B08 Attach 2 Bid Schedule 02162021 saf.xls
XLS spreadsheet 40 KB Posted
- Attached to
- RED MOUNTAIN ROAD UPGRADE PHASE II Federal contract opportunity
- Solicitation number
- 140L1221R0001
About this file
This bid schedule outlines pricing for a federal contract to upgrade Red Mountain Road. The contract solicitation number is 140L1221R0001 issued by the Bureau of Land Management California Region to improve culverts, conduct road grading and drainage work, place road rock and armoring materials, and perform related heavy equipment operations. The bid schedule includes line items for mobilization, culverts and fittings, road work, rock and transport, equipment operations, and supplies. There are also three additive line items to replace specific culverts. Bidders should indicate any supplemented Masterformat divisions in bold and provide pricing for the base scope of work as well as the optional additive items.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B08 Attach 4 Red Mtn Contractor Site Visit 2021 Q and A_0001.pdf | ||
| 140L1221R0001 Original_0001.pdf | ||
| Sol_140L1221R0001_Amd_0001.pdf | ||
| B03 Attach 3 DOL Wage Determination 2021 0101 CA20200004.pdf | ||
| B08 Attach 1 Red Mountain Road SOW 2021 0217.pdf | ||
| Sol_140L1221R0001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SCHEDULE
| Red Mountain Road Upgrade Phase II | |||
| Bid Schedule | |||
| Item | Unit | TOTAL | |
| CLINS 00001 | MOBILIZATION/DEMOBILIZATION | LS | |
| CLINS 00001 | Culverts and fittings | LS | |
| CLINS 00001 | Road Opening, Grading and non-site drainage repair and improvement | LS | |
| CLINS 00001 | Road rock + transport | LS | |
| CLINS 00001 | Armoring rock + transport | LS | |
| CLINS 00001 | Site-related heavy equipment operations | LS | |
| CLINS 00001 | Supplies, culvert disposal, mulch | LS | |
| Subtotal | |||
| Overhead | |||
| Profit | % | ||
| Subtotal | |||
| Bonds, Insurance, Permit Fees | |||
| Subtotal | |||
| Grand Total Main Work | |||
| Additive Line Item #1 | Site #51. Culvert replacement (48") | LS | |
| Subtotal | |||
| Overhead | |||
| Profit | % | ||
| Subtotal | |||
| Bonds, Insurance, Permit Fees | |||
| Subtotal | |||
| Grand Total Additive line #1 | |||
| Additive Line Item #2 | Site #17. Culvert replacement (84") | LS | |
| Subtotal | |||
| Overhead | |||
| Profit | % | ||
| Subtotal | |||
| Bonds, Insurance, Permit Fees | |||
| Subtotal | |||
| Grand Total Additive line #2 | |||
| Additive Line Item #3 | Site #9. Access and drainage improvements. | LS | |
| Subtotal | |||
| Overhead | |||
| Profit | % | ||
| Subtotal | |||
| Bonds, Insurance, Permit Fees | |||
| Subtotal | |||
| Grand Total Additive line #3 | |||
| *Additional Masterformat divisions may be supplemented as needed above. Please indicate supplemented divisions in BOLD. | |||
| FOR OFFICIAL USE ONLY |
File details come from the government source that posted it. Updated .