B08_A01_SAMA_Replace_VC_Doors-project_manual.pdf

PDF 3 MB Posted

Attached to
REPLACE SAMA VISITOR CENTER DOORS Federal contract opportunity
Solicitation number
140P4321R0019
Issued by
Department of the Interior National Park Service Northeast Region

About this file

This solicitation is for replacing doors at the Salem Maritime National Historic Site Visitor Center in Salem, Massachusetts. Work includes selective demolition of existing interior and exterior entrance assemblies, assessment of existing conditions, installation of temporary protections, and fabrication and installation of new accessible aluminum-framed entrance assemblies with integrated power operators and storefront. Bid options include replacement of additional entrance assemblies. The National Park Service is the contracting agency. The response due date is not provided, but the period of performance is 120 calendar days from notice to proceed. Pricing will be on a firm fixed-price basis. There are no set-asides, but the project is subject to prevailing wage requirements.

View the file

Other files for this federal contract opportunity

Other files attached to REPLACE SAMA VISITOR CENTER DOORS, newest first.
File Type Posted
B08_A02_SAMA_VC_Doors-drawings.pdf PDF
Sol_140P4321R0019.pdf PDF
B08_A03_DOL_DBA_GD_MA20200001_07302021.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INTERIOR REGION 1

NATIONAL PARK SERVICE

DEPARTMENT OF THE INTERIOR

UNITED STATES OF AMERICA

REPLACE VISITOR

CENTER DOORS WITH

ACCESSIBLE DOORWAYS

PMIS No. SAMA 244818

SALEM MARITIME

NATIONAL HISTORIC SITE

160 Derby Street Salem, MA 01970

MAY 2021

P R O J E C T M A N U A L

REPLACE VISITOR CENTER DOORS WITH ACCESSIBLE DOORWAYS

SALEM MARITIME NHS, SALEM, MASSACHUSETTS PMIS 244818

MAY 2021 PROJECT MANUAL COVER 000100 - 2

MAY 2021 TABLE OF CONTENTS 00 01 15 - Page 1 of 2

SECTION 00 01 15 – TABLE OF CONTENTS

The complete Project Manual for the Project consists of this entire electronically bound volume, which is not to be separated for any reason. The Government is not be responsible for any assumptions made by a Contractor, a Subcontractor, Consultant or Specialist, as applicable, who does not receive a complete Project Manual containing all sections and documents listed in the Table of Contents, below.

The following listing of documents comprises the Project Manual for the Project, entitled:

Replace Visitor Center Doors with Accessible Doorways Salem Maritime National Historic Site

160 Derby Street, Salem, Massachusetts 01970

Where numerical sequence of Specification Sections or Divisions is interrupted, such interruptions are intentional. It is the responsibility of each entity to review and become familiar with all Project Documents in order to execute the Project efficiently and in a timely manner. Failure to do so is not the responsibility of the Government.

Division Section Title Pages

DOCUMENT 00600 - PROCUREMENT AND CONTRACTING REQUIREMENTS

006000 NPS PROJECT FORMS:

SUBMITTAL TRANSMITTAL FORM (CM-16) 2

MATERIAL SUBMITTAL LIST 6

DIVISION 01 - GENERAL REQUIREMENTS

011000 SUMMARY OF WORK 6

012600 CONTRACT MODIFICATION PROCEDURES 6

012700 DEFINITION OF CONTRACT LINE ITEMS 6

013100 PROJECT MANAGEMENT AND COORDINATION 6

013216 CONSTRUCTION SCHEDULE 4

013323 SUBMITTAL PROCEDURES 8

013523 SAFETY REQUIREMENTS 2

014100 QUALITY REQUIREMENTS 4

015000 TEMPORARY FACILITIES AND CONTROLS 6

016700 PRODUCT REQUIREMENTS 6

017329 CUTTING & PATCHING 4

017340 EXECUTION 4

017700 CLOSEOUT PROCEDURES 2

MAY 2021 TABLE OF CONTENTS 00 01 15 - Page 2 of 2

DIVISION 02 – SITE WORK

024119 SELECTIVE DEMOLITION 8

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

079200 JOINT SEALANTS 6

DIVISION 08 – OPENINGS

087100 DOOR HARDWARE 6

084113 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 8

084229.23 SLIDING AUTOMATIC ENTRANCES 10

087113.50 AUTOMATIC DOOR OPERATORS 8

088000 GLAZING 4

DIVISION 09 – FINISHES

090391 INTERIOR PAINTING 10

DIVISION 26 – ELECTRICAL

260010 GENERAL ELECTRICAL PROVISIONS 4

260050 BASIC MATERIALS AND METHODS 4

LIST OF DRAWINGS

All Drawings listed are a part of this Project Manual and will not be issued separately.

END OF TABLE OF CONTENTS

A.1 A.2 A.3 A.4 A.5 E-1

COVER SHEET

KEY PLAN; EXISTING ENTRANCES; ENTRANCE SCHEDULE

NEW ENTRANCE ASSEMBLIES (101A, 101 B, 102C)

NEW ENTRANCE ASSEMBLIES (102A, 102D, 102B)

NEW ENTRANCE ASSEMBLIES (103, 104)

NEW ENTRANCE ASSEMBLIES – DETAILS

ELECTRICAL

Document 000600 - Project Forms

1. Form CM-16

THIS PAGE

INTENTIONALLY LEFT BLANK

2. Form “Material Submittal List”

MATERIAL SUBMITTAL LIST

Salem Maritime National Historic Site – SAMA 244818 Replace Visitor Center Doors with Accessible Doorways

SUBMITTAL REQUIREMENTS

(indicate with an "X")

Spec. Sec. Par.

No. Description

INFORMATIONAL ACTION

C

ER

T.

/L

A B

T

ES

T

R

EP

O R

T/ C

A

LC

O

R P

LA

N

M fg

. D A

TA

IN

ST

R

U C

TI

O

N S

W A

R R

A N

TY

SH

O

P D

R A

W

G

SA

M

PL

E

M fg

. D A

TA

ST

R

U C

TI

O

N S

EX

TR

A M

A

TE

R

IA

L

013100 Project Management and Coordination

1.4 Letter designating Project

Superintendent X

1.4 Construction Schedule X

1.4 A comprehensive breakdown of the

Schedule of Values X

1.4 A list of Subcontractors for this project X

1.4

Written statements from subcontractors certifying compliance with applicable labor standard clauses.

X

1.4

Satisfactory evidence of liability insurance coverage and workman’s compensation for the Contactor and all subcontractors

X

1.4 Quality Control Plan X

013216 Construction Schedule

1.3 Schedule of Values X

1.3 Construction Schedule X

1.3 Construction Schedule Updates X

013523 Safety Requirements

1.2 Accident Prevention Plan (APP) X

014000 Quality Requirements

1.4 Quality Control Plan X

1.4 Qualification Data X

1.4 Contractor’s Quality Control Daily

Reports (CQCR) X

1.4 Off-site Inspection Reports X

1.4 Copies of Permits, Licenses and

Certificates X

015000 Temporary Facilities and Controls

1.3 Secure Jobsite Enclosures X

016700 Product Requirements

1.3 Product Literature X

1.3 Comparable Product Requests X

017700 Closeout Procedures

1.2 Closeout Submittals X X

024119 Selective Demolition

1.6 Protection Measures X

1.6 Schedule of Selective Demo Activities X

1.6 Inventory X

1.6 Warranties X

1.7 Closeout Inventory X

072100 Thermal Insulation

1.2 Product Data X

1.3 Certification of Surface-Burning Char. X

079200 Joint Sealants

1.2 Samples for Initial Selection X

1.2 Samples for Verification X

1.3 Product Test Reports X

1.3 Sample Warranties X

084113 Aluminum-Framed Entrances and Storefronts

1.4 Product Data X

1.4 Entrance Door Hardware Schedule X

1.4 Shop Drawings X

1.4 Initial and Fabrication Sample(s) X

1.5 Product Test Reports X

1.5 Operating and Maintenance Manuals X

1.5 Warranties and Maintenance X

084229-23 Sliding Automatic Entrances

1.5 Product Data X

1.5 Shop Drawings X

1.5 Samples X

1.5 Manufacturers’ Field Reports X

1.6 Warranties and Maintenance X

087100 Door Hardware

1.2 Hardware Schedule X

1.2 Product Data X

1.2 Metal Finishes Selection Chart X

1.2 Samples X

1.3 Sample Warranties X

087113-50 Automatic Door Operators

1.5 Product Data X

1.5 Shop Drawings X

1.5 Samples X

1.5 Manufacturers’ Field Reports X

1.6 Warranties and Maintenance X

088000 Glazing

1.2 Glass Samples X

1.3 Warranties X

099123 Interior Painting

1.4 Product Data X

1.4 Samples X

1.4 Paint Product List X

1.5 Color Matching Certificate X

1.6 Extra Paint Materials X

260010 General Electrical Provisions

1.7 Manufacturer’s Literature: Circuit Breakers; EXIT signs; Wire and Cable; Conduit, Raceway and Fittings

X

1.8 Record Drawings X

END OF SECTION 000600

MAY 2021 SUMMARY OF WORK 011000 - Page 1 of 6

SECTION 01 10 00 - SUMMARY OF WORK

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes the following:

1. Work covered by the Contract Documents.

2. Work phases.

3. Work under other contracts.

4. Government-furnished materials.

5. Contractor use of premises.

6. Public use of site.

7. Occupancy requirements for buildings.

8. Work restrictions.

9. Special construction requirements.

1.2 PROJECT INFORMATION

A. Project: Replace Visitor Center Doors with Accessible Doorways

PMIS Number[s]: 244818 Park Alpha Code: SAMA Park Headquarters: Salem Maritime National Historic Site (“Park”) 160 Derby Street Salem, MA 01970 Project Location: Salem Visitor Center “Salem Armory” 2 New Liberty Street Salem, MA 01970

B. Owner: United States of America, Department of the Interior, National Park Service. From now referred to as ‘Government.

1. Person representing and possessing Contract authority for Government is Contracting

Officer, to be assigned.

2. Person representing Government on-site will be issued by Government at Pre-Bid

Meeting.

3. National Park Service Architect is:

Jack Glassman AIA, LEED AP HACE/PFCA, Interior Region 1 North Atlantic-Appalachian 15 State Street Boston, MA 02109-3572

4. Specific lines of authority will be issued at Preconstruction Conference

C. Project Manual Format:

1. Project Manual is arranged in Construction Specification Institute (CSI) Master Format, 2004, updated April 2012.

a. Manual contains custom Documents, Forms, and Specifications created by National

Park Service, Interior Region 1 North Atlantic-Appalachian. Utilize to execute Project efficiently in order to deliver Best Value to United States of America.

MAY 2021 SUMMARY OF WORK 011000 - Page 2 of 6

b. Efforts have been put forth to synchronize this Project Manual to closely match and function similarly to technical specifications / project manuals found in commercial construction market, used by experienced construction professionals.

2. Sections and Documents are cited utilizing all capitals for title / name.

3. References, such as books, codes, regulations, professional standards and similar, possess italicized title. Many of which will be hyperlinks as well.

4. Contact Government for clarifications.

5. Specification Content: Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. Conventions are as follows:

a. Specification requirements are activities of the Project performed by Contractor unless specifically stated otherwise.

b. Streamlined language is generally used.

c. Where a colon (:) appears in a sentence, phrase or listing, pending context, the implied meaning is ‘Contractor shall’, ‘shall’, ‘shall be’, ‘shall comply with’, or similar intent throughout the Specifications.

6. Division 00 - Procurement and Contracting Requirements: Division affords information to execute the Project, including organizational means and methods and defines skill requirements for working with Cultural Resources.

7. Division 01 - General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications.

8. Drawing Coordination: Requirements for materials and products identified on Drawings are described in detail in the Specifications. One or more of the following are used on Drawings to identify materials and products:

a. Terminology: Materials and products are identified by generic terms used in individual Specifications Sections.

b. Abbreviations: Drawing notes will include abbreviations. Those utilized are common standards of the industry.

c. Specification Section numbers found in this Project Manual.

1.3 BUY AMERICAN ACT

A. Project to be compliant with the Buy American Act for construction materials;

See FAR 52.225-9.

1.4 SYSTEM OF MEASUREMENT

A. It has been determined by Government that use of metric measurements and units is impracticable for Project and may cause inefficiencies. Thus, imperial measurements, also known as inch-pound units, will be cited and utilized throughout Project for layout and physical execution of construction.

1. Determination is based upon the fact that the historic structure was originally conceived and constructed utilizing imperial measurements.

1.5 SITE CONDITIONS

A. Prospective Bidder(s) and their Subs, as appropriate, are strongly urged to visit and examine existing conditions of Project prior to submission of Offer in order to better understand Work, verify quantities, and aid in forming any questions prior to the submission of Bid.

MAY 2021 SUMMARY OF WORK 011000 - Page 3 of 6

B. Be aware of all conditions of Site and Project; verify quantities and locations of Work intended.

1. Failure to verify does not waive obligations to furnish labor, materials and appurtenances required to perform the Work, or constitute grounds for a claim after Contract award.

1.6 WORK COVERED BY CONTRACT DOCUMENTS

A. Project Location: Salem Visitor Center “Salem Armory,” 2 New Liberty Street, Salem, Massachusetts (part of Salem Maritime National Historic Site) 01970.

B. The Work consists of the following:

1. Base Bid General Conditions Work includes, without limitation:

a. General supervision and coordination of various trades.

b. Miscellaneous rough carpentry indicated or required.

c. Final cleaning and cleanup as needed for a proper and workmanlike door replacement project.

2. Base Bid Site Work includes, without limitation:

a. Selective demolition of interior and exterior entrances and storefront assemblies designated for removal.

b. Assessment of existing substrates and detailed documentation and field-verification of all clear dimensions.

c. Fabrication and installation of temporary wood framing and plywood boarding for five (4) exterior entrances.

d. Miscellaneous cutting and patching of gypsum wallboard walls, column encasements, soffits, etc. required for removal of existing entrances and storefront and installation of new entrances and storefronts, including all associated mounting hardware.

e. Miscellaneous drilling, cutting and patching required for installation and routing of power feeds and sensor and control wiring for entrance door power operators.

3. Base Bid Openings Work includes, without limitation:

a. Fabrication, delivery and installation of entrances, entrance packages, integrated power door operators, storefront and all associated hardware.

4. Base Bid Interior Finishes Work includes, without limitation:

a. Touch-up surface preparation, priming and painting of existing interior gypsum wallboard, wood and metal components.

5. Base Bid Electrical Work includes, without limitation:

a. Permanent, concealed (wherever possible) connections to existing line-voltage power circuits.

b. Coordination with existing security system, including salvage and reinstallation of intrusion detection sensors and routing and installation of associated low-voltage and signal wiring.

MAY 2021 SUMMARY OF WORK 011000 - Page 4 of 6

6. Option #1 (Brown Street Entrance 104) Work includes, without limitation:

a. Selective demolition of Brown Street entrance assembly.

b. Assessment of existing substrates and detailed documentation and field-verification of all clear dimensions.

c. Fabrication and installation of temporary wood framing and plywood boarding.

d. Miscellaneous cutting and patching of existing interior soffit and ceiling assembly, as required for access to transom light, and cutting and patching of other finishes required for removal of existing entrance and installation of new entrance assembly, including all associated mounting hardware.

e. Fabrication, delivery and installation of Brown Street entrance, storefront and all associated hardware.

f. Mineral-fiber insulation in sidelight mid-rail assemblies and at entrance frame perimeter.

g. Perimeter caulking and all other joint sealants specified or required.

h. Touch-up surface preparation, priming and painting of existing interior gypsum wallboard, wood and metal components.

i. Coordination with existing security system, including salvage and reinstallation of intrusion detection sensors and re-routing (if required) of associated low-voltage and signal wiring.

7. Option #2 (Entrance Assemblies 101A, 101B and 103) Work includes, without limitation:

a. Selective demolition of three (3) entrance assemblies.

b. Assessment of existing substrates and detailed documentation and field-verification of all clear dimensions.

c. Fabrication and installation of temporary wood framing and plywood boarding at the two (2 exterior openings.

d. Miscellaneous cutting and patching of existing interior soffits and wall surfaces, as required for removal of existing entrances and installation of new entrance assemblies, entrance packages, and integrated power door operators, including doors, sidelights, transom lights, thresholds, and all associated mounting hardware.

e. Fabrication, delivery and installation of three (3) entrance assemblies, entrance packages, and integrated power door operators, including doors, sidelights, transom lights, thresholds, and all associated mounting hardware.

f. Touch-up surface preparation, priming and painting of existing interior gypsum wallboard, wood and metal components.

g. Connections to existing line-voltage power circuits.

h. Touch-up surface preparation, priming and painting of existing interior gypsum wallboard, wood and metal components.

i. Coordination with existing security system, including salvage and reinstallation of intrusion detection sensors and re-routing (if required) of associated low-voltage and signal wiring.

C. Project will be constructed under a single prime contract.

MAY 2021 SUMMARY OF WORK 011000 - Page 5 of 6

1.7 CONTRACTOR USE OF SITE

A. General: Contractor shall have limited use of the site for construction operations. Limit use of premises to work in areas designated by Contracting Officer (CO).

B. Storage of Materials: Confine storage of materials to locations designated by the Contracting Officer and Park managers as acceptable storage/laydown areas.

C. Preservation of Natural Features – General:

1. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.

2. Provide temporary barriers to protect existing trees and plants and root zones.

3. Do not remove, injure, or destroy trees or other plants, roots and branches without prior

Government approval.

4. Do not fasten ropes, cables, or guys to existing trees.

D. Driveways and Entrances: Keep driveways, sidewalks and entrances serving premises clear and available to Government's employees, the public and emergency vehicles at all times. Do not use these areas for parking or storage of materials.

1. Schedule deliveries to minimize use of driveways and entrances.

2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

E. Hauling Restrictions: Comply with all legal load restrictions in the hauling of materials. Load restrictions on park roads are identical to municipal and state load restrictions with such additional regulations as may be imposed by the Park Superintendent. Access permissions will not relieve Contractor of liability for damage which may result from moving of equipment.

1.8 PUBLIC USE OF SITE

A. Park hours of operation vary by season.

B. The Project Site encompasses five (5) existing entrances at the Salem Visitor Center, a former Armory converted to the present use in the early 1990s. The building is regularly open to the public for orientation, visitor programs, exhibits, visitor services and retail sales.

1.9 OCCUPANCY REQUIREMENTS FOR BUILDING

A. Existing Building

1. Government Occupancy: Government will occupy the premises during entire construction period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government’s operations. Maintain existing exits, unless otherwise indicated.

a. Maintain access to existing walkways, corridors and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the Government (CO).

MAY 2021 SUMMARY OF WORK 011000 - Page 6 of 6

1.10 CONDUCT OF OPERATIONS

A. At all times the contractor shall conduct his/her operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the Park Superintendent.

B. Work on Saturdays, Sundays, Federal holidays or at night may not be performed without prior consent from the Government. Submit requests one week in advance of the work to the Government for approval.

C. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park unless approved by the Government.

1.11 WORK RESTRICTIONS

A. On-Site Work Hours: Work shall be generally performed during normal business working hours of 7:00 a.m. to 3:30 p.m., Monday through Friday, except when otherwise indicated.

1. Weekend Hours: Weekend work is not allowed without prior approval of the

Government. Request weekend work a minimum of two (2) weeks prior to performing the work.

2. Early Morning Hours: Early-morning work is not allowed.

B. Existing Utilities

1. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no/expense to the Government.

2. If damage occurs to an unknown utility, repair utility, in consultation with authorization(s) having jurisdiction; an equitable adjustment will be made in accordance with the Changes clause of the contract.

C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:

1. Notify the Government not less than three (3) days in advance of proposed utility interruptions.

2. Do not proceed with utility interruptions without prior, written approval of the

Government.

3. Hours for Utility Shutdowns: Utility shutdowns shall only take place during regular business hours. Maximum utility shutdown shall not exceed four (4) hours.

D. Nonsmoking Building: Smoking is not permitted within buildings or within 25 feet of entrances, operable windows, or outdoor air intakes.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 10 00

MAY 2021 CONTRACT MODIFICATION PROCEDURES 01 26 01 - Page 1 of 6

SECTION 01 26 01 – CONTRACT MODIFICATION PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. The work of this section consists of administrative and procedural requirements for contract modifications.

1.2 DEFINITIONS AND ALLOWANCES

A. Home Office Overhead: Those costs incurred in support of all of a contractor’s projects and not attributable to a specific job. The cost for home office overhead is only allowed as a percentage of all direct work excluding profit. The following items represent allowable home office overhead costs identified in Part 31 of the Federal Acquisition Regulation (FAR):

1. Rent

2. Utilities

3. Furnishings

4. Office equipment

5. Executive and management staff not exclusively assigned to the project

6. Support, accounting, and administrative staff

7. Preparation of cost proposals, estimating, and schedule analyses connected with

Modifications

8. Estimating and preconstruction services

9. Mortgage costs

10. Real estate and corporate taxes

11. Automobile maintenance and travel costs for home office personnel

12. Home office insurances i.e. structure, automotive, umbrella, flood, etc.

13. Depreciation of equipment and other assets

14. Home office supplies (paper, staples, etc.)

15. Legal services

16. Accounting and data processing

17. Professional fees/registration

B. General Conditions (Field Office Overhead): Management and administrative costs incurred on site for the designated project. Costs associated with the preparation of modifications will not be allowed. The costs for these items are to be included only in the general conditions of the modification estimate. Only in the case of a contract time extension are additional general conditions included in modifications. The following items, if applicable, are considered allowable costs for calculating General Conditions:

1. Project Manager, Assistant Project Manager

2. Superintendent, Assistant Superintendent

3. Quality Control, Safety Officer, Environmental Manager, etc.

4. Engineers

5. Travel, lodging, and per diem (as established by Federal Travel Regulations)

6. Scheduling

7. Field Office Trailers and associated temporary utilities

8. Field office supplies

a. Mailing and couriers

b. Reproduction costs

c. Storage

MAY 2021 CONTRACT MODIFICATION PROCEDURES 01 26 01 - Page 2 of 6

d. Phones

e. Computers

f. Copiers

9. Personal vehicles, i.e. Superintendent pickup trucks

C. General Requirements: These are costs directly associated with the project and are necessary to perform the actual work of the modification. These costs shall be shown as direct costs in the estimate. The following items, if applicable, are considered allowable costs for calculating General Requirements:

1. Hoisting

2. Material handling

3. Temporary fencing

4. Port-a-lets

5. Trash removal, dumpsters

6. Barricades

7. Small tools

8. Safety supplies

9. Scaffolding

10. Daily cleaning

11. Traffic control

12. Temporary signage

13. Temporary heating and power

D. Personnel Costs: Costs included in the modification must only be for General Conditions staff and workers actually present and working on the project site. Modification costs for salaried workers are only allowed within the structure of a 40-hour week and no overtime or holiday pay will be allowed.

1. Worker Hourly Rates are costs directly associated with the individual worker and consist of the following:

a. Base Rate: This is the hourly rate paid directly to the worker

b. Labor Burden: Employer payments of all applicable burdens, this includes insurance and taxes that the business must pay on behalf of the worker to government entities and educational forums, such as:

1) Social Security

2) Medicare

3) Workers Compensation– Policy and company calculation to be made available.

4) FUTA– Cap Rate and percentage to be proportionally allocated over one year.

5) SUTA– Cap Rate and percentage to be proportionally allocated over one year.

6) Union agreement costs – Other costs required under an enforceable collective bargaining agreement.

c. Fringe Benefits: Various non-wage compensations provided to employees such as:

1) Health Care Insurance Premiums

2) Cell Phone

3) Clothing

4) 401K and Pensions

5) Vehicle allowances

6) Gas allowance http://en.wikipedia.org/wiki/Employee

MAY 2021 CONTRACT MODIFICATION PROCEDURES 01 26 01 - Page 3 of 6

7) Life insurance premiums

8) Disability insurance

9) Other Fringe Benefits required under an enforceable collective bargaining agreement

E. Bonuses or Deferred Compensation: No Bonus or Deferred Compensation will be allowed within any components of pricing including Home Office Overhead, General Conditions, General Requirements, Hourly Worker Rates, or the direct costs of work.

F. General Liability Insurance: An insurance policy that protects the contractor from claims resulting from bodily injury or property damage to a third party. Include this as a separate line item within all modification proposals and provide a current insurance quote upon request.

G. Performance and Payment Bonds: A performance bond is a surety bond issued by an insurance company or bank to guarantee satisfactory completion of a project. The Payment Bond guarantees that the contractor will pay the labor and material costs they have incurred. Banks and Insurance companies charge a premium for each individual project based on a sliding scale which relates to the size of the project. Include this as a separate line item in modification proposals and provide current company bonding rates upon request.

H. Builder’s Risk Insurance: This covers the contractor’s loss due to fire, high winds, or other natural forces. This is not reimbursed by the National Park Service (NPS) and shall not be included in modification proposals.

1.3 MODIFICATION PROPOSAL PRICING REQUIREMENTS

A. General:

1. Your proposal must be received in the format and within the time frame specified in the

Request for Proposal letter. Costs or delays resulting from failure of contractor to submit within the time frame specified will not be compensable.

2. The proposal must be detailed with itemized lists of equipment, materials, labor, production rates, overhead, profit, and bond markup for each item. Labor costs must be itemized by craft and hourly rate, including Fringe Benefits and Labor Burden. If the costs of Fringe Benefits and Labor Burden are not itemized, it is assumed that that they are included in the hourly rate shown, or contractor is not requesting reimbursement.

Contractor may utilize the government provided Contractor Estimate Form, or their own form, provided that it contains the same information and level of detail as the Gov’t provided form.

3. Requests for extensions of contract time as a result of this change must be justified with a Time Impact Analysis (TIA). Refer to Division 01 Specification, “Construction Schedule”, for time impact analysis requirements. TIA and associated costs must be received with the proposal by the date shown within the Request for Proposal letter.

Contractor’s failure to submit within the specified time frame will be construed as the Contractor waiving the right for additional time and no time extension will be allowed.

4. All supporting documentation used to justify the proposed modification will be made available to the Government upon request.

5. Contractor must review and approve all subcontractor/supplier pricing in detail for proper format, scope, production rates, and pricing prior to submission to the NPS. All delay costs associated with not reviewing and approving subcontractor/supplier pricing will be borne by the Contractor.

6. All pricing and production rates within the estimate must be based on fair and reasonable pricing and cannot include built-in contingency.

http://en.wikipedia.org/wiki/Surety_bond http://en.wikipedia.org/wiki/Insurance http://en.wikipedia.org/wiki/Bank http://www.nps.gov/dscw/publicforms.htm#ct http://www.nps.gov/dscw/publicforms.htm#ct

MAY 2021 CONTRACT MODIFICATION PROCEDURES 01 26 01 - Page 4 of 6

B. Labor:

1. Contractor shall estimate the cost of labor by itemizing each craft involved, indicating worker hourly rate (base rate + labor burden + fringe benefits) for each and itemizing the hours required for each craft that will be directly engaged in modification work. Any work proposed that will require overtime work or premium pay shall be itemized separately. All rates shall be in accordance with the Davis-Bacon Act as incorporated herein. Labor Burden may include payroll taxes, Social Security, unemployment insurances, workers compensation insurance, FICA, FUTA, and other direct costs resulting from Federal, State or local laws.

2. Itemize labor costs for equipment operators separate from equipment costs.

3. The labor cost for foremen shall only be costs for related work required for the modification.

C. Materials:

1. The estimated cost for materials shall include quotes from multiple sources. Material prices must include all applicable fees and credits, including but not limited to, sales tax, freight and delivery charges, and tax rebates.

2. No markup shall be applied to any material provided by the NPS.

D. Equipment:

1. Equipment used for the project must be appropriately sized for the work being performed.

2. Do not include costs for “miscellaneous tools and equipment”, in your proposal for a replacement value of $500 or less. Costs shown in excess of $500 must be broken out separately.

3. Regardless of ownership, the rates to be used in determining equipment rental costs shall be the lowest cost from one of the following sources:

a. U.S. Army Corps of Engineers , Ownership and Operating Expense Schedule (use latest edition and applicable region)

b. Construction Blue Book

c. Local equipment rental rates, documented by actual invoice charges, or itemized vendor quotes.

4. The estimated equipment rates shall include the operating costs of all fuel, oil, lubrication, supplies, small tools, necessary attachments, ground engaging components, tires & tracks, routine repairs and maintenance (cost of major repair and overhaul is not allowed per FAR 31.105(d)(2)), depreciation, storage, insurance, and all incidentals.

Mobilization, if applicable, may be included for equipment solely used on the modification work but must be listed separately.

5. Estimate the full rate for equipment only for the duration that the equipment will be utilized to accomplish the work of the modification.

6. Standby unit rates used are to be in accordance with paragraph 1.3, D, 2, above. If the US Army Corp of Engineers is utilized then their standby rates prevail. If Bluebook or local equipment pricing is accepted, then ½ of the equipment costs minus any operating costs, major repair and overhaul will be accepted.

7. If equipment is in standby mode due solely to a documented NPS delay, the established standby rate shall apply from the first day of the delay.

8. Equipment that is not used and on the jobsite for up to five consecutive days may be classified at standby rates, provided that the equipment is or has been used solely to perform work on the modification and will be necessary to complete additional modification work. Equipment that is still on the jobsite but not in use after five consecutive days will not be considered in the modification pricing.

MAY 2021 CONTRACT MODIFICATION PROCEDURES 01 26 01 - Page 5 of 6

9. Requests for compensation for equipment stand by time must be justified, documented and itemized separately.

10. The estimated timeframe (daily, weekly, monthly) for use of the equipment must reflect the lowest cost to the Government.

E. Establishment and Application of Overhead and Profit Percentages:

1. Home Office Overhead and Profit (OH&P) shall be applied to direct costs only. Profit shall not be applied to overhead amounts; and overhead shall not be applied to profit.

Home office overhead shall contain only allowable, allocable, and reasonable costs per the contract documents and FAR Part 31. Profit percentages are based on risk factors found in FAR Part 31which have been applied to the specific type of work included in this project. Negotiated rates shall not exceed the following percentages for OH&P for contractor self-performed work:

Overhead = 10% Profit = 10%

2. Total aggregate limit of markup OH&P for contractor and subcontractors on modification work shall not exceed 25%. The NPS will not be responsible for allocation of percentages between contractor and subcontractors at any tier.

3. If contractors form a partnership, than the partnership may only receive home office overhead and profit in the same amount as an individual contractor (refer to para. 1.3.E.1 above). It is the responsibility of the partners to decide on the division of revenue.

4. Combined Increases and Decreases: On proposals involving both increases and decreases in the Contract Price, the overhead and profit mark-ups are required on the net increases and deducted on net decreases.

5. At no time can profit be calculated on Overhead or itself, it must be calculated on direct costs of work only.

PART 2 – PRODUCTS (Not Used)

END OF SECTION 012601

MAY 2021 CONTRACT MODIFICATION PROCEDURES 01 26 01 - Page 6 of 6

MAY 2021 DEFINITION OF CONTRACT LINE ITEMS 01 27 00 - Page 1 of 6

SECTION 01 27 00 – DEFINITION OF CONTRACT LINE ITEMS

PART 1 - GENERAL

1.1 SUMMARY

A. The intent of this section is to explain, in general, what is and what is not included in a contract line item, and the limits or cut-off points where one item ends and another begins.

B. If no contract line item exists for a portion of the work, include the costs in a related item.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 LIST OF CONTRACT LINE ITEMS

A. Contract Line Item No. 1 General Conditions

1. Contract Line Item No. 1A, General Supervision/Coordination, Visitor Protections

a. This item consists of the following:

i. Visitor protection.

ii. General supervision and coordination of various trades.

iii. Miscellaneous rough carpentry indicated or required.

iv. Final cleaning and cleanup as needed for a proper and workmanlike door replacement project.

b. Work is to be bid as identified on the Drawings and requirements delineated in the Specifications.

c. Measurement for payment will be percentage complete of line item, per scheduled value.

d. Payment will be made at the contract lump sum price.

B. Contract Line Item No. 2 Site Work

1. Contract Line Item No. 2A, Selective Demolition, Temporary Boarding

a. This item consists of assessment and documentation of field conditions, and the following tasks:

i. Selective demolition of interior and exterior entrances and storefront assemblies designated for removal.

ii. Assessment of existing substrates and detailed documentation and field-verification of all clear dimensions.

iii. Fabrication and installation of temporary wood framing and plywood boarding for the two (2) exterior entrances at the southwest corner of the building.

MAY 2021 DEFINITION OF CONTRACT LINE ITEMS 01 27 00 - Page 2 of 6

Specifications.

c. Measurement for payment will be percentage complete of line item, per scheduled

2. Contract Line Item No. 2B, Drilling, Cutting and Patching

a. This item consists of the following:

i. Miscellaneous cutting and patching of gypsum wallboard walls, column encasements, soffits, etc. required for removal of existing entrances and storefront and installation of new entrances and storefronts, including all associated mounting hardware.

ii. Miscellaneous drilling, cutting and patching required for installation and routing of power feeds and sensor/control wiring for automatic entrances, standalone power operators, and associated switches and controls.

c. Measurement for payment will be percentage complete of line item, per scheduled

C. Contract Line Item No. 3 Openings

1. Contract Line Item No. 3A, Entrances, Storefront, Door Packages and Power Operators

a. This item consists of fabrication, delivery, installation and glazing of entrances, entrance packages, integrated power door operators, storefront and all associated hardware, at southwest Entrances 102A, 102B, 102C and 102D.

b. Work is to be bid as identified on the Drawings and requirements delineated in the Specifications.

c. Measurement for payment will be percentage complete of line item, per scheduled

D. Contract Line Item No. 4 Thermal and Moisture Protection

1. Contract Line Item No. 4A, Joint Sealants

a. This item consists of perimeter caulking and all other joint sealants specified or required for the following:

i. Two (2) exterior entrance assemblies;

ii. Two (2) interior vestibule entrance assemblies.

c. Measurement for payment will be percentage complete of line item, per scheduled

MAY 2021 DEFINITION OF CONTRACT LINE ITEMS 01 27 00 - Page 3 of 6

2. Contract Line Item No. 4B, Insulation

a. This item consists of supply and installation of mineral-fiber insulation in sidelight mid-rail and transom assemblies, and at entrance frame perimeters as required, for the two (2) exterior entrance assemblies.

b. Work is to be bid as identified on the Drawings and requirements delineated in the Specifications.

c. Measurement for payment will be percentage complete of line item, per scheduled

E. Contract Line Item No. 5 Finishes

1. Contract Line Item No. 5A, Interior Finishes

a. This item consists of touch-up surface preparation, priming and painting of existing interior gypsum wallboard, wood and metal components.

b. Work is to be bid as identified on the Drawings and requirements delineated in the

Specifications.

c. Measurement for payment will be percentage complete of line item, per scheduled

F. Contract Line Item No. 6 Electrical

1. Contract Line Item No. 6A, Electrical Work

a. This item consists of the following electrical work associated with the southwest

Entrance 102A, 102B, 102C and 102D:

i. Connections to existing line-voltage power circuits.

ii. Coordination with existing security and life-safety protection systems, including routing and installation of low-voltage and signal wiring.

c. Measurement for payment will be percentage complete of line item, per scheduled

G. Contract Line Item No. 7 (Bid Option #1) Brown Street Entrance

1. Contract Line Item No. 7A, Brown Street Entrance 104 consists of replacement of the existing Brown Street entrance assembly with a new entrance assembly, complete.

a. Additional costs for:

i. Selective demolition of Brown Street entrance assembly.

ii. Assessment of existing substrates and detailed documentation and field-verification of all clear dimensions.

MAY 2021 DEFINITION OF CONTRACT LINE ITEMS 01 27 00 - Page 4 of 6

iii. Fabrication and installation of temporary wood framing and plywood boarding.

iv. Miscellaneous cutting and patching of existing interior soffit and ceiling assembly, as required for access to transom light, and cutting and patching of other finishes required for removal of existing entrance and installation of new entrance assembly, including all associated mounting hardware.

v. Fabrication, delivery and installation of Brown Street entrance, storefront and all associated hardware.

vi. Mineral-fiber insulation in sidelight mid-rail assemblies and at entrance frame perimeter.

vii. Perimeter caulking and all other joint sealants specified or required.

viii. Touch-up surface preparation, priming and painting of existing interior gypsum wallboard, wood and metal components.

ix. Coordination with existing security system, including salvage and reinstallation of intrusion detection sensors and re-routing (if required) of associated low-voltage and signal wiring.

2. Contractor's overhead, profit, and related costs for products and equipment authorized as part of Bid Option #1 shall be included in the Option and the Base Bid Contract Sum.

These costs shall include delivery, on-site receipt and handling, labor, installation, taxes, insurance, equipment rental and similar costs.

a. Measurement for payment will be percentage complete of line item per scheduled

b. Payment will be made at the contract lump sum price.

H. Contract Line Item No. 8 (Bid Option #2) Entrance Assemblies 101A, 101B and 103

1. Contract Line Item No. 8A consists of replacement of the existing interior and exterior southeast Entrances 101A and 101B and the exterior “Auditorium” Entrance 103 with new entrance assemblies, complete.

a. Additional costs for:

x. Selective demolition of three (3) entrance assemblies.

xi. Assessment of existing substrates and detailed documentation and field-verification of all clear dimensions.

xii. Fabrication and installation of temporary wood framing and plywood boarding at the two (2) exterior openings.

xiii. Miscellaneous cutting and patching of existing interior soffits and wall surfaces, as required for removal of existing entrances and installation of new entrance assemblies, including all associated mounting hardware.

xiv. Fabrication, delivery and installation of three (3) entrance assemblies, entrance packages, and integrated power door operators, including doors, sidelights, transom lights, thresholds, and all associated mounting hardware.

MAY 2021 DEFINITION OF CONTRACT LINE ITEMS 01 27 00 - Page 5 of 6

xv. Mineral-fiber insulation in sidelight mid-rail and transom assemblies, and at entrance frame perimeters as required.

xvi. Perimeter caulking and all other joint sealants specified or required

xvii. Touch-up surface preparation, priming and painting of existing interior gypsum wallboard, wood and metal components.

xviii. Connections to existing line-voltage power circuits.

xix. Coordination with existing security system, including salvage and reinstallation of intrusion detection sensors and re-routing (if required) of associated low-voltage and signal wiring.

2. Contractor's overhead, profit, and related costs for products and equipment authorized as part of Bid Option #2 shall be included in the Option and the Base Bid Contract Sum.

These costs shall include delivery, on-site receipt and handling, labor, installation, taxes, insurance, equipment rental and similar costs.

a. Measurement for payment will be percentage complete of line item per scheduled

b. Payment will be made at the contract lump sum price.

END OF SECTION 012700

MAY 2021 DEFINITION OF CONTRACT LINE ITEMS 01 27 00 - Page 6 of 6

MAY 2021 PROJECT MANAGEMENT 01 31 00 - Page 1 of 6

SECTION 01 31 00 - PROJECT MANAGEMENT AND COORDINATION

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

1. Definitions

2. Construction Coordination.

3. Submittals

4. Coordination Drawings.

5. Requests for Information (RFIs).

6. Project meetings.

7. Environmental Coordination.

8. Responsibilities, Codes and Permits.

B. Related Requirements:

1. Section 01 32 16 - Construction Schedule: For preparing and submitting Contractor’s construction schedule.

2. Section 01 73 40 – Execution: For procedures for coordinating general installation and field-engineering services, including establishment of benchmarks and control points.

3. Section 01 77 00 - Closeout Procedures: For coordinating closeout of the Contract.

1.2 DEFINITIONS

A. Authority Having Jurisdiction (AHJ): For the purposes of this contract, the AHJ is the Interior Region 1 Director as represented by the NPS Fire Protection Engineer.

1.3 CONSTRUCTION COORDINATION

A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections, which depend on each other for proper installation, connection, and operation.

1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.

2. Make adequate provisions to accommodate items scheduled for later installation.

3. Where availability of space is limited, coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair of all components.

4. Properly plan construction operations to include permit requirements. Allow enough time to execute permit provisions to maintain work schedule, site visits, inspections, and reporting deadlines.

B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.

MAY 2021 PROJECT MANAGEMENT 01 31 00 - Page 2 of 6

C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of subcontractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:

1. Preparation of Contractor's Construction Schedule;

2. Preparation of the Schedule of Values;

3. Installation and removal of temporary facilities and controls;

4. Delivery and processing of submittals;

5. Progress meetings;

6. Permit requirements;

7. Pre-installation conferences;

8. Project closeout activities;

9. Commissioning activities.

1.4 SUBMITTALS

A. Division 01 documents: The following items shall be submitted a minimum of one (1) week prior to the Preconstruction Conference. Government will notify Contractor of tentative date for the Pre-Construction Conference.

1. Letter designating Project Superintendent;

2. Construction Schedule;

3. Schedule of Values;

4. A list of Subcontractors for this project;

5. Written statements from subcontractors certifying compliance with applicable labor standard clauses;

6. Satisfactory evidence of liability insurance coverage and workman’s compensation for the Contactor and all subcontractors;

7. Quality Control Plan.

B. All items listed must be provided to the Government before the Pre-Construction Conference is held. If all of these documents have not been received one (1) week prior to the scheduled Pre-Construction Conference date, the conference may be cancelled, Notice to Proceed may not be issued, and the Government may consider other contractual remedies. Work shall not commence until written Notice to Proceed has been issued.

1.5 REQUESTS FOR INFORMATION (RFI’s)

A. General: Immediately on discovery of the need for additional information or interpretation of the Contract Documents, during either the Bid process of construction, Contractor shall prepare and submit an RFI utilizing the form provided in Division 00 of this specification or the Contractor’s own form containing all information required by para 1.5.B, below.

1. The Government will not respond to RFI’s submitted by other entities controlled by

Contractor;

2. Coordinate and submit RFI’s in a prompt manner to avoid delays in the work.

B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:

1. RFI number, numbered sequentially;

2. Date;

3. RFI subject;

4. Specification Section number and title and related paragraphs, as appropriate;

MAY 2021 PROJECT MANAGEMENT 01 31 00 - Page 3 of 6

5. Drawing number and detail references, as appropriate;

6. Field dimensions and conditions, as appropriate;

7. Contractor's suggested resolution.

a. If Contractor's suggested resolution impacts the Contract Time or the Contract Sum, Contractor shall state impact in the RFI;

8. Contractor's signature;

9. Requested date for response;

10. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop

Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.

a. Include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments on attached sketches.

C. Government Action:

1. The Government will review each RFI, determine action required, and respond to

Contractor. The Government will determine the critical nature of each RFI and issue a response accordingly.

2. CO's action may include a request for additional information, in which case time for response will date from time of receipt of additional information.

3. CO's action on RFIs may result in the need for a change to the Contract Time or the Contract Sum. All contract changes will be processed following the terms and conditions of the contract.

D. The following are not considered to be RFI’s and will receive no action:

1. Requests for approval of submittals;

2. Requests for approval of substitutions;

3. Requests for approval of Contractor's means and methods;

4. Requests for coordination information already indicated in the Contract Documents;

5. Requests for adjustments in the Contract Time or the Contract Sum;

6. Requests for interpretation of the Government's actions on submittals;

7. Incomplete RFI’s or inaccurately prepared RFI’s.

1.6 PROJECT MEETINGS

A. Preconstruction Conference: Before start of construction, Government will arrange an on-site meeting with Contractor.

1. Attendees: Government Representatives, the Contractor, and appropriate Subcontractors as determined by the Contractor and other entity shall be represented at these meetings.

All participants at the meeting shall be familiar with the Project and authorized to conclude matters relating to the Work.

2. The meeting agenda will include the following as a minimum:

a. Roles & Responsibilities/ Lines of Authority;

b. Park rules and regulations;

c. Jobsite Safety;

d. Resolution of comments on required Division 01 documents;

e. Coordination of Subcontractors.

f. Labor law application;

g. Modifications;

h. Payments to Contractor;

i. Payroll…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .