This statement of work outlines the requirements for a bridge contract to operate and maintain the Optical and Scene Monitoring Network for the National Park Service. The contractor will oversee 11 optical monitors and 21 scene monitors, retrieving and validating nephelometer and webcam data daily. Additional tasks include organizing the annual IMPROVE Steering Committee meeting, conducting site maintenance visits for three optical monitors, replacing nephelometers at two sites, and developing an online tool to visualize haze images. The performance period is 10 months from September 2020 through July 2021. Deliverables are due monthly and quarterly, with data transfers quarterly and an annual report due 120 days after the close of the year. Payments will be made monthly based on accepted deliverables.

View the file

Other files for this federal contract opportunity

Other files attached to Optical And Scene Monitoring Bridge Contract, newest first.
File Type Posted
B08 ATT 2 NPS PROPERTY LIST.pdf PDF
A16 JOFOC Redacted.docx DOCX document
Sol_DOIPFBO200059.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Anthony J. Prenni (COR) Optical and Scene Monitoring Network Operations and Associated Tasks The National Park Service (NPS) conducts a variety of air quality related monitoring to better understand the condition of air resources in the national parks. One of the key air resources of the national parks is visibility. The objective of this Bridge Contract is to operate and maintain the Optical and Scene Monitoring aspects of the NPS visibility monitoring program. The current base operation is a network of 11 optical and 21 scene monitors. All optical monitors and 20 scene monitors (HAVO being the exception) are paid for through this bridge contract. The Optical portion currently measures scattering with open-air nephelometers and the scene monitoring is through high resolution web cameras tied with air quality measurements. The NPS also requests several additional tasks outlined below and listed as tasks 2-6. Listed below the tasks are the deliverables and payment schedule for each task. The Period of Performance is September 11, 2020 – July 10, 2021.

TASKS

1) Network Operation. The contractor will oversee and maintain, within the required standard operating procedures (http://vista.cira.colostate.edu/Improve/optical-monitoring/), the Optical and Scene Monitoring Network, which includes all nephelometers, AT/RH sensors, and webcams. NPS personnel are responsible for routine operation of the sites; however, the Contractor shall be responsible for training personnel and maintaining the instruments in operable condition. The Contractor is responsible for data retrieval. The Contractor shall provide technical support to operate digital cameras at air quality monitoring sites to maintain acquisition of high-resolution images and Internet upload of images and associated data to a contractor-hosted FTP site. Images are provided in 3 sizes that go into an NPS provided web page template. All webcam images should have metadata that includes title, park location, author, date, and time. For all archived, high-resolution web cam images, the contractor shall also calculate and include image analysis parameters in the image metadata. ASCII format, csv, or Excel files of extinction/scattering, relative humidity, and air temperature shall be made available on a seasonal basis via electronic means. These data shall be transferred to the IMPROVE/FED database, or other database as directed by the COR. The Contractor shall maintain records of nephelometer accuracy and sensitivity for the duration of the contract. This task order is for 10 months of Network Operation.

2) The Contractor shall work with the IMPROVE Steering Committee Chairman to plan and organize the annual meeting, which will be a virtual meeting in the Fall of 2020, and report on the IMPROVE Steering Committee meeting. The Contractor shall be responsible for compiling and publishing the minutes of these meetings. PDF files of the minutes shall be provided to the Steering Committee Chair and the COR.

3) The Contractor shall conduct site maintenance and calibration visits at three of the Optical monitoring sites. Maintenance for all sites will be conducted on a schedule of every two years. As part of this work, the Contractor shall calibrate the nephelometers, verify that the physical structures are in good condition, calibrate AT/RH sensors, and verify operational integrity of all monitoring support systems. Where appropriate, the contractor shall check alignment of webcam systems and train site operators.

4) The Contractor shall ship a fully calibrated replacement nephelometer to two of the Optical monitoring sites, with all necessary maintenance completed prior to shipment. Maintenance for all sites will be conducted on a schedule of every two years. The nephelometer shall be installed by the local site operator or other technician visiting the site. The contractor shall provide clear instructions on installing the fully calibrated nephelometer, provide phone/online support during installation, provide clear instructions for return shipment of the nephelometer that was replaced, and cover costs for shipment.

5) The Contractor shall implement all methods of data editing, validation and quality assurance for the nephelometer data for 10 months. For this task, the Contractor shall continue to retrieve and review data daily.

6) The Contractor shall develop an online framework for accessing new online images depicting haze on the IMPROVE website. This new framework shall be integrated into the existing online WinHaze tool. Images will be provided by the COR for between 10 and 20 sites, with a range of visibility conditions spanning 0-40 DV.

DELIVERABLES AND PAYMENT SCHEDULE

The contractor shall submit a monthly report (~1 page) to the COR outlining the tasks completed the previous month, referencing the tasks outlined in this task order. After acceptance of the report by the COR, the contractor shall submit an invoice for payment. Monthly invoicing shall be as follows.

TASK NO.
MEASUREABLE LEVEL OF PERFORMANCE
PAYMENT
1
Successfully operate the Optical and Scene Monitoring Network to the specifications of the contract.
1/10th of total cost, as described in contractor price proposal.
2
Successfully help organize, attend and report on the annual IMPROVE Meeting.
Invoice for full amount upon completion, as described in contractor price proposal.
3
Successfully conduct site maintenance and calibration visits at three of the optical monitoring sites.
Invoice after each site visit.
4
Successfully conduct maintenance and calibration of two nephelometers and ship to the monitoring sites.
Invoice for full amount upon completion, as described in contractor price proposal.
5
Successfully implement all methods of data editing, validation and quality assurance.
1/10th of total cost, as described in contractor price proposal.
6
Successfully develop and publish the new tool for visualizing haze, similar to the existing, online WinHaze tool.
Invoice for full amount upon completion, as described in contractor price proposal.

Additional Deliverables, not to be used as Milestones for Payment Quarterly technical reports: these include a listing of sites, metadata, and equipment, data submitted, site visits, major activities, network issues and expenditures.

Annual data report: this includes a summary of data processed and QA statistics, and lists changes to the network from throughout the year. The annual data report demonstrates completion of the data collection task.

Database and transfers: data from the network should be maintained in ASCII file format; formatted valid data should be transferred to the IMPROVE/FED database, or other database as directed by the COR.

Safety plan: Changes to the safety plan submitted as part of the Contractor proposal, if any, shall be submitted.

Place of Performance Performance of work under this task order will occur at multiple locations. Managing network operations (task 1), IMPROVE Steering Committee Meeting support (task 2), instrument maintenance (task 4), data editing, and validation and quality assurance (task 5) and developing the online tool (task 6) will take place at Air Resource Specialists in Fort Collins, CO. Conducting site maintenance (task 3) will occur at the field sites.

Contract Type The NPS anticipates awarding a firm fixed price bridge task order. Due to the fact that payments are needed prior to the end of the period of performance, performance-based payments will be issued in accordance with FAR 32.10. As such, these performance-based payments are not subject to the interest-penalty provisions of the prompt payment act.

Contract Period of Performance The NPS anticipates awarding a task order lasting ten (10) months from the award date. The period of performance is subject to competition of IDIQ vehicle 140P2120R0017 and will continue up until an award is issued under this solicitation. At the time of IDIQ award, the government reserves the right to end this Bridge Contract early in accordance with 52.212-4(l) Termination for the Government’s convenience.

Desired Delivery Schedule Monthly report will be delivered monthly to the COR for approval, prior to submission of monthly invoice.

Quarterly technical report will be delivered 15 days after the last month of the previous calendar quarter.

Annual data report will be delivered 120 days from end of year.

Data transfers will be done quarterly, delivered 15 days after the last month of the previous calendar quarter.

Changes to the safety plan will be delivered 60 days from start of the option year.

All of the tasks shall be completed during the period of performance identified in the task order. The Contractor is responsible for coordinating all tasks to ensure the work is completed in a timely and efficient manner. An annual expected schedule of visits should be reviewed with the COR. The COR will notify the Contractor if there are any changes to be made in planned travel. The Contractor is responsible for notifying the appropriate park personnel and the COR of pending trips to parks at least two weeks in advance.