B08_24R0046_Attachment_3_-_Price_Schedule.pdf

PDF 913 KB Posted

Attached to
GAOA GILA BOX DAY USE IMPROVEMENTS Federal contract opportunity
Solicitation number
140L0624R0046
Issued by
Department of the Interior Bureau of Land Management National Office

About this file

This document is a detailed cost estimate for the Bureau of Land Management's Gila Box Recreation Site Improvements project in Arizona. The estimate covers four distinct scopes of work: Flying W Day Use Area, Lee Trail, Old Safford Bridge & Boat Put-In, and Wildlife Viewing Area. For each scope, the estimate provides a detailed breakdown of mobilization, site preparation, and specific site improvements, along with associated material, labor, and markup costs. The total estimated construction cost for all four scopes is $394,594.

The related federal contract opportunity is Solicitation Number 140L0624R0046, titled "GAOA GILA BOX DAY USE IMPROVEMENTS", issued by the Department of the Interior Bureau of Land Management National Office. This solicitation appears to be for the construction work outlined in the cost estimate document.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUREAU OF LAND MANAGEMENT

GILA BOX RECREATION SITE IMPROVEMENTS

GILA DISTRICT , ARIZONA

COST ESTIMATE

Flying W Day Use Area

Lee Trail

Old Safford Bridge & Boat Put-In

Wild Life Viewing Area; Shade structure

Bureau Of Land Management

Gila Box Recreation Site Improvements

Summary

Scope Estimated Cost Scope Estimated Cost

Flying W Day Use Area Lee Trail

ESTIMATE: ESTIMATE:

- Mobilization/Site Preparation

- Site Improvements

- Mark Up's & Add-On's

Total Estimated Construction Cost:

- Mobilization/Site Preparation

- Site Improvements

- Mark Up's & Add-On's

Total Estimated Construction Cost:

Estimated Cost Scope

Wild Life Viewing Area

ESTIMATE:

- Mobilization/Site Preparation

- Site Improvements

- Mark Up's & Add-On's

Total Estimated Construction Cost:

TOTAL COST

Estimated CostScope

Old Safford Bridge & Boat Put-In

ESTIMATE:

- Mobilization

- Site Improvements

- Mark Up's & Add-On's

Total Estimated Construction Cost:

Bureau of Land Management

Gila Box; Site Improvements

Flying W Day Use Area

Description Quantity Unit Material Install Rate Total $

Mobilization/Site Preparation

1 ls

1 ls ls 180 lf 2 ea

1 ls

1 ea

4 ea incl

1 ls 500.00 250.00 750.00 750

6 ea

Mobilization /site set up

Site Improvements

Site preparation/grading/demo existing equipment & remove Volleyball Court Improvements

Railroad ties 9" x 7" for Volleyball Court

Steel poles; 3" dia X 8' tall incl base

Markings/net/auxillary items

Small shade structure 12'x12' incl footings/slab

Steel Camp Grill

Horse Shoe pits; ties incl with V. court

Trash receptacle; allow

Picnic Tables-

Misc Patch repairs to areas disturbed 1 ls

8,154

Sub Total: 62,514$

Mark Up's & Add-On's

3,126$

1,313$

10,043$

Sub Total: 76,995$

7,700$

8,304$

Tax

Bonds and Insurances

Overhead & Profit

Estimated Total To Summary: 99,509$ ties 9" x 7" 50 lf

Gila Box; Site Improvements

Lee Trail

Description Quantity Unit Material Install Rate Total $

Mobilization/Site Preparation

1 ls

1 ls

6,325 sy

6,325 sy

1 ea

1 ls

Mobilization /site set up

Site Improvements

Site preparation/grading/demo existing equipment & remove Scarify & recompact existing Gravel

Scarify & recompact 6"

5" Aggregate base topping

Kiosk incl footings

Misc Patch repairs to areas disturbed

Sub Total: $

Mark Up's & Add-On's

Sub Total: $

Tax

Bonds and Insurances

Overhead & Profit

Estimated Total To Summary: $

Gila Box Recreation Improvements

Old Safford Bridge & Boat Put-In

Description Quantity Unit Material Install Rate Total $

Mobilization/Site Preparation

1 ls

1 ls

1,012 sy

1,012 sy

575 lf

400 sf

192 sf

100 lf

1 ea

1 ea

1 ea

1 ea

1 ls

Mobilization /site set up

Site Improvements

Demolitions incl haul off site

Scarify & recompact existing Gravel

Scarify & recompact 6"

5" Aggregate base topping

Replace damaged tube steel rail section a detail; 36" high

10" Concrete Pad incl prep; det 2

4" Concrete sidewalk incl prep; det 1

6" turn down at edge

Kiosk incl footings

Vault Toilet

Picnic Table

Grill

Misc Patch repairs to areas disturbed

Sub Total: $

Mark Up's & Add-On's

Sub Total: $

Tax

Bonds and Insurances

Overhead & Profit

Gila Box Recreation Improvements

Wild Life Viewing Area

Description Quantity Unit Material Install Rate Total $

Mobilization/Site Preparation

1 ls

1 ls

1 ea

4 ea

6 ea

3 ea

1 ls

Mobilization /site set up

Site Improvements

Site prep; grading/ demolitions (Shade structure/interprative panels/ misc) Shade structure 16'x16' incl footings/slab repairs

Premium for stone columns

Interprtative panel

Benches

Misc Patch repairs to areas disturbed

Sub Total: $

Mark Up's & Add-On's

Sub Total: $

Tax

Bonds and Insurances

Overhead & Profit

File details come from the government source that posted it. Updated .