B08 Solicitation_Atch 1_Specifications.pdf
PDF 2 MB Posted
- Attached to
- REPLACE WINDOWS AND STORM WINDOWS ON D1 Federal contract opportunity
- Solicitation number
- 140P6321Q0037
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B09_Solicitation_Amendments_Atch_1_Q_and_A_Document_0001.pdf | ||
| Sol_140P6321Q0037_Amd_0001.pdf | ||
| B08 Solicitation_Atch 3_RFI Form.docx | DOCX document | |
| B08 Solicitation_Atch 7_DI-137 Release of Claims.pdf | ||
| B08 Solicitation_Atch 5_Payroll Form_DOL_WH_347_7_14_06.pdf | ||
| B08 Solicitation_Atch 6_Statement and Acknowledgement_SF 1413.pdf | ||
| B08 Solicitation_Atch 2_DOL Wage Determination.pdf | ||
| B08 Solicitation_Atch 8_Experience Questionnaire.xls | XLS spreadsheet | |
| B08 Solicitation_Atch 4_Submittal Form CM16.doc | DOC document | |
| Sol_140P6321Q0037.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MINUTEMAN MISSILE NATIONAL HISTORIC SITE
REPLEACE WINDOWS AND STORM WINDOWS ON DELTA 01
LAUNCH CONTROL FACILITY
PMIS 256790
PROJECT SPECIFICATIONS
NATIONAL PARK SERVICE
APRIL 25, 2021
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
Section 01 10 00 - Division 01 Short Form General Requirements
DIVISION 08 – OPENINGS
Section 08 53 13 – Wood Windows
PHOTOGRAPHS AND REFERENCE IMAGES
SECTION 01 10 00
DIVISION 1 SHORT FORM GENERAL REQUIREMENTS
PART 1 – GENERAL
ITEM 1 - DESCRIPTION OF WORK
1.1 Background: Delta 01 Launch Control Facility constructed in 1962 with wood, double hung, single pane windows installed with a storm/screen window. These windows are past their life cycles and have started to deteriorate. The windows are developing cracking in the frames, storm window glass is cracked in a few of these, along with the metal screens coming out. Project would replace 31 windows and storm/screen windows. Replacement of these items will preserve the facility and reduced future maintenance costs. Existing windows as described herein will be replaced with new metal clad aluminum frames with double pane thermal insulated double panes with storm windows and screens. New window systems to match profile and look of existing windows. Contractor to field verify existing conditions and dimensions
1.2 Work Covered by the Contract Documents:
A. Project Location: Delta-01 Launch Control Facility – located at 24301 200th 6th Avenue, Philip, SD
57567 – Exit 127 off of Interstate 90, ½ mile north of overpass.
B. Work consists of: The work for this project consists of demolishing all existing windows associated with this facility. Install (31) new aluminum clad wood windows with thermal insulated double panes with storm windows and screens. New window systems to match profile and look of existing windows. Windows to have solar film to provide 89% visible light, 99% ultraviolet light rejection. This film will allow natural lighting but protect against ultraviolet light. In addition (4) windows will have blackout film applied at location of existing windows with black out painted panes, film to match historical intent of blackout paint. Any exterior and/or interior finishes disturbed for construction need to be returned to original condition and approved by COR before acceptance. Contractor to remove and reinstall existing blinds to install new windows. Document initial and final condition of blinds with COR, any damage to blinds during construction will be the contractor’s responsibility.
31 Windows for replacement with storm and screen windows:
(7) – 48”H x 40”W (Control Office)
(20) – 46”H x 36”W (North & South Elevations)
(2) – 36”H x 34”W (North Elevation)
(2) – 38”H x 24”W (South Elevation)’ Field verify size and location of all windows
C. All work will be performed under a single contract.
D. Period of performance: Work shall be completed within approximately 120 calendar days.
ITEM 2 - EXISTING UTILITIES
2.1 Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.
2.2 Water service shall be maintained throughout construction.
2.3 Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:
2.3.1 Notify Contracting Officer not less than two days in advance of proposed utility interruptions.
2.3.2 Hours for Utility Shutdowns: Shut downs shall not exceed 2 to 3 hours. Temporary provisions will be needed by the Contractor for periods longer than stated allowance.
ITEM 3 - CONTRACTOR’S USE OF PREMISES
3.1 Conduct of Operations: At all times the contractor shall conduct his operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the Park Superintendent.
A. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.
B. Smoking is not permitted within any Federal building or within 25 feet of entrances, operable windows, or outdoor air intakes.
C. Pubic Use of Site: Contractor shall at all times conduct operations to ensure the least inconvenience to the public and NPS staff as required to perform their day to day operations.
3.2 On-site work hours: Work shall be generally performed during normal business working hours of 8 a.m. to 5 p.m., Monday through Friday, except when otherwise indicated.
A. Work on Saturdays, Sundays, Federal holidays, early morning, or at night may not be performed without prior consent from the Contracting Officer. Submit requests for work outside of the stated normal business hours to the Contracting Officer for approval at least 48 hours in advance of the work.
3.3 Contractor Use of Site:
A. General: Contractor shall have limited use of the site for construction operations. Limit use of premises to (See Referenced Images). Do not disturb portions of Project site beyond areas in which the Work is indicated.
B. Limits:
1. All parking shall be confined to areas not interfering with public and staff.
2. Trash and debris shall be collected and secured on site until it is removed.
3. Daily sweeps to be made around active areas of work and site to ensure no debris remains that can potentially cause injury to personnel or damage to a vehicle.
4. Coordinate schedules and placement of equipment with COR.
C. Driveways and Entrances: Keep driveways, access roads, and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize use of driveways and entrances.
D. Limit site disturbance to areas immediately adjacent to areas of work. Any areas disturbed or damaged will be repaired by the contractor.
E. Security and Protection facilities installation:
1. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.
2. Cleaning of Equipment: The Contractor shall ensure that prior to moving on to the Project Area, all equipment, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Ensure that all equipment has been pressure washed and is free of exotic species prior to start-up of operations and moving of equipment to Project Area. Equipment shall be considered free of soil, seeds, and other debris when a visual inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools are not required.
3. Pest Control: Follow NPS requirements and practices to minimize attraction and harboring of rodents, roaches, and other pests and to perform extermination and control procedures at regular intervals so Project will be free of pests and their residues at Final Completion. Perform control operations lawfully, using environmentally safe materials.
4. Temporary Enclosures: Provide temporary enclosures for protection of construction, in progress and completed, from exposure, foul weather, other construction operations, and similar activities. Provide temporary weathertight enclosure for building exterior.
3.4 Storage - Staging Areas:
A. Confine Storage of materials and equipment to the project area [See Photos]. Area around each facility will be available for placement of dumpster for demolition and placement of new materials for construction. Limits of use and control shall be subject to Contracting Officer’s approval. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site. Coordinate schedule and final placement of all materials with COR as needed for construction.
3.5 Preservation of Natural Features: N/A
3.6 Hauling Restrictions: https://sdtruckinfo.sd.gov/
3.7 Housekeeping:
A. Keep project neat, orderly, and in a safe condition at all times. Store and use equipment, tools, and materials in a manner that does not present a hazard. Immediately remove all hazardous rubbish. Do not allow rubbish to accumulate. Provide onsite containers for collection of rubbish and dispose of it at frequent intervals during progress of work.
B. Contractor to furnish dumpsters on site to dispose of waste materials legally.
C. Recycle materials to the furthest extent possible.
3.8 Occupancy Requirements for Buildings:
A. Existing Buildings:
1. Full Government Occupancy: Government will occupy buildings that will be under construction during the entire contract period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's day-to-day operations. Maintain existing exits, unless otherwise indicated.
a. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the CO.
b. Maintain existing building in a weather tight condition throughout construction period. Repair damage caused by construction operations. Protect building and its occupants during construction period.
3.9 Photo Documentation:
All photos shall be in focus, show maximum range of depth of field general photo and then close up detail photo as needed. Shall be in JPEG digital form and submitted via CD-R Archival Gold or DVD-R Archival Gold media with printed labels and 8 mega pixels minimum within 7 days from time of taken or as approved by COR.
A. Existing Condition Images: Before starting construction, take color, dated, digital images of project site and adjacent property/roads/etc. that may be impacted by construction activity/traffic.
Include existing items to remain or be salvaged from different vantage points and with context for location identification.
B. Construction Images:
1. Maintain organized index for photos with date, description, etc..
2. Additional images as needed when questions or emergency situations occur. Submit within 24 hours.
3.10 Fire and Life Safety:
As a minimum, conduct one weekly 15-minute "toolbox" safety meetings. These meetings shall be conducted by a foreman or supervisor and attended by all construction personnel at the worksite. Topics need to coincide with work scheduled for the following week. Document and submit meeting minutes to the Contracting Officer within one day after the meeting.
a. Comply with the requirements of NFPA 241 (Standard for Safeguarding Construction, Alteration, and Demolition Operations).
b. Store and handle hazardous materials in accordance with manufacturer’s and OSHA 29CFR1926 Subpart D requirements. Maintain readily available, on site, MSDS/Safety Data Sheets (SDS) for each chemical.
i. Immediately report all spills of hazardous materials to the park.
ii. Maintain a spill emergency response kit.
iii. Train employees how to respond to a spill and use the emergency response kit.
3.11 Noise and Acoustics Management:
A. Noise Control: Perform demolition and re-roof operations to minimize noise. Perform noise-producing work in less sensitive hours of the day or week as directed by the Contracting Officer.
B. Repetitive and/or intermittent, high-level noise: Permitted only during Daytime.
1. Do not exceed the following dB(A) limitations at 50 feet:
Sound Level in dB(A) Time Duration of Impact Noise 70 More than 12 minutes in any hour 80 More than 3 minutes in any hour
2. Maximum permissible construction equipment noise levels at 50 feet:
EARTHMOVING dB(A) MATERIALS HANDLING dB(A) Compressors 75 Pneumatic Tools 80 Pumps 75 Saws 75 Generators 75 Vibrators 75
C. Ambient Noise:
1. Maximum noise levels (dB) for receiving noise area at property line shall be as follows:
a. Residential receiving area :
Daytime: 65 dB Nighttime: 45 dB
b. Commercial/Industrial receiving area:
Daytime: 67 dB Nighttime: 65 dB
ITEM 4 - COMMENCEMENT, PROSECUTION, AND COMPLETION
4.1 The Contractor shall commence work in accordance with the terms and conditions of the contract.
(Block 11 of the SF 1442 or relevant section of the award document)
ITEM 5 - EXAMINATION OF THE SITE
5.1 All bidders are urged to visit the job site and examine existing conditions before submitting bids. All bidders will be held to have the same knowledge concerning the site and the on ground conditions as if they had inspected the job site. No change orders will be approved for work obvious during a site visit.
Please see FAR 52.236-27 - Site Visit (Construction).
ITEM 6 - ABBREVIATIONS
6.1 The list of abbreviations, which may be used in the Construction Specifications or Special Provisions, refer to the organizations and specifications of the organizations may be found at the below https://www.nps.gov/orgs/1671/do-business-with-us.htm
ITEM 7 - ACCIDENT PREVENTION
7.1 Description: The work of this section consists of establishing and implementing an effective accident prevention program and providing a safe environment for all personnel and visitors.
A. It is the Contractor's responsibility to require all those working on or visiting the site to wear hard hats and other necessary personal protective equipment in good repair at all times. As a minimum, maintain four hard hats and all other APP required equipment.
7.2 Submittals:
A. Accident Prevention Program: At the preconstruction conference submit for approval an accident prevention program. The program shall include:
1. Name of responsible supervisor to carry out the program
2. First aid procedures
3. Training, both initial and continuing
4. Planning for possible emergency situations
5. Contractor to identify nearest location of medical facility for emergencies
6. Recognition that work will be performed in remote areas with limited communication or cell phone coverage
B. Meeting and Inspection Reports: Safety Meetings: As a minimum, conduct 15 minute
"toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite. Submit a report of safety meetings and inspections.
The Contractor shall document the “toolbox” meetings through the daily logs.
7.3 Qualification of Employees:
A. Ensure that employees are physically qualified to perform their assigned duties in a safe manner to include operators of vehicles and equipment. .Provide operating instructions for all equipment. .
B. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.
https://www.nps.gov/orgs/1671/do-business-with-us.htm
7.4 Accident Reporting: The Contractor shall report all accidents to the Contracting Officer or designee as soon as possible and assist the Contracting Officer and other officials as required in the investigation of the accident.
7.5 First Aid Facilities: Provide adequate facilities for the number of employees and the type of construction at the site.
7.6 Emergency Instructions: Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.
7.7 Protective Equipment: It is the Contractor's responsibility to require all those working on or visiting the site to wear necessary protective equipment at all times.
7.8 Hazardous Materials: It shall be the responsibility of all operators and contractors, functioning within the park to properly cleanup, mitigate and remediate if necessary, all unauthorized discharges of hazardous materials or non-hazardous chemical and biological products released from fleet and/or other support vehicles or stationary sources. Response shall be consistent with guidelines established by federal, state and local regulations, and as outlined within the operator's Safety or Hazardous Materials Business Plan.
A. If a spill, leak or other release occurs, the operator shall as soon as possible, without impeding cleanup, notify the National Park Service Emergency Dispatch.
ITEM 8 - PRECONSTRUCTION CONFERENCE: See FAR 52.236-26
ITEM 9 - SUBMITTALS
9.1 General Submittal Procedures:
A. General: Prepare and submit submittals required by individual Specification Sections. Types of submittals are indicated in individual specific sections.
1. CM-16 Transmittal Form: All submittals shall be transmitted via electronic email using
National Park Service form CM-16 form. The form will be provided by the Contracting Officer. No action will be taken on a submittal item unless accompanied by the CM-16 transmittal form and submitted to the Contracting Officer for review and approval.
B. Submittal List: A submittal list has been attached to the end of this Specification Section. The intent is to provide an overall summary of submittal requirements and not a comprehensive list. The requirements of the individual Specification Sections, terms and conditions of the Contract still apply regardless of what is shown on the submittal list.
C. Preconstruction Conference Submittal: The following items shall be submitted within 14 calendar days after award. If all of these documents have not been received within 14 days, the Notice to Proceed cannot be issued, and the Contracting Officer will consider other contractual remedies. Work shall not commence until written Notice to Proceed has been issued:
1. Letter designating Project Superintendent.
2. Construction Schedule.
3. A comprehensive breakdown of the Schedule of Values.
4. Accident Prevention Plan (see section 7 of this document).
5. A list of Subcontractors for this project.
6. Written statements from subcontractors certifying compliance with applicable labor standard clauses (SF1413).
7. Satisfactory evidence of liability insurance coverage and workman’s compensation for the
Contactor and all subcontractors.
8. Waste Management Plan.
9. Quality Control Plan.
10. Historic Preservation Treatment Plan.
9.2 Shop Drawings, Product Data, and Samples: Contracting Officer will provide sample cover sheet.
A. Shop Drawings: Indicate window systems, and installation details.
1. Submit Shop Drawings according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and two full size hardcopy documents to COR.
B. Product Data: Provide component construction, anchorage method, hardware, etc.
1. Submit Product Data according to Part 9.1 of this section to include one digital file (.PDF or .TIF) to COR.
C. Samples: Submit 2 samples 4” x 6” in size of actual window films.
1. Submit Samples CM-16 Transmittal Form according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and physical samples of actual material to COR.
D. For submittals specified above, forward submittals to Contracting Officer at least 15 days before need for approval (depends on length of project).
E. After approving submittals, Contracting Officer will return one copy to the Contractor. If submittals are not approved, Contracting Officer will return all copies to Contractor with reasons for rejection. Resubmit, identifying changes. Any work done before approval shall be at Contractor's own risk.
9.3 Approved Equals: Refer to FAR 52.211-6 - If an item in this solicitation is identified as “brand name or equal” or lists more than 3 manufacturers, the purchase description reflects the characteristics and level of quality that will satisfy the Government’s needs. The salient physical, functional, or performance characteristics that “equal” products must meet are specified in the solicitation or relevant specification.
A. For each item proposed as an “approved equal,” submit supporting data, including:
1. Drawings and samples as appropriate.
2. Comparison of the characteristics of the proposed item with that specified.
3. Changes required in other elements of the work because of the substitution.
4. Name, address, and telephone number of vendor.
5. Manufacturer’s literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists. Describe availability of maintenance service, and state source of replacement materials.
B. A request for approval constitutes a representation that Contractor:
1. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.
2. Will provide the same warranties for the proposed item as for the item specified.
3. Has determined that the proposed item is compatible with interfacing items.
4. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.
5. Waives all claims for additional expenses that may be incurred as a result of the substitution.
C. Approved Equals will be evaluated and approved/disapproved during the submittal process.
9.4 Progress Schedules: As soon as possible after Notice of Award and before beginning any work, submit Progress Schedule. Contracting Officer will review the Progress Schedule for format and content.
Submit four copies of Progress Schedule (normally in bar chart form) showing estimated starting and completion dates for each part of the work. The first progress payment will not be issued until an acceptable progress schedule is submitted. The following information must accompany submission of progress schedules prior to processing any pay application:
A. Daily/weekly progress reports during construction as part of the administration process.
B. Schedule of Values: Breakdown each lump-sum item into component work activities used in the schedule, for which progress payments may be requested. The Schedule of Values will form the basis for payment. The work activities broken out within the schedule of values shall be integrated into and made a logical part of the construction baseline schedule submitted under this specification. The total costs for the component work activities shall equal the contract price for that lump-sum item. The Contracting Officer may request data to verify accuracy of dollar values.
A sample Schedule of Values will be provided by the Contracting Officer.
ITEM 10 – TEMPORARY SERVICES
10.1 Description: The work of this section consists of providing temporary services required for Contractor's performance of the work of this Contract.
10.2 Fire Prevention and Protection:
A. Hazard Control: Take all necessary precautions to prevent fire during construction. Provide adequate ventilation during use of volatile or noxious substances.
ITEM 11 - PROJECT CLOSEOUT
11.1 Description: The work of this section consists of final cleanup, closeout submittals, final inspection procedures, and safety precautions.
11.2 Cleaning: Remove all tools, equipment, surplus materials, and rubbish. At time of final inspection, project shall be thoroughly clean and ready for use.
11.3 Final Inspection: Final inspection must be requested to the Contracting Officer in writing. The Contracting Officer or designee will make an inspection within 10 days of receipt of request or at a mutually agreeable time. Contracting Officer will immediately notify Contractor in writing if the work is not completed, stating the specific reasons. Contractor shall complete any Punch List items within 30 calendar days, documented weather permitting. The Contracting Officer will issue Letter of Final Acceptance upon final completion. If the Contractor fails to complete the work within the time frame, the Contracting Officer may correct the work with an appropriate reduction in contract price or charge for re-inspection costs in accordance with the Inspection of Construction contract clause.
11.4 Acceptance of the Work: After all deficiencies have been corrected, a Letter of Acceptance will be issued. A Release of Claims document must be executed and submitted to the Contracting Officer before final payment can occur.
11.5 Warranties
A. Construction Warranty shall be based on date of Completion.
B. Provide All Warranty information of products installed organized by Division. All contact information, extents and conditions shall be clearly noted as well as date of overall project Completion.
C. Information shall include operation and maintenance manuals for each warranted material.
PART 2 – PRODUCTS (NOT USED)
PART 3 – EXCUTION (NOT USED)
END OF SECTION
SECTION 08 52 00
WOOD WINDOWS
PART 2 - GENERAL
2.1 SUMMARY
A. Section includes aluminum-clad wood windows.
2.2 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
2.3 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Shop Drawings: Include plans, elevations, sections, hardware, accessories, insect screens, operational clearances, and details of installation, including anchor, flashing, and sealant installation.
C. Samples: For each exposed product and for each color specified.
2.4 INFORMATIONAL SUBMITTALS
A. Product test reports.
B. Sample warranties.
2.5 WARRANTY
A. Manufacturer’s Warranty: Manufacturer agrees to repair or replace windows that fail in materials or workmanship within specified warranty period.
1. Warranty Period:
a. Window: 10 years from date of Completion.
b. Glazing Units: 10 years from date of Completion.
c. Aluminum-Cladding Finish: 10 years from date of Completion.
PART 3 - PRODUCTS
3.1 WINDOW PERFORMANCE REQUIREMENTS
A. Product Standard: Comply with AAMA/WDMA/CSA 101/I.S.2/A440 for definitions and minimum standards of performance, materials, components, accessories, and fabrication unless more stringent requirements are indicated.
1. Window Certification: WDMA certified with label attached to each window.
B. Performance Class and Grade: AAMA/WDMA/CSA 101/I.S.2/A440 as follows:
1. Minimum Performance Class: R.
2. Minimum Performance Grade: 15.
C. Thermal Transmittance: NFRC 100 maximum whole-window U-factor of 0.30 BTU/sq. ft. x h x deg F.
D. Solar Heat-Gain Coefficient (SHGC): NFRC 200 maximum whole-window SHGC of 0.32.
3.2 ALUMINUM-CLAD WOOD WINDOWS
A. Acceptable Manufacturers
1. Pella
2. Andersen Corp.
3. Jeld-Wen
4. Other approved equals.
B. Operating Types: Contractor to field verify and match existing operating types as indicated on
Drawings.
C. Frames and Sashes: Fine-grained wood lumber complying with AAMA/WDMA/CSA 101/I.S.2/A440; kiln dried to a moisture content of not more than 12 percent at a time of fabrication; free of visible finger joints, blue stain, knots, pitch pockets, and surface checks larger than 1/32 inch deep by 2 inches wide; water-repellent preservative treated.
1. Exterior Finish – Aluminum-Clad Wood
a. Aluminum Finish: Manufacturer’s standard baked-on enamel finish.
b. Color: White, to match existing. Sample must be selected and approved by COR from manufacturer’s full range.
2. Interior Finish: Match existing.
a. Exposed Unfinished Wood Species: [Manufacturer’s standard species].
b. Color: As selected by COR from manufacturer’s full range.
D. Insulating-Glass Units: ASTM E2190.
1. Glass: ASTM C1036, Type 1, Class 1, q3.
a. Tint: Clear.
b. Kind: Fully tempered.
2. Lites: Two.
3. Filling: Fill space between glass lites with air.
4. Low-E Coating: Pyrolytic or sputtered on second surface.
E. Glazing System: Manufacturer’s standard factory-glazing system that produces weathertight seal.
F. Hardware, General: Provide manufacturer’s standard corrosion-resistant hardware sized to accommodate sash weight and dimensions.
1. Exposed Hardware Color and Finish: As selected by COR from manufacturer’s full range.
G. Projected Window Hardware:
1. Gear-Type Rotary Operators: Complying with AAMA 901 when tested according to ASTM E405, Method A. Provide operators that function without requiring the removal of interior screens or using screen wickets.
a. Type and Style: Match existing quarters’ type and style. Final approval as selected by COR from manufacturer’s full range of types and styles.
2. Hinges: Manufacturer’s standard type for sash weight and size indicated.
3. Single-Handle Locking System: Operates positive-acting arms that pull sash into locked position. Provide one arm on sashes up to 29 inches tall and two arms on taller sashes.
H. Hung Window Hardware:
1. Counterbalancing Mechanism: AAMA 902.
2. Locks and Latches: Operated from the inside only.
3. Tilt Hardware: Releasing tilt latch allows sash to pivot about horizontal axis.
I. Weather Stripping: Provide full-perimeter weather stripping for each operable sash unless otherwise indicated.
J. Fasteners: Non-corrosive and compatible with window members, trim, hardware, anchors, and other components.
1. Exposed Fasteners: Do not use exposed fasteners to greatest extent possible. For application of hardware, use fasteners that match finish hardware being fastened.
3.3 ACCESSORIES:
A. Dividers Do not use Dividers/False Muntins on windows in this project.
3.4 INSECT SCREENS AND STORM WINDOWS
A. General: Fabricate insect screens and storm windows to integrate with window frame to match appearance of existing. Screen wickets are not permitted.
1. Type and Location: Full, outside for double-hung.
B. Aluminum Frames: Complying with SMA 1004 or SMA 1201, Color: White.
1. Finish for Exterior Screens: Matching color of existing (metal/gray).
C. Metal Mesh Fabric: 20-by-20 or 20-by-30 mesh; woven and fused to form a fabric mesh resistant to corrosion, shrinkage, stretch, impact damage, and weather deterioration. Comply with ASTM D3656/D3656M.
1. Mesh Color: Manufacturer’s standard.
3.5 FABRICATION
A. Contractor to field verify all existing window openings, operable types, and dimensions for new aluminum-clad wood windows to match salient characteristics and appearance of neighboring rehabilitated quarters as identified by COR.
B. Fabricate wood windows in sizes indicated. Include a complete system for installing and anchoring windows.
C. Glaze windows in the factory.
D. Weather strip each operable sash to provide weathertight installation.
E. Mullions: Provide mullions and cover plates, compatible with window units, complete with anchors for support to structure and installation of window units. Allow for erection tolerances and provide for movement of window units due to thermal expansion and building deflections.
Provide mullions and cover plates capable of withstanding design wind loads of window units.
Provide manufacturer’s standard finish to match window units.
F. Complete fabrication, assembly, finishing, hardware application, and other work in the factor to greatest extent possible. Disassemble components only as necessary for shipment and installation.
Allow for scribing, trimming, and fitting at Project site.
PART 4 - EXECUTION
4.1 INSTALLATION
A. Comply with manufacturer's written instructions for installing windows, hardware, accessories, and other components. For installation procedures and requirements not addressed in manufacturer's written instructions, comply with installation requirements in ASTM E2112.
B. Install windows level, plumb, square, true to line, without distortion, anchored securely in place to structural support, and in proper relation to wall flashing and other adjacent construction to produce weathertight construction.
C. Adjust operating sashes and hardware for a tight fit at contact points and weather stripping for smooth operation and weathertight closure.
D. Clean exposed surfaces immediately after installing windows. Remove excess sealants, glazing materials, dirt, and other substances.
E. Remove and replace sashes if glass has been broken, chipped, cracked, abraded, or damaged during construction period.
END OF SECTION
Pictures and Reference Images
1. Area Map
2. Delta-01 Enlarged Area Map
3. Delta-01 Site Plan
4. Delta-01 Viewed From I-90
5. Window Sizes
6. East Elevation
7. South Elevation
8. North Elevation
9. Existing Exterior Windows Conditions
10. Existing Interior Window Conditions
11. Existing Interior Window Conditions With Blackout Paint
12. Record Floor Plans for Reference (Not to Scale)
13. Record Elevations for Reference (Not to Scale)
14. Record Sections for Reference (Not to Scale)
15. Record Window Sections for Reference (Not to Scale)