B08_Attachment_2_Price_Schedule_Roof_Replacement_GATE.pdf
PDF 98 KB Posted
- Attached to
- GATE-JABA-QTRS ROOF REPLACEMENT Federal contract opportunity
- Solicitation number
- 140P4524R0003
About this file
This price schedule outlines the line items and pricing structure for a roof replacement contract opportunity with the National Park Service. The contract involves replacing roofs at quarters in the Gateway National Recreation Area and includes line items for roof preparation materials, roof system materials, labor for all roof preparation and placement activities, and options for additional roof sheathing. Offerors are required to provide pricing for all base line items and option line items. Pricing should be provided as a total for lump sum items and as both a unit price and extended total for unit priced items. The solicitation number is 140P4524R0003 and is issued by the National Park Service Northeast Region for the GATE-JABA-QTRS ROOF REPLACEMENT project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P4524R0003_Amd_0002.pdf | ||
| Sol_140P4524R0003_Amd_0001.pdf | ||
| Questions_and_Answers_0001.pdf | ||
| Ft__Tilden_106_0001.pdf | ||
| Quarters_C_D_E_0001.pdf | ||
| Sol_140P4524R0003.pdf | ||
| B08_Solicitation_Roof_Replacement_GATE.pdf | ||
| B08_Attachment_3_WD_Roof_Replacement_GATE.pdf | ||
| B08_Atttachment_1_SOW_Roof_Replacement_GATE.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Price Schedule National Park Service (NPS)
Solicitation Number:
PARK - PMIS: GATEWAY NATIONAL RECREATION AREA
(Project Management Information System) 322528 Developed Area: JABA
Project Title: Quarters Roof Replacements Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars.
Contract Line Item Number
(CLIN)
Contract Line Item (CLI) Title Quantity Unit of Measure Unit Price Total Price
1 Roof Prepartation Materials 1 EACH
2 Roof System Materials 1 EACH
3 All Roof Prep and Placement Activities Labor ) 1 EACH
4 1 EACH
5 1 EACH
6 1 EACH
7 1 EACH
8 1 EACH
TOTAL BASE PRICE (Contract Line Item Number 1 through 8)--------------------------------------------------------------------------
9 1 EACH
TOTAL PRICE FOR ALL OPTIONS BASE PRICE (Contract Line Item Number 9)------------------------------------------------
OPTION 1: ADDITIONAL Roof Sheathing Price/Sheet installed rsdaniels Cross-Out
File details come from the government source that posted it. Updated .