B08_Solicitation_(Attachment_2_-_A06_Specifications_(PLB-Solar-Install-Instructions).pdf

PDF 293 KB Posted

Attached to
Solar Light Bollard Replacment and Fiber Optic Sys Federal contract opportunity
Solicitation number
140P6022Q0045
Issued by
Department of the Interior National Park Service Midwest Region

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRIOR TO INSTALL

Ensure install location receives at least 2 to 3 hours of midday sun on average. Please handle bollard with care as scratches will affect appearance and powder coat durability.

TOOLS REQUIRED

• 5/32 inch hex key

• 3/4 inch wrench or deep socket

Path

First Light Technologies Document 70-0003 27 April 2021 © Copyright First Light Technologies www.firstlighttechnologies.com info@firstlighttechnologies.com

Toll Free: 1 (844) 279-8754

HEAD

POST

BASEPLATE

PLB MODELS

Please refer to the diagram below to identify the model you are installing. This is needed for step 4.

INSTALL INSTRUCTIONS

PLB Series Solar Bollard

1. INSTALL ANCHOR BOLTS

With a one to two foot setback from the path or area to be illuminated, install concrete footing with supplied anchor bolts. Align anchor bolts to path as shown below using the supplied cardboard template to hold the bolts in position.

Footing

Anchor Bolts

Path

Footing

PLB ASYMMETRICAL

(PLB ASM)

PLB SYMMETRICAL

(PLB SYM)

First Light Technologies Document 70-0003 27 April 2021 © Copyright First Light Technologies www.firstlighttechnologies.com info@firstlighttechnologies.com

Toll Free: 1 (844) 279-8754

INSTALL INSTRUCTIONS

PLB Series Solar Bollard

3. MOUNT BOLLARD

Mount the bollard onto the baseplate, with the supplied 1/4 - 20 screws and tighten to 65 in-lbs.

6. INSTALL COMPLETE

5. PUT BACK HEAD

Place the head back on the post and fasten with the supplied 1/4 - 20 screws and tighten to 65 in-lbs.

4. CONNECT BATTERY

Remove the head of the bollard from the post and connect the battery cables. Observe the light to ensure it illuminates for approximately 20 seconds after connecting the battery. If the light does not illuminate after connecting the battery, please call us at 1 (844) 279-8754.

Head

Battery

Battery Cables

*CLICK*

Path

Path

PLB Asymmetrical Model Only Ensure the PLB ASM Optic is facing the pathway.

2. INSTALL BASEPLATE

Remove the baseplate from the bottom of the bollard and place it on the footing. Use supplied nuts to secure baseplate to footing and tighten to 45 ft-lbs.

* Supplied leveling nuts can be placed below the baseplate but are optional.

Nuts

Footing

Baseplate

PLB ASM MODEL ONLY

Ensure base plate is aligned to path as shown.

File details come from the government source that posted it. Updated .