B08_Section_J_Attachment_2_Drawings_06-27-22_1.pdf
PDF 7 MB Posted
- Attached to
- DOI MATOC ONLY - BISC 251091, Attachments 1-3 Federal contract opportunity
- Solicitation number
- 140P2022R0152
About this file
This document provides plans and specifications for roof replacement and construction of a pavilion structure at Biscayne National Park. The project involves replacing the roof on an existing barn building with corrugated metal panels, replacing the roof on an existing pavilion with concrete tiles, and constructing a new pavilion structure. The National Park Service intends to issue a solicitation under the Department of Interior Multiple Award Task Order Contract to Florida-based vendors by July 15th for award later this fiscal year. The document includes 28 drawings providing details on the existing structures, proposed repairs and construction, framing plans, elevations, sections and other technical specifications.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B08_Section_J_Attachment_1_Specifications_06-27-22_1.pdf | ||
| B08_Section_J_Attachment_3_Product_File_06-03-22_1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Manager Date
QUALITY DESIGN CERTIFICATION
OR
OR
Development (Title I)
Prepared in Accordance with Design by Design Development (Title I)
Construction Drawing Not Preceded
Approved by Superintendent on
Variance from Design Development (Title I)
Drawing No.
Date
STATEREGION COUNTY
NAME OF PARK
TITLE OF PROJECTCROFT & ASSOCIATES -
PRIME / ARCH / MEP:
CROFT & ASSOCIATES
KENNESAW, GEORGIA
SheetMark REVISION Date Initial
LOCATION WITHIN PARK
NATIONAL PARK SERVICE
UNITED STATES
DEPARTMENT OF THE INTERIOR
DRAWING NO.
PMIS/PKG NO.
SHEET
OF
CONSTRUCTION DOCUMENTS
PMIS/PKG NO. BISC
/2
/2
:1
:0
P M
ROOF REPLACEMENT AND PAVILION
STRUCTURE
BOCA CHITA KEY
BISCAYNE NATIONAL PARK
SOUTHEAST MONROE FLORIDA
1 28
166033
251091
BISCAYNE NATIONAL PARK
140P2019D0008
STRUCTURAL:
PES STRUCTURAL
ENGINEERS
ATLANTA, GEORGIA
DENVER SERVICE CENTER
251091
140P2019D0008
SCALE OF KILOMETERS
SCALE OF MILES
0 1
2 3
SCALE OF NAUTICAL MILES
11 0 2 3
SCALE OF MILES
10 0 10 20
ORNAMENTAL LIGHTHOUSE
INFORMATION CENTER
RANGER STATION
PARK HEADQUARTERS
VISITOR CENTER
RESTROOMS
PICNIC AREA
INTERCOASTAL WATERWAY
PARK BOUNDARY
LEGEND
CREEK
TRAIL
COUNTY LINE
HQ.
V.C.
BILL BAGGS CAPE
FLORIDA STATE PARK
BREWSTER
H A
W K
C H
A N
N E
L
PARK (DADE COUNTY)
TURKEY POINT
POWER PLANT
KEY WEST
TO
MARINE
SANCTUARY
V.C.
SWAN KEY
JOHN PENNEKAMP
CORAL REEF
STATE PARK
KEY
DADE COUNTY
MONROE COUNTY
CARD
SOUND
KEY LARGO
MANGROVE
POINT
TURKEY
POINT
COOLING
CANALS
ARSENICKER
KEYS
TOTTEN
ATLANTIC
OCEAN
KEY LARGO
NATIONAL
KEY
RHODES
OLD REEF
PACIFIC
KEYCOVE
ADAMS KEY
SANDWICH ELLIOTT
AJAX
REEF
LONG
REEF
DRIVE
HQ.
CONVOY POINT
HOMESTEAD BAYFRONT
BLACK POINT PARK
(DADE COUNTY)
E X
T E
N S
IO
N
SO
U
TH
D
A D
E
NORTH CANAL DRIVE
(SW 328 STREET)
HOMESTEAD
TO
H O
M E S
TE
A D
FL
O
R
ID
A 'S
LEISURE
CITY
T U
R N
P
IK
E
DIX
IE
H
IG
HW
AY
COCONUT PALM
ELLIOTT KEY
IN
T
E R
C O
A S
T A
L W
A T
E R
W A
Y
FENDER
POINT
BISCAYNE
BAY
BLACK
POINT
O
LD
CUTLE
R
SANDS KEY
REEF
BOCA CHITA
KEY
TRIUMPH
RAGGED KEYS REEF
STAR
KEY
SOLDIER
REEF
MATHESON
HAMMOCK PARK
(DADE COUNTY)
874 E
XP
W Y.
CORAL REEF DR.
R D
KENDALL
CUTLER POWER PLANT
CHICKEN
KEY
C U
T
LE
R
O
LD
826 R D
.MIAMI
TO
OCEAN
ATLANTIC
BISCAYNE
KEY
EVERGLADES
NATIONAL
PARK
L E
E C
O
PARK
ATLANTIC
FLORIDA BAY
KEY LARGO
OCEAN
FORT LAUDERDALE
NORTH MIAMI BEACH
H E
N D
R Y
C O
PRINSTON
HOMESTEAD
BROWARD CO.
DADE CO.
PALM BEACH CO.
KENDALL
FLORIDA CITY
C O
L L
IE
R C
O
MONROE CO.
BIG CYPRESS
NATIONAL
PRESERVE
MIAMI
BISCAYNE
NATIONAL
HOLLYWOOD
INDEX OF DRAWINGS
SHEET
SUB
SHEET TITLE OF SHEET
STRUCTURAL
20 S001 GENERAL NOTES
21 S111 PAVILION ROOF REBUILD
22 S121 BARN CHIMNEY SHORING
23 S501 FRAMING SECTIONS & DETAILS
ELECTRICAL
24 E001 ELECTRICAL LEGEND
25 E101 POWER FLOOR PLAN - BARN
26 E102 ROOF PLANS - BARN
27 E501 ELECTRICAL RISER
28 E701 ELECTRICAL DETAILS
Grand total: 28
INDEX OF DRAWINGS
SHEET
SUB
SHEET TITLE OF SHEET
GENERAL
1 CS COVER SHEET
2 G001 GENERAL INFORMATION
ARCHITECTURAL SITE
3 AS101 ARCHITECTURAL SITE PLAN
ARCHITECTURAL DEMOLITION
4 AD111 DEMOLITION FLOOR PLAN - BARN
5 AD115 DEMOLITION ROOF PLAN - BARN
6 AD125 DEMOLITION ROOF PLAN - PAVILION
7 AD135 DEMOLITION ROOF PLAN AND ELEVATIONS - CHAPEL
8 AD211 DEMOLITION ELEVATIONS - BARN
9 AD212 DEMOLITION ELEVATIONS - BARN
10 AD221 DEMOLITION ELEVATIONS - PAVILION
ARCHITECTURAL
11 A111 FLOOR PLAN - BARN
12 A115 ROOF PLAN - BARN
13 A125 ROOF PLAN - PAVILION
14 A135 ROOF PLAN AND EXTERIOR ELEVATION - CHAPEL
15 A211 EXTERIOR ELEVATIONS - BARN
16 A212 EXTERIOR ELEVATIONS - BARN
17 A221 EXTERIOR ELEVATION - PAVILION
18 A301 BUILDING SECTIONS
19 A351 SECTION DETAILS
THIS PROJECT
MATCH LINE MARK
KEYNOTE
DETAIL NUMBER
ELEVATION NUMBER
DRAWING NUMBER
SHEET NO. (WHERE SHOWN)
ELEVATION NUMBER
COLUMN LINE NUMBER
ROOM NUMBER AND LEVEL
SHEET NO. (WHERE SHOWN)
PARTITION TYPE
DOOR NUMBER
ELEVATION MARKS
WINDOW TYPE
GRID LINE
W1
A1
A101
A1
A101 A1
A101
LEGENDS & SYMBOLS:
SECTION NUMBER
A101
A1
A*
BUILDING SECTION
DETAIL
EXTERIOR ELEVATION
TITLES
INTERIOR ELEVATION
INDICATES WINDOW ABOVE
SHEET NO. (WHERE SHOWN)
SHEET NO. (WHERE SHOWN)
ROOM NAME NAME
SHEET NO. (WHERE SHOWN)
SECTION NUMBER
A101 A1
WALL SECTION
SHEET NO. (WHERE SHOWN)
COLUMN GRID
A101 A1
CENTER LINE
GENERAL NOTES:
1. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE
SUPERVISION AND COORDINATION OF ALL
CONSTRUCTION PROCEDURES.
2. ALL WORK SHALL BE PERFORMED IN STRICT
ACCORDANCE WITH THE APPLICABLE CODES AND
ORDINANCES IN EFFECT AT THE TIME OF
CONSTRUCTION OUTLINED ON G001. IN THE EVENT OF A
CONFLICT, THE MORE STRINGENT REQUIREMENT SHALL
GOVERN AND BE MET.
3. ALL DIMENSIONS SHALL BE VERIFIED BY THE
CONTRACTOR AND THE CONTRACTING OFFICER MUST
BE NOTIFIED OF ANY DISCREPANCIES BEFORE
PROCEEDING WITH THE WORK.
4. WHERE A DETAIL IS SHOWN FOR ONE CONDITION, IT
SHALL APPLY TO ALL LIKE OR SIMILAR CONDITIONS,
EVEN THOUGH NOT SPECIFICALLY MARKED ON THE
DRAWINGS.
5. CONTRACTOR SHALL ENSURE THAT CONSTRUCTION
ENVIRONMENT IS MAINTAINED IN SUCH A WAY TO
INHIBIT MOLD AND MILDEW GROWTH.
6. CONTRACTOR SHALL REMOVE PROMPTLY AND LEGALLY
ALL ACCUMULATED DEBRIS OUTSIDE OF PARK
BOUNDARIES, PROTECT ALL EXPOSED PORTIONS OF
WORK FROM ELEMENTS, AVOID OVERLOADING
STRUCTURE, AND SECURELY STORE ALL ITEMS TO BE
USED FOR CONSTRUCTION.
7. CONTRACTOR SHALL VERIFY LOCATION OF ALL
EXISTING UNDERGROUND UTILITIES PRIOR TO
EXCAVATION.
8. THE CONTRACTOR SHALL TAKE ALL NECESSARY
PRECAUTIONARY MEASURES TO PROTECT THE PUBLIC
AND ADJACENT PROPERTIES FROM DAMAGE
THROUGHOUT CONSTRUCTION.
9. ANY EXISTING UTILITIES TO BE ABANDONED SHALL BE
PROPERLY DISCONNECTED, PLUGGED OR CAPPED, AS
REQUIRED BY CODE OR SOUND CONSTRUCTION
PRACTICE.
10. NO CHANGES, MODIFICATIONS OR DEVIATIONS SHALL
BE MADE FROM THE DRAWINGS OR SPECIFICATIONS
WITHOUT FIRST SECURING WRITTEN PERMISSION FROM
THE CONTRACTING OFFICER.
11. WHERE LACK OF INFORMATION, OR ANY DISCREPANCY
SHOULD APPEAR IN THE DRAWINGS OR
SPECIFICATIONS, REQUEST WRITTEN INTERPRETATION
FROM THE CONTRACTING OFFICER BEFORE
PROCEEDING WITH THAT PORTION OF THE WORK.
12. WHEN A SYSTEM OR ASSEMBLY IS SPECIFIED, ALL
NECESSARY PARTS AND MATERIALS REQUIRED FOR A
COMPLETE INSTALLATION / SYSTEM SHALL BE
INSTALLED ACCORDING TO THE MANUFACTURERS
INSTRUCTIONS.
13. UNLESS OTHERWISE NOTED, ELECTRICAL CONDUITS,
PLUMBING LINES, ETC., SHALL BE RUN CONCEALED AND
FRAMING SHALL BE ADEQUATE SIZE TO ACCOMPLISH
RESULT WITHOUT CAUSING ANY CHANGES IN THE WALL
PLANE.
14. COORDINATE WITH ALL TRADES THE LOCATIONS OF
SLEEVES OR OTHER PRESET ACCESSORIES INVOLVING
OTHER TRADES.
15. THESE PLANS SHOULD BE STUDIED AND USED IN THEIR
ENTIRETY AS INFORMATION VITAL TO EACH STAGE OF
CONSTRUCTION.
16. GENERAL CONTRACTOR WILL BE HELD SOLELY
RESPONSIBLE FOR COMPLETION OF ALL WORK SHOWN
OR REASONABLY IMPLIED BY THESE DRAWINGS AND /
OR SPECIFICATIONS.
17. DETAILS TAKE PRECEDENCE OVER PLANS AND
ELEVATIONS - LARGER SCALE DRAWINGS TAKE
PRECEDENCE OVER SMALLER SCALE DRAWINGS.
18. MANUFACTURERS AND MODELS REFLECTED ON
DRAWINGS ARE DESIGN BASIS ONLY UNLESS
SPECIFICALLY NOTED AS “SOLE SOURCE”. FOR ITEMS
NOT LABELED AS “SOLE SOURCE”, EQUIVALENT
PRODUCT SUBSTITUTIONS ARE PERMITTED PROVIDED
THEY OFFER THE SAME OR BETTER PERFORMANCE AND
ARE APPROVED BY THE CONTRACTING OFFICER
THROUGH FORMAL SUBMITTAL PROCESS.
19. THE CONTRACTOR SHALL FURNISH COPIES OF PERMITS,
INSPECTIONS, AND CERTIFICATES TO CONTRACTING
OFFICER AS REQUESTED ALONG WITH FIRST
APPLICATION FOR PAYMENT.
20. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
OBTAINING ALL REQUIRED BUILDING PERMITS PRIOR TO
THE COMMENCEMENT OF ANY WORK.
21. THE CONTRACTOR SHALL PROVIDE ALL CERTIFICATES
OF OCCUPANCY, PERMITS AND CLOSE OUT DOCUMENTS
TO CONTRACTING OFFICER UPON COMPLETION OF
PROJECT.
22. ANY ITEMS NOT BEING DEMOLISHED ARE TO BE
PROTECTED DURING CONSTRUCTION. IF DAMAGED OR
DESTROYED, REPLACE OR REPAIR DAMAGED OR
DESTROYED ITEMS WITH APPROVED ITEMS AT NO
EXPENSE TO THE NATIONAL PARK SERVICE.
23. THE DESIGN OF THIS PROJECT IS BASED UPON
INFORMATION PROVIDED BY NATIONAL PARK SERVICE
THROUGH EXISTING DRAWINGS AND ON-SITE
OBSERVATION. VERIFY ALL EXISTING DIMENSIONS AND
CONDITIONS PRIOR TO COMMENCING WORK. IF
EXISTING CONDITIONS ARE NOT AS DEPICTED OR
ANTICIPATED, NOTIFY THE CONTRACTING OFFICER
IMMEDIATELY UPON DISCOVERY AND DO NOT PROCEED
WITHOUT APPROVAL. IF CONTRACTOR PROCEEDS
WITHOUT APPROVAL, THE CONTRACTOR ACCEPTS FULL
LIABILITY FOR THAT PORTION OF CONSTRUCTION.
A
A/E ARCHITECT/ENGINEER
ABV ABOVE
ADJ ADJUSTABLE
ADMIN ADMINISTRATION
AFF ABOVE FINISH FLOOR
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZED
ARCH ARCHITECT (URAL)
AUTO AUTOMATIC
AVG AVERAGE
& AND
@ AT
B
BLDG BUILDING
BD BOARD
B.O. BOTTOM OFF
C
CJ CONTROL JOINT
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CO CONTRACTING OFFICER
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS(ATION)
COR CONTRACTING OFFICER
REPRESENTATIVE
D
DBL DOUBLE
DIA DIAMETER
DIFF DIFFUSER
DIM DIMENSION
DIV DIVISION
DN DOWN
DSC DENVER SERVICE CENTER
DTL DETAIL
DWG DRAWING
E
EA EACH
ELEC ELECTRICAL
ELEV ELEVATION
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXP JT EXPANSION JOINT
EXPS EXPOSE(D)
EXT EXTERIOR
F
FAB FABRICATION
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FFE FINISHED FLOOR
ELEVATION
FFL FINISHED FLOOR LINE
FIN FINISH
FLR FLOOR(ING)
FRP FIBER REINFORCED PANEL
FRT FIRE RETARDANT TREATED
FT FOOT/FEET
G
GA GAUGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GEN GENERAL
GL GLASS
GYP GYPSUM
H
H HIGH
HC HANDICAP
HDWR HARDWARE
HM HOLLOW METAL
HORIZ HORIZONTAL
HT HEIGHT
HVAC HEATING, VENTILATION AND
AIR CONDITIONING
I
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
J
JAN JANITOR
JT JOINT
L
LAV LAVATORY
L LONG
M
MAINT MAINTENANCE
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MISC MISCELLANEOUS
MIN MINIMUM
MO MASONRY OPENING
MOD MODIFICATION
MTD MOUNTED
MTL METAL
N
N/A NOT APPLICABLE
NIC NOT IN CONTRACT
NPS NATIONAL PARK SERVICE
NTS NOT TO SCALE
O
OC ON CENTER
OPNG OPENING(S)
OPP OPPOSITE
OVHD OVERHEAD
P
PL PLATE
PLBG PLUMBING
PLYWD PLYWOOD
PMIS PROJECT MANAGEMENT
INFORMATION SYSTEM
PMIS NO PROJECT PMIS NUMBER
PNL PANEL
PREFAB PREFABRICATED
PREFIN PREFINISHED
PT PRESSURE TREATED
Q
QTY QUANTITY
R
R, RAD RADIUS
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REINF REINFORCE (D) (ING)
REQD REQUIRED
REV REVISION
RO ROUGH OPENING
RTU ROOF TOP UNIT
S
SIM SIMILAR
SPEC SPECIFICATION
SQ SQUARE
SS STAINLESS STEEL
STD STANDARD
STRUCT STRUCTURAL
STL STEEL
STO STORAGE
SUSP SUSPENDED
T
TBD TO BE DETERMINED
TEL TELEPHONE
TEMP TEMPERED
THK THICK
T.O. TOP OF
T & G TONGUE AND GROOVE
TYP TYPICAL
U
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
V
VAR VARIES
VERT VERTICAL
VIF VERIFY IN FIELD
W
W/ WITH
W WIDTH
WD WOOD
W/O WITHOUT
WTRPRF WATERPROOFING
ABBREVIATIONS:
DEFINITIONS:
A. "ALIGN" MEANS (I.E.) WHERE A NEW PARTITION IS TO BE
BUILT TO ALIGN WITH ONE SIDE OF THE COLUMN, STUDS
SHALL ALIGN WITH THE COLUMN OR EXISTING
PARTITION SO THAT THE GYPSUM WALL BOARD WILL BE
CONTINUOUS ACROSS STUDS AND FINISHED FACE OF
COLUMN OR EXISTING PARTITION, AND JOINT SHALL BE
SMOOTH AND UNDETECTABLE.
B. DIMENSIONS NOTED AS "CLEAR" SHALL BE FROM
FINISHED FACE TO FINISHED FACE.
C. "TYPICAL" MEANS TYPICAL FOR ALL SIMILAR
CONDITIONS, UNO.
D. WHEREVER THE TERM "OR EQUAL" IS USED, IT SHALL
MEAN EQUAL OR BETTER PRODUCT AS APPROVED BY
THE CONTRACTING OFFICER.
APPLICABLE CODES:APPLICABLE CODES:
• INTERNATIONAL BUILDING CODE (IBC) 2021, WITH APPENDICES
• NFPA 101 (LIFE SAFETY CODE) – USE WHEN IBC IS SILENT
• INTERNATIONAL EXISTING BUILDING CODE (IEBC) 2021,
WITH APPENDICES
• ABAAS (ARCHITECTURAL BARRIERS ACT ACCESSIBILITY
STANDARDS)
• IECC 2018 (INTERNATIONAL ENERGY CONSERVATION CODE)
• IMC 2018 (INTERNATIONAL MECHANICAL CODE)
• NATIONAL HISTORIC PRESERVATION ACT, 1966 AS
AMENDED
• SECRETARY OF INTERIOR STANDARDS FOR REHABILITATION,
CODIFIED 36 CFR 67
• SECRETARY OF THE INTERIOR STANDARDS FOR THE
TREATMENT OF HISTORIC PROPERTIES
• FEMA WIND SPEED-UP MAPS
• FLORIDA BUILDING CODE (USED ONLY AS GUIDELINE FOR
IMPACT RATED HURRICANE PRODUCTS)
• MIAMI-DADE APPROVAL (USED ONLY AS A GUIDELINE FOR
IMPACT RATED HURRICANE PRODUCTS)
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
LOCATION WITHIN PARK
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:1
:0
P M
GENERAL INFORMATION
G001
C.BAXTER
J.RYAN
J.MORGAN
2 28
BARN, PAVILION, AND CHAPEL 196
166033
251091
BISCAYNE NATIONAL PARK06/27/2022
SEE INDIVIDUAL SHEETS FOR APPLICATION
MASTER KEY: ARCHITECTURAL DEMOLITION KEYNOTES
TAG # TAG DESCRIPTION
D1 STORAGE RACK LOCATED IN FRONT OF THE CHIMNEY TO BE TEMPORARILY
MOVED 15' - 20' TO PLAN LEFT BY THE PARK PRIOR TO ANY CHIMNEY SHORING
WORK AND WORK OCCURRING ON ROOF. STORAGE RACK TO BE MOVED BACK
BY THE PARK ONCE PROJECT IS COMPLETE. COORDINATE WITH PARK. SEE A111
FOR CHIMNEY SHORING INFORMATION.
D2 REMOVAL OF ELECTRICAL ITEMS. SEE ELECTRICAL DRAWINGS.
D3 REMOVE EXISTING ASPHALT SHINGLE ROOF AND UNDERLAYMENT DOWN TO
WOOD ROOF DECK.
D4 REMOVE AND REPLACE DAMAGED WOOD ROOF DECKING (MAX. QUANTITY 480
SF). CONTRACTOR TO DOCUMENT AMOUNT OF DECKING REPLACED AND TO
COORDINATE WITH THE CO AND THE PARK. NOTIFY CO OF QUANTITIES OVER
480 SF.
D5 REMOVE ALL EXISTING SOLAR PANELS AND SUPPORTING STRUCTURE BACK TO
DECK. SEE ELECTRICAL DRAWINGS.
D6 REMOVE EXISTING FLASHING AROUND CHIMNEYS AND PREP FOR NEW.
EXISTING CHIMNEYS TO REMAIN. CHIMNEY TO BE SHORED UP FROM BELOW
PRIOR TO ANY ROOF WORK. SEE A111 FOR CHIMNEY SHORING INFORMATION.
D7 REMOVE EXISTING LIGHTNING PROTECTION SYSTEM. SEE ELECTRICAL
DRAWINGS.
D8 REMOVE EXISTING GUTTERS AND DOWNSPOUTS. SEE DETAIL 2/AD115 FOR
ADDITIONAL INFORMATION.
D9 REMOVE EXISTING TONGUE AND GROOVE WOOD DECKING AND WOOD FRAMING
SYSTEM. SEE STRUCTURAL DRAWINGS.
D10 REMOVE EXISTING WOOD RAFTERS. SEE STRUCTURAL DRAWINGS.
D11 REMOVE EXISTING WOOD TRIM. SEE DETAIL 3/AD125.
D12 REMOVE EXISTING METAL ROD. SEE DETAIL 3/AD125.
D13 REMOVE ROOF-MOUNTED FLAG LIGHT
D14 HISTORIC METAL RIDGE CAP TO BE SALVAGED IN ORDER TO BE DUPLICATED
SEE INDIVIDUAL SHEETS FOR APPLICATION
MASTER KEY: ARCHITECTURAL NEW WORK KEYNOTES
TAG # TAG DESCRIPTION
1 IN BUILDING INTERIOR, SHORE UP CHIMNEY SLAB PRIOR TO ANY WORK
OCCURRING ON ROOF. SEE S121 FOR ADDITIONAL INFORMATION. SHOP
DRAWINGS TO BE SUBMITTED FOR REVIEW PRIOR TO CONTRACTOR
INSTALLATION.
2 NEW ELECTRICAL WORK. SEE ELECTRICAL DRAWINGS
3 NEW CORRUGATED METAL ROOF OVER NEW UNDERLAYMENT.
4 NEW CONCRETE TILE ROOF ON (2) NEW LAYERS OF UNDERLAYMENT OVER NEW
1/2" PLYWOOD SHEATHING. WHERE FIELD CUT TILES ARE USED AT THE RIDGE,
ATTACH THE CUT TILE AND FULL TILE EACH SIDE OF TOP RIDGE COURSE TO
THE UNDERLAYMENT WITH MANUFACTURER APPROVED MORTAR AND
MANUFACTURER APPROVED ADHESIVE AT THE TILE OVERLAPS.
5 NEW SOLAR PANEL SYSTEM TO BE SUPPORTED BY BRACKETS CONNECTED TO
ROOF STRUCTURAL MEMBERS. SEE ELECTRICAL DRAWINGS.
6 NEW ALUMINUM FLASHING AT ROOF TO EXISTING TO REMAIN STONE CHIMNEYS.
USE ROOFING CEMENT BEHIND FLASHING AND BEAD FLASHING AT TOP EDGE.
FLASHING TO MATCH EXISTING, HISTORICAL PATTERN.
7 NEW LIGHTNING PROTECTION SYSTEM. SEE ELECTRICAL DRAWINGS.
8 NEW 6" HALF-ROUND ALUMINUM GUTTER AND 4" ROUND ALUMINUM
DOWNSPOUT SYSTEM THAT TIE INTO EXISTING WATER TANK SYSTEM.
TRANSITION TO PVC DOWNSPOUTS INSIDE BUILDING. SEE DETAIL 5/A351.
9 NEW T&G WOOD ROOF DECK. SEE STRUCTURAL DRAWINGS.
10 NEW WOOD ROOF RAFTERS. SEE STRUCTURAL DRAWINGS.
11 NEW DECORATIVE WOOD TRIM TO MATCH EXISTING HISTORIC PROFILE AND
FINISH. SEE DETAILS. COORDINATE WITH THE PARK AND THE CO.
12 NEW METAL ROD TO MATCH EXISTING ELEMENTS AND COLOR. COORDINATE
WITH THE PARK AND THE CO.
13 NEW ASPHALT SHINGLE ROOF AND UNDERLAYMENT ON EXISTING WOOD ROOF
DECK
14 NEW METAL RIDGE CAP TO MATCH HISTORIC METAL RIDGE CAP.
RESTROOM
(NIC)
CHAPEL
BOCA CHITA
LIGHTHOUSE (NIC)
HARBOR
EXISTING FLAGPOLE (NIC)
PAVILION
GENERATOR BUILDING
AND CISTERN (NIC)
CAMPING AREA
(NIC)
ATLANTIC
OCEAN
BISCAYNE
BAY
BARN
EXISTING STONE WALL (NIC)
* DO NOT DISTURB WALL.
EXISTING LOADING/ BOAT/ BARGE/
LANDING CRAFT RAMP (NIC)
*DO NOT USE FOR THIS PROJECT
STAGING AREA APPROX. LOCATION
FOR 50' X 75' TEMPORARY WORK
FENCING WITH GATE. CONFIRM
LAYOUT WITH THE CO PRIOR TO
BEGINNING CONSTRUCTION.
LOCATION FOR CONTAINERS FOR
SUPPLY / EQUIPMENT ON PLYWOOD
WITHIN TEMPORARY FENCED AREA.
LIMITS OF WORK
LIMITS OF WORK
LIMITS OF WORK
INDICATES PATHS OF TRAVEL ON ISLAND.
ALL TRANSPORT ON ISLAND NEEDS TO
OCCUR ON THESE PATHWAYS. COORDINATE
WITH THE PARK AND THE CO.
BARGE / BOAT MOORING
AREA. COORDINATE WITH
THE PARK AND THE CO.
TEMPORARY WORK
FENCING WITH GATE.
TEMPORARY WORK
FENCING WITH GATE.
TEMPORARY WORK
FENCING WITH GATE.
A. SITE PLAN IS PROVIDED FOR CONTEXT ONLY. THERE ARE NO
PLANNED UPGRADES TO UTILITY INFRASTRUCTURE SYSTEMS FOR
THIS PROJECT.
B. CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO EXISTING
CONDITIONS TO REMAIN. DAMAGE SHALL BE RESTORED TO MATCH
EXISTING OR BETTER.
C. CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO
EXISTING LANDSCAPING AND HARDSCAPE/SOFTSCAPE ONCE
PROJECT IS COMPLETE. COORDINATE WITH THE CONTRACTING
OFFICER AND THE PARK TO IDENTIFY LANDSCAPE CONDITIONS TO
BE RESTORED.
D. SITE IS REMOTE, ACCESS TO THE SITE IS BY BOAT.
E. CONTRACTOR TO PROTECT ALL EXISTING CONCRETE SIDEWALKS,
CONCRETE PADS, AND SOIL SURFACE WITHIN BOTH THE LIMITS OF
WORK AND ALONG CONTRACTOR TRAVEL PATH. CONTRACTOR TO
ACHIEVE THIS BY PLACING 1" PLYWOOD PANELS ON A MINIMUM OF 3
INCHES OF SAND ABOVE EACH CONCRETE SIDEWALK AND PAD, AS
WELL AS A MINIMUM OF 18 INCHES BEYOND EDGE OF EACH
SIDEWALK AND PAD. TO BE RESTORED TO EXISTING OR BETTER
CONDITIONS ONCE PROJECT IS COMPLETE. COORDINATE WITH THE
CONTRACTING OFFICER AND THE PARK.
F. COORDINATE WITH PARK FOR FINAL APPROVED CONSTRUCTION
STAGING/STORAGE, ROUTING AND FENCE AREAS.
G. CONTRACTOR TO PROVIDE SIGNAGE NO MORE THAN 10 FEET APART
ON FENCING THAT STATES IN BOTH ENGLISH AND SPANISH:
"DANGER: CONSTRUCTION AREA, KEEP OUT." THIS SIGNAGE SHOULD
ALSO OCCUR AT THE STAGING AREA. COORDINATE WITH PARK.
H. CLEAN JOB SITE DAILY BY REMOVING SCRAPS, DEBRIS, AND WASTE
MATERIALS OUTSIDE OF PARK BOUNDARIES.
I. SEE SPEC'S FOR ADDITIONAL REQUIREMENTS.
GENERAL SITE NOTES:
T
Y P
6'-0" TYP
CONCRETE BASE IN MOVEABLE
5-GALLON CONTAINERS FOR
SUPPORTING POSTS
GALVANIZED STEEL POST
GALVANIZED STEEL CHAIN-LINK
FENCE WITH PRIVACY SCREENING
SECURE DOWN TO GRADE
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
LOCATION WITHIN PARK
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:1
:0
P M
ARCHITECTURAL SITE PLAN
AS101
C.BAXTER
J.RYAN
J.MORGAN
3 28
BARN, PAVILION, AND CHAPEL 196
166033
251091
BISCAYNE NATIONAL PARK06/27/2022
NOT TO SCALEAS101
1 ARCHITECTURAL SITE PLAN
NOT TO SCALEAS101
2 TEMPORARY WORK FENCE DETAIL
AD212
AD212
AD211
AD211
EXISTING CONCRETE SLAB
EXISTING CONCRETE SLAB
D1
D2
EXISTING
WATER TANKS
EXISTING GRAVEL
EXISTING
CHIMNEY
ABOVE
EXISTING
CHIMNEY ABOVE
GENERAL DEMOLITION NOTES:
A. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR USING
TEMPORARY PROTECTION THROUGHOUT THE PROJECT TO
SAFEGUARD THE SURFACE QUALITY OF FINISHES TO REMAIN.
B. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK,
BRING ANY DISCREPANCIES FROM THE DRAWINGS AND NOTES TO
THE CO IMMEDIATELY. MINOR CHANGES IN THE SCOPE OF THE
DEMOLITION WORK SHALL NOT JUSTIFY ANY ADDITIONAL COST.
C. ANY EXISTING ITEM TO REMAIN THAT IS DEMOLISHED OR DAMAGED
BY DEMOLITION SHALL BE REPLACED WITH AN EQUAL ITEM OR
BETTER AS APPROVED BY THE CONTRACTING OFFICER AT NO COST
TO THE GOVERNMENT.
D. FURNISH, INSTALL, AND MAINTAIN IN SAFE CONDITIONS AT ALL
TIMES TEMPORARY PROTECTION REQUIRED TO ENSURE SAFETY
FOR PERSONS AND PROPERTY DURING DEMOLITION AND REMOVAL
WORK.
E. CLEAN JOB SITE DAILY BY REMOVING SCRAPS, DEBRIS, AND WASTE
MATERIALS OUTSIDE OF PARK BOUNDARIES.
F. SEE STRUCTURAL AND ELECTRICAL PLANS FOR ADDITIONAL
DEMOLITION
G. ALL FEATURES TO BE REPAIRED / REPLACED SHALL BE REPAIRED /
REPLACED WITH LIKE IN KIND OR BETTER MATERIALS AND
COMPLIES WITH THE SECRETARY OF THE INTERIOR'S STANDARDS
FOR THE TREATMENT OF HISTORIC PROPERTIES. COORDINATE WITH
THE PARK AND THE CONTRACTING OFFICER.
H. IF HAZARDOUS MATERIALS ARE IDENTIFIED, THE CONTRACTOR
SHALL STOP WORK AND IMMEDIATELY NOTIFY THE CONTRACTING
OFFICER FOR DIRECTION.
I. PROTECT EXISTING HISTORIC FEATURES. COORDINATE WITH THE
PARK AND THE CONTRACTING OFFICER.
DEMOLITION PLAN LEGEND:
EXISTING TO
REMAIN (SOLID
GRAY LINES)
EXISTING TO
BE DEMOED
(DASHED LINES)
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
LOCATION WITHIN PARK
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:1
:0
P M
DEMOLITION FLOOR PLAN -
BARNAD111
C.BAXTER
J.RYAN
J.MORGAN
4 28
BARN, PAVILION, AND CHAPEL 196
166033
251091
BISCAYNE NATIONAL PARK06/27/2022
AD111
1 DEMOLITION - BARN FLOOR PLAN
SCALE OF FEET
B L D
G
SEE MASTER KEY ON G101 FOR COMPLETE LIST
DEMOLITION BARN FLOOR PLAN KEYNOTES
TAG # TAG DESCRIPTION
D1 STORAGE RACK LOCATED IN FRONT OF THE CHIMNEY TO BE
TEMPORARILY MOVED 15' - 20' TO PLAN LEFT BY THE PARK PRIOR
TO ANY CHIMNEY SHORING WORK AND WORK OCCURRING ON
ROOF. STORAGE RACK TO BE MOVED BACK BY THE PARK ONCE
PROJECT IS COMPLETE. COORDINATE WITH PARK. SEE A111 FOR
CHIMNEY SHORING INFORMATION.
D2 REMOVAL OF ELECTRICAL ITEMS. SEE ELECTRICAL DRAWINGS.
GENERAL DEMOLITION NOTES:
A. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR USING
TEMPORARY PROTECTION THROUGHOUT THE PROJECT TO
SAFEGUARD THE SURFACE QUALITY OF FINISHES TO REMAIN.
B. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK,
BRING ANY DISCREPANCIES FROM THE DRAWINGS AND NOTES TO
THE CO IMMEDIATELY. MINOR CHANGES IN THE SCOPE OF THE
DEMOLITION WORK SHALL NOT JUSTIFY ANY ADDITIONAL COST.
C. ANY EXISTING ITEM TO REMAIN THAT IS DEMOLISHED OR DAMAGED
BY DEMOLITION SHALL BE REPLACED WITH AN EQUAL ITEM OR
BETTER AS APPROVED BY THE CONTRACTING OFFICER AT NO COST
TO THE GOVERNMENT.
D. FURNISH, INSTALL, AND MAINTAIN IN SAFE CONDITIONS AT ALL
TIMES TEMPORARY PROTECTION REQUIRED TO ENSURE SAFETY
FOR PERSONS AND PROPERTY DURING DEMOLITION AND REMOVAL
WORK.
E. CLEAN JOB SITE DAILY BY REMOVING SCRAPS, DEBRIS, AND WASTE
MATERIALS OUTSIDE OF PARK BOUNDARIES.
F. SEE STRUCTURAL AND ELECTRICAL PLANS FOR ADDITIONAL
DEMOLITION
G. ALL FEATURES TO BE REPAIRED / REPLACED SHALL BE REPAIRED /
REPLACED WITH LIKE IN KIND OR BETTER MATERIALS AND
COMPLIES WITH THE SECRETARY OF THE INTERIOR'S STANDARDS
FOR THE TREATMENT OF HISTORIC PROPERTIES. COORDINATE WITH
THE PARK AND THE CONTRACTING OFFICER.
H. IF HAZARDOUS MATERIALS ARE IDENTIFIED, THE CONTRACTOR
SHALL STOP WORK AND IMMEDIATELY NOTIFY THE CONTRACTING
OFFICER FOR DIRECTION.
I. PROTECT EXISTING HISTORIC FEATURES. COORDINATE WITH THE
PARK AND THE CONTRACTING OFFICER.
DEMOLITION PLAN LEGEND:
EXISTING TO
REMAIN (SOLID
GRAY LINES)
EXISTING TO
BE DEMOED
(DASHED LINES)
AD212
AD212
AD211
AD211
D3
D4
D5
D6
D7
D8
D5
D5
D5
D5
D5 D6
TYP
AD115
LINE OF FACE OF EXISTING
STONE WALL BELOW
EXISTING ROOF DECKING TO REMAIN.
SEE KEYNOTE D4.
EXISTING ROOF FRAMING TO REMAIN
REMOVE EXISTING GUTTERS
REMOVE DOWNSPOUT TO INSIDE
BUILDING AND CAP INTERIOR PIPE
UNTIL NEW WORK. PROVIDE
TEMPORARY COVER OVER EXISTING
WINDOW AND PLEXIGLASS OPENING
TO REMAIN UNTIL NEW WORK.
REMOVEEXIST
REMOVE EXISTING ASPHALT SHINGLE ROOF.
SEE KEYNOTE D3.
EXISTING ROOF FRAMING TO REMAIN
EXISTING EXTERIOR WALL
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
LOCATION WITHIN PARK
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:1
:0
P M
DEMOLITION ROOF PLAN -
BARNAD115
C.BAXTER
J.RYAN
J.MORGAN
5 28
BARN, PAVILION, AND CHAPEL 196
166033
251091
BISCAYNE NATIONAL PARK06/27/2022
SCALE
SCALE OF FEET
A
B L D
G
SCALE AAD115
1 DEMOLITION - BARN ROOF PLAN
SEE MASTER KEY ON G101 FOR COMPLETE LIST
DEMOLITION ROOF PLAN KEYNOTES
TAG # TAG DESCRIPTION
D3 REMOVE EXISTING ASPHALT SHINGLE ROOF AND UNDERLAYMENT
DOWN TO WOOD ROOF DECK.
D4 REMOVE AND REPLACE DAMAGED WOOD ROOF DECKING (MAX.
QUANTITY 480 SF). CONTRACTOR TO DOCUMENT AMOUNT OF
DECKING REPLACED AND TO COORDINATE WITH THE CO AND THE
PARK. NOTIFY CO OF QUANTITIES OVER 480 SF.
D5 REMOVE ALL EXISTING SOLAR PANELS AND SUPPORTING
STRUCTURE BACK TO DECK. SEE ELECTRICAL DRAWINGS.
D6 REMOVE EXISTING FLASHING AROUND CHIMNEYS AND PREP FOR
NEW. EXISTING CHIMNEYS TO REMAIN. CHIMNEY TO BE SHORED UP
FROM BELOW PRIOR TO ANY ROOF WORK. SEE A111 FOR CHIMNEY
SHORING INFORMATION.
D7 REMOVE EXISTING LIGHTNING PROTECTION SYSTEM. SEE
ELECTRICAL DRAWINGS.
D8 REMOVE EXISTING GUTTERS AND DOWNSPOUTS. SEE DETAIL
2/AD115 FOR ADDITIONAL INFORMATION.
SCALE BAD115
2 DEMOLITION - TYP EAVE / GUTTER DETAIL
SCALE
1 0 1 2
SCALE OF FEET
B
TEMPORARY PROTECTION THROUGHOUT THE PROJECT TO
SAFEGUARD THE SURFACE QUALITY OF FINISHES TO REMAIN.
B. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK,
BRING ANY DISCREPANCIES FROM THE DRAWINGS AND NOTES TO
THE CO IMMEDIATELY. MINOR CHANGES IN THE SCOPE OF THE
DEMOLITION WORK SHALL NOT JUSTIFY ANY ADDITIONAL COST.
C. ANY EXISTING ITEM TO REMAIN THAT IS DEMOLISHED OR DAMAGED
BY DEMOLITION SHALL BE REPLACED WITH AN EQUAL ITEM OR
BETTER AS APPROVED BY THE CONTRACTING OFFICER AT NO COST
TO THE GOVERNMENT.
D. FURNISH, INSTALL, AND MAINTAIN IN SAFE CONDITIONS AT ALL
TIMES TEMPORARY PROTECTION REQUIRED TO ENSURE SAFETY
FOR PERSONS AND PROPERTY DURING DEMOLITION AND REMOVAL
WORK.
E. CLEAN JOB SITE DAILY BY REMOVING SCRAPS, DEBRIS, AND WASTE
MATERIALS OUTSIDE OF PARK BOUNDARIES.
F. SEE STRUCTURAL AND ELECTRICAL PLANS FOR ADDITIONAL
DEMOLITION
G. ALL FEATURES TO BE REPAIRED / REPLACED SHALL BE REPAIRED /
REPLACED WITH LIKE IN KIND OR BETTER MATERIALS AND
COMPLIES WITH THE SECRETARY OF THE INTERIOR'S STANDARDS
FOR THE TREATMENT OF HISTORIC PROPERTIES. COORDINATE WITH
THE PARK AND THE CONTRACTING OFFICER.
H. IF HAZARDOUS MATERIALS ARE IDENTIFIED, THE CONTRACTOR
SHALL STOP WORK AND IMMEDIATELY NOTIFY THE CONTRACTING
OFFICER FOR DIRECTION.
I. PROTECT EXISTING HISTORIC FEATURES. COORDINATE WITH THE
PARK AND THE CONTRACTING OFFICER.
DEMOLITION PLAN LEGEND:
EXISTING TO
REMAIN (SOLID
GRAY LINES)
EXISTING TO
BE DEMOED
(DASHED LINES)
AD221
AD221
AD221
AD221
AD125
D3
D13
LINE OF EXISTING HISTORIC
COLUMNS BELOW (TYP)
D9
D10
EXISTING HISTORIC
COLUMNS TO REMAIN (TYP)
AD125
D9
D10
D11
D12
D12
D12
HISTORIC WOOD TRIM PROFILE
TO BE REMOVED. NEW WOOD
TRIM TO MATCH HISTORIC
PROFILE
REMOVE EXISTING TONGUE
AND GROOVE WOOD DECK
AND WOOD FRAMING SYSTEM.
SEE STRUCTURAL DRAWINGS.
REMOVE EXISTING ASPHALT
SHINGLE ROOF
EXISTING HISTORIC METAL
ROD TO BE REMOVED AND
SALVAGED IN ORDER TO
BE DUPLICATED
EXISTING HISTORIC
COLUMNS AND COLUMN
CAPITALS TO REMAIN
REMOVE WOOD TRIM. NEW
WOOD TRIM TO MATCH
HISTORIC PROFILE.
NOTE: WOOD STRUCTURE WITHIN THIS AREA TO BE
REVIEWED IN FIELD BY PARK AND THE CONTRACTING
OFFICER TO DETERMINE IF THERE IS ANY DAMAGE TO
STRUCTURAL MEMBERS. IF NO DAMAGE, TRIM WILL BE
REPLACED TO MATCH HISTORIC TRIM BOX OUT. IF DAMAGE,
CONTRACTING OFFICER TO DETERMINE NEXT STEPS.
CONNECTIONS UNKNOWN.
VERIFY IN FIELD
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
LOCATION WITHIN PARK
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:1
:0
P M
DEMOLITION ROOF PLAN -
PAVILIONAD125
C.BAXTER
J.RYAN
J.MORGAN
6 28
BARN, PAVILION, AND CHAPEL 196
166033
251091
BISCAYNE NATIONAL PARK06/27/2022
SCALE
SCALE OF FEET
A
B L D
G
SCALE AAD125
2 DEMOLITION - PAVILION ROOF PLAN
SCALE AAD125
1 DEMOLITION - PAVILION REFLECTED CEILING PLAN
SEE MASTER KEY ON G101 FOR COMPLETE LIST
DEMOLITION ELEVATION KEYNOTES
TAG # TAG DESCRIPTION
D3 REMOVE EXISTING ASPHALT SHINGLE ROOF AND UNDERLAYMENT
DOWN TO WOOD ROOF DECK.
D9 REMOVE EXISTING TONGUE AND GROOVE WOOD DECKING AND
WOOD FRAMING SYSTEM. SEE STRUCTURAL DRAWINGS.
D10 REMOVE EXISTING WOOD RAFTERS. SEE STRUCTURAL DRAWINGS.
D11 REMOVE EXISTING WOOD TRIM. SEE DETAIL 3/AD125.
D12 REMOVE EXISTING METAL ROD. SEE DETAIL 3/AD125.
D13 REMOVE ROOF-MOUNTED FLAG LIGHT
SCALE BAD125
3 DEMOLITION TYP EAVE DETAIL
SCALE
1 0 1 2
SCALE OF FEET
B
D3
D14
D3
D14
D3
D14
D3
D14
GENERAL DEMOLITION NOTES:
A. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR USING
TEMPORARY PROTECTION THROUGHOUT THE PROJECT TO
SAFEGUARD THE SURFACE QUALITY OF FINISHES TO REMAIN.
B. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK,
BRING ANY DISCREPANCIES FROM THE DRAWINGS AND NOTES TO
THE CO IMMEDIATELY. MINOR CHANGES IN THE SCOPE OF THE
DEMOLITION WORK SHALL NOT JUSTIFY ANY ADDITIONAL COST.
C. ANY EXISTING ITEM TO REMAIN THAT IS DEMOLISHED OR DAMAGED
BY DEMOLITION SHALL BE REPLACED WITH AN EQUAL ITEM OR
BETTER AS APPROVED BY THE CONTRACTING OFFICER AT NO COST
TO THE GOVERNMENT.
D. FURNISH, INSTALL, AND MAINTAIN IN SAFE CONDITIONS AT ALL
TIMES TEMPORARY PROTECTION REQUIRED TO ENSURE SAFETY
FOR PERSONS AND PROPERTY DURING DEMOLITION AND REMOVAL
WORK.
E. CLEAN JOB SITE DAILY BY REMOVING SCRAPS, DEBRIS, AND WASTE
MATERIALS OUTSIDE OF PARK BOUNDARIES.
F. SEE STRUCTURAL AND ELECTRICAL PLANS FOR ADDITIONAL
DEMOLITION
G. ALL FEATURES TO BE REPAIRED / REPLACED SHALL BE REPAIRED /
REPLACED WITH LIKE IN KIND OR BETTER MATERIALS AND
COMPLIES WITH THE SECRETARY OF THE INTERIOR'S STANDARDS
FOR THE TREATMENT OF HISTORIC PROPERTIES. COORDINATE WITH
THE PARK AND THE CONTRACTING OFFICER.
H. IF HAZARDOUS MATERIALS ARE IDENTIFIED, THE CONTRACTOR
SHALL STOP WORK AND IMMEDIATELY NOTIFY THE CONTRACTING
OFFICER FOR DIRECTION.
I. PROTECT EXISTING HISTORIC FEATURES. COORDINATE WITH THE
PARK AND THE CONTRACTING OFFICER.
DEMOLITION PLAN LEGEND:
EXISTING TO
REMAIN (SOLID
GRAY LINES)
EXISTING TO
BE DEMOED
(DASHED LINES)
AD135
AD135
AD135
AD135
D3
EXISTING EXTERIOR
STONE STEP BELOW
EXISTING EXTERIOR
STONE STEP BELOW
EXISTING LOW
STONE WALL BELOW
LINE OF FACE OF EXISTING
STONE WALL BELOW
D14
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
LOCATION WITHIN PARK
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:1
:0
P M
DEMOLITION ROOF PLAN AND
ELEVATIONS - CHAPELAD135
C.BAXTER
J.RYAN
J.MORGAN
7 28
BARN, PAVILION, AND CHAPEL 196
166033
251091
BISCAYNE NATIONAL PARK06/27/2022
AD135
4 DEMOLITION - CHAPEL SOUTH ELEVATION
AD135
3 DEMOLITION - CHAPEL EAST ELEVATION
AD135
2 DEMOLITION - CHAPEL NORTH ELEVATION
AD135
5 DEMOLITION - CHAPEL WEST ELEVATION
SCALE OF FEET
AD135
1 DEMOLITION - CHAPEL ROOF PLAN
SEE MASTER KEY ON G101 FOR COMPLETE LIST
DEMOLITION REFLECTED CEILING PLAN KEYNOTES
TAG # TAG DESCRIPTION
D3 REMOVE EXISTING ASPHALT SHINGLE ROOF AND UNDERLAYMENT
DOWN TO WOOD ROOF DECK.
D14 HISTORIC METAL RIDGE CAP TO BE SALVAGED IN ORDER TO BE
DUPLICATED
B L D
G
TEMPORARY PROTECTION THROUGHOUT THE PROJECT TO
SAFEGUARD THE SURFACE QUALITY OF FINISHES TO REMAIN.
B. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK,
BRING ANY DISCREPANCIES FROM THE DRAWINGS AND NOTES TO
THE CO IMMEDIATELY. MINOR CHANGES IN THE SCOPE OF THE
DEMOLITION WORK SHALL NOT JUSTIFY ANY ADDITIONAL COST.
C. ANY EXISTING ITEM TO REMAIN THAT IS DEMOLISHED OR DAMAGED
BY DEMOLITION SHALL BE REPLACED WITH AN EQUAL ITEM OR
BETTER AS APPROVED BY THE CONTRACTING OFFICER AT NO COST
TO THE GOVERNMENT.
D. FURNISH, INSTALL, AND MAINTAIN IN SAFE CONDITIONS AT ALL
TIMES TEMPORARY PROTECTION REQUIRED TO ENSURE SAFETY
FOR PERSONS AND PROPERTY DURING DEMOLITION AND REMOVAL
WORK.
E. CLEAN JOB SITE DAILY BY REMOVING SCRAPS, DEBRIS, AND WASTE
MATERIALS OUTSIDE OF PARK BOUNDARIES.
F. SEE STRUCTURAL AND ELECTRICAL PLANS FOR ADDITIONAL
DEMOLITION
G. ALL FEATURES TO BE REPAIRED / REPLACED SHALL BE REPAIRED /
REPLACED WITH LIKE IN KIND OR BETTER MATERIALS AND
COMPLIES WITH THE SECRETARY OF THE INTERIOR'S STANDARDS
FOR THE TREATMENT OF HISTORIC PROPERTIES. COORDINATE WITH
THE PARK AND THE CONTRACTING OFFICER.
H. IF HAZARDOUS MATERIALS ARE IDENTIFIED, THE CONTRACTOR
SHALL STOP WORK AND IMMEDIATELY NOTIFY THE CONTRACTING
OFFICER FOR DIRECTION.
I. PROTECT EXISTING HISTORIC FEATURES. COORDINATE WITH THE
PARK AND THE CONTRACTING OFFICER.
DEMOLITION PLAN LEGEND:
EXISTING TO
REMAIN (SOLID
GRAY LINES)
EXISTING TO
BE DEMOED
(DASHED LINES)
D3
D6
D7D5
AD115
D5
D7
D6
D8
D3
D8 D8
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
LOCATION WITHIN PARK
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:1
:0
P M
DEMOLITION ELEVATIONS -
BARNAD211
C.BAXTER
J.RYAN
J.MORGAN
8 28
BARN, PAVILION, AND CHAPEL 196
166033
251091
BISCAYNE NATIONAL PARK06/27/2022
SCALE OF FEET
AD211
1 DEMOLITION - BARN NORTH ELEVATION
AD211
2 DEMOLITION - BARN SOUTH ELEVATION
SEE MASTER KEY ON G101 FOR COMPLETE LIST
DEMOLITION ROOF PLAN KEYNOTES
TAG # TAG DESCRIPTION
D3 REMOVE EXISTING ASPHALT SHINGLE ROOF AND UNDERLAYMENT
DOWN TO WOOD ROOF DECK.
D5 REMOVE ALL EXISTING SOLAR PANELS AND SUPPORTING
STRUCTURE BACK TO DECK. SEE ELECTRICAL DRAWINGS.
D6 REMOVE EXISTING FLASHING AROUND CHIMNEYS AND PREP FOR
NEW. EXISTING CHIMNEYS TO REMAIN. CHIMNEY TO BE SHORED UP
FROM BELOW PRIOR TO ANY ROOF WORK. SEE A111 FOR CHIMNEY
SHORING INFORMATION.
D7 REMOVE EXISTING LIGHTNING PROTECTION SYSTEM. SEE
ELECTRICAL DRAWINGS.
D8 REMOVE EXISTING GUTTERS AND DOWNSPOUTS. SEE DETAIL
2/AD115 FOR ADDITIONAL INFORMATION.
D8
D3
D5
D6
D7
D7
D6
D3
D8
D5
GENERAL DEMOLITION NOTES:
A. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR USING
TEMPORARY PROTECTION THROUGHOUT THE PROJECT TO
SAFEGUARD THE SURFACE QUALITY OF FINISHES TO REMAIN.
B. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK,
BRING ANY DISCREPANCIES FROM THE DRAWINGS AND NOTES TO
THE CO IMMEDIATELY. MINOR CHANGES IN THE SCOPE OF THE
DEMOLITION WORK SHALL NOT JUSTIFY ANY ADDITIONAL COST.
C. ANY EXISTING ITEM TO REMAIN THAT IS DEMOLISHED OR DAMAGED
BY DEMOLITION SHALL BE REPLACED WITH AN EQUAL ITEM OR
BETTER AS APPROVED BY THE CONTRACTING OFFICER AT NO COST
TO THE GOVERNMENT.
D. FURNISH, INSTALL, AND MAINTAIN IN SAFE CONDITIONS AT ALL
TIMES TEMPORARY PROTECTION REQUIRED TO ENSURE SAFETY
FOR PERSONS AND PROPERTY DURING DEMOLITION AND REMOVAL
WORK.
E. CLEAN JOB SITE DAILY BY REMOVING SCRAPS, DEBRIS, AND WASTE
MATERIALS OUTSIDE OF PARK BOUNDARIES.
F. SEE STRUCTURAL AND ELECTRICAL PLANS FOR ADDITIONAL
DEMOLITION
G. ALL FEATURES TO BE REPAIRED / REPLACED SHALL BE REPAIRED /
REPLACED WITH LIKE IN KIND OR BETTER MATERIALS AND
COMPLIES WITH THE SECRETARY OF THE INTERIOR'S STANDARDS
FOR THE TREATMENT OF HISTORIC PROPERTIES. COORDINATE WITH
THE PARK AND THE CONTRACTING OFFICER.
H. IF HAZARDOUS MATERIALS ARE IDENTIFIED, THE CONTRACTOR
SHALL STOP WORK AND IMMEDIATELY NOTIFY THE CONTRACTING
OFFICER FOR DIRECTION.
I. PROTECT EXISTING HISTORIC FEATURES. COORDINATE WITH THE
PARK AND THE CONTRACTING OFFICER.
DEMOLITION PLAN LEGEND:
EXISTING TO
REMAIN (SOLID
GRAY LINES)
EXISTING TO
BE DEMOED
(DASHED LINES)
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
LOCATION WITHIN PARK
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:1
:0
P M
DEMOLITION ELEVATIONS -
BARNAD212
C.BAXTER
J.RYAN
J.MORGAN
9 28
BARN, PAVILION, AND CHAPEL 196
166033
251091
BISCAYNE NATIONAL PARK06/27/2022
AD212
1 DEMOLITION - BARN EAST ELEVATION
AD212
2 DEMOLITION - BARN WEST ELEVATION
SCALE OF FEET
SEE MASTER KEY ON G101 FOR COMPLETE LIST
DEMOLITION ROOF PLAN KEYNOTES
TAG # TAG DESCRIPTION
D3 REMOVE EXISTING ASPHALT SHINGLE ROOF AND UNDERLAYMENT
DOWN TO WOOD ROOF DECK.
D5 REMOVE ALL EXISTING SOLAR PANELS AND SUPPORTING
STRUCTURE BACK TO DECK. SEE ELECTRICAL DRAWINGS.
D6 REMOVE EXISTING FLASHING AROUND CHIMNEYS AND PREP FOR
NEW. EXISTING CHIMNEYS TO REMAIN. CHIMNEY TO BE SHORED UP
FROM BELOW PRIOR TO ANY ROOF WORK. SEE A111 FOR CHIMNEY
SHORING INFORMATION.
D7 REMOVE EXISTING LIGHTNING PROTECTION SYSTEM. SEE
ELECTRICAL DRAWINGS.
D8 REMOVE EXISTING GUTTERS AND DOWNSPOUTS. SEE DETAIL
2/AD115 FOR ADDITIONAL INFORMATION.
AD125
EXISTING PICNIC TABLES TO
BE MOVED TO PROTECTED
LOCATION DURING
CONSTRUCTION.
COORDINATE WITH CO.
EXISTING HISTORIC
COLUMNS AND COLUMN
CAPITALS TO REMAIN
EXISTING STEPS
TO REMAIN
D3
D11
D10D9
EXISTING PICNIC TABLES TO
BE MOVED TO PROTECTED
LOCATION DURING
CONSTRUCTION.
COORDINATE WITH CO.
AD125
D3
D13
D11
EXISTING HISTORIC
COLUMNS AND COLUMN
CAPITALS TO REMAIN
EXISTING STEPS
TO REMAIN
D10D9
EXISTING PICNIC TABLES TO
BE MOVED TO PROTECTED
LOCATION DURING
CONSTRUCTION.
COORDINATE WITH CO.
D3
D13
D11
AD125
EXISTING HISTORIC
COLUMNS AND COLUMN
CAPITALS TO REMAIN
EXISTING STEPS
TO REMAIN
D10D9
EXISTING PICNIC TABLES TO
BE MOVED TO PROTECTED
LOCATION DURING
CONSTRUCTION.
COORDINATE WITH CO.
AD125
EXISTING HISTORIC
COLUMNS AND COLUMN
CAPITALS TO REMAIN
EXISTING STEPS
TO REMAIN
D3
D13
D11
D9D10
GENERAL DEMOLITION NOTES:
A. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR USING
TEMPORARY PROTECTION THROUGHOUT THE PROJECT TO
SAFEGUARD THE SURFACE QUALITY OF FINISHES TO REMAIN.
B. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK,
BRING ANY DISCREPANCIES FROM THE DRAWINGS AND NOTES TO
THE CO IMMEDIATELY. MINOR CHANGES IN THE SCOPE OF THE
DEMOLITION WORK SHALL NOT JUSTIFY ANY ADDITIONAL COST.
C. ANY EXISTING ITEM TO REMAIN THAT IS DEMOLISHED OR DAMAGED
BY DEMOLITION SHALL BE REPLACED WITH AN EQUAL ITEM OR
BETTER AS APPROVED BY THE CONTRACTING OFFICER AT NO COST
TO THE GOVERNMENT.
D. FURNISH, INSTALL, AND MAINTAIN IN SAFE CONDITIONS AT ALL
TIMES TEMPORARY PROTECTION REQUIRED TO ENSURE SAFETY
FOR PERSONS AND PROPERTY DURING DEMOLITION AND REMOVAL
WORK.
E. CLEAN JOB SITE DAILY BY REMOVING SCRAPS, DEBRIS, AND WASTE
MATERIALS OUTSIDE OF PARK BOUNDARIES.
F. SEE STRUCTURAL AND ELECTRICAL PLANS FOR ADDITIONAL
DEMOLITION
G. ALL FEATURES TO BE REPAIRED / REPLACED SHALL BE REPAIRED /
REPLACED WITH LIKE IN KIND OR BETTER MATERIALS AND
COMPLIES WITH THE SECRETARY OF THE INTERIOR'S STANDARDS
FOR THE TREATMENT OF HISTORIC PROPERTIES. COORDINATE WITH
THE PARK AND THE CONTRACTING OFFICER.
H. IF HAZARDOUS MATERIALS ARE IDENTIFIED, THE CONTRACTOR
SHALL STOP WORK AND IMMEDIATELY NOTIFY THE CONTRACTING
OFFICER FOR DIRECTION.
I. PROTECT EXISTING HISTORIC FEATURES. COORDINATE WITH THE
PARK AND THE CONTRACTING OFFICER.
DEMOLITION PLAN LEGEND:
EXISTING TO
REMAIN (SOLID
GRAY LINES)
EXISTING TO
BE DEMOED
(DASHED LINES)
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
LOCATION WITHIN PARK
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:1
:0
P M
DEMOLITION ELEVATIONS -
PAVILIONAD221
C.BAXTER
J.RYAN
J.MORGAN
10 28
BARN, PAVILION, AND CHAPEL 196
166033
251091
BISCAYNE NATIONAL PARK06/27/2022
AD221
1 DEMOLITION - PAVILION NORTH ELEVATION
AD221
2 DEMOLITION - PAVILION EAST ELEVATION
AD221
3 DEMOLITION - PAVILION SOUTH ELEVATION
AD221
4 DEMOLITION - PAVILION WEST ELEVATION
SCALE OF FEET
SEE MASTER KEY ON G101 FOR COMPLETE LIST
DEMOLITION ELEVATION KEYNOTES
TAG # TAG DESCRIPTION
D3 REMOVE EXISTING ASPHALT SHINGLE ROOF AND UNDERLAYMENT
DOWN TO WOOD ROOF DECK.
D9 REMOVE EXISTING TONGUE AND GROOVE WOOD DECKING AND
WOOD FRAMING SYSTEM. SEE STRUCTURAL DRAWINGS.
D10 REMOVE EXISTING WOOD RAFTERS. SEE STRUCTURAL DRAWINGS.
D11 REMOVE EXISTING WOOD TRIM. SEE DETAIL 3/AD125.
D13 REMOVE ROOF-MOUNTED FLAG LIGHT
A. DO NOT SCALE DRAWINGS. USE DIMENSIONS ONLY.
B. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND JOB CONDITIONS
AND NOTIFY THE CONTRACTING OFFICER IMMEDIATELY OF
DISCREPANCIES BEFORE PROCEEDING WITH THE WORK.
C. NO CHANGES, MODIFICATIONS OR DEVIATIONS SHALL BE MADE
FROM THE DRAWINGS WITHOUT FIRST SECURING WRITTEN
PERMISSION FROM THE CONTRACTING OFFICER.
D. REQUEST WRITTEN INTERPRETATION FROM THE CONTRACTING
OFFICER FOR ANY LACK OF OR AMBIGUITY OF INFORMATION IN THE
DRAWINGS PRIOR TO PROCEEDING WITH THAT PORTION OF THE
WORK.
E. CONTRACTOR TO MAINTAIN ORDERLY AND CLEAN WORK SITE FOR
THE DURATION OF THE PROJECT. WORK SITE SHALL BE CLEANED
DAILY TO MAINTAIN A NEAT AND ORDERLY WORK ENVIRONMENT.
SITE SHOULD APPEAR NEAT TO THE VISITING PUBLIC
F. SEE STRUCTURAL DRAWINGS, ELECTRICAL DRAWINGS, AND
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
GENERAL NOTES:
A301
A301
A212
A212
A211
A211
EXISTING CONCRETE SLAB
EXISTING CONCRETE SLAB
EXISTING
WATER TANKS
EXISTING GRAVEL
EXISTING
CHIMNEY
ABOVE
EXISTING
CHIMNEY ABOVE
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
LOCATION WITHIN PARK
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:0
:0
P M
FLOOR PLAN - BARN
A111
C.BAXTER
J.RYAN
J.MORGAN
11 28
BARN, PAVILION, AND CHAPEL 196
166033
251091
BISCAYNE NATIONAL PARK06/27/2022
SCALE OF FEET
B L D
G
A111
1 BARN FLOOR PLAN
SEE MASTER KEY ON G101 FOR COMPLETE LIST
FLOOR PLAN KEYNOTES
TAG # TAG DESCRIPTION
1 IN BUILDING INTERIOR, SHORE UP CHIMNEY SLAB PRIOR TO ANY
WORK OCCURRING ON ROOF. SEE S121 FOR ADDITIONAL
INFORMATION. SHOP DRAWINGS TO BE SUBMITTED FOR REVIEW
PRIOR TO CONTRACTOR INSTALLATION.
2 NEW ELECTRICAL WORK. SEE ELECTRICAL DRAWINGS
A. DO NOT SCALE DRAWINGS. USE DIMENSIONS ONLY.
B. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND JOB CONDITIONS
AND NOTIFY THE CONTRACTING OFFICER IMMEDIATELY OF
DISCREPANCIES BEFORE PROCEEDING WITH THE WORK.
C. NO CHANGES, MODIFICATIONS OR DEVIATIONS SHALL BE MADE
FROM THE DRAWINGS WITHOUT FIRST SECURING WRITTEN
PERMISSION FROM THE CONTRACTING OFFICER.
D. REQUEST WRITTEN INTERPRETATION FROM THE CONTRACTING
OFFICER FOR ANY LACK OF OR AMBIGUITY OF INFORMATION IN THE
DRAWINGS PRIOR TO PROCEEDING WITH THAT PORTION OF THE
WORK.
E. CONTRACTOR TO MAINTAIN ORDERLY AND CLEAN WORK SITE FOR
THE DURATION OF THE PROJECT. WORK SITE SHALL BE CLEANED
DAILY TO MAINTAIN A NEAT AND ORDERLY WORK ENVIRONMENT.
SITE SHOULD APPEAR NEAT TO THE VISITING PUBLIC
F. SEE STRUCTURAL DRAWINGS, ELECTRICAL DRAWINGS, AND
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
GENERAL NOTES:
A301
A301
A212
A212
A211
A211
EXISTING CONCRETE SLAB BELOW
LINE OF FACE OF EXISTING
STONE WALL BELOW
/2
V
IF
/2
V
IF
V
IF
VIF
± 70' - 0"
S L O
P E
:1
S L O
P E
:1
EQEQEQEQ
/2
BARN ROOFING BASIS OF DESIGN:
NEW CORRUGATED ALUM. PANELS ON EXISTING / NEW PLYWOOD
DECKING.
MFR: PAC CLAD ALUMINUM
PRODUCT: 7/8" COATED CORRUGATED, 0.040 ALUM., 39.75" WIDE
PANELS
COLOR: ZINC
GUTTERS AND DOWNSPOUTS: TO MATCH ROOF COLOR. NOTE:
GUTTERS TO TRANSITION TO MATCH EXISTING PVC INSIDE
BUILDING.
HIP / RIDGE FLASHING: TO MATCH ROOF COLOR
CHIMNEY FLASHING: TO MATCH EXISTING COLOR. COORDINATE
WITH CO.
ALL OTHER FLASHING: TO MATCH ROOF COLOR
NOTE: GENERAL CONTRACTOR IS TO COORDINATE WITH THE CO
FOR FINAL COLORS PRIOR TO ORDERING.
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
LOCATION WITHIN PARK
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:0
:4
P M
ROOF PLAN - BARN
A115
C.BAXTER
J.RYAN
J.MORGAN
12 28
BARN, PAVILION, AND CHAPEL 196
166033
251091
BISCAYNE NATIONAL PARK06/27/2022
A115
1 BARN ROOF PLAN
SCALE OF FEET
B L D
G
SEE MASTER KEY ON G101 FOR COMPLETE LIST
ROOF PLAN KEYNOTES
TAG # TAG DESCRIPTION
3 NEW CORRUGATED METAL ROOF OVER NEW UNDERLAYMENT.
5 NEW SOLAR PANEL SYSTEM TO BE SUPPORTED BY BRACKETS
CONNECTED TO ROOF STRUCTURAL MEMBERS. SEE ELECTRICAL
DRAWINGS.
6 NEW ALUMINUM FLASHING AT ROOF TO EXISTING TO REMAIN
STONE CHIMNEYS. USE ROOFING CEMENT BEHIND FLASHING AND
BEAD FLASHING AT TOP EDGE. FLASHING TO MATCH EXISTING,
HISTORICAL PATTERN.
7 NEW LIGHTNING PROTECTION SYSTEM. SEE ELECTRICAL
DRAWINGS.
8 NEW 6" HALF-ROUND ALUMINUM GUTTER AND 4" ROUND ALUMINUM
DOWNSPOUT SYSTEM THAT TIE INTO EXISTING WATER TANK
SYSTEM. TRANSITION TO PVC DOWNSPOUTS INSIDE BUILDING. SEE
DETAIL 5/A351.
A301
A301
A221
A221
A221
A221
LINE OF EXISTING HISTORIC
COLUMNS BELOW (TYP)
V
IF
VIF
± 16' - 5"
S L O
P E
/8
:1
S L O
P E
/8
:1
SLOPE
± 4 3/8:12
SLOPE
± 4 3/8:12
S L O
P E
/4
:1
S L O
P E
/4
:1
SLOPE
± 2 3/4:12
SLOPE
± 2 3/4:12
A. DO NOT SCALE DRAWINGS. USE DIMENSIONS ONLY.
B. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND JOB CONDITIONS
AND NOTIFY THE CONTRACTING OFFICER IMMEDIATELY OF
DISCREPANCIES BEFORE PROCEEDING WITH THE WORK.
C. NO CHANGES, MODIFICATIONS OR DEVIATIONS SHALL BE MADE
FROM THE DRAWINGS WITHOUT FIRST SECURING WRITTEN
PERMISSION FROM THE CONTRACTING OFFICER.
D. REQUEST WRITTEN INTERPRETATION FROM THE CONTRACTING
OFFICER FOR ANY LACK OF OR AMBIGUITY OF INFORMATION IN THE
DRAWINGS PRIOR TO PROCEEDING WITH THAT PORTION OF THE
WORK.
E. CONTRACTOR TO MAINTAIN ORDERLY AND CLEAN WORK SITE FOR
THE DURATION OF THE PROJECT. WORK SITE SHALL BE CLEANED
DAILY TO MAINTAIN A NEAT AND ORDERLY WORK ENVIRONMENT.
SITE SHOULD APPEAR NEAT TO THE VISITING PUBLIC
F. SEE STRUCTURAL DRAWINGS, ELECTRICAL DRAWINGS, AND
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
GENERAL NOTES:
A301
A301
EXISTING HISTORIC
COLUMNS TO REMAIN (TYP)
PAVILION ROOFING BASIS OF DESIGN:
NEW CONCRETE TILE ON NEW T&G WOOD DECKING
MFR: BORAL
PRODUCT: BERMUDA SMOOTH, 10" X 16" PANEL
COLOR: BOCA WHITE
HIP / RIDGE: TO MATCH ROOF
EAVE DRIP EDGE FLASHING: TO MATCH PAINTED WOOD TRIM
EXPOSED METAL: PAINT TO MATCH SURROUNDING SURFACES
DECORATIVE WOOD TRIM: FINISH TO MATCH EXISTING HISTORIC
COLOR
RAFTERS: CYPRESS. SEE STRUCTURAL
T&G WOOD DECKING: CYPRESS. BOARD WIDTHS TO MATCH
EXISTING. SEE STRUCTURAL
NOTE: GENERAL CONTRACTOR IS TO COORDINATE WITH THE CO
FOR FINAL COLORS PRIOR TO ORDERING.
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
LOCATION WITHIN PARK
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:0
:4
P M
ROOF PLAN - PAVILION
A125
C.BAXTER
J.RYAN
J.MORGAN
13 28
BARN, PAVILION, AND CHAPEL 196
166033
251091
BISCAYNE NATIONAL PARK06/27/2022
A125
2 PAVILION ROOF PLAN
SCALE OF FEET
B L D
G
A125
1 PAVILION REFLECTED CEILING PLAN
SEE MASTER KEY ON G101 FOR COMPLETE LIST
ROOF PLAN KEYNOTES
TAG # TAG DESCRIPTION
4 NEW CONCRETE TILE ROOF ON (2) NEW LAYERS OF
UNDERLAYMENT OVER NEW 1/2" PLYWOOD SHEATHING. WHERE
FIELD CUT TILES ARE USED AT THE RIDGE, ATTACH THE CUT TILE
AND FULL TILE EACH SIDE OF TOP RIDGE COURSE TO THE
UNDERLAYMENT WITH MANUFACTURER APPROVED MORTAR AND
MANUFACTURER APPROVED ADHESIVE AT THE TILE OVERLAPS.
9 NEW T&G WOOD ROOF DECK. SEE STRUCTURAL DRAWINGS.
10 NEW WOOD ROOF RAFTERS. SEE STRUCTURAL DRAWINGS.
11 NEW DECORATIVE WOOD TRIM TO MATCH EXISTING HISTORIC
PROFILE AND FINISH. SEE DETAILS. COORDINATE WITH THE PARK
AND THE CO.
12 NEW METAL ROD TO MATCH EXISTING ELEMENTS AND COLOR.
COORDINATE WITH THE PARK AND THE CO.
A301
FFE
0'-0"
T/O CONC WALL
± 9'-11"
T/O ROOF
± 18'-2"
A301
A301
FFE
0'-0"
T/O CONC WALL
± 9'-11"
T/O ROOF
± 18'-2"
A301
A301
A135
A135
A135
A135
LINE OF FACE OF EXISTING
STONE WALL BELOW
EXISTING EXTERIOR
STONE STEP BELOW
EXISTING EXTERIOR
STONE STEP BELOW
EXISTING LOW
STONE WALL BELOW
S L O
P E
:1
S L O
P E
:1
CHAPEL ROOFING BASIS OF DESIGN:
NEW SHINGLES ON EXISTING T&G WOOD DECKING
MFR: OWENS CORNING
PRODUCT: SUPREME, AR 3 TAB, 12x36
NOA: 18-0215-01
COLOR: ASPEN GRAY
HIP / RIDGE FLASHING: TO MATCH EXISTING ORIGINAL METAL
RIDGE CAP. COORDINATE WITH CO.
FLASHING: TO MATCH ROOF COLOR
NOTE: GENERAL CONTRACTOR IS TO COORDINATE WITH THE CO
FOR FINAL COLORS PRIOR TO ORDERING.
A. DO NOT SCALE DRAWINGS. USE DIMENSIONS ONLY.
B. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND JOB CONDITIONS
AND NOTIFY THE CONTRACTING OFFICER IMMEDIATELY OF
DISCREPANCIES BEFORE PROCEEDING WITH THE WORK.
C. NO CHANGES, MODIFICATIONS OR DEVIATIONS SHALL BE MADE
FROM THE DRAWINGS WITHOUT FIRST SECURING WRITTEN
PERMISSION FROM THE CONTRACTING OFFICER.
D. REQUEST WRITTEN INTERPRETATION FROM THE CONTRACTING
OFFICER FOR ANY LACK OF OR AMBIGUITY OF INFORMATION IN THE
DRAWINGS PRIOR TO PROCEEDING WITH THAT PORTION OF THE
WORK.
E. CONTRACTOR TO MAINTAIN ORDERLY AND CLEAN WORK SITE FOR
THE DURATION OF THE PROJECT. WORK SITE SHALL BE CLEANED
DAILY TO MAINTAIN A NEAT AND ORDERLY WORK ENVIRONMENT.
SITE SHOULD APPEAR NEAT TO THE VISITING PUBLIC
F. SEE STRUCTURAL DRAWINGS, ELECTRICAL DRAWINGS, AND
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
GENERAL NOTES:
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
LOCATION WITHIN PARK
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:0
:4
P M
ROOF PLAN AND EXTERIOR
ELEVATION - CHAPELA135
C.BAXTER
J.RYAN
J.MORGAN
14 28
BARN, PAVILION, AND CHAPEL 196
166033
251091
BISCAYNE NATIONAL PARK06/27/2022
SCALE OF FEET
A135
2 CHAPEL NORTH EXTERIOR ELEVATION
A135
3 CHAPEL EAST EXTERIOR ELEVATION
A135
4 CHAPEL SOUTH EXTERIOR ELEVATION
A135
5 CHAPEL WEST EXTERIOR ELEVATION
A135
1 CHAPEL ROOF PLAN
SEE MASTER KEY ON G101 FOR COMPLETE LIST
REFLECTED CEILING PLAN KEYNOTES
TAG # TAG DESCRIPTION
13 NEW ASPHALT SHINGLE ROOF AND UNDERLAYMENT ON EXISTING
WOOD ROOF DECK
14 NEW METAL RIDGE CAP TO MATCH HISTORIC METAL RIDGE CAP.
B L D
A301
FFE
0'-0"
B/O STRUCTURE
± 9'-3 3/8
T/O ROOF
± 24'-2"
A301
A301
FFE
0'-0"
B/O STRUCTURE
± 9'-3 3/8
T/O ROOF
± 24'-2"
8 8
A. DO NOT SCALE DRAWINGS. USE DIMENSIONS ONLY.
B. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND JOB CONDITIONS
AND NOTIFY THE CONTRACTING OFFICER IMMEDIATELY OF
DISCREPANCIES BEFORE PROCEEDING WITH THE WORK.
C. NO CHANGES, MODIFICATIONS OR DEVIATIONS SHALL BE MADE
FROM THE DRAWINGS WITHOUT FIRST SECURING WRITTEN
PERMISSION FROM THE CONTRACTING OFFICER.
D. REQUEST WRITTEN INTERPRETATION FROM THE CONTRACTING
OFFICER FOR ANY LACK OF OR AMBIGUITY OF INFORMATION IN THE
DRAWINGS PRIOR TO PROCEEDING WITH THAT PORTION OF THE
WORK.
E. CONTRACTOR TO MAINTAIN ORDERLY AND CLEAN WORK SITE FOR
THE DURATION OF THE PROJECT. WORK SITE SHALL BE CLEANED
DAILY TO MAINTAIN A NEAT AND ORDERLY WORK ENVIRONMENT.
SITE SHOULD APPEAR NEAT TO THE VISITING PUBLIC
F. SEE STRUCTURAL DRAWINGS, ELECTRICAL DRAWINGS, AND
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
GENERAL NOTES:
BARN ROOFING BASIS OF DESIGN:
NEW CORRUGATED ALUM. PANELS ON EXISTING / NEW PLYWOOD
DECKING.
MFR: PAC CLAD ALUMINUM
PRODUCT: 7/8" COATED CORRUGATED, 0.040 ALUM., 39.75" WIDE
PANELS
COLOR: ZINC
GUTTERS AND DOWNSPOUTS: TO MATCH ROOF COLOR. NOTE:
GUTTERS TO TRANSITION TO MATCH EXISTING PVC INSIDE
BUILDING.
HIP / RIDGE FLASHING: TO MATCH ROOF COLOR
CHIMNEY FLASHING: TO MATCH EXISTING COLOR. COORDINATE
WITH CO.
ALL OTHER FLASHING: TO MATCH ROOF COLOR
NOTE: GENERAL CONTRACTOR IS TO COORDINATE WITH THE CO
FOR FINAL COLORS PRIOR TO ORDERING.
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
LOCATION WITHIN PARK
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:0
:3
P M
EXTERIOR ELEVATIONS -
BARNA211
C.BAXTER
J.RYAN
J.MORGAN
15 28
BARN, PAVILION, AND CHAPEL 196
166033
251091
BISCAYNE NATIONAL PARK06/27/2022
SCALE OF FEET
A211
1 BARN NORTH EXTERIOR ELEVATION
A211
2 BARN SOUTH EXTERIOR ELEVATION
SEE MASTER KEY ON G101 FOR COMPLETE LIST
ELEVATION KEYNOTES
TAG # TAG DESCRIPTION
3 NEW CORRUGATED METAL ROOF OVER NEW UNDERLAYMENT.
5 NEW SOLAR PANEL SYSTEM TO BE SUPPORTED BY BRACKETS
CONNECTED TO ROOF STRUCTURAL MEMBERS. SEE ELECTRICAL
DRAWINGS.
6 NEW ALUMINUM FLASHING AT ROOF TO EXISTING TO REMAIN
STONE CHIMNEYS. USE ROOFING CEMENT BEHIND FLASHING AND
BEAD FLASHING AT TOP EDGE. FLASHING TO MATCH EXISTING,
HISTORICAL PATTERN.
7 NEW LIGHTNING PROTECTION SYSTEM. SEE ELECTRICAL
DRAWINGS.
8 NEW 6" HALF-ROUND ALUMINUM GUTTER AND 4" ROUND ALUMINUM
DOWNSPOUT SYSTEM THAT TIE INTO EXISTING WATER TANK
FFE
0'-0"
B/O STRUCTURE
± 9'-3 3/8
T/O ROOF
± 24'-2"
± 9" / 12" ± 9" / 12"
T/O ROOF
± 24'-2"
B/O STRUCTURE
± 9'-3 3/8
FFE
0'-0"
± 9" / 12" ± 9" / 12"
A. DO NOT SCALE DRAWINGS. USE DIMENSIONS ONLY.
B. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND JOB CONDITIONS
AND NOTIFY THE CONTRACTING OFFICER IMMEDIATELY OF
DISCREPANCIES BEFORE PROCEEDING WITH THE WORK.
C. NO CHANGES, MODIFICATIONS OR DEVIATIONS SHALL BE MADE
FROM THE DRAWINGS WITHOUT FIRST SECURING WRITTEN
PERMISSION FROM THE CONTRACTING OFFICER.
D. REQUEST WRITTEN INTERPRETATION FROM THE CONTRACTING
OFFICER FOR ANY LACK OF OR AMBIGUITY OF INFORMATION IN THE
DRAWINGS PRIOR TO PROCEEDING WITH THAT PORTION OF THE
WORK.
E. CONTRACTOR TO MAINTAIN ORDERLY AND CLEAN WORK SITE FOR
THE DURATION OF THE PROJECT. WORK SITE SHALL BE CLEANED
DAILY TO MAINTAIN A NEAT AND ORDERLY WORK ENVIRONMENT.
SITE SHOULD APPEAR NEAT TO THE VISITING PUBLIC
F. SEE STRUCTURAL DRAWINGS, ELECTRICAL DRAWINGS, AND
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
GENERAL NOTES:
BARN ROOFING BASIS OF DESIGN:
NEW CORRUGATED ALUM. PANELS ON EXISTING / NEW PLYWOOD
DECKING.
MFR: PAC CLAD ALUMINUM
PRODUCT: 7/8" COATED CORRUGATED, 0.040 ALUM., 39.75" WIDE
PANELS
COLOR: ZINC
GUTTERS AND DOWNSPOUTS: TO MATCH ROOF COLOR. NOTE:
GUTTERS TO TRANSITION TO MATCH EXISTING PVC INSIDE
BUILDING.
HIP / RIDGE FLASHING: TO MATCH ROOF COLOR
CHIMNEY FLASHING: TO MATCH EXISTING COLOR. COORDINATE
WITH CO.
ALL OTHER FLASHING: TO MATCH ROOF COLOR
NOTE: GENERAL CONTRACTOR IS TO COORDINATE WITH THE CO
FOR FINAL COLORS PRIOR TO ORDERING.
DATE:
TECH REVIEW:
DESIGNED: SUB SHEET NO. DRAWING NO.
PMIS/PKG NO.
SHEET
OF
LOCATION WITHIN PARK
TITLE OF SHEET
A/E FIRM
CROFT &
ASSOCIATES
KENNESAW,
GEORGIA
/2
/2
:0
:5
P M
EXTERIOR ELEVATIONS -
BARNA212
C.BAXTER
J.RYAN
J.MORGAN
16 28
BARN, PAVILION, AND CHAPEL 196
166033
251091
BISCAYNE NATIONAL PARK06/27/2022
A212
1 BARN EAST…
This is the start of the file's text. The full file is on GovTribe.