B08_-_Solicitation_140P6222R0004_Attachment_1_Specifications.pdf

PDF 4 MB Posted

Attached to
HVAC System Replacement - Visitor Center Building Federal contract opportunity
Solicitation number
140P6222R0004
Issued by
Department of the Interior National Park Service Midwest Region

About this file

This solicitation is for an HVAC system replacement project at the Lincoln Home National Historic Site Visitor Center in Springfield, Illinois. The project includes removing the existing HVAC system, which includes an aging chiller unit and air handlers, and replacing it with a new high-efficiency chiller, electric steam humidifiers, air handlers with economizers, chilled and heating water pumps, boilers, and a direct digital control system. The contractor will be selected using full and open competition procedures. The performance period is approximately 200 calendar days from notice to proceed. The contractor must complete construction within 60 days of material delivery and 60 additional days on site for installation.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LINCOLN HOME NATIONAL HISTORIC SITE

VISITORS CENTER

413 S 8th St, Springfield, IL 62701

HVAC SYSTEM REPLACEMENT

PMIS 219488

PROJECT SPECIFICATIONS

NATIONAL PARK SERVICE

08/03/2021

140P6222R0004 Attachment 1 Page 1 of 256

TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

Section 01 10 00 - Division 01 Short Form General Requirements

DIVISION 22 - PLUMBING

Section 22 05 19 - METERS AND GAGES FOR PLUMBING PIPING

Section 22 05 23.12 BALL VALVES FOR PLUMBING PIPING

Section 22 05 23.14 CHECK VALVES FOR PLUMBING PIPING

Section 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

Section 22 05 53 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

Section 22 07 19 PLUMBING PIPING INSULATION

Section 22 11 16 DOMESTIC WATER PIPING

Section 22 11 19 DOMESTIC WATER PIPING SPECIALTIES

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

Section 23 05 17 SLEEVES AND SLEEVE SEALS FOR HVAC PIPING

Section 23 05 18 ESCUTCHEONS FOR HVAC PIPING

Section 23 05 19 METERS AND GAGES FOR HVAC PIPING

Section 23 05 23 VALVES FOR HVAC PIPING

Section 23 05 29 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

Section 23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

Section 23 07 13 DUCT INSULATION

Section 23 07 19 HVAC PIPING INSULATION

Section 23 09 23 DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC

Section 23 11 26 FACILITY LIQUEFIED-PETROLEUM GAS PIPING

Section 23 21 13 HYDRONIC PIPING

Section 23 21 16 HYDRONIC PIPING SPECIALTIES

Section 23 21 23 HYDRONIC PUMPS

Section 23 23 00 REFRIGERANT PIPING

140P6222R0004 Attachment 1 Page 2 of 256

Section 23 52 16 CONDENSING BOILERS

Section 23 64 23 AIR-COOLED, SCROLL WATER CHILLERS

Section 23 82 19 FAN COIL UNITS

Section 23 82 39 PROPELLER UNIT HEATERS

DIVISION 26 - ELECTRICAL

Section 26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

Section 26 05 33 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS

Section 26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS

Section 26 28 16 ENCLOSED SWITCHES AND CIRCUIT BREAKERS

DRAWINGS

0 - COVER SHEET

G1 – GENERAL NOTES / LEGEND / ABBREVIATIONS

MD1 – MECHINAL DEMOLITION FLOOR PLAN

M1 – MECHANICAL FLOOR PLAN

M2 – HVAC PIPING PLAN

M3 – SCHEDULES

M4 – SCHEDULES AND DETAILS

M5 – DETAILS

M6 – BOILER/WATER HEATER PIPING ISOMETRIC

M7 – CONTROL DIAGRAMS

ED1 – ELECTRICAL DEMOLITION FLOOR PLAN

E1 – ELECTRICAL FLOOR PLAN

E2 – ELECTRICAL PANEL INFORMATION

140P6222R0004 Attachment 1 Page 3 of 256

SECTION 01 10 00

PART 1 – GENERAL

ITEM 1 - DESCRIPTION OF WORK

1.1 Background: This project consists of replacing the HVAC and control system in the Lincoln Home Visitor Center. The current HVAC system is old and inefficient. The chiller is seventeen+ years old and has reached the end of its life cycle. Constant repairs are being made to the chiller and condenser, as well as the pumps. The air handlers and evaporator coils are the original units that were installed in the 1970’s. The current coils are deteriorating. The controls, mixing valves and dampers are all pneumatic with numerous leaks, causing the air compressor to run more frequently than designed.

1.2 Work Covered by the Contract Documents:

A. Project Location: Lincoln Home National Historic Site, 413 S 8th St, Springfield, IL 62701.

B. Work consists of: The old HVAC system will be removed and replaced with a completely new HVAC system including: a new 30 ton high efficiency chiller unit, three electric steam humidifiers, three air handlers with economizers, 2 chilled water pumps, 2 heating water pumps, all new chilled and heating water piping. The existing boiler will be replaced with a high efficiency boiler and 2 high efficiency combo boiler/domestic hot water heaters. A direct digital control system will be installed to control the new HVAC system.

C. All work will be performed under a single contract.

D. Period of performance: Work shall be completed within approximately 200 calendar days after notice to proceed issuance. 60 days for shop drawings, material delivery as verified with manufacture material suppliers, and 60 days on site for active installation of the new system to substantial completion (POP is inclusive of 6 weather days), 7 days for final completion. Work on site shall not commence until critical equipment and materials required to complete the work are in the Contractor’s possession in order to minimize period of incactivity to the project’s progress once commencing. The Contractor shall obtain the CO’s written approval to proceed with active removals and construction within the Visitor Center upon confirmation that critical equipment and materials have been physically received.

a. The Contractor is expected to commence and remain actively progressing with the project work once issued the Notice to Proceed. The Period of Performance 200 calendar days are intended to account for extended equipment and material lead times to delivery and Contractor monitoring the seasonal winter weather forecasting to attempt to minimize periods of severe cold during active installation when the HVAC system is disconnected and temporary heating and protecting infrastructure is required (see Part

3.8 B of this document for temporary climate control requirements.) These two occurrences are recognized to be largely outside the control of the Contractor or NPS and therefore incorporated into the extended duration of the Period of Performance noted. The Contractor shall provide all reasonable efforts to commence and complete the project in the most efficient timeframe possible to the duration of disruption of HVAC service to the Visitor Center facility.

ITEM 2 - EXISTING UTILITIES

2.1 Existing Utilities: Notify Contracting Officer and utility companies of proposed locations and times for excavation.

140P6222R0004 Attachment 1 Page 4 of 256

2.2 Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.

2.3 Water service shall be maintained throughout construction.

2.4 Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:

2.4.1 Notify Contracting Officer not less than two days in advance of proposed utility interruptions.

2.4.2 Hours for Utility Shutdowns: Shut downs shall not exceed 2 to 3 hours. Temporary provisions will be needed by the Contractor for periods longer than stated allowance.

ITEM 3 - CONTRACTOR’S USE OF PREMISES

3.1 Conduct of Operations: At all times the contractor shall conduct his operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the Park Superintendent.

A. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.

B. Smoking is not permitted within any Federal building or within 25 feet of entrances, operable windows, or outdoor air intakes.

C. Public Use of Site: Contractor shall at all times conduct operations to ensure the least inconvenience to the public.

3.2 On-site work hours: Work shall be generally performed during normal business working hours of 8 a.m. to 5 p.m., Monday through Friday, except when otherwise indicated.

A. Work on Saturdays, Sundays, Federal holidays, early morning, or at night may not be performed without prior consent from the Contracting Officer. Submit requests for work outside of the stated normal business hours to the Contracting Officer for approval at least 48 hours in advance of the work.

3.3 Contractor Use of Site:

A. General: Contractor shall have limited use of the site for construction operations. Limit use of premises to.

Do not disturb portions of Project site beyond areas in which the Work is indicated.

B. Driveways and Entrances: Keep driveways, access roads, and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize use of driveways and entrances.

C. Security and Protection facilities installation:

1. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.

2. Cleaning of Equipment: The Contractor shall ensure that prior to moving on to the Project Area, all equipment, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds.

Ensure that all equipment has been pressure washed and is free of exotic species prior to start-up of operations and moving of equipment to Project Area. Equipment shall be considered free of soil, seeds, 140P6222R0004 Attachment 1 Page 5 of 256 and other debris when a visual inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools are not required.

3. Tree and Plant Protection: Provide Tree Protection fence at drip line of trees impacted in construction area. Coordinate with COR.

4. Pest Control: Follow NPS requirements and practices to minimize attraction and harboring of rodents, roaches, and other pests and to perform extermination and control procedures at regular intervals so Project will be free of pests and their residues at Substantial Completion. Perform control operations lawfully, using environmentally safe materials.

5. Site Enclosure Fence: Before construction operations begin, furnish and install portable chain link fencing in a manner that will prevent people and animals from easily entering site and or storage areas except by entrance gates.

a. Extent of Fence: As required to enclose portion determined sufficient to accommodate construction operations and storage

b. Locate vehicular gates to avoid interference with traffic on public thoroughfares.

c. Locate pedestrian entrance gates as required to provide controlled personnel entry.

d. Maintain security by limiting number of keys and restricting distribution to authorized personnel. Provide Contracting Officer with one set of keys.

6. Security Enclosure and Lockup: Install substantial temporary enclosure around partially completed areas of construction. Provide lockable entrances to prevent unauthorized entrance, vandalism, theft, and similar violations of security.

7. Temporary Enclosures: Provide temporary enclosures for protection of construction, in progress and completed, from exposure, foul weather, other construction operations, and similar activities. Provide temporary weathertight enclosure for building exterior.

3.4 Storage - Staging Areas:

A. Confine Storage of materials and equipment to the project area (Reference a plan showing project and allowable construction area ). One bay and the parking lot will be available for storage. Limits of use and control shall be subject to Contracting Officer’s approval. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

3.5 Preservation of Natural Features: N/A

3.6 Hauling Restrictions: Match State and County road requirements for all park work/access.

3.7 Housekeeping:

A. Keep project neat, orderly, and in a safe condition at all times. Store and use equipment, tools, and materials in a manner that does not present a hazard. Immediately remove all hazardous rubbish. Do not allow rubbish to accumulate. Provide onsite containers for collection of rubbish and dispose of it at frequent intervals during progress of work.

B. Dispose of waste and recycled materials legally. Contractor shall not use park dumpsters.

C. Address Recycling

3.8 Occupancy Requirements for Buildings:

A. Existing Buildings:

140P6222R0004 Attachment 1 Page 6 of 256

1. Full Government Occupancy: Government will occupy buildings that will be under construction during the entire contract period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's day-to-day operations. Maintain existing exits, unless otherwise indicated.

a. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the CO.

b. Maintain existing building in a weather tight condition throughout construction period. Repair damage caused by construction operations. Protect building and its occupants during construction period.

B. Temporary Climate Control Equipment:

1. The Contractor shall be responsible for providing any necessary temporary heating equipment and protection of Visitor Center infrastructure (including but not limited domestic water piping and fire suppression piping) by methods approved by the CO. This may include electric space heaters, insulative covers and sleeves, or methods as proposed by the Contractor and approved by the CO.

2. The Contractor shall be allowed to utilize NPS electricity solely for temporary heading measures at no cost to the Contractor. The Contractor shall verify with the CO/COR that their proposed methods are within the electrical capacities of the Visitor Center facility to avoid a disruption or damage to existing utility and retain daily Visitor Center operations. The Contractor shall be required to implement measures that do not create a fire hazard, overload the facility’s electrical system, or employ methods that subject equipment to function outside of its intended use as per the manufacturer. Equipment employed for providing temporary climate control (heating) shall be in proper working order. The CO/COR reserves the right to reject and require removal of any equipment that is not in proper functioning order. The CO/COR retains the right to require the Contractor to adjust their means and methods of providing temporary heating equipment and insulative measures should measures employed demonstrate insufficiency to providing protection, climate control, and utility infrastrucure operation.

3. The Contractor shall be responsible for monitoring the long range weather forecast, with severe low temperatures specifically monitored and make decisions regarding removal and replacement of HVAC system based on minimizing risk to freezing impacts to the facility infrastructure. The Contractor shall maintain clear communication with the CO/COR as to forecast monitoring and intended scheduling of work progress.

3.9 Photo Documentation:

All photos shall be in focus, show maximum range of depth of field general photo and then close up detail photo as needed. Shall be in JPEG digital form and submitted via CD-R Archival Gold or DVD-R Archival Gold media with printed labels and 8 mega pixels minimum within 7 days from time of taken or as approved by COR.

A. Existing Condition Images: Before starting construction, take color, dated, digital images of project site and adjacent property/roads/etc. that may be impacted by construction activity/traffic. Include existing items to remain or be salvaged from different vantage points and with context for location identification.

B. Construction Images:

1. Document all sub-surface work/ trenches etc. prior to backfill with enough overall field view to show location and then details.

2. Maintain organized index for photos with date, description, etc..

3. Additional images as needed when questions or emergency situations occur. Submit within

24 hours.

3.10 Fire and Life Safety:

140P6222R0004 Attachment 1 Page 7 of 256

As a minimum, conduct one weekly 15-minute "toolbox" safety meetings. These meetings shall be conducted by a foreman or supervisor and attended by all construction personnel at the worksite. Topics need to coincide with work scheduled for the following week. Document and submit meeting minutes to the Contracting Officer within one day after the meeting.

A. Comply with the requirements of NFPA 241 (Standard for Safeguarding Construction, Alteration, and Demolition Operations).

B. Store and handle hazardous materials in accordance with manufacturer’s and OSHA 29CFR1926 Subpart D requirements. Maintain readily available, on site, MSDS/Safety Data Sheets (SDS) for each chemical.

i. Immediately report all spills of hazardous materials to the park.

ii. Maintain a spill emergency response kit.

iii. Train employees how to respond to a spill and use the emergency response kit.

3.11 Noise and Acoustics Management:

A. Noise Control: Perform demolition and re-roof operations to minimize noise. Perform noise-producing work in less sensitive hours of the day or week as directed by the Contracting Officer.

B. Repetitive and/or intermittent, high-level noise: Permitted only during Daytime.

1. Do not exceed the following dB(A) limitations at 50 feet:

Sound Level in dB(A) Time Duration of Impact Noise 70 More than 12 minutes in any hour 80 More than 3 minutes in any hour

2. Maximum permissible construction equipment noise levels at 50 feet:

EARTHMOVING dB(A) MATERIALS HANDLING dB(A) Compressors 75 Pneumatic Tools 80 Pumps 75 Saws 75 Generators 75 Vibrators 75

C. Ambient Noise:

1. Maximum noise levels (dB) for receiving noise area at property line shall be as follows:

a. Residential receiving area : Daytime:

65 dB Nighttime: 45 dB

b. Commercial/Industrial receiving area:

Daytime: 67 dB Nighttime: 65 dB

ITEM 4 - COMMENCEMENT, PROSECUTION, AND COMPLETION

4.1 The Contractor shall commence work in accordance with the terms and conditions of the contract.

ITEM 5 - EXAMINATION OF THE SITE

5.1 All bidders are urged to visit the job site and examine existing conditions before submitting bids. All bidders will be held to have the same knowledge concerning the site and the on ground conditions as if they had inspected the job site. No change orders will be approved for work obvious during a site visit. Please see FAR 52.236-27 - Site Visit (Construction).

ITEM 6 - ABBREVIATIONS

140P6222R0004 Attachment 1 Page 8 of 256

6.1 The list of abbreviations, which may be used in the Construction Specifications or Special Provisions, refer to the organizations and specifications of the organizations may be found at the below location via a link ‘NPS Reference Standards.’ Noted in the ‘Contracting and Procurement’ paragraph.

https://www.nps.gov/orgs/1671/do-business-with-us.htm

ITEM 7 - ACCIDENT PREVENTION

7.1 Description: The work of this section consists of establishing and implementing an effective accident prevention program and providing a safe environment for all personnel and visitors.

A. It is the Contractor's responsibility to require all those working on or visiting the site to wear hard hats and other necessary personal protective equipment in good repair at all times. As a minimum, maintain four hard hats and all other APP required equipment.

7.2 Submittals:

A. Accident Prevention Program: At the preconstruction conference submit for approval an accident prevention program. The program shall include:

1. Name of responsible supervisor to carry out the program

2. First aid procedures

3. Training, both initial and continuing

4. Planning for possible emergency situations

5. Contractor to identify nearest location of medical facility for emergencies

6. Recognition that work will be performed in remote areas with limited communication or cell phone coverage

B. Meeting and Inspection Reports: Safety Meetings: As a minimum, conduct 15 minute "toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite. Submit a report of safety meetings and inspections. The Contractor shall document the “toolbox” meetings through the daily logs.

7.3 Qualification of Employees:

A. Ensure that employees are physically qualified to perform their assigned duties in a safe manner to include operators of vehicles and equipment. .Provide operating instructions for all equipment. .

B. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.

7.4 Accident Reporting: The Contractor shall report all accidents to the Contracting Officer or designee as soon as possible and assist the Contracting Officer and other officials as required in the investigation of the accident.

7.5 First Aid Facilities: Provide adequate facilities for the number of employees and the type of construction at the site.

7.6 Emergency Instructions: Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.

7.7 Protective Equipment: It is the Contractor's responsibility to require all those working on or visiting the site to wear necessary protective equipment at all times.

7.8 Hazardous Materials: It shall be the responsibility of all operators and contractors, functioning within the park to properly cleanup, mitigate and remediate if necessary, all unauthorized discharges of hazardous materials or non-hazardous chemical and biological products released from fleet and/or other support vehicles or stationary

140P6222R0004 Attachment 1 Page 9 of 256 https://www.nps.gov/orgs/1671/do-business-with-us.htm sources. Response shall be consistent with guidelines established by federal, state and local regulations, and as outlined within the operator's Safety or Hazardous Materials Business Plan.

A. If a spill, leak or other release occurs, the operator shall as soon as possible, without impeding cleanup, notify the National Park Service Emergency Dispatch.

ITEM 8 - PRECONSTRUCTION CONFERENCE: See FAR 52.236-26

ITEM 9 - SUBMITTALS

9.1 General Submittal Procedures:

A. General: Prepare and submit submittals required by individual Specification Sections. Types of submittals are indicated in individual specific sections.

1. CM-16 Transmittal Form: All submittals shall be transmitted via electronic email using National

Park Service form CM-16 form. The form will be provided by the Contracting Officer. No action will be taken on a submittal item unless accompanied by the CM-16 transmittal form.

B. Submittal List: A submittal list has been attached to the end of this Specification Section. The intent is to provide an overall summary of submittal requirements and not a comprehensive list. The requirements of the individual Specification Sections, terms and conditions of the Contract still apply regardless of what is shown on the submittal list.

C. Preconstruction Conference Submittal: The following items shall be submitted a minimum of one week prior to the Preconstruction Conference. If all of these documents have not been received one week prior to the scheduled Pre-Construction Conference date, the conference will be cancelled, Notice to Proceed will not be issued, and the Contracting Officer will consider other contractual remedies. Work shall not commence until written Notice to Proceed has been issued. Contracting Officer will notify Contractor of tentative date for the Pre-Construction Conference:

1. Letter designating Project Superintendent.

2. Construction Schedule.

3. A comprehensive breakdown of the Schedule of Values.

4. Accident Prevention Plan (see section 7 of this document).

5. A list of Subcontractors for this project.

6. Written statements from subcontractors certifying compliance with applicable labor standard clauses (SF1413).

7. Satisfactory evidence of liability insurance coverage and workman’s compensation for the

Contactor and all subcontractors.

8. Waste Management Plan.

9. Quality Control Plan.

9.2 Shop Drawings, Product Data, and Samples: Contracting Officer will provide sample cover sheet.

A. Shop Drawings: Indicate mechanical and electrical materials, connection details, anchorage spacing, hardware locations, and installation details.

1. Submit Shop Drawings according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and two full size hardcopy documents to COR.

B. Product Data: Provide component construction, anchorage method, hardware, etc.

1. Submit Product Data according to Part 9.1 of this section to include one digital file (.PDF or .TIF) to COR.

C. For submittals specified above, forward submittals to Contracting Officer at least 15 days before need for approval.

140P6222R0004 Attachment 1 Page 10 of 256

D. After approving submittals, Contracting Officer will return one copy to the Contractor. If submittals are not approved, Contracting Officer will return all copies to Contractor with reasons for rejection. Resubmit, identifying changes. Any work done before approval shall be at Contractor's own risk.

9.3 Approved Equals: Refer to FAR 52.211-6 - If an item in this solicitation is identified as “brand name or equal” or lists more than 3 manufacturers, the purchase description reflects the characteristics and level of quality that will satisfy the Government’s needs. The salient physical, functional, or performance characteristics that “equal” products must meet are specified in the solicitation or relevant specification.

A. For each item proposed as an “approved equal,” submit supporting data, including:

1. Drawings and samples as appropriate.

2. Comparison of the characteristics of the proposed item with that specified.

3. Changes required in other elements of the work because of the substitution.

4. Name, address, and telephone number of vendor.

5. Manufacturer’s literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists. Describe availability of maintenance service, and state source of replacement materials.

B. A request for approval constitutes a representation that Contractor:

1. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.

2. Will provide the same warranties for the proposed item as for the item specified.

3. Has determined that the proposed item is compatible with interfacing items.

4. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.

5. Waives all claims for additional expenses that may be incurred as a result of the substitution.

C. Approved Equals will be evaluated and approved/disapproved during the submittal process.

9.4 Progress Schedules: As soon as possible after Notice to Proceed Issuance and before beginning any work, submit Progress Schedule. Contracting Officer will review the Progress Schedule for format and content. Submit One copies of Progress Schedule (normally in bar chart form) showing estimated starting and completion dates for each part of the work. The first progress payment will not be issued until an acceptable progress schedule is submitted. The following information must accompany submission of progress schedules prior to processing any pay application:

A. Daily/weekly progress reports during construction as part of the administration process.

B. Schedule of Values: Breakdown each lump-sum item into component work activities used in the schedule, for which progress payments may be requested. The Schedule of Values will form the basis for payment. The work activities broken out within the schedule of values shall be integrated into and made a logical part of the construction baseline schedule submitted under this specification. The total costs for the component work activities shall equal the contract price for that lump-sum item. The Contracting Officer may request data to verify accuracy of dollar values. A sample Schedule of Values will be provided by the Contracting Officer.

ITEM 11 - PROJECT CLOSEOUT

11.1 Description: The work of this section consists of final cleanup, closeout submittals, final inspection procedures, and safety precautions.

140P6222R0004 Attachment 1 Page 11 of 256

11.2 Cleaning: Remove all tools, equipment, surplus materials, and rubbish. At time of final inspection, project shall be thoroughly clean and ready for use.

11.3 Substantial Completion and Final Inspection: Submit written certification that project is substantially complete, and a final inspection must be requested to the Contracting Officer in writing. The Contracting Officer or designee will make an inspection within 10 days of receipt of request or at a mutually agreeable time.

A. If the work is determined to be substantially complete, following the final inspection, the. Contracting

Officer will prepare a Punch List and issue a Letter of Substantial Completion.

B. If the work is not determined to be substantially complete following the final inspection, the Contracting

Officer will notify Contractor in writing. Contractor shall request a new final inspection after completing the work. Re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction contract clause.

C. Contractor shall complete the Punch List within 7 calendar days, documented weather permitting.

D. If Contracting Officer determines that the work is not substantially complete; he will immediately notify

Contractor in writing, stating reasons. After completing work, Contractor shall resubmit certification and request a new final inspection. Re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction contract clause.

E. If Contractor completes all items of work on the Punch List and all contractually required items, Contracting Officer will issue Letter of final acceptance of work.

F. If the Contractor fails to complete the work within the time frame, the Contracting Officer may correct the work with an appropriate reduction in contract price or charge for re-inspection costs in accordance with the Inspection of Construction contract clause.

G. Disposition of any permits and warranties required by the specifications in this section.

11.4 Acceptance of the Work: After all deficiencies have been corrected, a Letter of Acceptance will be issued. A Release of Claims document must be executed and submitted to the Contracting Officer before final payment can occur.

11.5 Warranties

A. Construction Warranty shall be based on date of Substantial Completion.

B. Provide All Warranty information of products installed organized by Division. All contact information, extents and conditions shall be clearly noted as well as date of overall project Substantial Completion.

C. Information shall include operation and maintenance manuals for each warranted material.

PART 2 – PRODUCTS (NOT USED)

PART 3 – EXCUTION (NOT USED)

END OF SECTION

140P6222R0004 Attachment 1 Page 12 of 256

140P6222R0004 Attachment 1 Page 13 of 256

SECTION 220519 - METERS AND GAGES FOR PLUMBING PIPING

PART 2 - GENERAL

2.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

2.2 SUMMARY

A. Section Includes:

1. Liquid-in-glass thermometers.

2. Thermowells.

3. Dial-type pressure gages.

4. Gage attachments.

2.3 ACTION SUBMITTALS

A. Product Data: For each type of product.

2.4 INFORMATIONAL SUBMITTALS

A. Product Certificates: For each type of meter and gage.

2.5 CLOSEOUT SUBMITTALS

A. Operation and Maintenance Data: For meters and gages to include in operation and maintenance manuals.

PART 3 - PRODUCTS

3.1 LIQUID-IN-GLASS THERMOMETERS

A. Plastic-Case, Industrial-Style, Liquid-in-Glass Thermometers:

1. Standard: ASME B40.200.

2. Case: Plastic; 9-inch (229-mm) nominal size unless otherwise indicated.

3. Case Form: Adjustable angle unless otherwise indicated.

4. Tube: Glass with magnifying lens and blue or red organic liquid.

5. Tube Background: Nonreflective aluminum with permanently etched scale markings graduated in deg F (deg C).

6. Window: Glass or plastic.

7. Stem: Aluminum, brass, or stainless steel and of length to suit installation.

a. Design for Thermowell Installation: Bare stem.

140P6222R0004 Attachment 1 Page 14 of 256

8. Connector: 1-1/4 inches (32 mm), with ASME B1.1 screw threads.

9. Accuracy: Plus or minus 1 percent of scale range or one scale division, to a maximum of 1.5 percent of scale range.

3.2 THERMOWELLS

A. Thermowells:

1. Standard: ASME B40.200.

2. Description: Pressure-tight, socket-type fitting made for insertion into piping tee fitting.

3. Material for Use with Copper Tubing: CNR or CUNI.

4. Type: Stepped shank unless straight or tapered shank is indicated.

5. External Threads: NPS 1/2, NPS 3/4, or NPS 1 (DN 15, DN 20, or NPS 25), ASME B1.20.1 pipe threads.

6. Internal Threads: 1/2, 3/4, and 1 inch (13, 19, and 25 mm), with ASME B1.1 screw threads.

7. Bore: Diameter required to match thermometer bulb or stem.

8. Insertion Length: Length required to match thermometer bulb or stem.

9. Lagging Extension: Include on thermowells for insulated piping and tubing.

10. Bushings: For converting size of thermowell's internal screw thread to size of thermometer connection.

B. Heat-Transfer Medium: Mixture of graphite and glycerin.

3.3 PRESSURE GAGES

A. Direct-Mounted, Metal-Case, Dial-Type Pressure Gages:

1. Standard: ASME B40.100.

2. Case: Liquid-filled type(s); cast aluminum or drawn steel; 4-1/2-inch (114-mm) nominal diameter.

3. Pressure-Element Assembly: Bourdon tube unless otherwise indicated.

4. Pressure Connection: Brass, with NPS 1/4 or NPS 1/2 (DN 8 or DN 15), ASME B1.20.1 pipe threads and bottom-outlet type unless back-outlet type is indicated.

5. Movement: Mechanical, with link to pressure element and connection to pointer.

6. Dial: Nonreflective aluminum with permanently etched scale markings graduated in psi (kPa).

7. Pointer: Dark-colored metal.

8. Window: Glass or plastic.

9. Ring: Metal.

10. Accuracy: Grade A, plus or minus 1 percent of middle half of scale range.

3.4 GAGE ATTACHMENTS

A. Snubbers: ASME B40.100, brass; with NPS 1/4 or NPS 1/2 (DN 8 or DN 15), ASME B1.20.1 pipe threads and piston-type surge-dampening device. Include extension for use on insulated piping.

B. Valves: Brass ball, with NPS 1/4 or NPS 1/2 (DN 8 or DN 15), ASME B1.20.1 pipe threads.

140P6222R0004 Attachment 1 Page 15 of 256

PART 4 - EXECUTION

4.1 INSTALLATION

A. Install thermowells with socket extending one-third of pipe diameter and in vertical position in piping tees.

B. Install thermowells of sizes required to match thermometer connectors. Include bushings if required to match sizes.

C. Install thermowells with extension on insulated piping.

D. Fill thermowells with heat-transfer medium.

E. Install direct-mounted thermometers in thermowells and adjust vertical and tilted positions.

F. Install remote-mounted thermometer bulbs in thermowells and install cases on panels; connect cases with tubing and support tubing to prevent kinks. Use minimum tubing length.

G. Install direct-mounted pressure gages in piping tees with pressure gage located on pipe at the most readable position.

H. Install valve and snubber in piping for each pressure gage for fluids.

I. Install thermometers in the following locations:

1. Inlet and outlet of each water heater.

J. Install pressure gages in the following locations:

1. Suction and discharge of each domestic water pump.

K. Install meters and gages adjacent to machines and equipment to allow service and maintenance of meters, gages, machines, and equipment.

L. Adjust faces of meters and gages to proper angle for best visibility.

4.2 THERMOMETER SCALE-RANGE SCHEDULE

A. Scale Range for Domestic Cold-Water Piping: 0 to 100 deg F (Minus 20 to plus 50 deg C).

B. Scale Range for Domestic Hot-Water Piping: 0 to 250 deg F (0 to 150 deg C).

4.3 PRESSURE-GAGE SCALE-RANGE SCHEDULE

A. Scale Range for Water Service Piping: 0 to 100 psi (0 to 600 kPa).

B. Scale Range for Domestic Water Piping: 0 to 100 psi (0 to 600 kPa).

END OF SECTION 220519

140P6222R0004 Attachment 1 Page 16 of 256

140P6222R0004 Attachment 1 Page 17 of 256

SECTION 220523.12 - BALL VALVES FOR PLUMBING PIPING

PART 5 - GENERAL

5.1 SUMMARY

A. Section Includes:

1. Brass ball valves.

2. Bronze ball valves.

5.2 ACTION SUBMITTALS

A. Product Data: For each type of valve.

1. Certification that products comply with NSF 61 and NSF 372.

PART 6 - PRODUCTS

6.1 GENERAL REQUIREMENTS FOR VALVES

A. Source Limitations for Valves: Obtain each type of valve from single source from single manufacturer.

B. ASME Compliance:

1. ASME B1.20.1 for threads for threaded end valves.

2. ASME B16.10 and ASME B16.34 for ferrous valve dimensions and design criteria.

3. ASME B16.18 for solder-joint connections.

4. ASME B31.9 for building services piping valves.

C. NSF Compliance: NSF 61 and NSF 372 for valve materials for potable-water service.

D. Bronze valves shall be made with dezincification-resistant materials. Bronze valves made with copper alloy (brass) containing more than 15 percent zinc are not permitted.

E. Valve Pressure-Temperature Ratings: Not less than indicated and as required for system pressures and temperatures.

F. Valve Sizes: Same as upstream piping unless otherwise indicated.

G. Valve Actuator Types:

1. Hand-lever: For quarter-turn valves smaller than NPS 4 (DN 100).

H. Valves in Insulated Piping:

1. Include 2-inch (50-mm) stem extensions.

140P6222R0004 Attachment 1 Page 18 of 256

2. Extended operating handles of nonthermal-conductive material and protective sleeves that allow operation of valves without breaking vapor seals or disturbing insulation.

3. Memory stops that are fully adjustable after insulation is applied.

6.2 BRASS BALL VALVES

A. Brass Ball Valves, Two-Piece with Full Port and Brass Trim, Threaded or Soldered Ends:

1. Description:

a. Standard: MSS SP-110 or MSS SP-145.

b. CWP Rating: 600 psig (4140 kPa).

c. Body Design: Two piece.

d. Body Material: Forged brass.

e. Ends: Threaded and soldered.

f. Seats: PTFE.

g. Stem: Brass.

h. Ball: Chrome-plated brass.

i. Port: Full.

PART 7 - EXECUTION

7.1 VALVE INSTALLATION

A. Install valves with unions or flanges at each piece of equipment arranged to allow service, maintenance, and equipment removal without system shutdown.

B. Locate valves for easy access and provide separate support where necessary.

C. Install valves in horizontal piping with stem at or above center of pipe.

D. Install valves in position to allow full stem movement.

7.2 GENERAL REQUIREMENTS FOR VALVE APPLICATIONS

A. If valves with specified CWP ratings are unavailable, the same types of valves with higher CWP ratings may be substituted.

B. Select valves with the following end connections:

1. For Copper Tubing, NPS 2 (DN 50) and Smaller: Threaded ends except where solder-joint valve-end option is indicated in valve schedules below.

7.3 DOMESTIC HOT- AND COLD-WATER VALVE SCHEDULE

A. Pipe NPS 2 (DN 50) and Smaller:

1. Brass ball valves, two-piece with full port and brass trim. Provide with threaded or solder joint ends.

140P6222R0004 Attachment 1 Page 19 of 256

END OF SECTION 220523.12

140P6222R0004 Attachment 1 Page 20 of 256

SECTION 220523.14 - CHECK VALVES FOR PLUMBING PIPING

PART 8 - GENERAL

8.1 SUMMARY

A. Section Includes:

1. Bronze swing check valves.

8.2 ACTION SUBMITTALS

A. Product Data: For each type of valve.

1. Certification that products comply with NSF 61 and NSF 372.

PART 9 - PRODUCTS

9.1 GENERAL REQUIREMENTS FOR VALVES

A. Source Limitations for Valves: Obtain each type of valve from single source from single manufacturer.

B. ASME Compliance:

1. ASME B1.20.1 for threads for threaded end valves.

2. ASME B16.1 for flanges on iron valves.

3. ASME B16.10 and ASME B16.34 for ferrous valve dimensions and design criteria.

4. ASME B16.18 for solder joint.

5. ASME B31.9 for building services piping valves.

C. Drinking Water System Components - Health Effects and Drinking Water System Components - Lead Content Compliance: NSF 61 and NSF 372.

D. Bronze valves shall be made with dezincification-resistant materials. Bronze valves made with copper alloy (brass) containing more than 15 percent zinc are not permitted.

E. Valve Pressure-Temperature Ratings: Not less than indicated and as required for system pressures and temperatures.

F. Valve Sizes: Same as upstream piping unless otherwise indicated.

G. Valve Bypass and Drain Connections: MSS SP-45.

9.2 BRONZE SWING CHECK VALVES

A. Bronze Swing Check Valves with Bronze Disc, Class 125:

140P6222R0004 Attachment 1 Page 21 of 256

1. Description:

a. Standard: MSS SP-80, Type 3.

b. CWP Rating: 200 psig (1380 kPa).

c. Body Design: Horizontal flow.

d. Body Material: ASTM B62, bronze.

e. Ends: Threaded or soldered. See valve schedule articles.

f. Disc: Bronze.

PART 10 - EXECUTION

10.1 VALVE INSTALLATION

A. Install valves with unions or flanges at each piece of equipment arranged to allow service, maintenance, and equipment removal without system shutdown.

B. Locate valves for easy access and provide separate support where necessary.

C. Install valves in horizontal piping with stem at or above center of pipe.

D. Install valves in position to allow full stem movement.

E. Install swing check valves for proper direction of flow in horizontal position with hinge pin level.

10.2 ADJUSTING

A. Adjust or replace valve packing after piping systems have been tested and put into service but before final adjusting and balancing. Replace valves if persistent leaking occurs.

10.3 GENERAL REQUIREMENTS FOR VALVE APPLICATIONS

A. If valve applications are not indicated, use the following:

1. Pump-Discharge Check Valves:

a. NPS 2 (DN 50) and Smaller: Bronze swing check valves with bronze disc.

B. If valves with specified CWP ratings are unavailable, the same types of valves with higher CWP ratings may be substituted.

C. End Connections:

1. For Copper Tubing, NPS 2 (DN 50) and Smaller: Threaded or soldered ends.

10.4 DOMESTIC HOT- AND COLD-WATER VALVE SCHEDULE

A. Pipe NPS 2-1/2 (DN 65) and Smaller:

140P6222R0004 Attachment 1 Page 22 of 256

1. Bronze swing check valves bronze disc, Class 125, with soldered or threaded end connections.

END OF SECTION 220523.14

140P6222R0004 Attachment 1 Page 23 of 256

SECTION 220529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

PART 11 - GENERAL

11.1 SUMMARY

A. Section Includes:

1. Metal pipe hangers and supports.

2. Trapeze pipe hangers.

3. Fastener systems.

4. Pipe-positioning systems.

11.2 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Delegated-Design Submittal: For trapeze hangers indicated to comply with performance requirements and design criteria, including analysis data signed and sealed by the qualified professional engineer responsible for their preparation.

11.3 INFORMATIONAL SUBMITTALS

A. Welding certificates.

11.4 QUALITY ASSURANCE

A. Structural-Steel Welding Qualifications: Qualify procedures and personnel according to

AWS D1.1/D1.1M.

B. Pipe Welding Qualifications: Qualify procedures and operators according to "2015 ASME Boiler and Pressure Vessel Code, Section IX."

PART 12 - PRODUCTS

12.1 PERFORMANCE REQUIREMENTS

A. Delegated Design: Engage a qualified professional engineer, as defined in Section 014000 "Quality Requirements," to design trapeze pipe hangers and equipment supports.

12.2 METAL PIPE HANGERS AND SUPPORTS

A. Copper Pipe and Tube Hangers:

140P6222R0004 Attachment 1 Page 24 of 256

1. Description: MSS SP-58, Types 1 through 58, copper-coated-steel, factory-fabricated components.

2. Hanger Rods: Continuous-thread rod, nuts, and washer made of copper-coated steel.

12.3 TRAPEZE PIPE HANGERS

A. Description: MSS SP-58, Type 59, shop- or field-fabricated pipe-support assembly, made from structural-carbon-steel shapes, with MSS SP-58 carbon-steel hanger rods, nuts, saddles, and U-bolts.

B. For Trapeze or Clamped Systems: Insert and shield shall cover entire circumference of pipe.

C. For Clevis or Band Hangers: Insert and shield shall cover lower 180 degrees of pipe.

D. Insert Length: Extend 2 inches (50 mm) beyond sheet metal shield for piping operating below ambient air temperature.

12.4 FASTENER SYSTEMS

A. Powder-Actuated Fasteners: Threaded-steel stud, for use in hardened portland cement concrete, with pull-out, tension, and shear capacities appropriate for supported loads and building materials where used.

B. Mechanical-Expansion Anchors: Insert-wedge-type anchors, for use in hardened portland cement concrete, with pull-out, tension, and shear capacities appropriate for supported loads and building materials where used.

1. Indoor Applications: Zinc-coated or stainless steel.

2. Outdoor Applications: Stainless steel.

12.5 PIPE-POSITIONING SYSTEMS

A. Description: IAPMO PS 42 positioning system composed of metal brackets, clips, and straps for positioning piping in pipe spaces; for plumbing fixtures in commercial applications.

12.6 EQUIPMENT SUPPORTS

A. Description: Welded, shop- or field-fabricated equipment support made from structural-carbon-steel shapes.

12.7 MATERIALS

A. Aluminum: ASTM B221 (ASTM B221M).

B. Carbon Steel: ASTM A1011/A1011M.

C. Structural Steel: ASTM A36/A36M carbon-steel plates, shapes, and bars; black and galvanized.

D. Stainless Steel: ASTM A240/A240M.

E. Grout: ASTM C1107/C1107M, factory-mixed and -packaged, dry, hydraulic-cement, nonshrink and nonmetallic grout; suitable for interior and exterior applications.

140P6222R0004 Attachment 1 Page 25 of 256

1. Properties: Nonstaining, noncorrosive, and nongaseous.

2. Design Mix: 5000-psi (34.5-MPa), 28-day compressive strength.

PART 13 - EXECUTION

13.1 APPLICATION

A. Strength of Support Assemblies: Where not indicated, select sizes of components, so strength will be adequate to carry present and future static loads within specified loading limits. Minimum static design load used for strength determination shall be weight of supported components plus 200 lb (90 kg).

13.2 HANGER AND SUPPORT INSTALLATION

A. Metal Pipe-Hanger Installation: Comply with MSS SP-58. Install hangers, supports, clamps, and attachments as required to properly support piping from building structure.

B. Metal Trapeze Pipe-Hanger Installation: Comply with MSS SP-58. Arrange for grouping of parallel runs of horizontal piping, and support together on field-fabricated trapeze pipe hangers.

1. Pipes of Various Sizes: Support together and space trapezes for smallest pipe size, or install intermediate supports for smaller-diameter pipes as specified for individual pipe hangers.

2. Field fabricate from ASTM A36/A36M carbon-steel shapes selected for loads being supported.

Weld steel according to AWS D1.1/D1.1M.

C. Fastener System Installation:

1. Install powder-actuated fasteners for use in lightweight concrete or concrete slabs less than 4 inches (100 mm) thick in concrete, after concrete is placed and completely cured. Use operators that are licensed by powder-actuated tool manufacturer. Install fasteners according to powder-actuated tool manufacturer's operating manual.

2. Install mechanical-expansion anchors in concrete, after concrete is placed and completely cured.

Install fasteners according to manufacturer's written instructions.

D. Pipe-Positioning-System Installation: Install support devices to make rigid supply and waste piping connections to each plumbing fixture.

E. Install hangers and supports complete with necessary attachments, inserts, bolts, rods, nuts, washers, and other accessories.

F. Install hangers and supports to allow controlled thermal and seismic movement of piping systems, to permit freedom of movement between pipe anchors, and to facilitate action of expansion joints, expansion loops, expansion bends, and similar units.

G. Install lateral bracing with pipe hangers and supports to prevent swaying.

H. Install building attachments within concrete slabs or attach to structural steel. Install additional attachments at concentrated loads, including valves, flanges, and strainers, NPS 2-1/2 (DN 65) and larger and at changes in direction of piping. Install concrete inserts before concrete is placed; fasten inserts to forms, and install reinforcing bars through openings at top of inserts.

140P6222R0004 Attachment 1 Page 26 of 256

I. Load Distribution: Install hangers and supports, so that piping live and dead loads and stresses from movement will not be transmitted to connected equipment.

J. Pipe Slopes: Install hangers and supports to provide indicated pipe slopes and to not exceed maximum pipe deflections allowed by ASME B31.9 for building services piping.

K. Insulated Piping:

1. Attach clamps and spacers to piping.

a. Piping Operating Above Ambient Air Temperature: Clamp may project through insulation.

b. Piping Operating Below Ambient Air Temperature: Use thermal hanger-shield insert with clamp sized to match OD of insert.

c. Do not exceed pipe stress limits allowed by ASME B31.9 for building services piping.

13.3 METAL FABRICATIONS

A. Cut, drill, and fit miscellaneous metal fabrications for trapeze pipe hangers.

B. Fit exposed connections together to form hairline joints. Field weld connections that cannot be shop welded because of shipping size limitations.

C. Field Welding: Comply with AWS D1.1/D1.1M procedures for shielded, metal arc welding; appearance and quality of welds; and methods used in correcting welding work.

13.4 ADJUSTING

A. Hanger Adjustments: Adjust hangers to distribute loads equally on attachments and to achieve indicated slope of pipe.

B. Trim excess length of continuous-thread hanger and support rods to 1-1/2 inches (40 mm).

13.5 HANGER AND SUPPORT SCHEDULE

A. Specific hanger and support requirements are in Sections specifying piping systems and equipment.

B. Comply with MSS SP-58 for pipe-hanger selections and applications that are not specified in piping system Sections.

C. Use hangers and supports with galvanized metallic coatings for piping and equipment that will not have field-applied finishes.

D. Use nonmetallic coatings on attachments for electrolytic protection where attachments are in direct contact with copper tubing.

E. Use carbon-steel pipe hangers and supports and metal trapeze pipe hangers and attachments for general service applications.

F. Use copper-plated pipe hangers and…