piping in protective conduit where installed belowground.

L. Install refrigerant piping in rigid or flexible conduit in locations where exposed to mechanical injury.

M. Slope refrigerant piping as follows:

1. Install horizontal hot-gas discharge piping with a uniform slope downward away from compressor.

2. Install horizontal suction lines with a uniform slope downward to compressor.

3. Install traps and double risers to entrain oil in vertical runs.

4. Liquid lines may be installed level.

N. When brazing or soldering, remove solenoid-valve coils and sight glasses; also remove valve stems, seats, and packing, and accessible internal parts of refrigerant specialties. Do not apply heat near expansion-valve bulb.

O. Install piping with adequate clearance between pipe and adjacent walls and hangers or between pipes for insulation installation.

140P6221Q0022 Attachment 1 Page 20 of 31

4.4 PIPE JOINT CONSTRUCTION

A. Ream ends of pipes and tubes and remove burrs.

B. Remove scale, slag, dirt, and debris from inside and outside of pipe and fittings before assembly.

C. Soldered Joints: Construct joints according to ASTM B 828 or CDA's "Copper Tube Handbook."

D. Brazed Joints: Construct joints according to AWS's "Brazing Handbook," Chapter "Pipe and Tube."

1. Use Type BCuP (copper-phosphorus) alloy for joining copper socket fittings with copper pipe.

2. Use Type BAg (cadmium-free silver) alloy for joining copper with bronze or steel.

4.5 INSTALLATION OF HANGERS AND SUPPORTS

A. Install the following pipe attachments:

1. Adjustable steel clevis hangers for individual horizontal runs less than 20 feet (6 m) long.

2. Roller hangers and spring hangers for individual horizontal runs 20 feet (6 m) or longer.

3. Pipe Roller: MSS SP-58, Type 44 for multiple horizontal piping 20 feet (6 m) or longer, supported on a trapeze.

4. Spring hangers to support vertical runs.

5. Copper-clad hangers and supports for hangers and supports in direct contact with copper pipe.

B. Install hangers for copper tubing, with maximum horizontal spacing and minimum rod diameters, to comply with MSS-58, locally enforced codes, and authorities having jurisdiction requirements, whichever are most stringent.

C. Support horizontal piping within 12 inches (300 mm) of each fitting.

D. Support vertical runs of copper tubing to comply with MSS-58, locally enforced codes, and authorities having jurisdiction requirements, whichever are most stringent.

4.6 FIELD QUALITY CONTROL

A. Perform the following tests and inspections:

1. Comply with ASME B31.5, Chapter VI.

2. Test refrigerant piping, specialties, and receivers. Isolate compressor, condenser, evaporator, and safety devices from test pressure if they are not rated above the test pressure.

3. Test high- and low-pressure side piping of each system separately at not less than the pressures indicated in "Performance Requirements" Article.

a. Fill system with nitrogen to the required test pressure.

140P6221Q0022 Attachment 1 Page 21 of 31

b. System shall maintain test pressure at the manifold gage throughout duration of test.

c. Test joints and fittings with electronic leak detector or by brushing a small amount of soap and glycerin solution over joints.

d. Remake leaking joints using new materials, and retest until satisfactory results are achieved.

B. Prepare test and inspection reports.

4.7 SYSTEM CHARGING

A. Charge system using the following procedures:

1. Install core in filter dryers after leak test but before evacuation.

2. Evacuate entire refrigerant system with a vacuum pump to 500 micrometers (67 Pa). If vacuum holds for 12 hours, system is ready for charging.

3. Break vacuum with refrigerant gas, allowing pressure to build up to 2 psig (14 kPa).

4. Charge system with a new filter-dryer core in charging line.

4.8 ADJUSTING

A. Adjust thermostatic expansion valve to obtain proper evaporator superheat.

B. Adjust high- and low-pressure switch settings to avoid short cycling in response to fluctuating suction pressure.

C. Adjust set-point temperature of air-conditioning or chilled-water controllers to the system design temperature.

D. Perform the following adjustments before operating the refrigeration system, according to manufacturer's written instructions:

1. Open shutoff valves in condenser water circuit.

2. Verify that compressor oil level is correct.

3. Open compressor suction and discharge valves.

4. Open refrigerant valves except bypass valves that are used for other purposes.

5. Check open compressor-motor alignment and verify lubrication for motors and bearings.

E. Replace core of replaceable filter dryer after system has been adjusted and after design flow rates and pressures are established.

END OF SECTION 232300

140P6221Q0022 Attachment 1 Page 22 of 31

GAS-FIRED FURNACES 235416.13 - 1

SECTION 235416.13 - GAS-FIRED FURNACES

PART 5 - GENERAL

5.1 SUMMARY

A. Section Includes:

1. Gas-fired, condensing furnaces and accessories complete with controls.

2. Air filters.

5.2 ACTION SUBMITTALS

A. Product Data: For each type of product.

5.3 CLOSEOUT SUBMITTALS

A. Operation and maintenance data.

5.4 WARRANTY

A. Special Warranty: Manufacturer agrees to repair or replace the following components of furnaces that fail in materials or workmanship within specified warranty period:

1. Warranty Period, Commencing on Date of Substantial Completion:

a. Furnace Heat Exchanger: 20 years.

b. Integrated Ignition and Blower Control Circuit Board: Five years.

c. Draft-Inducer Motor: Five years.

PART 6 - PRODUCTS

6.1 ASSEMBLY DESCRIPTION

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a qualified testing agency, and marked for intended location and application.

B. General Requirements for Noncondensing Gas-Fired Furnaces: Factory assembled, piped, wired, and tested; complying with ANSI Z21.47/CSA 2.3 and NFPA 54.

6.2 GAS-FIRED FURNACES, CONDENSING

A. Cabinet: Steel.

140P6221Q0022 Attachment 1 Page 23 of 31

GAS-FIRED FURNACES 235416.13 - 2

1. Cabinet interior around heat exchanger shall be factory-installed insulation.

2. Lift-out panels shall expose burners and all other items requiring access for maintenance.

3. Factory paint external cabinets in manufacturer's standard color.

4. Airstream Surfaces: Surfaces in contact with the airstream shall comply with requirements in ASHRAE 62.1.

B. Fan: Centrifugal, factory balanced, resilient mounted, direct drive.

1. Fan Motors: Comply with requirements in Section 230513 "Common Motor Requirements for HVAC Equipment."

2. Special Motor Features, Single Speed: Single speed, premium efficiency, as defined in Section 230513 "Common Motor Requirements for HVAC Equipment," and with internal thermal protection and permanent lubrication.

3. Special Motor Features, Multispeed: Multitapped, multispeed with internal thermal protection and permanent lubrication.

4. Special Motor Features, ECM: Electronically controlled motor (ECM) controlled by integrated furnace/blower control.

C. Type of Gas: Natural.

D. Heat Exchanger:

1. Primary: Stainless steel.

2. Secondary: Stainless steel.

E. Burner:

1. Gas Valve: 100 percent safety modulating main gas valve, main shutoff valve, pressure regulator, safety pilot with electronic flame sensor, limit control, transformer, and combination ignition/fan timer control board.

2. Ignition: Electric pilot ignition, with hot-surface igniter or electric spark ignition.

F. Gas-Burner Safety Controls:

1. Electronic Flame Sensor: Prevents gas valve from opening until pilot flame is proven; stops gas flow on ignition failure.

2. Flame Rollout Switch: Installed on burner box; prevents burner operation.

3. Limit Control: Fixed stop at maximum permissible setting; de-energizes burner on excessive bonnet temperature; automatic reset.

G. Combustion-Air Inducer: Centrifugal fan with thermally protected motor and sleeve bearings prepurges heat exchanger and vents combustion products; pressure switch prevents furnace operation if combustion-air inlet or flue outlet is blocked.

H. Furnace Controls: Solid-state board integrates ignition, heat, cooling, and fan speeds; adjustable fan-on and fan-off timing; terminals for connection to accessories; diagnostic light with viewport.

I. Accessories:

1. Combination Combustion-Air Intake and Vent: PVC plastic fitting to combine combustion-air inlet and vent through outside wall or roof.

140P6221Q0022 Attachment 1 Page 24 of 31

GAS-FIRED FURNACES 235416.13 - 3

2. CPVC Plastic Vent Materials:

a. CPVC Plastic Pipe: Schedule 40, complying with ASTM F441/F441M.

b. CPVC Plastic Fittings: Schedule 40, complying with ASTM F438, socket type.

c. CPVC Solvent Cement: ASTM F493.

3. PVC Plastic Vent Materials:

a. PVC Plastic Pipe: Schedule 40, complying with ASTM D1785.

b. PVC Plastic Fittings: Schedule 40, complying with ASTM D2466, socket type.

c. PVC Solvent Cement: ASTM D2564.

J. Capacities and Characteristics: