B08__Attachment_No__1_SOW.pdf
PDF 4 MB Posted
- Attached to
- AV FIRE CENTER HVAC REPLACEMENT Federal contract opportunity
- Solicitation number
- 140L1225Q0009
About this file
This document is a Statement of Work (SOW) for the Apple Valley Fire Station Heli-Base HVAC Replacement project for the Bureau of Land Management. The project requires a comprehensive HVAC system replacement at the Apple Valley Fire Center Heli-Base, located at 18809 Central Road, Apple Valley, CA. Specifically, the contractor must remove and install a 5-ton, 15.2 SEER, 96% AFUE complete split system, including an AC condenser unit, multi-positioned cased evaporator coil, new furnace, and air ducting.
The period of performance is one month, from May 19, 2025 to June 19, 2025. Key tasks include inspecting the existing system, removing old components, preparing surfaces, installing new HVAC equipment, commissioning the system, and ensuring efficient performance in extreme weather conditions. The contractor must dispose of all non-salvageable materials, maintain a clean work area, and provide system schematics, owner's manuals, and warranty documentation to the Contracting Officer's Representative (COR). The project requires certified technicians and compliance with safety standards, with the goal of restoring the facility's HVAC system to excellent working condition.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_0001.pdf | ||
| AVFC_HB_HVAC_Site_Visit_Sign_In_0001.pdf | ||
| Sol_140L1225Q0009_Amd_0001.pdf | ||
| B08_Attachment_No__3_Bid_Schedule.pdf | ||
| Sol_140L1225Q0009.pdf | ||
| B08_Attachment_No__2_WD.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION C, UNIFORM CONTRACT FORMAT (UCF)
DESCRIPTION / SPECIFICATION / STATEMENT OF WORK (SOW)
SOW Page 1
APPLE VALLEY FIRE STATION HELI-BASE HVAC
REPLACEMENT
Table of Contents SOW 1.0 Background on the Government’s Requirement SOW 2.0 General Scope of Work SOW 3.0 Overall Objective(s) SOW 4.0 Specific Tasks SOW 5.0 Delivery / Performance Schedule SOW 6.0 Government-Furnished Property, Materials, Services SOW 7.0 Security and Administrative Matters SOW 8.0 Technical Exhibits and Definitions
SOW Page 2
SOW 1.0 Background on the Government’s Requirement
The Barstow Field Office is requiring removal and installation services of 5-ton 15.2 SEER 96% AFUE complete split system including AC condenser unit, matching multi positioned cased evaporator coil, new furnace, and air ducting. This contract will cover all labor and parts needed to return Apple Valley Fire Center Heli-Base HVAC system to great working and physical condition.
SOW 2.0 General Scope of Work
Removal of existing AC condenser unit, multi positioned cased evaporator coil, furnace and any damaged non-salvageable components including air ducting. Replace AC condenser unit, multi-positioned cased evaporator coil, furnace, and any damaged non-salvageable components including air ducting. Contractor must dispose of all existing and non-salvageable materials. Contractor must have ability, equipment, and certified technicians to access AC condenser unit, matching multi positioned cased evaporator coil, furnace and air ducting. Contractor must have the ability, equipment, and certified technicians to remove existing AC condenser unit, matching multi positioned cased evaporator coil, furnace, and damaged air ducting. Contractor must have the ability, equipment and certified technicians to install AC condenser unit, matching multi positioned cased evaporator coil, furnace, and damaged air ducting. Contractor must have ability, equipment, and certified technicians to commission the installed HVAC system to efficient working condition. The AVFC Heli-Base must be restored to a climate-controlled building comfortable for maximum human occupancy. Efficient performance is required in extreme weather conditions. This place of performance must have a neat and clean appearance before leaving the facility at the end of each workday. The area of responsibility will be within 10 feet of work area.
Place of Performance:
The Apple Valley Fire Center Heli-Base is located at 18809 Central Road, Apple Valley CA, 92307. All the described services will be provided at The Apple Valley Fire Center Heli-Base. Maps of the location and units being replaced attached.
Period of Performance:
The period of performance shall be for 1 month. The Period of Performance reads as follows: May 19, 2025 – June 19, 2025. This should include the lead time supply order.
SOW 3.0 Overall Objective(s)
The objective of this work is to remove and replace Apple Valley Fire Center Heli-base HVAC system including AC condenser unit, matching multi positioned cased evaporator
SOW Page 3 coil, furnace, and any damaged components in order to restore the HVAC to great working and physical condition.
SOW 4.0 Specific Tasks
Furnish Equipment, Labor, and supplies required to inspect, remove, prepare, and replace HVAC system including AC condenser unit, matching multi positioned cased evaporator coil, furnace, damaged air ducting, and any other damaged non salvageable HVAC parts at The AVFC Heli-Base. The new system must be tested and in efficient working condition. New HVAC system must hold a warranty. New HVAC system must perform efficiently in extreme weather conditions. This place of performance must have a neat and clean appearance before leaving the facility at the end of the workday. The area of responsibility will be within 10 feet of work area.
Task 1: Inspect, assess, and plan for adequate equipment, technicians, and supplies to successfully and efficiently remove, prepare, and replace existing AC condenser unit, matching multi positioned cased evaporator coil, furnace, damaged non-salvageable air ducting, and any other components that are damaged or need to be replaced in order to restore visitor center HVAC system to efficient working condition. Dispose of all trash, waste, and debris produced during this task at an approved facility that is off BLM land.
This place of performance must have a neat and clean appearance before leaving the facility at the end of the workday. The area of responsibility will be within 10 feet of work area.
Task 2: Remove existing AC condenser unit located at northwest exterior of building on the ground. Remove matching multi positioned evaporator coil and furnace located in attic of AVFC Heli-Base. Remove all damaged non-salvageable HVAC components including air ducting which will need to be replaced to restore HVAC system to efficient working condition. Dispose of AC condenser unit, matching multi positioned cased evaporator coil, furnace, and any non-salvageable HVAC components including air ducting, trash, waste, and debris at an approved facility that is off BLM land. This place of performance must have a neat and clean appearance before leaving the facility at the end of the workday. The area of responsibility will be within 10 feet of work area.
Task 3: Prepare all surfaces, areas, and spaces for installation of new AC condenser unit, matching multi positioned cased evaporator coil, furnace, and any other HVAC components/materials including air ducting. Prepare all existing salvageable and usable HVAC components/materials for installation of new AC condenser unit, matching multi positioned cased evaporator coil, furnace and any other HVAC components including air ducting. Dispose of all non-salvageable components/materials, trash, waste, and debris produced during the preparation at an approved facility that is off BLM land. This place of performance must have a neat and clean appearance before leaving the facility at the end of the workday. The area of responsibility will be within 10 feet of work area.
SOW Page 4
Task 4: Install new AC condenser unit, matching multi positioned cased evaporator coil, furnace, and any other new HVAC components/materials needed to restore HVAC system to great working condition. Contractor must furnish all equipment, certified technicians and materials needed to restore HVAC to good working condition. AC condenser unit, matching multi positioned cased evaporator coil, furnace, and any other HVAC components/materials including air ducting installed must be in new condition.
Dispose of damaged or non-salvageable components/materials, trash, waste, and debris produced during installation at an approved facility that is off BLM land. This place of performance must have a neat and clean appearance before leaving the facility at the end of the workday. The area of responsibility will be within 10 feet of work area.
Task 5: Commission new AC condenser unit, matching multi positioned cased evaporator coil, furnace, and any new HVAC components/material including air ducting.
Thoroughly test HVAC system to ensure efficient working condition. HVAC must efficiently cool and heat The AVFC Heli-base to comfortable temperature up to maximum human occupancy of AVFC Heli-Base. HVAC system must work efficiently in extreme weather conditions. Dispose of damaged or non-salvageable components/materials, trash, waste, and debris produced during commissioning at an approved facility that is off BLM land. This place of performance must have a neat and clean appearance before leaving the facility at the end of the workday. The area of responsibility will be within 10 feet of work area.
Task 6: Repair any damages to building and surrounding area. Place of performance will be left in the exact same condition and appearance as it was before removal, preparation, and installation of new HVAC system. Dispose of damaged or non-salvageable components/materials, trash, waste, and debris produced during at an approved facility that is off BLM land. This place of performance must have a neat and clean appearance before leaving the facility at the end of the workday. The area of responsibility will be within 10 feet of work area.
Task 7: Provide new HVAC system schematics and owners manuals to COR. Provide proof and details of warranty to COR. Ensure COR and facility manager are aware of how to safely manage operation and maintenance of new HVAC system.
SOW 5.0 Delivery / Performance Schedule
Contractor must furnish Equipment, Labor, and supplies required to inspect, remove, prepare, and replace HVAC including AC condenser unit, matching multi positioned cased evaporator coil, furnace, damaged air ducting, and any other damaged non salvageable HVAC parts at The AVFC Heli-Base. The new system must be tested and in good working condition. New HVAC system must hold a warranty. New HVAC system must perform efficiently in extreme weather conditions. This place of performance must have a neat and clean appearance before leaving the facility at the end of the workday. The area of responsibility will be within 10 feet of work area.
SOW Page 5
Contractor must complete all specific tasks (SOW 4.0) within 48 hours of beginning specific task 1 within the dates May 19, 2025 – June 19, 2025. The scheduling of services or specific tasks will be agreed upon by both the assigned government COR and the awarded contractor.
The Apple Valley Fire Center Heli-Base is located at 18809 Central Road, Apple Valley CA, 92307. All the described services will be provided at The AVFC Heli-Base. Maps of the location attached.
SOW 6.0 Government-Furnished Property, Materials, Services
General:
The Contractor shall furnish all personnel, materials, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the work tasks defined in this Statement of Work, except for those items specified as government furnished.
Materials:
The Government shall not furnish any materials.
Equipment:
The Government shall not furnish any equipment.
Facilities: The Government will provide restroom facilities and the necessary workspace for the contractor staff to provide the support outlined in the SOW to restroom accessibility.
Utilities:
The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish the work.
SOW Page 6
SOW 7.0 Security and Administrative Matters
Security:
The Contractor shall be responsible for safeguarding all Government property provided for Contractor use or under their control, including securing all facilities the Contractor may access after normal business hours.
Contractor shall coordinate work schedule with Contracting Officers Representative to minimize public and employee ingress/egress to the building.
Safety:
The Contractor shall not require, or allow any employee, engaged in the performance of this Contract to work under conditions which are unsanitary, hazardous, or dangerous to his/her health or safety, as determined under safety and health standards promulgated by the Secretary of Labor under Section 107 of the Contract Work Hours and Safety Standards Act (40 U.S.C. 327 et seq.) as amended and other Federal, State and applicable local government safety standards.
Department of Labor Code of Federal Regulations Title 29 and other Federal, State and local government safety standards will apply in its entirety to the Contractor.
Examples of applicable safety standards are OSHA 29 CFR 1910, OSHA 29 CFR 1926, California Title 19, "Public Safety", California Title 8, "General Industry Safety Orders", and 41 CFR, Subpart B, "Public Contracts, General Safety and Health Standards."
The contractor shall also use the “BLM SAFETY AND HEALTH STANDARDS” (The Yellow Book) for reference.
Should the contractor fail to comply with any of these standards and regulations, the contractor shall be found to have defaulted on the terms of the contract.
Contingency Plan:
Sudden or unusual events could result in a negative impact to the delivery / performance of these requirements.
As an aid to properly plan for such events, the Contractor shall prepare and submit for approval a Contingency Plan for each Place of Performance for these requirements.
The Contractor will outline in detail the method(s) that the Contractor shall use in meeting Contract requirements in the following circumstances:
• a natural disaster occurs which impacts upon the Contractor's ability to perform.
• a labor strike occurs which impacts upon the Contractor's ability to perform.
• a hazardous materials spill which impacts the Contractor’s ability to perform, or which may affect public safety.
• an incident which causes major damage which impacts the Contractor's ability to perform.
• other unforeseen circumstances In all cases, the Contractor will assume that government cannot provide supplemental forces and continues to need the same or additional performance under the Contract, which the Contractor must meet.
This Contingency Plan shall be submitted as a part of the Contractor proposal.
SOW Page 7
Emergency Response:
Response to emergency service calls outside of the normal business hours shall not exceed four (4) hours regardless of the time during the day or night, weekends or holidays.
Response to emergency service during normal business hours shall not exceed two (2) hours.
Response is defined as having all personnel and equipment required to correct an emergency at the site of the emergency or at a pre-approved staging area, ready, willing, and able to perform the emergency work. The Contractor will provide a draft emergency response plan prior to Contract start date.
Emergency Services:
On occasion, services may be required to support an activation or exercise of contingency plans outside the normal business hours described above. The Contractor's responsibilities for emergency support will be in accordance with the contingency plan.
Hazardous Materials and Hazardous Response:
The Contractor will conform to all Bureau, Federal, State, and local regulations in the use and disposal of hazardous materials and hazardous waste. The Contractor will provide the appropriate response to any emergency involving hazardous materials at any of the facilities covered by this Contract. The Contractor will provide proof/certification of its personnel qualified to work with hazardous materials and wastes to the Bureau. The Contractor will notify the Bureau immediately upon discovering a release of hazardous waste into the environment.
Public contact:
Contractor personnel may encounter adjacent landowners or members of the public during the performance of their work.
Contractor personnel will present a professional appearance and be able to provide appropriate identification, including display of proper identification by each employee.
All Contractor and subcontractor personnel shall comply with all Federal and State laws relative to citizenship.
Contractor personnel shall inform any trespassers along the right of way of hazards and, as necessary and appropriate, ask trespassers to leave fenced off or restricted areas.
If Contractor personnel may encounter emergency personnel, policemen, or firemen along the right of way, the Contractor personnel shall notify the On-Site Foreman If Contractor personnel encounter the news media, they should refer all questions to the On-Site Foreman, who shall keep the COR informed of all news media contacts.
Government Observations:
Government personnel other than COR may from time to time observe, photograph, or otherwise record Contract operations.
However, these personnel will not interfere with Contractor performance.
SOW Page 8
Regular Work Hours:
The performance period established for this contract is based upon all work being conducted during regular working hours between 8:00am and 4:30pm, Monday through Friday, excluding government holidays.
If the Contractor desires to carry on work outside regular hours, including Saturdays, Sundays, and government holidays, a request must be submitted to the COR in sufficient time to allow satisfactory arrangements to be made for access to the work site.
Communications:
“Time” for communications received after 3:00pm, after 12:00 pm locally on Fridays, or after 12:00 pm locally prior to a holiday will not start until the next business day. All times are local Pacific Standard Time.
Federal Holidays:
The following Federal Legal Holidays are observed:
New Year’s Day Martin Luther King, Jr. Day President’s Day Memorial Day Juneteenth Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day
Fire Danger Season:
If the Contracting Officer Representative (COR) allows the Contractor to continue work during periods of declared fire danger or season, the Contractor shall comply with all applicable state laws relating to fire prevention and with all special conditions of work as directed by the COR.
Drawings:
Typical Drawings: Any drawings titled typical are general only and dimensions of each structure will be fixed by the Contracting Officer to adapt the design to existing conditions at the structure location.
Reduced Size Drawings: Any drawings identified as "REDUCED SIZE DRAWINGS" are photographically reduced in size. Accordingly, measurements and dimensions should not be taken or be based on any numerical scales shown. Prospective bidders desiring to review a copy of the full-size drawings may contact the Contracting Officer identified in the solicitation.
SOW Page 9
SOW 8.0 Technical Exhibits and Definitions
Standard Definitions:
Physical Condition The Physical appearance of Federal equipment or facilities that considers cracks, chips, dents, abrasions, rust, corrosion, general cleanliness, vibration, operating temperature, and discoloration and other items as identified by the COR. Physical condition may be determined by visual as well as diagnostic means.
Contracting Officer (CO) The Secretary of the Interior or designated authorized representative who is the only agent capable of signing a federal award or obligating funds.
Contracting Officer’s Representative (COR) The Contracting Officer’s designated representative as indicated in a delegation of authority letter.
Quality Assurance (QA) Surveillance of Contractor performance to determine performance requirements are met.
Technical Definitions:
HVAC: Heating Ventilation and Air Conditioning
AVFC: Apple Valley Fire Center
AFUE: Annual Fuel Utilization Efficiency
SEER: Seasonal Energy Efficiency Ratio
SOW Page 10
Technical Exhibits:
EX 1: AC Condenser Unit Northwest Exterior of AVFC Heli-Base
SOW Page 11
SOW Page 12
SOW Page 13
EX 2: Furnace and Evaporator coil located in attic of AVFC Heli-Base Attic
SOW Page 14
SOW Page 15
SOW Page 16
SOW Page 17
SOW Page 18
EX 3: Apple Valley Fire Center Heli-Base Location (18809 Central Road. Apple Valley, CA 92311) 34.591402, -117.168929
| SOW 1.0 Background on the Government’s Requirement |
| SOW 2.0 General Scope of Work |
| SOW 3.0 Overall Objective(s) |
| SOW 4.0 Specific Tasks |
| SOW 5.0 Delivery / Performance Schedule |
| SOW 6.0 Government-Furnished Property, Materials, Services |
| SOW 7.0 Security and Administrative Matters |
| SOW 8.0 Technical Exhibits and Definitions |