This award notice documents a firm fixed price contract awarded to American International Contractors (Special Projects) Inc. for alterations to the Operations Control Center at NSA Bahrain. The contractor will provide all labor, materials, equipment, and supervision for first floor alterations, fire protection systems, HVAC, and electrical work. The base period of performance is 590 days from award with a total value of $10,017,893.96 in U.S. dollars. The contract was awarded on an unusual and compelling urgency basis pursuant to FAR 6.302-2 and a synopsis will be posted within 30 days as required by FAR 6.305(b). The work will be performed at NSA Bahrain in the Kingdom of Bahrain.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Operation Control Center Alterations, NSA Bahrain, Kingdom of Bahrain

The contractor shall provide all labor, management, supervision, tools, materials, and equipment necessary for the alterations of the Operation Control Center Alterations at NSA Bahrain.

Proposals are due prior to close of business Monday 28 October 2019.

This contract w ill be aw arded and administered in US Dollars ($).

The estimated magnitude of construction is betw een $1,000,000.00 and $5,000,000.00.

The contract period of performance is 590 calendar days from aw ard.

OSCAR E. BECERRIL 39-081-568-4071

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

24-Oct-2019

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______15 calendar days and complete it w ithin ________530 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________28 Oct 2019 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

N3319120C0002

7. ISSUED BY CODE

NAVFAC EUROPE AFRICA CENTRAL

VIALE PORTO CAPODICHINO

NAPOLI 80144

N33191

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

05:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

39 081 568 7750FAX:TEL: 39 081 568 7750 TEL: FAX:

N3319120R40070001 82

FEAD BAHRAIN

NAVAL SUPPORT ACTIVITY

P.O. BOX 116

MANAMA

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE

4B3S1

FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

SEE SCHEDULE

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

$10,017,893.96 See Schedule

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE N33191

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE N6873227. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

DFAS-CLEVELAND

P.O. BOX 998022

CLEVELAND OH 44199

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR

AMERICAN INTERNATIONAL CONTRACTORS (SPEC

4600 N FAIRFAX DR 602

ARLINGTON VA 22203-1560

15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.)1 Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract. REF:

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print) Richard J. Spagnuolo / Contract Specialist

TEL: 314 626 1015 EMAIL: richard.spagnuolo@eu.navy.mil

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY 12-Mar-2020

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENTX

(M ust be fully completed by offeror)OFFER

N3319120C0002

Section SF 30 - Block 14 Continuation Page (SF 30)

AMENDMENT 0001

Solicitation Amendment 0001 as ennumerated in Block 2, incoroporates all Amendments for this procurement as of 25 October 2019: these Amendments have been numbered 0001 through 0007 as shown below:

Amendment 0001 is hereby incorporated to include the following:

1. Pre-proposal inquiry (PPI) due date is changed to Wednesday August 14, 2019 at 11:00 AM

CEST.

2. Answers to PPI’s will be provided no later than Monday August 19, 2019.

3. The proposal due date has been changed to Tuesday September 3, 2019 11:00 AM CEST.

4. In addition please note the additional changes below and the two attachments:

a. 170621_P930_Final Drawings AMMENDMENT floor plan (Enclosure A)

b. 170621_P930_Final Drawings AMMENDMENT demo (Enclosure B)

To the base bid:

Sheet AD101: Demolish the wall between the room labeled Open Office Server Room N204 (this room is not within the construction limits) and the room labeled Administration A N204. Align new floor, ceiling and wall finishes in Administration A to meet and match existing finishes in Open Office Server Room.

Option 1:

Sheet AD101: Provide new floor, wall and ceiling finishes in room labeled Open Office Server Room N204 to match room labeled Administration A N204.

Option 2:

Sheet A101: Extend secure area boundary to include the Electronic Maintenance Shop and adjacent Storage Space. Eliminate the secure area boundary between the Conference Room and the Electronic Maintenance Shop.

Add a door between the Conference Room and the Electronic Maintenance Shop.

There will be no secure area boundary between the Electronic Maintenance Shop and the adjacent Storage Space. Provide a double door vestibule using doors and spacing similar to vestibule N1222 to provide ingress/egress to the corridor to the plan north of the electronic maintenance shop.

Please acknowledge all amendments in your proposal.

Amendment 0002 is hereby incorporated to include the following:

1. Answers to Pre-proposal inquiries (PPI).

PPI 01

Reference to SECTION 01 14 00 “WORK RESTRICTIONS”, paragraph 1.3.5.2 Citizenship Requirements, Page 5- 6, it is stated that “…the design and general construction for this project shall be accomplished by U.S. companies using US citizens.” It is also mentioned that “Any use of non-U.S. citizens or foreign national personnel must be vetted through the Authorizing Official via U.S. Fleet Cyber Command Security.”

Based on the above, please confirm that the use of non-U.S citizens and foreign national personnel is acceptable given that the required approval is provided by the Authorizing Official via U.S. Fleet Cyber Command Security.

Answer: to comply with UFC 4-010-05, the answer is No. UFC 4-010-05 refers to ICS 705-1. Version 1.4 [Sept.

28, 2017 of the ICTech Specs for ICD / ICS 705 states: "5. Construction and design should be performed by U.S.

companies using U.S. citizens to reduce risk, but may be performed by U.S. companies using U.S. persons (an individual who has been lawfully admitted for permanent residence as defined in 8 U.S.C. § 1101(a)(20) or who is a protected individual as defined by Title 8 U.S.C. §1324b (a)(3))

Foreign National persons are not U.S. Citizens. Foreign National persons also do not fall within the definition of U.S. persons contained in the IC Tech Specs.

PPI 02

Reference to the RFP documents, Page 3 of 19, it is required to submit the proposal package no later than Monday 12 August 2019 at 11:00 A.M., Central European Summer Time (CEST).

Accordingly, you are kindly requested to extend the proposal submission due date by three (3) weeks from 12 August 2019 until 2 September 2019 due to the following reasons:

1. The nature and complexity of this task order.

2. The site visit being only 2 weeks before the proposal submission date.

3. The Eid Holiday celebrated in Bahrain and the entire region extends from 11 August until 15 August 2019.

This additional time will be used to obtain answers for the questions raised during the site visit as well as to get more accurate and economic proposals from suppliers/subcontractors, which will eventually result in more competitive proposals for the benefit of all stakeholders.

Answer: Answered by Contract Specialist and amendment 01.

PPI 03

Reference to Specification Section 01 50 00, page 2, paragraph 3.4.1, please confirm that a Government Field Office is required. If yes, please provide more details about the Trailer-Type Mobile Office in terms of area, number of personnel to occupy the office, types and quantities of furniture and any additional facilities/utilities required.

Answer: This contract does not include any Government Field Office.

PPI 04

Reference to the RFP document, Technical Factors, Eligibility for Award, page 9 of 19, it is stated that “…portions of the SCIF construction to be performed by U.S. citizens with an adjudicated final SECRET security clearance.”

Furthermore, in SECTION 01 14 00 “WORK RESTRICTIONS”, paragraph 1.3.5.2 Citizenship Requirements, Page 5-6, it is also stated that “SECURE AREA finish work… shall be accomplished by SECRET-cleared, U.S.

personnel.”

Based on the above, please advise how the client intends for the competing contractors to perform classified work when none of the competitors is a cleared facility.

If you do not have a facility clearance, you cannot hire cleared U.S. labor.

Accordingly, we recommend that you either split the classified work out into a separate contract that you bid amongst classified firms or do the same for the contract in its entirety.

Answer: The General Contractor is eligible to bid on this project and use the subsidiary with the Facilities Clearance, as described in the question.

PPI 05

Reference to Specification Section 26 20 00, paragraph 2.4.1, and Drawing no. E001 “Telecom Pathway Detail”, please confirm that the Telecom Floor outlet shall be provided with empty faceplates. Otherwise, please clarify which type of jack to be used for the NIPR outlets (RJ45 UTP or RJ45 STP).

Answer Specification Section 26 20 00, paragraph 2.4.1 requires the contractor to coordinate the telecoms outlet jack type with the government. The outlet will be selected by the end user. Stainless Steel faceplates are specified.

PPI 06 Reference to Specification Section 26 20 00, paragraph 2.4.1, and Drawing no. E001 “Telecom Pathway Detail”, please confirm that the Telecom Floor outlet shall be provided with empty faceplates. Otherwise, please clarify which type of jack to be used for the SIPR outlets (RJ45 UTP, RJ45 STP, FO SC or FO LC).

Answer Specification Section 26 20 00, paragraph 2.4.1 requires the contractor to coordinate the telecoms outlet jack type with the government. The outlet will be selected by the end user. Stainless Steel faceplates are specified.

PPI 07

Reference to Specification Section 26 20 00, paragraph 2.4.1, and Drawing no. E001 “Telecom Pathway Detail”, please confirm that the Telecom Floor outlet shall be provided with empty faceplates. Otherwise, please clarify which type of jack to be used for the SCI outlets (RJ45 UTP, RJ45 STP, FO SC or FO LC).

Answer Specification Section 26 20 00, paragraph 2.4.1 requires the contractor to coordinate the telecoms outlet jack type with the government. The outlet will be selected by the end user. Stainless Steel faceplates are specified.

PPI 08

Reference to Specification Section 26 20 00, paragraph 2.4.2, and Drawing no. E001 “Communication outlet symbol”, please confirm that the Telecom Wall outlet shall be provided without faceplates. Otherwise, please provide the type of the faceplate and jack to be used.

Answer Specification Section 26 20 00, paragraph 2.4.1 requires the contractor to coordinate the telecoms outlet jack type with the government. The outlet will be selected by the end user. Stainless Steel faceplates are specified.

PPI 09

RFP, Technical Approach – Element 3. The Element 3 project list has a column for :MTP, (Yes / No) and for: Size (in gallons). Please clarify what is wanted here?

Answer: Bidders are asked to disregard the MTP and the Size/Gallon Columns

PPI 10

Spec SECTION 01 14 00, para1.3.5.2 B. states: SECURE AREA finish work (work that includes closing up wall structures; installing, floating, taping and sealing wallboards; installing trim, chair rail, molding, and floorboards;

painting; etc.) shall be accomplished by SECRET-cleared, U.S. personnel.

Is this the only work required by SECRET-cleared, U.S. personnel? Will our management staff have to also be SECRET-cleared, U.S. personnel?

Answer: No, All workers must be (fully adjudicated) Secret cleared and US personnel. Refer to CSP for further guidance.

PPI 11

It is our understanding that all of the work under this Task Order/contract will be performed under the:A. Phase 1 - Construction Phase as stated on page 18 of the CONSTRUCTION SECURITY PLAN.

Please clarify if this understanding is correct or if any of the work in this Task order will be performed in Phase 2 after BOD?

Answer: There is no Phase 2 work in this contract.

PPI 12

Please identify what construction materials in this contract are considered “Non-inspectable materials” as described in the Construction Security Plan Para. 4.04 MATERIAL PROCUREMENT AND TRANSPORTATION, Para B?

Presently we think all materials can fall into the Inspectable Materials category.

Answer: All Materials will be inspectable.

PPI 13

It is our understanding that under the U.S. government rules and regulations, only a U.S. company with a Cleared Facility in the USA are able to hire and maintain U.S. employees with a Security Clearance. If the MACC contractors does NOT have such as USA-based Cleared Facility, but can find U.S. citizens as construction workers that hold active security clearances, would they still be qualified to have these workers with security clearance work on the project?

Also can we use a subcontractor with Secured Workers to perform the Secured construction work?

And can the SECRET-cleared, U.S. personnel we’ve hire or from a sub work in the site at the same time as uncleared workers?

Answer: All workers MUST be (fully adjudicated) Secret cleared and citizens of the USA, and all companies MUST have a Facility Clearance (FCL) or have either a subcontractor or subsidiary with a FCL.

PPI 14

It is our best solution to utilize local subcontractors and inhouse workers/staff for construction services. These will be personnel already legally residing in Bahrain and many of whom are or have already worked at NSA Bahrain or temporary workers. These will include Bahraini, Indian, Philippino, Turkish, and Italian nationals. Per the contract it states: Any use of non-U.S. citizens or foreign national personnel must be vetted through the Authorizing Official via U.S. Fleet Cyber Command Security.( SECTION 01 14 00 WORK RESTRICTIONS 1.3.5.2 Citizenship Requirements) Does NAVFAC see or anticipate any issue approving these individuals for this project?

Answer: Yes, NAVFAC anticipates these individuals will not be approved.

PPI 15

It is our understanding that NSA Security will issue a limited, temporary base access to personnel coming to Bahrain to work on NAVFAC projects. However, once this pass expires, one will not be allowed access to the base unless they have a legal VISA and residence permit (CPR) in the Kingdom of Bahrain.

A. Can you confirm this is correct?

B. And how long a duration is issued for the limited, temporary base access for construction workers and staff?

Answer: NCTS Bahrain does not dictate or decide on how the CPR process is processed for contracted personnel, the company owners and any other entity that engages in contracted work. The CPR process must be worked out with the embassy and immigration.

PPI 16

A. The drawings provided with the RFP are unclassified. Are we to assume that all of the work in the provided drawing package can be constructed by non-secured, local contractors?

Answer: No, Follow the CSP.

B. Is there a second design package of secured/classified work, such as communications that will be performed by a follow-on contractor after our BOD?

Answer: No, there will be no second design package as part of this work.

PPI 17

It is our understanding that importing materials into the Kingdom of Bahrain requires (1) one have an established company in Bahrain with a CPR, (2) the prime must utilize a locally registered company to act as their import agent or subcontractor. Can you confirm this is correct?

Answer: We are not able to confirm importing materials into the Kingdom of Bahrain requiring anyone to have an established company in Bahrain with a CPR and having to utilize a locally registered company to act as their import agent or subcontractor.

PPI 18

In the past, for the US Navy in EURAFSWA, we have brought in a team of local contractors to perform all non-secured work. Once completed, the US national, secured team or follow on contractor came in to complete the work, pull the cables, etc.

We were required to have 1 US secured personnel, or military with security clearance, for every 3 local nationals as escorts.

Would NAVFAC consider this solution for this project in order to reduce costs and reduce construction time?

Answer: No. Follow the CSP

PPI 19

Reference to Drawing no. ET101, Keynote 7, please confirm that the cabinet is not included in the contractor scope of work. Otherwise, please provide the cabinet requirement.

Answer: Regarding Sheet ET101, Keynote 7, A/V cabinet is not included in contractor scope of work. It is government furnished government installed.

PPI 20

Reference to PPI No. 4 dated 28 July 2019, kindly note that this inquiry included a very critical question concerning SCIF construction and the requirement for SECRET-cleared, U.S. personnel.

Based on our first-hand experience on Contract no. W912ER-11-D-0001-0006 “P-908 Operations and Support Facilities, Naval Support Activity, Manama, Bahrain”, this issue has to be resolved during the bidding period or it will cause major complications and delays after award. Accordingly, your urgent response is sincerely appreciated.

Answer: The company is permitted to use the fact they have a subsidiary with a FCL to bid on the contract.

Amendment 0003 is hereby incorporated to include the following:

1. Answers to Pre-proposal inquiries (PPI).

PPI 21

Reference to your response to PPI No. 4 included in Amendment 0002, , kindly note that based on our recent discussions with companies having Facility Clearance (FCL) and Secret Cleared personnel about the possibility of using them as a subcontractor on this project, we were clearly informed that per National Industrial Security Program (NISP) requirements and the direction of the Defense Counterintelligence and Security Agency (DCSA - the government agency that issues the FCLs), they cannot apply their FCL to a classified contract as a subcontractor to a prime contractor without Facility Clearance. The NISPOM (National Industrial Security Program Operating Manuals) requires the Prime Contractor to have FCL even in instances when classified access is limited to subcontractors. They have told us that they need to have a Department of Defense Contract Security Classification Specification (DD254) issued to them in order to apply access to their cleared personnel’s security clearances (there does not appear to be any reference to a DD254 being issued once this contract is awarded). That would need to come directly from the government, or it would come from a prime contractor with FCL who had received a DD254 from the government. Based on the above and our first-hand experience at NSA, Bahrain, it will not be possible to execute the SCIF scope of work associated with this project by any of the U.S. MACC awardees since they do not possess the required Facility Clearance. Should you need to discuss this critical issue in more details, please advise who at NAVFAC should our subcontractor’s DCSA Representative speak to about this subject. Since the proposal is due in only one week, your urgent response is sincerely appreciated.

Answer:

See Amendment 0002’s Answer for PPI 04. In addition, Should you need to discuss this critical issue in more details during the contract period, you may contact the Contracting Officer’s Representative who will be named at award.

Amendment 0004 is hereby incorporated to include the following:

1. Responses to PPI's 1-47 (Dated 10/08/2019) (Attachment 1, excel sheet)

2. Attachment Potential Lay Down Area (Enclosure C)

Amendment 0005 is hereby incorporated to include the following:

1. Responses to PPI’s 47-72 (Dated 10/11/2019) (Attachment 1, excel sheet)

Amendment 0006 is hereby incorporated to include the following:

1. Responses to PPI;s 73-76 (Dated 10/17/2019) (Attachment 1, excel sheet)

2. Appendix A- Inspectability (Enclosure D)

Amendment 0007 is hereby incorporated to include the following:

1. Responses to PPI’s 77-83 (Dated 10/18/2019) (Attachment 1, excel sheet)

Section 00 10 00 - Solicitation

INSTRUCTIONS TO OFFERORS

A. GENERAL INFORMATION

1. This SF-1442 Request for Proposal replaces and supercedes the one having been sent on 20 September 2019 for the purposes of scoping collaboration to American International Contractors (Special Projects) Inc. for the work described herein and attachments which had been sent to you via https://safe.apps.mil/ containing the technical Specifications. You had received an email(s) from this website for access. If you have any questions about this information, by email please inform Contract Specialists Mr. Oscar Becerril at email oscar.becerril@eu.navy.mil and Mr. Joshua Mentink at joshua.mentink@eu.navy.mil with a courtesy copy (cc) the Contracting Officer, Mr.

Richard J. Spagnuolo at richard.spagnuolo@eu.navy.mil.

This acquisition will result in the award of a Firm Fixed Price (FFP) contract. The contract will be procured using negotiated procedures as it has been determined in accordance with FAR Part 15, Contrcting by Negotiation to be the most appropriate method of contracting the subject requirement.

Note 1: Within one (1) business day, the contractor shall send an email to the Contract Specialist indicating receipt of this Request for Proposal. Please send this email to:

Contract Specialists Mr. Oscar Becerril at email oscar.becerril@eu.navy.mil and Mr. Joshua Mentink at joshua.mentink@eu.navy.mil with a courtesy copy (cc) the Contracting Officer, Mr. Richard J. Spagnuolo at richard.spagnuolo@eu.navy.mil.

The Government invites you to provide a Technical package with a Price Proposal for use in negotiating a successful award of this construction contract in support of the Navy’s mission in Bahrain.

Note 2: At this time, there is no site visit scheduled for this project.

Note 3: Notify the Contract Specialist immediately if there is any erroneous information in this RFP that refers to your company, SUCH AS BUT NOT LIMITED TO i.e. CAGE CODE, DUNS NUMBER, STATUS AS A SOLE-

PRIME CONTRACTOR PROVIDING A PROPOSAL FOR THIS CONTRACT).

Your initial proposal should contain the proposal’s best terms from a price and technical standpoint. If the proposal is greater than the project funding limit, it may be rejected. It is the Government’s intention to award this contract as soon as possible at a fair and reasonable price.

2. Project Description:

This project will provide alterations to 750 m2 (8,073 SF) on the first floor of building 103 (BER III Wing) to provide a consolidated watch-floor for the Navy's ongoing Communications mission and to support the Navy's Cyber Mission Force build-out, both of which will enable secure operations in the NAVCENT area of responsibility (AOR), by fusing intelligence with networks command and control in a Sensitive Compartmented Information Facility (SCIF). Additionally, the project will alter 105 m2 (1,130 SF) on the ground floor to create a separate office operations area within the existing server room directly supporting the server room operations.

3. The Request for Proposal (RFP) includes the following Contract Line Item (CLIN) for the Task Order:

CLIN 0001 (Base Price) – The contractor shall provide all labor, management, supervision, tools, materials, and equipment necessary for the alterations to the Operation Control Center, Bahrain.

4. The contract period of performance for CLIN 0001 is 590 days. The base period of performance includes the time necessary to submit bonding or a performance guarantee. Notice to Proceed (NTP) will not be issued prior to acceptance of bonding or a performance guarantee and proper insurance documentation. Any delays in issuing NTP caused by the lack of bonding or a performance guarantee and insurance will be contractor caused delays.

The awardee shall provide all Payment and Performance Bonds and Certificate of Insurance within 15 calendar days of award to:

JENNIFER L. MATTIVI

Bahrain FEAD Bahrain PSC 851 Box 510

FPO AE 09834-0510

5. This is a Design-Bid-Build construction project with a magnitude of construction between $1,000,000.00 and $5,000,000.00 (Federal Acquisition Regulation 36.204). If your proposal exceeds $2,000,000 the requirement for Certified cost and Pricing Data shall apply (Ref. FAR 15.403-4). The template for you to provide to the Government is attached hereto, (Attchment B).

6. All proposed prices shall be in US Currency (Dollars); award will be made in US Currency. Proposals submitted in any other currency shall be deemed Unacceptable. The proposed price shall indicate any Value Added Tax (Reference 2 Code of Federal Regulations (CFR) § 200.470 - Taxes (including Value Added Tax, VAT).

7. Your Technical and Price proposals shall be submitted using the enclosed forms and on the enclosed Price Schedule shown below:

B. TECHNICAL PACKAGE TO INCLUDE: (listed i – iii)

(i) TECHNICAL APPROACH:

(a) Solicitation Submittal Requirements:

The Offeror must provide a narrative describing their understanding and approach to executing the project that meets the requirements of the RFP. The submitted technical approach must clearly address at least the following elements:

1. Describe any proposed teaming of construction firms for this contract and the rationale for proposing this arrangement, if applicable. Provide the role, responsibilities, and contractual relationships between the various firms (see FAR Subpart 9.6). Describe how the Offeror intends to meet the Construction Security Plan (CSP) as it relates to the vetting of personnel. Particular attention will be given to how the Offeror intends to meet section 3.03 CITIZENSHIP REQUIREMENTS.

2. Describe the approach to completing all construction activities associated within the stated Construction Completion Date. Describe how the Offeror intends to meet the Construction Security Plan (CSP) as it relates to material procurement, transportation and storage.

3. Provide a list of at least (3) three Relevant Construction projects, completed by the Offeror (or) the proposed team and within the last (10) years, where relevant projects are further defined as:

a. A single or multi-story administrative and communication facility, data processing facility, operations center, intelligence center or similar facilities. The facility size must be 465 SM (5,000 SF) or greater.

b. Describe at least one construction project that demonstrates your experience with construction of secure areas or a secure facility. Highlighting compliance with the following is requested:

Intelligence Community Standard (ICS) 705-1 Physical and Technical Security Standards for Sensitive Compartmented Information Facilities or DCID 6/9 Physical Security Standards for Sensitive Compartmented Information Facilities.

Note (1) – A maximum of (5) projects may be submitted for evaluation under this element.

Note (2) - If the submitted project experience is for any entity other than the Offeror, the Offeror must submit a signed copy of a joint venture agreement, partnership agreement, teaming agreement, approved mentor protégé agreement (MPA), or letter of commitment for each member of the Offeror’s team identified for which the submitted experience is provided (e.g., joint venture member, partner, team member, subcontractor, parent company, subsidiary, or other affiliated company, etc.) in English.

4. Critical path schedule, which includes the following at a minimum and in accordance with the CSP:

a. Sequence of construction activities associated with the project, including:

i. Material procurement.

ii. Phases of construction.

There are no page limitations to any schedule or narrative response.

(b) Basis of Evaluation:

The Government will evaluate the approach and supporting information considering the extent to which the Offeror demonstrates a clear understanding of the requirements of the project within each of the elements described in Part

(a) (above). Scope clarifications may be necessary.

(END OF DESCRIPTION OF TECHNCIAL PACKAGE REQUIREMENTS: (i) TECHNICAL APPROACH

– see sheets next to fill out)

See next page.

Technical Solution for

Element 1

Describe the proposed primary construction firms for this contract and the rationale for proposing this arrangement. Provide the role, responsibilities, and contractual relationships between the various firms (see FAR Subpart 9.6). Describe how the Offeror intends to meet the Construction Security Plan (CSP) as it relates to the vetting of personnel.

Element 2

Describe the approach to completing all construction activities associated within the stated Construction Completion Date. Describe how the Offeror intends to meet the Construction Security Plan (CSP) as it relates to material procurement, transportation and storage.

Provide a list of at least (3) Relevant Construction projects, completed by the Offeror (or) the proposed team and within the last (10) years, where relevant projects are further defined as:

a. A single or multi-story administrative and communication facility, data processing facility, operations center, intelligence center or similar facilities. The facility size must be 465 SM (5,000 SF) or greater.

b. As a minimum requirement, at least one construction project must demonstrate relevant experience with construction of secure areas; preferably in accordance with Intelligence Community Standard (ICS) 705-1, Physical and Technical Security Standards for Sensitive Compartmented Information Facilities or DCID 6/9 Physical Security Standards for Sensitive Compartmented Information Facilities

Project Title Performed by

(Offeror/Other)

MTP

(Yes / No) Size

(in gallons) Relevant?

(Yes / No)

If submitting experience for any entity other than the Offeror, indicate below the firm(s) and their relationship to the Offeror. A signed copy of a joint venture agreement, partnership agreement, teaming agreement, approved mentor protégé agreement (MPA), or letter of commitment must be attached for each member of the Offeror’s team identified for which the submitted experience is provided (e.g., joint venture member, partner, team member, subcontractor, parent company, subsidiary, or other affiliated company, etc.) in English.

Description of Proposed Team

(ii) PAST PERFORMANCE EVALUATION: The intent of this submittal information os to assist NAVFAC’s verifying your qualifications for this project to determine your ability to perform successfully.

Past performance relates to how well a contractor has performed. Past performance will be rated as either “acceptable” or “unacceptable” based on the following criteria:

A. SOLICITATION SUBMITTAL REQUIREMENTS:

THE OFFERORS MUST PROVIDE THIS INFORMATION AS THE GOVERNMENT MAY USE IT BASE

ITS RESPONSIBILITY DETERIMINATION ON THE EVALUATION ON KNOWN PAST

PERFORMANCE. Additionally, you may provide any information on problems encountered and the corrective actions taken on any projects and you may also address any adverse past performance issues under any contract.

Explanations have no page limitations.

B. Basis of Evaluation:

This evaluation focuses on how well the Offeror performed on projects of similar size, scope and complexity.

The Government reserves the right to obtain information for use in the evaluation of past performance from any and all sources including sources outside of the Government. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.

The Government will consider the currency and relevance of the information, the source of the information, context of the data, and general trends in the Contractor’s performance. This evaluation is separate and distinct from the Contracting Officer’s responsibility determination. The assessment of the Offeror’s past performance will be used as a means of evaluating the Offeror’s ability to successfully meet the requirements of the RFP.

(iii) SAFETY

A. Solicitation Submittal Requirements

The Offeror shall submit the following information:

(1) Technical Approach for Safety: Describe the Offeror’s technical approach to safety for its employees as well as the plan that the Offeror will implement to evaluate and measure safety performance of potential Subcontractors as a part of the selection process for all levels of subcontractors. Also, describe any innovative methods that the Offeror will employ to ensure and monitor safe work practices at all subcontractor levels. The Safety Narrative has no page limitation..

B. Basis of Evaluation:

The Government is seeking to determine that the Offeror has consistently demonstrated a commitment to safety and that the Offeror plans to properly manage and implement safety procedures for itself and its subcontractors. The Government will evaluate the Offeror's overall safety record, the Offeror's plan to select and monitor subcontractors and any innovative safety methods that the Offeror plans to implement for this procurement. The Government's sources of information for evaluating safety may include, but are not limited to, Government agencies, OSHA, NAVFAC's Facility Accident and Incident Reporting (FAIR) and Contractor Incident Reporting System (CIRS) databases, and other related sources. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete safety information regarding these submittals requirements rests with the Offeror. The evaluation will collectively consider the following: offerors Technical Approach to Safety Narrative and other sources of information available to the Government

(END OF SAFETY FACTOR INFORMATION)

CONTRACTOR FACILITY CLEARANCE INFORMATION:

The federal government entrusts classified information to defense contractors in order to meet government procurement needs. Part of the trust inherent in the relationship between government and industry contractors is the assignment of facility security clearances to contractors. Please provide a brief on:

- The contractor company’s business structure

- The company’s corporate history, such as changes in the company’s operating name or changes in the company’s address

- The preliminary identification of Key Management Personnel

- Information about any home office facilities, or HOFs, parent companies, or other affiliated companies, such as the name, address, and CAGE code of the HOF, whether the HOF already has an FCL and the level of that clearance

- Whether the prospective facility has been granted a clearance by another government agency

PRICE PROPOSAL REQUIREMENTS (IN ADDITION TO THE CERTIFIED COST AND PRICING DATA Per FAR 15.404 -- Proposal Analysis):

See Price Schedule next page to be signed and submitted to the Contract Specialists.

C. PRICE SCHEDULE

Operations Control Center, NSA Bahrain, Kingdom of Bahrain CLIN Description Qty Unit Amount

BASE ITEM: The contractor shall provide all labor, management, supervision, tools, materials, and equipment necessary for the alterations to the Operation Control Center, Bahrain for the segmented work elements below listed i, ii, ii, iv, v.

and vi under CLIN 0001.

(i-iv)

LS

See Total amount of CLIN 0001 below.

i. FIRST FLOOR ALTERATIONS

1 LS

ii. FIRE PROTECTION SYSTEM

iii. HVAC

iv. ELECTRICAL SYSTEMS, PWR AND

LIGHTING

v. All Value Added Tax 1 LS

vi. Any other costs not identified above. 1 LS

Description Qty Unit Total Amount of CLIN 0001

TOTAL PRICE $

ACKNOWLEDGE AMENDMENTS Date Signature

Amendment 001

Amendment 002

Amendment 003

Amendment 004

Amendment 005

Amendment 006

Offerors must complete the following:

COMPANY NAME:

CAGE CODE:_____________________________

Duns Number:_____________________________

OFFER’S PRICE IS VALID FOR (number of days) : See Note (5) on this Price Schedule

INDICATE IF YOU, AS THE OFFEROR FOR THIS PROJECT, ARE A JOINT VENTURE TO PERFORM THE

WORK OF THIS PROJECT (circle one): YES NO

ARE YOU AN AMERICAN-OWNED COMPANY? (circle one): YES NO

Signature of Offeror Date

NOTES:

(1) Offerors shall provide a price for all items on the Price Schedule and the certified cost and pricing data.

(2) A firm fixed price is required for each item and no provision will be made for economic adjustments.

(3) The magnitude of construction for CLIN 0001 is between $1,000,000.00 and $5,000,000.00.

(4) All proposed prices shall be in US dollars ($); award shall be made in US dollars. Proposals submitted in any other currency shall be deemed Unacceptable.

(5) The Offeror’s price is valid for at least 120 days from the receipt of proposals for all items.

(6) All Amendments shall be acknowledged otherwise the Price Proposal is not valid.

(7) Provide Backup pricing information if the total proposal exceeds the Certified Cost and Pricing Data threshold of $2M.

(End Price Schedule Sheet)

15.404 -- Proposal Analysis.

15.404-1 -- Proposal Analysis Techniques.

(a) General. The objective of proposal analysis is to ensure that the final agreed-to price is fair and reasonable.

(1) The contracting officer is responsible for evaluating the reasonableness of the offered prices. The analytical techniques and procedures described in this section may be used, singly or in combination with others, to ensure that the final price is fair and reasonable. The complexity and circumstances of each acquisition should determine the level of detail of the analysis required.

(2) Price analysis shall be used when certified cost or pricing data are not required (see paragraph (b) of this subsection and 15.404-3).

(3) Cost analysis shall be used to evaluate the reasonableness of individual cost elements when certified cost or pricing data are required. Price analysis should be used to verify that the overall price offered is fair and reasonable.

(4) Cost analysis may also be used to evaluate data other than certified cost or pricing data to determine cost reasonableness or cost realism when a fair and reasonable price cannot be determined through price analysis alone for commercial or non-commercial items.

(5) The contracting officer may request the advice and assistance of other experts to ensure that an appropriate analysis is performed.

(6) Recommendations or conclusions regarding the Government’s review or analysis of an offeror’s or contractor’s proposal shall not be disclosed to the offeror or contractor without the concurrence of the contracting officer. Any discrepancy or mistake of fact (such as duplications, omissions, and errors in computation) contained in the certified cost or pricing data or data other than certified cost or pricing data submitted in support of a proposal shall be brought to the contracting officer’s attention for appropriate action.

(7) The Air Force Institute of Technology (AFIT) and the Federal Acquisition Institute (FAI) jointly prepared a five-volume set of Contract Pricing Reference Guides to guide pricing and negotiation personnel. The five guides are: I Price Analysis, II Quantitative Techniques for Contract Pricing, III Cost Analysis, IV Advanced Issues in Contract Pricing, and V Federal Contract Negotiation Techniques. These references provide detailed discussion and examples applying pricing policies to pricing problems. They are to be used for instruction and professional guidance. However, they are not directive and should be considered informational only. They are available via the internet at http://www.acq.osd.mil/dpap/cpic/cp/contract_pricing_reference_guides.html.

PROPOSAL PROCESS REQUIREMENTS:

1. Offers must be submitted in English, to include any and all supporting documentation (certificates, licenses, award documents, etc.). If supporting documentation cannot be recreated in English, than at a minimum an English translation for any supporting documentation written in a language other than English must be provided.

Each offeror must electronically submit a price and technical proposal to the Contract Specialist Oscar Becerril at the following email address oscar.becerril@eu.navy.mil and richard.spagnuolo@eu.navy.mil and joshua.mentink@eu.navy.mil. All proposals must be received by the time and date stated on the Request for Proposal Letter. Timeliness of proposals will be in strict accordance with FAR 52.215-1. Only those proposals received by the specified time and date will be considered and reviewed. Incomplete proposals may result in the rejection of the proposal.

2. Pre-Proposal Inquiries (PPI): These inquires are used by us if you determine that the technical and or contractual requirements of this RFP require clarification(s) in order to permit submittal of a responsive proposal shall submit all questions in writing, in the English Language. Additionally, all inquiries shall be submitted using the Pre-Proposal Inquiry (PPI) format (Attachment A). All inquiries shall be submitted via e-mail to oscar.becerril@eu.navy.mil and richard.spagnuolo@eu.navy.mil and joshua.mentink@eu.navy.mil.

Pre-proposal inquiries will be accepted up to 25 October 2019. A response will be published as an amendment to the solicitation.

3. PROPOSAL PACKAGE E-MAILING:

The entire proposal package to include all submittal materials in PDF format shall be sent via email to:

oscar.becerril@eu.navy.mil and richard.spagnuolo@eu.navy.mil and joshua.mentink@eu.navy.mil.

This proposal package shall be received via email no later than 28 October 2019 No Later Than Close of Business Eastern Time, USA.

4. UTILITIES FOR CONSTRUCTION AND TESTING:

The Contractor shall be responsible for obtaining, either from available Government sources or local utility companies, all utilities required for construction and testing. The Contractor shall provide these utilities at his expense, paid for at the current utility rate delivered to the job site. The Contractor shall provide and maintain all temporary utility connections and distribution lines, and all meters required to measure the amount of each utility used.

5. Contractor Availability. The contractor shall maintain a telephone at which he or his representative may be reached 24 hours daily. The telephone shall be listed in the contractor's name. If the contractor does not have a local telephone, he shall maintain a toll free emergency telephone (or accept collect calls from authorized Government personnel) at which he or his representative may be reached at night, weekends and holidays. It is mandatory that the contractor or his representative be available to a toll-free telephone 24 hours per day, seven days per week, including holidays. He shall notify the Government Project Manager and Government Contracting Officer, in writing of the telephone number within three days after award of this contract and immediately thereafter in the event of change.

6. English Speaking Representative At all times when any performance of the work at the site is being conducted by an employee of the Contractor or his subcontractors, the contractor shall have a representative present on the site capable of explaining the work operations and receiving instructions in the English language. The Contracting Officer shall have the right to determine, without appeal of such decision, whether the proposed representative has sufficient technical and lingual capabilities, and the Contractor shall immediately replace any individual not acceptable to the Contracting Officer.

52.215-20 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data.

Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data (Oct 2010)

(a) Exceptions from certified cost or pricing data.

(1) In lieu of submitting certified cost or pricing data, offerors may submit a written request for exception by submitting the information described in the following paragraphs. The Contracting Officer may require additional supporting information, but only to the extent necessary to determine whether an exception should be granted, and whether the price is fair and reasonable.

(i) Identification of the law or regulation establishing the price offered. If the price is controlled under law by periodic rulings, reviews, or similar actions of a governmental body, attach a copy of the controlling document, unless it was previously submitted to the contracting office.

(ii) Commercial item exception. For a commercial item exception, the offeror shall submit, at a minimum, information on prices at which the same item or similar items have previously been sold in the commercial market that is adequate for evaluating the reasonableness of the price for this acquisition. Such information may include-

(A) For catalog items, a copy of or identification of the catalog and its date, or the appropriate pages for the offered items, or a statement that the catalog is on file in the buying office to which the proposal is being submitted. Provide a copy or describe current discount policies and price lists (published or unpublished), e.g.,wholesale, original equipment manufacturer, or reseller. Also explain the basis of each offered price and its relationship to the established catalog price, including how the proposed price relates to the price of recent sales in quantities similar to the proposed quantities;

(B) For market-priced items, the source and date or period of the market quotation or other basis for market price, the base amount, and applicable discounts. In addition, describe the nature of the market;

(C) For items included on an active Federal Supply Service Multiple Award Schedule contract, proof that an exception has been granted for the schedule item.

(2) The offeror grants the Contracting Officer or an authorized representative the right to examine, at any time before award, books, records, documents, or other directly pertinent records to verify any request for an exception under this provision, and the reasonableness of price. For items priced using catalog or market prices, or law or regulation, access does not extend to cost or profit information or other data relevant solely to the offeror’s determination of the prices to be offered in the catalog or marketplace.

(b) Requirements for certified cost or pricing data. If the offeror is not granted an exception from the requirement to submit certified cost or pricing data, the following applies:

(1) The offeror shall prepare and submit certified cost or pricing data, data other than certified cost or pricing data, and supporting attachments in accordance with the instructions contained in Table 15-2 of FAR 15.408, which is incorporated by reference with the same force and effect as though it were inserted here in full text. The instructions in Table 15-2 are incorporated as a mandatory format to be used in this contract, unless the Contracting Officer and the Contractor agree to a different format and change this clause to use Alternate I.

(2) As soon as practicable after agreement on price, but before contract award (except for unpriced actions such as letter contracts), the offeror shall submit a Certificate of Current Cost or Pricing Data, as prescribed by FAR 15.406-2.

(End of Provision)

PERFORMANCE GUARANTEE:

52.228-15 -- Performance and Payment Bonds -- Construction

As prescribed in 28.102-3(a), insert a clause substantially as follows:

Performance and Payment Bonds -- Construction (Oct 2010)

(a) Definitions. As used in this clause --

“Original contract price” means the award price of the contract; or, for requirements contracts, the price payable for the…