B08_Solicitation_attach_3_Submittal_List.xlsx

XLSX spreadsheet 92 KB Posted

Attached to
REPLACE HVAC SYSTEM IN PAINTED CANYON VC Federal contract opportunity
Solicitation number
140P6323B0010
Issued by
Department of the Interior National Park Service Midwest Region

About this file

This solicitation is for construction services to replace the HVAC system at the Theodore Roosevelt National Park Painted Canyon Visitor Center. The Department of the Interior National Park Service Midwest Region is seeking bids to replace the HVAC system as outlined in solicitation number 140P6323B0010. Bids are due by the date specified in the attached submittal list spreadsheet for the project named "REPLACE HVAC SYSTEM IN PAINTED CANYON VC." The solicitation describes the need to replace the entirety of the HVAC system serving the visitor center to ensure continued operations.

View the file

Other files for this federal contract opportunity

Other files attached to REPLACE HVAC SYSTEM IN PAINTED CANYON VC, newest first.
File Type Posted
Sol_140P6323B0010_Amd_0003.pdf PDF
B09_Solicitation_Amendment_2_attachment_Q_A_0002.docx DOCX document
Sol_140P6323B0010_Amd_0002.pdf PDF
Sol_140P6323B0010_Amd_0001.pdf PDF
B08_Solicitation_Attach_5_wage_determination.pdf PDF
Sol_140P6323B0010.pdf PDF
B08_Solicitation_attach_1_SPECS.pdf PDF
B08_Solicitation_attach_2_Drawing_.pdf PDF
B08_Solicitation_attach_4_Limitations_on_Subcontracting_Report.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Submittal List with Review Estimate Instructions
National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21
DESIGN SERVICES (Construction Documents (CD) Phase)
Responsible Party: Design Architect/Engineer (A/E)
1Enter Park Acronym, Project Management Information System (PMIS) Number, and Project Title.
2Record construction submittal requirements. Complete Specification Section, Paragraph Number, and Description sections. Insert additional rows as required for sections containing multiple submittals.
3In Requirements section, enter X for submittal requirements where applicable. Insert additional columns as needed under Informational or Action. Refer to Specification Section 01 33 23 for clarification. (Action submittals require Government resposive action and Informational submittals do not.) Division 1 Specifications submittals are Information submittals.
4Attach black and white version to Specification Section 01 33 23 in project manual. Delete instructional note on top of page.
CONSTRUCTION SERVICES (Construction Phase)
Responsible Party: Construction Contracting Officer Representative (COR)
1Use Submittal List submitted with Final Construction Documents. Copy/paste submittal information into Submittal List with Review Estimate Template. If amendments issued, adjust submittal requirements as necessary.
2Attach this template to Architect/Engineer (A/E) Construction Services Scope of Services.
3Use Review Estimate to estimate time required for Architect/Engineer to accomplish Action submittal reviews. Enter estimated whole or partial number of hours per discipline.
4Add discipline heading column as required.
5Use total number of hours per discipline at bottom of template and apply hourly rates listed in Indefinite Delivery/Indefinite Quantity (IDIQ) contract (using appropriate option period rates) to formulate Government estimate for submittal reviews.
6Use information from this template to negotiate submittal review portion of Architect/Engineer Construction Services task order.
7Provide template to Construction Management Representative (CMR) to show submittals they are responsible for and submittals to be forwarded to the Architect/Engineer. All Informational submittals will be reviewed by Construction Management Representative.
Responsible Party: Architect/Engineer (A/E)
1Indicate level of effort required for each Action submittal review by entering number of whole or partial hours for each discipline under Architect/Engineer Review Time section.
2All Informational submittals will be reviewed by Construction Management Representative (CMR).
3Use total number of hours per discipline at bottom of template and apply hourly rates listed in Indefinite Delivery/Indefinite Quantity (IDIQ) contract (using appropriate option period rates) to formulate estimate.
4Use this estimate to negotiate submittals review portion of Architect/Engineer Construction Services portion of the task order.

&8&K01+024Submittal List with Review Estimate Instructions | National Park Service (NPS) - Denver Service Center (DSC) &8&K01+024page &P of &N

Template

Submittal List with Review Estimate Template
National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21
SUBMITTAL LISTACTION SUBMITTAL
REVIEW ESTIMATE
Park Acronym/Project Management Information System (PMIS) Number:THRO/252321(Complete this portion for Architect / Engineer (A/E)
Project Title:Visitor Center HVAC Replacementsconstruction service task order negotiation.)
SUBMITTALREQUIREMENTSARCHITECT / ENGINEER REVIEW TIME
(Indicate with X)(Indicate in whole or partial hours.)
INFORMATIONALACTION
SPECIFICATION SECTIONPARAGRAPH NUMBERDESCRIPTIONCERTIFICATIONS OR LABORATORY TESTSREPORTS OR CALCULATIONS
OR PLANMANUFACTURER DATA
AND INSTRUCTIONSOTHERSAMPLESSHOP DRAWINGSMANUFACTURER DATA
AND INSTRUCTIONSOTHERARCHITECTCIVIL ENGINEERSTRUCTURAL ENGINEERMECHANICAL ENGINEERELECTRICAL ENGINEERPROJECT MANAGER COORDINATIONLANDSCAPE ARCHITECT
01 10 00General Requirements
1.2B5Photo Documentation of Existing DuctworkX
7.2AAccident Prevention (Safety) Plan (APPX
7.2BMeeting and Inspection Reports: Safety MeetingsX
9.1CPreconstruction Conference SubmittalX
9.4Schedule of ValuesX
9.5Progress ReportingX
11.3Completion and Final InspectionX
11.5WarrantiesX
23 05 13Common Motor Requirements for HVAC and Plumbing
Technical Data
1.3A.1aProduct RequirementsX
1.3A.1bData SheetsX
1.3A.1cEquipment IdentificationX
1.3A.1dOperating CharacteristicsX
1.3A.1eElectric MotorsX
1.3A.1fControl PanelsX
1.3BOperation and Maintenance DataX
23 05 93HVAC Systems Balancing and Testing
1.3A.1CertificationsX
1.3A.2Report FormsX
1.3B.1Test Reports and Data FormsX
23 09 00Instrumentation and Control For HVAC Systems
1.4A1Wiring DiagramsX
1.4A2Proposed Equipment InformationX
1.4BQuality Control SubmittalsX
1.4COperation and Maintenance DataX
23 34 00HVAC - Fans
1.3A1Product technical dataX
1.3A2CertificationsX
1.3BFactory Performance testX
1.3COperation and Maintenance DataX
23 74 36Refrigerant Piping System
1.3A1Product technical dataX
1.3A2Test reportsX
1.3BOperation and Maintenance DataX
23 80 00HVAC Equipment
1.3A1Fabrication and Layout DrawingsX
1.3A2Product technical dataX
1.3A3CertificationsX
1.3BOperation and Maintenance DataX

Total: 0 0 0 0 0 0 0