The document is a comprehensive bid package from the Town of Yorktown for the John C. Hart Memorial Library, seeking proposals for the purchase and installation of an Audio/Visual (AV) system for the library's Community Room and Program Room. The project involves installing a sophisticated AV infrastructure that enables users to conduct hybrid meetings and presentations using a USB dongle, with a detailed scope of work including equipment installation, networking, audio-visual components, and system integration. The bid is scheduled to be received by the Town Clerk on Friday, April 25, 2025, at 10:00 A.M., with a requirement for bidders to submit an original completed Proposal Form, a narrative responsive to the project specifications, and a Non-Collusive Bidding Certificate.

The bid package specifies a comprehensive list of required materials and equipment, including Sennheiser wireless microphones, a Digital Projection 10k Lumen Laser Projector, network infrastructure components, control systems, and various accessories for both the Large Presentation Space and a smaller Meeting Room. The project involves installing ceiling speakers, a projection screen, PTZ cameras, network switches, and control touchscreens, with specific technical requirements for integration and functionality. The specifications include detailed installation instructions, system testing, and end-user training. While specific pricing is not provided in the document, the bid requires an all-inclusive price covering equipment, spare parts, warranties, performance guarantees, and a service contract, with the understanding that the Town reserves the right to adjust project quantities by up to 30% and may evaluate bids based on lowest responsible bid or best value.

View the file

Other files for this state and local contract opportunity

Other files attached to Library Audio Visual Room, newest first.
File Type Posted
Wage Schedule.pdf PDF
NOTICE TO BIDDERS_Library AV Room.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TOWN OF YORKTOWN

PROCUREMENT

INSTRUCTIONS TO BIDDERS

NOTICE IS HERE GIVEN that sealed bids will be received by the Town Clerk, Town of Yorktown, Westchester County, NY until 10:00 A.M. on Friday, April 25, 2025 at Town Hall, 363 Underhill Avenue, Yorktown Heights, N.Y. 10598 for Library AV Room. Copies of the Bid Documents will be available in the office of the Town of Yorktown Town Clerk located at 363 Underhill Avenue, Yorktown Heights, NY 10598. A completed Bid Proposal Form must be returned to the Town Clerk, 363 Underhill Avenue, Yorktown Heights, NY 10598, marked: “Proposal: Library AV Room”.

The Bid Documents consists of the following documents:

1. Instructions to Bidders

2. Part One Proposal Form

3. Part Two General Terms and Conditions of Proposal

4. Part Three Specifications

5. Non-Collusive Bidding Certificate

A submitted proposal will consist of

1. one original completed Proposal Form, signed on behalf of Bidder with information for all blanks supplied, a proposal Narrative responsive to the Scope in Part Three, a detailed listing of any exceptions taken by Bidder; and

2. a signed Non-Collusive Bidding Certificate.

Diana Quast, Town Clerk

Master Municipal Clerk Town of Yorktown

PROCUREMENT

BID PROPOSAL FORM

PART ONE

The Town of Yorktown seeks proposals from qualified parties to supply the following work, goods and services: Library AV Room

BIDDER’S OFFICIAL CORPORATE NAME (required, if bidder is a corporation):

BIDDER’S D/B/A NAME (if any) ____________________________________________

All Inclusive Price for all Costs, Parts and Labor to perform the Library Room Rehab, Including all Equipment, Spare Parts, Warranties, Performance Guarantees, and Service Contract as per Scope

Total Dollar Amount: $ ______________________________________

Amount in words: _________________________________________________

The price(s) set forth above shall remain valid for one (1) year from the date of bid proposal award.

Prices in the bid proposal must cover all of bidder’s costs. There shall be no additional charges to the Town for postage, mailings, permits, delivery, training, set-up, notifications, sampling, lab work, reporting, etc.

Name of person authorized to submit proposal for bidder:

Signed: ___________________________________________________________ [Signature of authorized person]

TITLE of authorized person: __________________________________________

- END OF BID PROPOSAL FORM -

SERVICES AND PUBLIC WORKS CONTRACTS BID

PART TWO

General Terms and Conditions of Bid

Section Numbers Heading

Section 1. Bid Proposal Form

Section 2. Pre-Bid Site Inspection

Section 3. Quality and Samples

Section 4. Request for information and/or clarification of the Bid Documents

Section 5. Non-Collusion

Section 6. Late Bids

Section 7. Bid Opening

Section 8. Acceptance and Rejection

Section 9. Appeal of Determination of Non-Responsiveness and

Non-Responsibility

Section 10. Award

Section 11. Notice of Award

Section 12. Performance And Payment Bond

Section 13. Assignment Prohibited

Section 14. Special Requirements

Section 15. Purchase of Additional Quantities of Bid Items

Section 16. Contractor’s Subcontracts and Material Lists

Section 17. Representative Always Present

Section 18. Performance

Section 19. Insurance Requirements

Section 20. Indemnification

Section Numbers Heading

Section 21. Delivery Point

Section 22. Date of Delivery

Section 23. Damages

Section 24. Warranty/Guarantee

Section 25. Breach of Contract/Termination

Section 26. Prevailing Wage Rates and Supplements

Section 27. Estimates and Payments

Section 28. Payments to Subcontractors and Materialmen by Contractor

Section 29. Change in Contract Price

Section 30. Proper Method of Work and Materials

Section 31. Utilities and Service Lines

Section 32. Protection, Existing Structures

Section 33. Acceleration of the Work

Section 34. Stopping Work

Section 35. Change in the Contract Time

Section 36. Disputed Work – Notice of Claims For Damages

Section 1. Bid Proposal Form

1.1 The bidder shall complete the Bid Proposal Form by filling in the unit price and the total price in the appropriate designated spaces. Unit price and total price of each item bid shall be written legibly in ink, or typed. All bids shall be signed in ink. Any erasures or alterations shall be initialed in ink by the signer. The completed Bid Proposal Form shall be submitted, along with any documentation in support of the bid proposal if required by the Bid Documents, in a sealed envelope addressed as required in the Invitation to Bidders on or before the time and at the place so designated. Any Bid Proposal Form which has been materially altered in any way may render the bid nonresponsive and the bid rejected.

1.2 In the event of a discrepancy between the unit price and the total price of the Bid

Proposal Form, the unit price will prevail. In the event of a discrepancy between the written bid amount and the numerical bid amount, the written amount will take precedence and be controlling as to the amount of the Bid. All items not bid shall be indicated as “not bid” in the total price space. When bids are requested on a lump sum basis, bidder must bid on each item in the lump sum group. Any bidder desiring to bid “no charge” on an item in a group must so indicate.

1.3 Failure to comply with the provisions of this section may be grounds for rejection of the bid proposal.

1.4 Correction or withdrawal of a bid because of an inadvertent, non-judgmental mistake in the Bid Proposal Form requires careful consideration to protect the integrity of the competitive bidding process, and to ensure fairness. If the mistake is attributable to an error in judgment, the Bid Proposal Form may not be corrected. Bid correction or withdrawal by reason of the non-judgmental mistake is permissible at the sole discretion of the Town Clerk, but only to the extent that it is not contrary to the interests of the Town or the fair treatment of other bidders.

1.5 By signing the Bid Proposal Form, the bidder certifies that:

i. the person whose signature appears below is legally empowered to bind the bidder;

ii. the bidder has read the complete Bid Documents and understands and agrees to all terms and conditions set forth in the Bid Documents;

iii. if accepted by the Town, the bid is guaranteed as written and will be implemented as stated;

iv. By submission of the bid, each bidder and each person signing on behalf of any bidder certifies, and in the case of a joint bid each party thereto certifies as to its own organization, under penalty of perjury, that to the best of its knowledge and belief that each bidder is not on the list created pursuant to paragraph (b) of subdivision 3 of section 165-a of the New York State Finance Law.1

1 List found at http://ogs.ny.gov/about/regs/docs/ListofEntities.pdf.

http://ogs.ny.gov/about/regs/docs/ListofEntities.pdf

1.6 The bidder understands and agrees that quantities shown on the Bid Proposal Form opposite items of the work for which unit prices have been requested are approximate estimated quantities, and that during the progress of the work the Town may find it advisable and shall have the right to omit portions of the work, and to increase or decrease the shown approximate estimated quantities, or the scope of the whole work;

and that the Town reserves the right to add to or take from the total amount of the work up to a limit of thirty (30%) percent of the total amount of the contract based upon the executed contract price for all the specified work.

1.7 The bidder shall make no claim for anticipated profits or loss of profits, because of any difference between the quantities of the various classes of work actually done, or of the materials actually furnished, and the original specified scope of work and the shown approximate estimated quantities.

1.8 All prices bid include a sum sufficient for the preparation and submission of approved final “As-builts”, record drawings, guarantees, warranties, and operations and maintenance manuals.

1.9 All plans and other like records compiled by the contractor in completing the work under this contract shall become the property of the Town. The Contractor may retain copies of each such plan or record for its own use.

1.10 The contractor shall secure and pay for all necessary permits for the proper executing and completion of work.

1.11 The Town is exempt from all federal, state and local taxes.

Section 2. Pre-Bid Site Inspection

1.1 The bidder shall satisfy itself by personal examination of the location of the proposed work and surroundings thereof, and by such other means as it may prefer, as to the scope of the work and the accuracy of the approximate estimated quantities; and shall not at any time after submission of the bid dispute such approximate estimated quantities or assert that there was any misrepresentation by the Town or any misunderstanding by the bidder in regard to the quantity or kind of materials to be furnished, or work to be done. Failure to do so will not relieve a successful bidder contractor (“contractor”) of the obligation to furnish all material and labor necessary to carry out the provisions of the contract documents and to complete the contemplated work for the consideration set forth in its bid.

1.2 Unless otherwise stated, the bidder is free and encouraged to examine the work site during normal work hours preceding the submission of the bid. For those bidders requesting further clarification of the conditions, an appointment with the Town's representative, can be requested, by contacting the, Town Clerk.

1.3 At the time of the opening of bids each bidder will be presumed to have inspected the sites and to have read and to be thoroughly familiar with the Bid Documents.

Section 3. Quality and Samples

3.1 All equipment, material and supplies bid upon must conform to the description and specifications set forth in the in the Bid Documents, or their reasonable equivalent.

3.2 References in the Bid Documents to type, style, brand or trade name, and catalog are intended to be descriptive only and not restrictive.

Section 4. Request for information or interpretation and/or clarification of the Bid Documents

4.1 The bidder shall have seven (7) business days prior to the bid opening date to notify the Town Clerk in writing of any errors or defects in the Bid Documents which would prevent the bidder from providing a responsive bid.

4.2 No interpretation of the Bid Documents will be made to any bidder orally by any representative of the Town.

4.3 Any request for information or interpretation and/or clarification of the Bid Documents must be addressed in writing to Diana Quast, Yorktown Town Clerk, 363 Underhill Avenue, Yorktown Height, NY 10598, and be submitted no later than five (5) business days prior to the date fixed for the opening of bids.

4.4 Any written response to a request for information or interpretation and/or clarification of the Bid Documents shall be issued by Town Clerk and will be incorporated into and made part of the Bid Documents and will be made available in the same manner and method as the Bid Documents. The Town Clerk’s decision shall be final and binding on all parties. The failure of any bidder to receive such Addenda will not relieve the contractor of any obligation to comply with the terms and conditions of the Addenda.

4.5 The Bid Documents, including the drawings, Bid Documents, have been prepared with care and are intended to show as clearly as is practicable the work required to be done.

The bidder must realize however, that construction details cannot always be accurately anticipated and that in executing the work, field conditions may require reasonable modifications in the details of the plans and quantities of work involved. Work under all items in the contract must be carried out to meet these field conditions to the satisfaction of the Town and in accordance with the Bid Documents. The bidder shall not take advantage of any apparent errors or omission in the Bid Documents. In the event the contractor discovers an error or omission in the Bid Documents, it shall immediately notify the Town. The Town will then make such corrections and interpretations as may be deemed necessary for fulfilling the intent of the Bid Documents.

4.6 A bidder’s failure to request a clarification, interpretation, etc. of any portion of the Bid

Documents or to point out any inconsistency therein will preclude such bidder from thereafter claiming any ambiguity, inconsistency, or error which should have been discovered by a reasonably prudent bidder and from asserting any claim for damages arising directly or indirectly therefrom.

Section 5. Non-Collusion

5.1 The bidder shall certify that it has complied with all of the requirements stated in the non-collusive bidding certificate by signing the form included in the Bid Documents.

Failure by the bidder to complete and sign the non-collusive bidding certificate will constitute grounds for rejection of the bid.

Section 6. Late Bids

6.1 All bids received after the deadline date and time stated in the Instructions to Bidders will not be considered and will be returned to the bidder unopened. The bidder assumes the risk of any delay in the mail and the handling of the mail by the employees of the Town. Whether sent by mail or by means of personal delivery, the bidder assumes all responsibility for having the bid delivered on time and to the place specified above.

Section 7. Bid Opening

7.1 Sealed bids will be publicly opened on the date and time specified in the Instructions to Bidders. Bids may be read aloud to those persons present when practicable. Any bidder may request to review any submitted Bid Proposal Forms by arranging a mutually convenient time with the Town Clerk.

7.2 The prices stated in the Bid Proposal Form are irrevocable until the Notice of Award is issued, unless the bid is withdrawn only after the expiration of sixty (60) days from the bid opening and only in writing received by the Town Clerk and in advance of the issuance of the Notice of Award.

Section 8. Acceptance or Rejection

8.1 A responsive bid is one that complies with all material terms and conditions of the Bid Documents.

8.2 If the lowest price bid or proposal is found non-responsive, a determination setting in detail and with specificity the reasons for such finding shall be issued by the Town Clerk.

A copy of such determination shall be mailed to the non-responsive bidder no later than two (2) business days after the determination is made.

8.3 The Town reserves the sole right to waive any informality that is a matter of form rather than substance without prejudice to other bidders and what is in the best interests of the Town. The Town’s decision shall be final and binding.

8.4 Any corporation not incorporated under the Laws of New York State, must furnish a copy of its certificate of authority, from the New York State Secretary of State, to do business in the State of New York, in accordance with Article 13 of the New York State Business Corporation Law.

8.5 The Town will consider the qualifications of all bidders and may conduct such investigation as it deems necessary to assist in the evaluation of any bid. The Town reserves the right to reject any bid if the evidence submitted by, or the investigation of such bidder fails to satisfy the Town, in the Town’s sole discretion, that it is properly qualified to carry out the obligations of the contract and to complete the contemplated work. In evaluating a bidder’s responsibility, the Town may consider the following factors:

i. financial resources;

ii. technical qualifications;

iii. experience;

iv. organization, material, equipment, facilities, and personnel resources and expertise (or the ability to obtain them) necessary to carry out the work and to comply with required delivery or performance schedules, taking into consideration other business commitments;

v. a satisfactory record of performance;

vi. a satisfactory record of business integrity;

vii. where the contract includes provisions for reimbursement of contractor costs, the existence of accounting and auditing procedures adequate to control property funds, or other assets, accurately delineate costs, and attribute them to their causes; and

viii. compliance with requirements for the utilization of small, minority-owned, and women-owned businesses as subcontractors.

8.6 The Town reserves the right to require additional information as it deems appropriate concerning the history of any bidder’s performance of prior contracts. The final determination of whether the bidder possesses the requisite experience rests in the sole discretion of the Town. Failure of a bidder to provide relevant information specifically requested by the Town may be grounds for a determination of non-responsive and/or non-responsible.

Section 9. Appeal of Determination of Non-Responsiveness or Non-Responsible

9.1 Any determination that a bid is non-responsive or a bidder is non-responsible may be appealed as set forth herein.

9.2 Time Limit; A bidder shall have five (5) business days from receipt of the determination of non-responsiveness or non-responsible to file an appeal with the Town Clerk. Receipt of notice by the bidder shall be deemed to be no later than five (5) business days from the date of mailing or upon delivery, if delivered. Filing of the appeal shall be accomplished by actual delivery of the appeal document to the Town Clerk. The bidder shall also send a copy of its appeal, for informational purposes, to the Town Attorney.

9.3 Form and Content: The appeal shall be in writing and shall briefly state all the facts or other basis upon which the bidder contests the finding of non-responsiveness or non-responsible. Supporting documentation, if any, shall be included.

9.4 Stay of Award of Contract Pending. Award of the contract shall be stayed pending the determination of the Town Clerk unless the Town Clerk makes a determination that proceeding with the award without delay is necessary to protect substantial Town’s interests. Where such a determination is made, the bidder shall be advised of this action in the determination of non-responsiveness or, if the stay is removed at any time after the bidder has been notified of determination of non-responsiveness or non-responsible, notification shall be provided to the bidder no later than two (2) business days after such determination is made. The Town Clerk shall consider the appeal, and may, in his or her sole discretion, meet with the bidder to discuss the merits of the appeal. The Town Clerk shall make a prompt determination with respect to the merits of the appeal, a copy of which shall be sent to the bidder. The Town Clerk s determination shall be final.

Section 10. Award

10.1 Town reserves the right to make an award within sixty (60) days after the date of the bid opening, during which period bids may not be withdrawn.

10.2 The Award will be made to the responsible and responsive bidder submitting the lowest bid that fully complies with all the specifications stated in the Bid documents.

10.3 Town reserves the right to reject all bids and to purchase any or all items on contracts awarded by agencies or departments of the State of New York or of the Town, if such items can be obtained on substantially the same terms, conditions, specifications, and at a lower price.

Section 11. Notice of Award

11.1 If the bid is awarded by Town, a written Notice of Award will be issued by the Town Clerk to the contractor. Such Notice of Award will constitute a binding enforceable contract between the contractor and the Town of Yorktown. These General Terms and Conditions shall be incorporated into the contract as material terms.

11.2 The Town may issue a Notice of Award based on either Lowest Responsible Bid or Best

Value, in accordance with the 2012 amendments to General Municipal Law § 103, as implemented by Yorktown Town Code Chapter 78 entitled Procurement for Goods and Services.

11.3 Upon receipt of the Notice of Award the contractor will be required to submit to the Town

Clerk a completed W-9 form in addition to any other information or documents required by the Town. Failure to supply a completed W-9 form or such other information or documents required by the Town will invalidate the bid.

Section 12. Performance and Payment Bond

12.1 A performance bond for the full amount of the project will be required, subject to the approval of the Town.

Section 13. Assignment Prohibited

13.1 The contractor shall not assign, transfer, convey or otherwise dispose of the contract or any part of it or any monies due and payable under the contract, without prior written approval of the Town. If such approvals are granted by the Town, they shall in no way relieve the contractor or from any obligations under the terms of the contract.

Section 14. Special Requirements

14.1 Special requirements for any bid may supersede and/or be added to any provision contained in these General Terms and Conditions.

Section 15. Purchase of Additional Quantities of Bid Items

15.1 The Town may purchase additional quantities of the bid items at any time during the contract period, for the same price and under the same terms and conditions as set in the Bid Proposal Form.

Section 16. Contractor's Subcontracts and Material Lists

16.1 Within fifteen (15) days after execution of the Contract, the contractor shall submit to the

Town for approval a list of the subcontractors, materialmen and materials that the contractor plans to use in the performance of the work and statements of the work they are to perform. The format and content of the list shall be in accordance with directives from the Town. No part of the work may be sublet until after the contractor has received the Town’s approval. The contractor shall be fully responsible for all acts and omissions of its subcontractors and persons directly or indirectly employed by them, and the Town’s approval to sublet parts of the work will in no way relieve the contractor of any of its obligations under the Contract. All dealings of the Town with the subcontractors shall be through the contractor.

16.2 The contractor shall insert appropriate clauses in all subcontracts to bind the subcontractors to the contractor by all applicable provisions of the contract documents executed between the contractor and the Town, but this shall not be construed as creating any contractual relationships between subcontractors and the Town. Prior to approval of the subcontractors, the Town has the right to review and recommend changes in the subcontracts. The Town reserves the right to reject any subcontractor proposed by the contractor if in the reasonable opinion of the Town such subcontractor lacks the experience or capability to perform its subcontract work or is otherwise non-responsible.

16.3 The contractor shall insert appropriate clauses in each subcontract that require that if the contractor is terminated by the Town either for default or convenience that at the sole option of the Town the subcontract shall automatically at torn to the Town and the subcontractor shall continue without delay or interruption to fully perform all of the obligations required by its subcontract.

Section 17. Representative Always Present

17.1 The contractor in case of its absence from the work shall have a competent representative or foreman present, who shall obey without delay, all instructions of the Town in the prosecution and completion of the work in conformity with the contract, and shall have full authority to supply labor and material immediately.

17.2 The contractor, or its superintendent, shall attend job meetings with the Town for the purpose of discussing expedition, execution and coordination of the work. Job meetings will be scheduled periodically (the first to be prior to commencement of construction) at a time and place designated by the Town.

17.3 The contractor shall not commence any work prior to the first (pre-construction) meeting between the contractor, Town, and other concerned governmental and utility company representatives.

Section18. Performance

18.1 All work performed and all materials furnished shall be in reasonably close conformity with the lines, grades, cross sections, dimensions and materials requirements, including tolerances, shown in the Bid Documents.

18.2 Plan dimensions and contract specification values are to be considered as the target value to be strived for and complied with as the design value from which any deviations are allowed. It is the intent of the specifications that the materials and workmanship shall be uniform in character and shall conform as nearly as realistically possible to the prescribed target value or to the middle portion of the tolerance range. The purpose of the tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons. When a maximum or minimum value is specified, the production and processing of the material and the performance of the work shall be so controlled that material or work shall not be preponderantly of borderline quality or dimension.

18.3 Figured dimensions on the plans shall be given preference over scaled dimensions, but shall be checked by the contractor before starting construction.

Information and data on the contract documents shall take precedence in the following order (1) Drawing; Details, Sections, Plans, Notes, General Notes, (2) Technical Specifications, (3) General Specifications. Any errors, omissions or discrepancies shall be brought to the attention of the Town whose decision thereon shall be final.

18.4 In the event that the Town determines that the materials or the finished product in which the materials used are not within reasonably close conformity with the Bid Documents but that reasonably acceptable work had been produced, the Town shall then make a determination if the work shall be accepted and remain in place. In this event, the Town will document the basis of acceptance by contract modification, subject to the approval of the Town Board, which will provide for an appropriate adjustment in the contract price for such work or materials as deems necessary.

18.5 In the event that the Town determines that the materials or the finished product in which the materials used are not within reasonably close conformity with the Bid Documents and have resulted in an inferior or unsatisfactory product, the work or materials shall be removed and replaced or otherwise corrected by and at the expense of the contractor.

18.6 All traffic control devices (signs, signals, markings, and devices placed by the authority of a public body or official having jurisdiction for the purpose of regulating, warning or guiding traffic) shall be in conformity with the latest edition of the New York State Manual of Uniform Traffic Control Devices or other such standard as directed by the Town.

18.7 Time being of the essence, the contractor shall take notice that the timely completion of the work called for under the contract is of the greatest importance. The contractor shall commence its work within ten (10) days after "Notice of Award” has been given it by the

Town (unless a definite starting date is otherwise stated). Prior to commencing its work, the contractor shall notify the Town, at least forty-eight (48) hours prior to the planned date of its "start".

Section 19. Insurance Requirements

19.1 The contractor, upon award of the contract, shall provide at its own cost and expense the following insurance to the Town from insurance companies licensed in the State of New York, carrying a Best’s financial rating of “A” or better, which insurance shall be evidenced by certificates and/or policies as determined by the Town.

19.2 Each certificate or policy shall require that, thirty (30) days prior to cancellation or material change in the policies, notice thereof shall be given to the Town Clerk by registered mail, return receipt requested, for all of the following stated insurance policies.

All such notices shall name the contractor and identify the contract number or description.

19.3 All policies and certificates of insurance shall be approved by the Town prior to the inception of any work.

i. Workmen's Compensation: The contractor shall evidence compliance with

Workers' Compensation Law, or as otherwise directed by the Town.

ii. Commercial General Liability Insurance with minimum limits of liability per occurrence of $1,000,000 with the Town named as an additional insured.

iii. Automobile Liability Insurance with minimum limits of liability per occurrence of $1,000,000 with the Town named as an additional insured.

iv. Additional insurance may be required on an individual basis for extra hazardous contracts and specific service agreements. If such additional insurance is required for a specific contract, that requirement will be described in the Special Requirements of the contract specifications.

v. If any of the insurance requirements are not complied with at their renewal dates, payments to the contractor will be withheld until those requirements have been met, or at the option of the Town, the Town may pay the Renewal Premium and withhold such payments from any monies due the contractor.

vi. If at any time any of the foregoing policies shall be or become unsatisfactory to the Town, as to form or substance, or if a company issuing any such policy shall be or become unsatisfactory to the Town, the contractor shall upon notice to that effect from the Town, promptly obtain a new policy, submit the same to the Town for approval and submit a certificate thereof as herein above provided.

Upon failure of the contractor to furnish, deliver and maintain such insurance as above provided, the contract, at the election of the Town, may be forthwith declared suspended, discontinued or terminated. Failure of the contractor to secure and/or maintain or the taking out and/or maintenance of any required insurance, shall not relieve the contractor from any liability under the contract, nor shall the insurance requirements be construed to conflict with or otherwise limit the obligations of the contractor concerning indemnification.

vii. In the event that claims in excess of the insured amounts provided herein, are filed by reason of any operations under the contract, the amount of excess of such claims or any portion thereof, may be withheld from payment due or to become due the contractor until such time as the contractor shall furnish such additional security covering such claims as may be determined by the Town.

Section 20. Indemnification

20.1 The contractor hereby agrees to indemnify and save harmless the Town, its officers, employees, elected officials, and agents from and against all liability, loss or damage the Town may suffer, arising directly or indirectly out of the contract between the contractor and the Town. The Contractor further agrees to provide defense for and defend any claims or causes of action of any kind or character directly or indirectly arising out of this Agreement at its sole expense and agrees to bear all other costs and expenses relating thereto. The foregoing provisions shall not be construed to cause the contractor to indemnify the Town, its officers, elected officials, agents or employees from its or their sole negligence.

20.2 Neither the acceptance of the completed work nor payment therefore shall release the Contractor from its obligation under this section.

Section 21. Delivery Point

21.1 Shipping of any products shall be FOB Destination. Delivery shall be at the location set forth in the Specifications except on national, state or local holidays when Town buildings are closed. Bidder shall be responsible to verify that the appropriate Town building for delivery is open prior to delivering items. All bid items shall be unloaded and placed within the particular Town building, at points of delivery, and in quantities, as directed by the Town. Any costs incurred by the Town or bidder due to the failure of bidder to comply with this requirement will be the responsibility of bidder. Bidder should be prepared to furnish proof of delivery, if requested by Town. Deliveries shall be made in accordance with the specifications, and shall be made Monday through Friday from 8 a.m. to 2 p.m. unless otherwise stated in the Specific Specifications.

21.2 If bidder is shipping bid items to Town using a third-party carrier (US Postal Service, UPS, FedEx), there shall be no additional shipping charge to the Town.

21.3 Delivery will not be complete until the good are inspected and accepted by the Town.

Section 22. Date of Delivery

22.1 Delivery of all materials included under this bid shall be made not later than the date specified in the Bid Documents or Project Schedule. If contractor cannot meet the delivery date specified in Bid Documents or Project Schedule, contractor shall state on the bid form the proposed date of delivery and such date will be considered when determining responsiveness in awarding the bid.

Section 23. Damages

23.1 The contractor shall be fully responsible for shipping and delivery of materials specified in the Bid Documents or Project Schedule in an undamaged condition. Town will not consider the carrier responsible for damaged or delayed deliveries. Any bid item damaged or broken when delivered to Town shall be replaced immediately by contractor at no cost to the Town.

Section 24. Warranty/Guarantee

24.1 It is the intent of the Bid Documents to require first-class work and materials and any work not fully covered herein Bid Documents shall be interpreted to require first-class work and materials, and such interpretations shall be binding upon the Contractor. The contractor shall be fully responsible for performance of work in a satisfactory manner with satisfactory results in the discretion of the Town quality materials.

24.2 Contractor is deemed to warrant and guarantee all work performed under this agreement.

24.3 Unless otherwise stated in other parts of the specifications, all work performed or goods supplied under the contract shall be guaranteed by the contractor against all defects resulting from the use of inferior materials, equipment or workmanship, for a period of five (5) years from the date of final completion and acceptance of the work, which shall be defined as the date of the Town’s approval of the final Certificate for Payment or from the date the Town takes possession and makes full use of the constructed facility.

24.4 Any goods furnished must be standard, new, latest model of the regular stock product, as required by the specifications, with parts regularly used for the type of equipment offered.

24.5 No attachment or part will be substituted or applied contrary to manufacturer’s recommended and standard practice. All regularly manufactured stock electrical items must bear the label of the Underwriters Laboratories, Inc. Any equipment, part or constructed item which is or becomes defective during the guarantee period shall be replaced or redone by the contractor, including all labor at no additional charge to the Town. All replacements shall carry the same guarantee as the original equipment. The contractor shall make any such replacement promptly upon receiving written notice from Town.

Section 25. Breach of Contract/Termination

25.1 If contractor fails to deliver as ordered, or within the time specified, or within reasonable time as interpreted by Town, or fails to make replacement of rejected or defective goods, whether so requested immediately or as directed by Town, that shall constitute a breach of the contract, and Town may arrange to have the work performed from other sources to take the place of the work product found defective or not delivered. Without limiting the foregoing, Town reserves the right to terminate the contract upon breach within ten (10) days written notice provided to the contractor.

Section 26. Prevailing Wage Rates and Supplements

26.1 Wages to be Paid and Supplements to be Provided

i. The contractor shall, at its own cost and expense, comply with all provisions of the Labor Law (i.e. prevailing rate of wages and supplements), Lien Law, Workmen's Compensation Law and all other laws and ordinances affecting the contract or order, either Federal, State or local.

ii. Contractor shall by registered with N.Y.S. D.O.L. and provide proof of registration as required by Labor Law Section 220-i as a minimum qualification.

Failure to provide proof of registration will disqualify a bidder.

26.2 Records to be kept on Site

The contractor, subcontractors at any tier shall certify their payrolls and keep them on site and available, in addition to the following informative records:

i. Record of hours worked by each workman, laborer and mechanic on each day;

ii. Record of days worked each week by each workman, laborer and mechanic;

iii. Schedule of occupation or occupations at which each workman, laborer and mechanic on the project is employed during each work day and week;

iv. Schedule of hourly wage rates paid to each workman, laborer and mechanic for each occupation.

v. A statement or declaration signed by each workman, laborer and mechanic attesting that they have been provided with a written notice, informing them of the prevailing wage rates and supplements requirement for the contract.

Section 27. Estimates and Payments

27.1 As the work progresses but not more often than once a month and then on such days as the Town shall direct, the contractor will submit a requisition in writing of the amount and value of the work performed and the materials and equipment provided to the date of the requisition, less any amount previously paid to the contractor.

27.2 From each requisition, the Town will retain five percent (5%) plus one hundred fifty percent (150%) of the amount necessary to satisfy any claims, liens or judgments against the contractor that have not been suitably discharged. The Town will thereupon cause the balance of the requisition therein to be paid to the contractor.

27.3 As a condition to the making of any progress payment as set forth in this paragraph, the

Town, in its sole discretion may require the contractor to submit such document as may be reasonably required to establish that the contractor and its subcontractors have timely and properly paid their respective subcontractors and materialmen at any tier.

27.4 When the work or major portion thereof, as contemplated by the terms of the contract are substantially completed in the judgment of the Town, the contractor shall submit a requisition for the remainder of the contract balance. An amount equal to two (2) times the value of the remaining items to be completed plus one hundred fifty percent (150%) of the amount that the Town deems necessary to satisfy any claims, liens or judgments against the contractor which have not been suitably discharged shall be deducted from the requisition. As the remaining items of work are satisfactorily completed or corrected, the Town will, upon receipt of a requisition, pay for these items less one hundred fifty percent (150%) of the amount necessary to satisfy any claims, liens or judgments.

27.5 All estimates will be made for actual quantities for work performed and materials and equipment incorporated in the work as determined by the measurements of the Town, and this determination shall be accepted as final, conclusive and binding upon the contractor.

All estimates will be subject to correction in any succeeding estimate.

27.6 Payment will be made only upon the written request of the contractor. Payment requests shall be processed by the Town no more than one (1) time per month. Payment will be made for materials pertinent to the project which have been delivered to the site or off-site by the contractor suitably stored and secured in first-class condition as required by the Town. The contractor must submit certified copies of the manufacturer's or Contractor's invoices or statements establishing the true purchase value of the material or equipment; freight bills, release of liens and certificate of insurance covering all equipment and materials.

27.7 The Contractor shall be responsible for safeguarding stored equipment and materials against loss or damage of any nature whatsoever, shall retain title until incorporated into the work and acceptance by the Town and in case of loss or damage, the contractor shall replace such lost or damaged equipment and materials at no cost to the Town. After receipt of payment, the contractor shall not remove from the site equipment and materials for which such payment was made without written authorization from the Town.

27.8 Within thirty (30) days after receiving written notice from the Contractor of substantial completion of the work under this Agreement, the Town will cause an inspection to be made of the work done under the contract. If, upon such inspection, the Town determines that the work is substantially complete, a Substantial Completion Payment to the contractor for the work done under the contract, less any and all deductions authorized to be made by the Town under the contract or by law, will be issued.

27.9 As a condition precedent to receiving payment therefore, the Contractor must have received Town approval of all Shop Drawing submittals, the Operation and Maintenance Manuals, and As-Built Drawing(s).

27.10 Together with its application for substantial completion payment the Contractor shall also deliver to the Town a verified statement certifying that all claims or liabilities arising from the completed work, including all charges for Extra Work, Change Orders, additional time, damages or credits (collectively referred to as “claims”) have been presented to the Town. All such claims shall be described in sufficient detail so as to be easily identified. The contractor’s failure to submit the verified statement shall constitute a full and final waiver of all claims against the Town from the beginning of the project through the date of substantial completion as established by the Town. The presentation of the verified statement to the Town shall not constitute an acknowledgement by the Town that any such claim is valid. The Town expressly reserves its right to assert that any such claim(s) is waived or precluded by reason of other provisions of the contract documents. Only claims particularly identified on the contractor’s verified statement shall be preserved; all other claims whatever nature shall be deemed waived and released. It shall also submit proof of title of the materials and equipment covered by the contract. The contractor shall also, prior to the issuance of said Substantial Completion Payment, supply to the Town affidavits and certificates for labor, material and equipment (where applicable).

27.11 Within ten (10) days after receiving written notice from the contractor of completion of all the work, the Town will make a final inspection. If upon inspection the Town determines that no further work is needed, the Town will request that the Town approve the completion of the project and authorize payment of the Final Estimate.

Section 28. Payments to Subcontractors and Materialmen By Contractor

28.1 Within fifteen (15) calendar days of the receipt of any payment from the Town, the contractor shall pay each of its subcontractors and materialmen the proceeds from the payment representing the value of the work performed and/or materials furnished by the subcontractor and/or materialmen as reflected in the payment from the Town less an amount necessary to satisfy any claims, liens or judgment against the subcontractor or materialman which have not been suitably discharged and less any retained amount as hereafter described.

28.2 Nothing provided herein shall create any obligation on the part of the Town to pay or to see the payment of any moneys to any subcontractor or materialman from any contractor nor shall anything provided herein serve to create any relationship in contract or otherwise, implied or expressed between the subcontractor or materialman and the Town. Notwithstanding anything to the foregoing, the Town may tender payments to the Contractor in the form of joint or dual payee checks.

Section 29. Change in the Contract Price

29.1 The Contract Price constitutes the total compensation (subject to authorized adjustments) payable to the contractor for performing the work pursuant to the contract. All duties, responsibilities and obligations assigned to or undertaken by the contractor shall be at its expense without change in the Contract Price.

Section 30. Proper Method of Work and Proper Materials

30.1 The Town shall have the power in general to direct the order and sequence of the work, which will be such as to permit the entire work under the contract to be begun and to proceed as rapidly as possible, and such as to bring the several parts of the work to a successful completion at about the same time.

30.2 If at any time before the commencement or during the progress of the work the materials and appliances used or to be used appear to the Town as insufficient or improper for securing the quality of work required, or the required rate of progress, he may order the contractor to increase its efficiency or to improve their character, and the contractor shall promptly conform to such order; but the failure of the Town to demand any increase of such efficiency or improvement shall not release the Contractor from its obligation to secure the quality of work or the rate of progress specified.

30.3 The Contractor will establish the lines, grades and measurements necessary in his opinion to properly locate the work, by setting suitably marked offset or reference stakes. These stakes are referenced to the control points, coordinates and similar data that may be shown on the contract drawings, but the Town reserves the right to modify that information.

30.4 The Contractor shall carefully and properly preserve all stakes, pins and markers required at no additional costs to the Town. All existing property lines and survey monuments which may, of necessity have to be disturbed during the construction work, will be properly tied to fixed points and reset by the Contractor at no cost to the Town.

Section 31. Utilities and Service Lines

31.1 The Contractor is hereby warned that a reasonable opportunity is to be given the municipalities and public service corporations to alter and install pipes, conduits or other structures prior to placing to pavement. No guarantee is given that public utility structures and service lines herein shown are correctly located. Locations given are from the best available information.

Section 32. Protection, Existing Structures

32.1 The Contractor, at his expense, shall protect adjacent and other property or premises from damage of any kind during the progress of the work and shall erect and maintain guards around his work in such a way as to afford protection to the public. The Contractor shall be held responsible for improper, illegal, or negligent conduct of himself, his subcontractors, employees and agents in and about said work or in the execution of the work covered by this Contract.

32.2 The Contractor shall, at his expense, sustain in their places and permanently protect from direct or indirect injury any and all pipelines, subways, pavements, sidewalks, curbs, railways, buildings, trees, poles, wells, and other property in the vicinity of his work, whether over-or underground, or which appear within the trench or excavations, and he shall assume all costs and expenses for direct or indirect damage which may be occasioned by injury to any of them.

32.3 The Contractor’s liability shall also include the damage or injury sustained by any structure whatsoever due to settlement of trenches or excavations or to settlement or lateral movement of the sides of such trenches or excavations, whether such movement occurs during or after excavation or backfilling of such trenches or excavations. His liability to so support and protect all such structures from damage or injury shall continue without limitation, throughout the Contract period and during the period of guarantee.

32.4 The Contractor shall at all times have on the ground suitable and sufficient material and shall use the same as may be necessary or required for sustaining and supporting any and all such structures which are uncovered, undermined, weakened, endangered, threatened, or otherwise materially affected.

32.5 In case injury occurs to any portion of a pipeline or structure, or to the material surrounding or supporting the same, through blasting or similar operations, the Contractor shall immediately notify the Engineer, and, at his expense, shall remove such injured work and shall rebuild the pipeline or structure and shall replace the material surrounding the supporting the same, or shall furnish such material and perform such work of repairs or replacement as the Town may order. Any damage whatsoever shall be promptly, completely and satisfactorily repaired by the Contractor at his expense.

Section 33. Acceleration of the Work

33.1 The Town may, at its sole discretion and as circumstances reasonably require, require the contractor to accelerate the schedule of performance by providing overtime, extended day, extra crews, Saturday, Sunday and/or holiday work and/or by having all or any subcontractors designated by the Town provide overtime, extended day, extra crews, Saturday, Sunday or holiday work by the contractor’s or his subcontractor’s own forces.

33.2 The Town, pursuant to a validly issued written change order, may reimburse the contractor for the direct cost to the contractor of the premium time for the labor utilized by the contractor in such overtime, extended day, extra crews, Saturday, Sunday or holiday work (but not for the straight time costs of such labor) together with any social security and state or federal unemployment insurance taxes in connection with such premium time.