B08_24R0046_Attachment_3_-_Price_Schedule.pdf
PDF 913 KB Posted
- Attached to
- GAOA GILA BOX DAY USE IMPROVEMENTS Federal contract opportunity
- Solicitation number
- 140L0624R0046
About this file
This document is a detailed cost estimate for the Bureau of Land Management's Gila Box Recreation Site Improvements project in Arizona. The estimate covers four distinct scopes of work: Flying W Day Use Area, Lee Trail, Old Safford Bridge & Boat Put-In, and Wildlife Viewing Area. For each scope, the estimate provides a detailed breakdown of mobilization, site preparation, and specific site improvements, along with associated material, labor, and markup costs. The total estimated construction cost for all four scopes is $394,594.
The related federal contract opportunity is Solicitation Number 140L0624R0046, titled "GAOA GILA BOX DAY USE IMPROVEMENTS", issued by the Department of the Interior Bureau of Land Management National Office. This solicitation appears to be for the construction work outlined in the cost estimate document.
View the file
Other files for this federal contract opportunity
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUREAU OF LAND MANAGEMENT
GILA BOX RECREATION SITE IMPROVEMENTS
GILA DISTRICT , ARIZONA
COST ESTIMATE
Flying W Day Use Area
Lee Trail
Old Safford Bridge & Boat Put-In
Wild Life Viewing Area; Shade structure
Bureau Of Land Management
Gila Box Recreation Site Improvements
Summary
Scope Estimated Cost Scope Estimated Cost
Flying W Day Use Area Lee Trail
ESTIMATE: ESTIMATE:
- Mobilization/Site Preparation
- Site Improvements
- Mark Up's & Add-On's
Total Estimated Construction Cost:
- Mobilization/Site Preparation
- Site Improvements
- Mark Up's & Add-On's
Total Estimated Construction Cost:
Estimated Cost Scope
Wild Life Viewing Area
ESTIMATE:
- Mobilization/Site Preparation
- Site Improvements
- Mark Up's & Add-On's
Total Estimated Construction Cost:
TOTAL COST
Estimated CostScope
Old Safford Bridge & Boat Put-In
ESTIMATE:
- Mobilization
- Site Improvements
- Mark Up's & Add-On's
Total Estimated Construction Cost:
Bureau of Land Management
Gila Box; Site Improvements
Flying W Day Use Area
Description Quantity Unit Material Install Rate Total $
Mobilization/Site Preparation
1 ls
1 ls ls 180 lf 2 ea
1 ls
1 ea
4 ea incl
1 ls 500.00 250.00 750.00 750
6 ea
Mobilization /site set up
Site Improvements
Site preparation/grading/demo existing equipment & remove Volleyball Court Improvements
Railroad ties 9" x 7" for Volleyball Court
Steel poles; 3" dia X 8' tall incl base
Markings/net/auxillary items
Small shade structure 12'x12' incl footings/slab
Steel Camp Grill
Horse Shoe pits; ties incl with V. court
Trash receptacle; allow
Picnic Tables-
Misc Patch repairs to areas disturbed 1 ls
8,154
Sub Total: 62,514$
Mark Up's & Add-On's
3,126$
1,313$
10,043$
Sub Total: 76,995$
7,700$
8,304$
Tax
Bonds and Insurances
Overhead & Profit
Estimated Total To Summary: 99,509$ ties 9" x 7" 50 lf
Gila Box; Site Improvements
Lee Trail
Description Quantity Unit Material Install Rate Total $
Mobilization/Site Preparation
1 ls
1 ls
6,325 sy
6,325 sy
1 ea
1 ls
Mobilization /site set up
Site Improvements
Site preparation/grading/demo existing equipment & remove Scarify & recompact existing Gravel
Scarify & recompact 6"
5" Aggregate base topping
Kiosk incl footings
Misc Patch repairs to areas disturbed
Sub Total: $
Mark Up's & Add-On's
Sub Total: $
Tax
Bonds and Insurances
Overhead & Profit
Estimated Total To Summary: $
Gila Box Recreation Improvements
Old Safford Bridge & Boat Put-In
Description Quantity Unit Material Install Rate Total $
Mobilization/Site Preparation
1 ls
1 ls
1,012 sy
1,012 sy
575 lf
400 sf
192 sf
100 lf
1 ea
1 ea
1 ea
1 ea
1 ls
Mobilization /site set up
Site Improvements
Demolitions incl haul off site
Scarify & recompact existing Gravel
Scarify & recompact 6"
5" Aggregate base topping
Replace damaged tube steel rail section a detail; 36" high
10" Concrete Pad incl prep; det 2
4" Concrete sidewalk incl prep; det 1
6" turn down at edge
Kiosk incl footings
Vault Toilet
Picnic Table
Grill
Misc Patch repairs to areas disturbed
Sub Total: $
Mark Up's & Add-On's
Sub Total: $
Tax
Bonds and Insurances
Overhead & Profit
Gila Box Recreation Improvements
Wild Life Viewing Area
Description Quantity Unit Material Install Rate Total $
Mobilization/Site Preparation
1 ls
1 ls
1 ea
4 ea
6 ea
3 ea
1 ls
Mobilization /site set up
Site Improvements
Site prep; grading/ demolitions (Shade structure/interprative panels/ misc) Shade structure 16'x16' incl footings/slab repairs
Premium for stone columns
Interprtative panel
Benches
Misc Patch repairs to areas disturbed
Sub Total: $
Mark Up's & Add-On's
Sub Total: $
Tax
Bonds and Insurances
Overhead & Profit