B08_-_Atch_1_-_SOW_600_Tons_Cold_Mix_Asphalt.pdf

PDF 105 KB Posted

Attached to
JOTR - 600 TONS COLD MIX ASPHALT Federal contract opportunity
Solicitation number
140P8124Q0082
Issued by
Department of the Interior National Park Service Pacific West Region

About this file

This document is a Statement of Work (SOW) for sourcing and delivering 600 tons of bulk cold mix asphalt (CMA) to the Black Rock Campground located at Joshua Tree National Park (JOTR). The contractor will be responsible for sourcing the CMA, coordinating delivery with the Roads Maintenance Foreman, and ensuring deliveries of approximately 50 tons per request over the period of performance from September 3, 2024 to October 31, 2024. Deliveries can only occur Monday through Thursday between 6:30 am and 4:00 pm. The CMA must meet specific sieve requirements detailed in the SOW. Acceptance of the 600 tons of CMA will be made by JOTR personnel, and all delivery vehicles will undergo a weed-free inspection before entering the park.

View the file

Other files for this federal contract opportunity

Other files attached to JOTR - 600 TONS COLD MIX ASPHALT, newest first.
File Type Posted
Sol_140P8124Q0082.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Source and Deliver 600 Tons of Bulk Cold Mix Asphalt for Black Rock Campground roads

Part 1: Scope/Background/Objective

1.1 Scope of Work

The Contractor shall source and provide 600 tons of bulk cold mix asphalt (CMA).

Contractor shall arrange delivery to the Black Rock Campground located at Joshua Tree National Park (JOTR). Deliveries will be on call in quantities of 50 tons until the full 600 tons have been delivered.

All vehicles making deliveries will need to undergo a weed free inspection during the initial delivery into the park. The location and time of such inspections will be determined by the Roads Foreman in conjunction with the contractor.

This project may require intermittent deliveries based on other work that comes up in the park. If so, the Roads Foreman will work with the contractor to identify a date in which deliveries can resume.

1.2 Background

The park’s Roads Maintenance program has been approved to carry out a major rehabilitation project for Black Rock Campground. The existing CMA roads are decades old and have deteriorated to the point where an overlay of fresh asphalt is required.

1.2 Objective

The objective of this contract is to provide the required supply of cold mix asphalt that meet the objectives of the Maintenance Division, as well as requirements of NPS regulation and policy.

Part 2: Contractor Tasks & Supplies

2.1 The primary task for the contractor is to source and deliver 600 tons of cold mix asphalt. The contractor will guarantee delivery of the asphalt to the Black Rock Campground in Yucca Valley, CA, 92284. The material will be delivered directly onto the road which is being overlayed.

The contractor will be responsible for coordinating delivery with the Road’s Maintenance Foreman or his designee and will not schedule a delivery without explicit verbal confirmation. Due to the nature of the road and other requirements within the park the deliveries will be on call for 50 tons at a time. All delivery requests made by the Roads Foreman will be at least 2 weeks before the requested delivery date.

The roads crew is expected to ask for deliveries of approx. 50 tons each during each delivery request. The deliveries will be requested over the length of the period of performance, which is from September 3rd, 2024, until October 31st, 2024.

Deliveries may only take place from Monday – Thursday of each week. Fridays, weekends, and federal holidays are non-workdays for the Roads section and personnel are not authorized to work overtime to facilitate deliveries on these days. Any delivery attempt outside of these days will be rejected. Delivery will need to occur between 6:30am and 4:00pm and no deliveries outside of those times will be accepted.

2.2 Cold mix asphalt specs:

• Slow curing bulk asphalt

• SC800 type

• Individual Bing Gradings % Passing in table below

SIEVE ¾” ½” 3/8” R.D. Sand RAP Combined 1-1/2” 100 100 100 100 100 100 100 1” 100 100 100 100 100 100 100 ¾” 97 100 100 100 100 100 100 ½” 33 80 100 100 100 100 100 3/8” 8 46 97 100 100 84.9 98 #4 5 4 21 93 99 21.3 77 #8 4 1 0 82 83 13.7 61 #16 3 0 0 52 64 11.3 47 #30 2 0 0 32 43 9.2 32 #50 1 0 0 20 22 7.2 16 #100 0 0 0 13 10 5.3 8 #200 0.0 0.0 0.0 10.1 5.2 3.7 4.1

Part 3: Contract End Items

Inspection and acceptance of 600 tons of cold mix asphalt will be made by JOTR personnel. A weed free inspection of all vehicles hauling material must be made before entering the park boundaries. Upon delivery of a total of 600 tons of the specified cold mix asphalt, the contract will be considered complete.