B08_Contract_Price_Schedule.pdf
PDF 97 KB Posted
- Attached to
- Replace Courtesy Dock, Lake Mead, Nevada Federal contract opportunity
- Solicitation number
- 140P8122R0005
About this file
This document contains a price schedule for replacing courtesy docks at two lake locations on behalf of the National Park Service. The schedule breaks out pricing for individual work items including dock recycling, ramp replacement, walkway installation, and floating dock replacement at Hemenway Harbor and Willow Beach. The total price for each location is also provided, and the overall contract will be awarded as a lump sum equal to the combined total of all eight work items. The solicitation specifies this will be a firm fixed-price contract governed by FAR Subpart 15.4, with all costs to perform the work according to the project specifications to be included in the pricing.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B08_Release_of_Claims.pdf | ||
| B08_Invoice_Payment_Request.docx | DOCX document | |
| B08_Transmittal.pdf | ||
| B03_General_Decision_AZ20220006.pdf | ||
| B03_General_Decision_NV20220024.pdf | ||
| A04_Project_Specifications.pdf | ||
| Sol_140P8122R0005.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Price Items – From Page 15 of the Project Specifications
Item No. 01 - Replace Courtesy Dock at Hemenway Harbor is the sum of items 1-4 in the table below.
Item No. 02 – Replace Courtesy Dock at Willow Beach is the sum of items 5-8 in the table below.
Item No.
Schedule of Values
Quantities
Unit
Total ($)
Replace Courtesy Docks 1 Recycle Courtesy Dock at Hemenway Harbor 1 EA 2 Replace Ramp at Hemenway Harbor 1 EA
3 Replace Two (2) Access Walkways at Hemenway Harbor 1 EA
4 Replace Floating Dock at Hemenway Harbor 1 EA
TOTAL for Hemenway Harbor Courtesy Dock 5 Recycle Courtesy Dock at Willow Beach 1 EA 6 Replace Ramp at willow Beach 1 EA 7 Replace Two (2) Access Walkways at Willow Beach 1 EA 8 Replace Floating Dock at Willow Beach 1 EA
TOTAL for Willow Beach Courtesy Dock TOTAL for Both Courtesy Docks
Note that this is FOB Destination. This is a firm fixed price requirement. All costs associated to perform the work in accordance to the Project Specifications shall be include. It is anticipated that award will be made as a lump sum.
For price evaluation purposes, price reasonableness will be based on the total sum of item prices 1-8 and requirements in FAR 15.420(a)(2).