B09_Solicitation_Amendments_Atch_1_Q_and_A_Document_0001.pdf
PDF 96 KB Posted
- Attached to
- REPLACE WINDOWS AND STORM WINDOWS ON D1 Federal contract opportunity
- Solicitation number
- 140P6321Q0037
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P6321Q0037_Amd_0001.pdf | ||
| B08 Solicitation_Atch 3_RFI Form.docx | DOCX document | |
| B08 Solicitation_Atch 7_DI-137 Release of Claims.pdf | ||
| B08 Solicitation_Atch 5_Payroll Form_DOL_WH_347_7_14_06.pdf | ||
| B08 Solicitation_Atch 6_Statement and Acknowledgement_SF 1413.pdf | ||
| B08 Solicitation_Atch 1_Specifications.pdf | ||
| B08 Solicitation_Atch 2_DOL Wage Determination.pdf | ||
| B08 Solicitation_Atch 8_Experience Questionnaire.xls | XLS spreadsheet | |
| B08 Solicitation_Atch 4_Submittal Form CM16.doc | DOC document | |
| Sol_140P6321Q0037.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions & Answers Replace Windows at Delta 01 Launch Control Facility
Minuteman Missile National Historic Site Solicitation No. 140P6321Q0037 – Amendment 1
A site visits was conducted on 6/9/2021. The following questions were generated during the solicitation phase. The questions and responses are incorporated into the solicitation and resulting contract.
QUESTIONS & ANSWERS:
Ref Question Response 1 Will NPS provide restroom facilities for contractors and subcontractors?
The public restrooms will be closed during contract performance.
The contractor is responsible to provide portable toilets.
2 Is it acceptable to replace insert windows or will these be full tear out and replacement? If full removal is there a limitation on the time allowed for window to be removed prior to new window being installed or can contractor temporary close the opening?
It is acceptable to replace window inserts provided they meet the stated specifications in the solicitation documents. Temporary openings must be sealed to prevent rain, insects, etc. from entering the structure.
3 Do the storm windows have to be from the same manufacture as the replacement windows? Pella Windows indicated they can provide and meet the specifications on the windows just not the storm windows.
The storm windows do not need to be from the same manufacture provided they meet the specifications in the scope of work.
4 NPS indicated that the government will be responsible to remove, store, and reinstall window shades and treatments. Please confirm.
Correct. The specifications, paragraph 1.2 B is changed as follows:
The last 2 sentences of paragraph 1.2 B are deleted and replaced.
DELETED: “Contractor to remove and reinstall existing blinds to install new windows. Document initial and final condition of blinds with COR, any damage to blinds during construction will be the contractor’s responsibility.”
REPLACED WITH: “NPS is responsible to remove all window coverings for proper storage prior to the contractor performing work inside the structure.”
5 Who is responsible to move furniture, etc. to access windows?
NPS will move furniture and other items not permanently installed.