About this file
This document is a Project Manual for an Aggregate Supply Contract for the Jab's Dike Repair project at the Minnesota Valley National Wildlife Refuge. The contract requires the contractor to furnish and deliver specific aggregate and fill materials to the project site, with a total estimated quantity of 100 tons of Type 2 Base Aggregate, 600 tons of Class IV Rip-Rap, 200 tons of "Shot" Rock Fill, and 150 cubic yards of General Fill Material. Delivery is to be made to Jab's Dike in Sand Creek Township, with most materials required in the summer of 2025 when dike repairs are anticipated.
The document specifies detailed requirements for material types, including that all aggregates must meet Minnesota Department of Transportation Standard Specifications, with recycled concrete not permitted. The contractor must provide delivery tickets, coordinate delivery amounts and timing with Refuge staff, and may need to use tandem axle dump trucks due to site conditions. The contract includes provisions for negotiating additional material quantities if needed, with potential credits to the government for less-than-estimated deliveries. Safety requirements include proper vehicle equipment, insurance, trained operators, and compliance with OSHA regulations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140FGA25Q0032_Amd_0001.pdf | ||
| B08_140FGAQ0032_TermsConditions_31pp.pdf | ||
| Sol_140FGA25Q0032.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Aggregate Supply Contract for the Jab’s Dike Repair project at the Minnesota Valley National Wildlife Refuge
United States Department of the Interior Fish and Wildlife Service
Infrastructure Management Division Region 3, Bloomington, MN 55437-1458
May 2025
PROJECT MANUAL
Table of Contents TOC - 1
TABLE OF CONTENTS
DIVISION 01 – GENERAL REQUIREMENTS
011000 General Requirements
DIVISION 32 – EXTERIOR IMPROVEMENTS
321123 Aggregate & General Fill Materials
Attachments Refuge Maps
GENERAL REQUIREMENTS (MATERIALS) 110000 - 1
SECTION 110000 – GENERAL REQUIREMENTS (MATERIALS)
PART 1 − GENERAL
1.1 SUMMARY
A. Section Includes:
1. Summary of work included under these specifications.
2. Site Location
3. Specifications
4. Government Testing
5. Site Access
6. Safety
1.2 SUMMARY OF WORK
A. The U.S. Fish & Wildlife Service is in need of aggregate and fill materials for the repairs of dikes at the Minnesota Valley NWR. The FWS staff is preparing to mobilize construction equipment in order to repair flooding damage that has occurred to infrastructure within the Refuge. The Contractor shall furnish & deliver to the project locations the following materials in the amounts specified and in compliance with the attached specifications.
MATERIALS LIST ESTIMATED QUANTITY
100 TONS
600 TONS
200 TONS
1. Type 2 Base Aggregate
2. Class IV Rip-Rap
3. “Shot” Rock Fill
4. General Fill Material 150 CUBIC YARDS
All materials shall be delivered to the project location at Jab’s Dike, Sand Creek TWSHP.
B. Delivery amounts per day shall be as requested by the Refuge Staff. A majority of the aggregate shall be required to be delivered in the summer of 2025 when the dike is anticipated to be repaired.
C. As part of typical construction, the Refuge staff may request the aggregates be tailgate spread along the parking lot or trail.
D. Because of site conditions, the materials may require delivery by tandem axle dump truck instead of larger tractor trailers.
E. If additional amounts of materials are required to complete the project, the contractor and government shall negotiate for a per ton cost for additional materials to be delivered. If the actual amounts needed to complete the project are less than the estimate then a credit to the government shall be given for the amounts not delivered to the site.
GENERAL REQUIREMENTS (MATERIALS) 110000 - 2
1.3 LOCATION & INSPECTION OF THE SITE
A. The work site is located at the existing Jab’s trail and dike within the Minnesota Valley NWR. Additional information on the location is attached.
B. All prospective bidders, contractors, subcontractors, and related persons are encouraged to visit the site of the proposed work and to assess the location and extent of the work prior to submitting bids/quotes.
1.4 SPECIFICATIONS
A. The attached specifications provide the requirements for the materials to be supplied.
B. The contractor shall be required to submit testing reports to the government to ensure the materials being supplied meet the specifications.
C. Testing submittals shall be submitted to the Contracting Officers Representative (COR) for review and approval before materials are ordered, fabricated, or delivered.
1.5 GOVERNMENT TESTING
A. The Government may at its expense perform testing of the materials being supplied to ensure that they meet the required specifications. The contractor shall be required to cooperate with and supply a small amount of material for testing purposes.
1.6 SITE ACCESS & RIGHT OF WAY
A. The construction access limits on Government property will be established by the Government and the Contractor shall be responsible for complying with these limits.
B. All bidders are reminded that they are responsible for contacting the local entity such as township, county, or state having jurisdiction in the project vicinity to insure bidders are aware of any requirements of the local entity. These requirements are between the entity and the bidder. Load limits and other restrictions shall be obeyed.
1.7 SAFETY
A. Contractor shall be responsible for ensuring that all delivery vehicles have proper safety equipment, insurance, and trained operators.
B. The Contractor shall provide Material Safety Data Sheets (MSDS) for all hazardous materials brought on-site.
C. All equipment and delivery activities shall comply with OSHA Regulations and all accidents incidental to work performed under this contract shall be reported in accordance with OSHA reporting requirements. Additionally, a copy of the accident report shall be provided to the Contracting Officer.
D. Provide necessary Personnel Protective Equipment (PPE) as identified by MSDS and OSHA regulations. Provide documentation, workers have been trained in use of PPE prior to individual use.
END OF SECTION 110000
AGGREGATE AND FILL MATERIALS 321123 - 1
SECTION 321123 – AGGREGATES AND FILL MATERIALS
PART 1 −GENERAL
1.1 SUMMARY
A. Section Includes:
1. Aggregate for dike repairs and protection.
2. General fill material for dike repairs.
1.2 REFERENCES
A. State of Minnesota Department of Transportation Standard Specifications for Highway Construction (MNDOT SS).
1.3 SUBMITTALS
A. Borrow Source(s): The Contractor shall provide the proposed source(s) for borrow material prior to initiation of work. Available/previous laboratory testing data shall be provided.
B. Test Reports: Submit 2 copies of the following test reports:
1. Gradation reports.
1.4 QUALITY ASSURANCE
A. Furnish each aggregate material from single source throughout the Work.
B. Perform Work in accordance with the Minnesota Department of Transportation Standard Specifications for Highway Construction (MNDOT SS). General Conditions, Payment, and Quantity provisions of the MNDOT SS, do not apply to this project.
C. Ensure aggregate is delivered to the project site with a moisture content within ±4% of optimum moisture content for compaction purposes. Add water as requested by the refuge staff to allow for appropriate compaction.
PART 2 −PRODUCTS
2.1 AGGREGATE MATERIALS
A. Type 2 Base Aggregate: Consisting of Crushed Stone aggregate meeting the requirements of MNDOT SS, TYPE “2” Aggregate for Surface or Base. Recycled concrete aggregates shall not be used.
AGGREGATE AND FILL MATERIALS 321123 - 2
B. Class IV Rip-Rap: Consisting of washed stone meeting the requirement of MNDOT SS, Class IV Rip-Rap. Recycled concrete or other materials shall not be used.
C. Shot-Rock Fill: Consisting of a mixture of various stone rip-rap sizes with fines as created during blasting. Recycled concrete or other materials shall not be used.
D. General Fill Material: Consisting of borrow material classified as silt loam, loam, clay loam, or a mixture of these types of soils. Soils shall be dry and suitable for compaction without the need for onsite added water.
PART 3 − EXECUTION
3.1 DELIVERY
A. Inspect the project site conditions before delivery to ensure vehicles access is sufficient.
B. Provide delivery tickets with total weight of aggregate being delivered from a State of Minnesota approved scale.
C. Coordinate with the Refuge staff to determine the exact amount, timing, and location of delivery Also, coordinate if they need the aggregate tailgate spread or piled on site.
D. Driver shall ensure mud, and debris is not tracked onto county or state roadways. Notify Refuge staff if cleaning equipment is required at entrance to site.
END OF SECTION 321123
Deliver Here
Louisville Swamp
M in ne so ta R
SM
IT
H
DR
LO
U
IS
VI
LL
E
R D
W 147TH ST
145TH ST W
R
ED
R O
C K D
R
SCOTT CO.
Prior Lake
New Prague
Shakopee
Belle Plaine
0 10 miles
M
AT
T M
IL
LE
TT
5/
/2
• U
TM
Z
O N
E
N (N
AD
H
AR
N
S O
U R
C
ES
: M
VN
W R
, M N
G
EO
, M N
D N
R , M
N D
O T
Minnesota Valley National Wildlife Refuge Louisville Swamp Unit
N
0 0.1 0.2 0.3 0.4 0.5 miles
Parking lot to site
From the south
From the north
Directions:
Parking Lot Refuge Boundary Refuge Trail
CHASKA Athletic Park Minnesota Valley
State Trail
Chaska Blvd.
Chaska L.
Chaska Unit
Riverside Park
Gifford Lake
(DNR)
Gifford L.
CARVER
W. 133rd St.
Carver Creek Trail
Carver Bluffs Pkwy.
Bluff Park
Ramsey Ave.
Rapids Lake Unit
Louisville Swamp Unit
Minnesota Renaissance
Festival
State Access Trail
W. 145th St.
Jabs Farm Site
JABS TRAIL
Louisville Swamp
Ehmiller Site
W. 147th St.
Rapids Lake Unit
Rapids L.
Johnson Slough
W. 150th St.
Rapids
Carver Rapids
(DNR)
Mazomani Trail
Rapids Lake Visitor Center Glacial
Erratic
Carve Rapids Lake Rd.
Forest Loop Trail
Middle Road Boulder r
Rapids Lake Unit
Louisville Swamp Unit
Long L.
Jailhouse Marsh W. 173rd St.
Duck Lane
Minnesota Valley State
Trail
W. 180th St.
p hlands D r.
Jo na th an
C ar ve r P kw y.
Jo na th an
C ar ve r P kw y.
X an ad u
Av e.
| JABS DIKE MATERIALS SOW.pdf |
| JabsDike.pdf |
File details come from the government source that posted it. Updated .