B08_-_Atch_1_-_MANZ_Emergency_Road_Base_Order_Specifications_20230825.pdf
PDF 62 KB Posted
- Attached to
- MANZ ROAD BASE DELIVERY Federal contract opportunity
- Solicitation number
- 140P8123Q0139
About this file
This document includes specifications for a federal contract opportunity to deliver class II road base material to Manzanar National Historic Site. The National Park Service Pacific West Region is soliciting bids under solicitation number 140P8123Q0139 for the delivery of approximately 3900 tons of class II road base to repair and stabilize existing site roads damaged by Hurricane Hilary. The road base must be delivered to the Manzanar National Historic Site located at 5001 HWY 395 in Independence, CA by September 15, 2023. The period of performance runs from August 28 through September 15, 2023 dependent on award and delivery availability. Upon delivery, National Park Service staff will apply and spread the road base to the damaged locations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8123Q0139.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Manzanar National Historic Site
Specifications
Prepared by: Isaac Vaughan Date: 8/25/23
Class II Road Base for Stabilization and Repair of Site Roads Damaged by Hurricane Hilary
Location – Manzanar National Historic Site – 5001 HWY 395, Independence, CA 93526 Use – Repair and stabilize existing site roads to a spec of 16’ wide and a road base depth of 6”
Once delivered to the site road base will be applied and spread to damaged locations by NPS staff.
Period of Performance – 8/28/2023 – 9/15/23 – Dependent on award and delivery availability timing
Requirement – Delivery of 3900 tons of class II road base material to Manzanar National Historic Site
File details come from the government source that posted it. Updated .