ATTH D QASP.docx
DOCX document 30 KB Posted
- Attached to
- R602--Lab Courier services, JACC, FL Federal contract opportunity
- Solicitation number
- 36C25620Q0945
About this file
This Quality Assurance Surveillance Plan outlines performance monitoring for a pathology and laboratory medicine services contract. The contract requires lab courier services between the Joint Ambulatory Care Center in Pensacola, Florida and other facilities. Performance will be evaluated on timely pickups and deliveries, safeguarding of VA property, proper loading/unloading, and appropriate transport of materials. Monitoring methods include periodic inspections, performance reports, customer feedback, and 100% inspections. Ratings will indicate whether performance exceeds, meets, or fails to meet standards. The pre-solicitation notice for Solicitation Number 36C25620Q0945 describes this requirement as a set-aside for Service-Disabled Veteran Owned Small Businesses. Interested parties must register in SAM, VetBiz, and report as a Veteran-owned small business to be considered for award. No proposals or quotes will be accepted until the full solicitation is released.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25620Q0945 0001.docx | DOCX document | |
| 36C25620Q0945.docx | DOCX document | |
| ATTH F NOT OF COMPLIANCE WITH INS.docx | DOCX document | |
| ATTH E CONTRACTOR CERTIFICATION.docx | DOCX document | |
| ATTH A WD 15-4561 Escambia PCola FL R13.pdf | ||
| ATTH C PAST PERFORMANCE QUESTIONNAIRE.docx | DOCX document | |
| ATTH B LIST OF PAST PERF REF.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT D – QUALITY ASSURANCE SURVEILLANCE PLAN
36C25620Q0945
QUALITY ASSURANCE SURVEILLANCE PLAN
For: Pathology & Laboratory Medicine Service
Contract Number: (The Government will enter contract number upon award.)
Contract Description: Lab Courier Services
Contractor’s name: (hereafter referred to as the Contractor)
Period of Performance: October 1, 2020 through September 30, 2025 (base plus four option periods)
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
· What will be monitored.
· How monitoring will take place.
· Who will conduct the monitoring.
· How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: Danette Rene’ Impey Organization or Agency: Department of Veterans Affairs, Network Contracting Office (NCO) 16 Gulf Coast Veterans Health Care System, Biloxi, MS 39531
b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: Jennifer Abendan
c. Other Key Government Personnel: N/A
3. CONTRACTOR REPRESENTATIVES
The following employees of the contractor serve as the contractor’s program manager for this contract.
a. Program Manager: (Contractor please provide name here)
b. Other Contractor Personnel: (Contractor please enter name(s) or delete these lines if not applicable.)
Title: (Contractor please enter title(s) or delete these lines if not applicable.)
4. PERFORMANCE STANDARDS
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.
Performance Requirements Summary Matrix:
The Government will use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
| Task |
| Standard |
| Acceptable Quality Level |
| Method of Surveillance |
| Incentive |
Pick-up and deliveries, when needed, performed in a timely manner Meet PWS (para. 1)
| 100% |
| Performance |
Positive Past Performance & Exercise of Option Period
| Safeguard all VA property |
| Meet PWS |
(para. 1)
| 100% |
| Periodic inspection |
| Positive Past Performance & Exercise of Option Period |
| Properly loading and unloading of vehicle at each pickup / drop off location |
| Meet PWS |
(para. 1)
| 100% |
| Performance |
Positive Past Performance & Exercise of Option Period
| Appropriate transporting materials, i.e. specimen bags, coolers, vehicles |
| Meet PWS |
(para. 2)
| 100% |
| Performance |
Positive Past Performance & Exercise of Option Period
5. INCENTIVES
The Government shall use Exercise of Option Period and Past Performance as incentives. Incentives shall be based on exceeding, meeting, or not meeting performance standards.
6. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. PERFORMANCE MANAGEMENT APPROACH. (The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives.)
b. PERIODIC INSPECTION. (Evaluates outcomes on a periodic basis. Inspections may be scheduled [Daily, Weekly, Monthly, Quarterly, or annually] or unscheduled, as required.)
c. CUSTOMER FEEDBACK. (Elements of validated user complaints. Complaints are then investigated and validated.)
e. 100% INSPECTION. (Evaluates all outcomes.)
f. REPORTING. (Demonstrates whether the contractor meets the stated objectives and/or performance standards.)
g. REVIEWS AND RESOLUTIONS. Meeting with contractor and COR and/or CO to discuss performance evaluation, such as cost, schedules, etc.)
7. RATINGS
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:
Excellent (“E”) = Exceeds Standards Satisfactory (“S”) = Meets Standards Unsatisfactory (“U”) = Fails To Meet Standards
8. DOCUMENTING PERFORMANCE
a. ACCEPTABLE PERFORMANCE
The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.
b. UNACCEPTABLE PERFORMANCE
When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.
When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor's program manager.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
9. FREQUENCY OF MEASUREMENT
a. Frequency of Measurement.
During contract performance, the COR will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.
b. Frequency of Performance Assessment Meetings.
The COR shall meet with the contractor quarterly to assess performance and shall provide a written assessment.
(After award, both the contractor’s Program Manager and the COR shall sign this document.)
Signature – Contractor Program Manager
Signature – Contracting Officer’s Representative
Contract Discrepancy Report
| Contract No. |
| Report No. for this Discrepancy: |
Contractor/Manager’s Name:
From: (Name of Project Officer)
Dates
Prepared:
Returned by Contractor:
Action Complete:
Discrepancy or Problem:
Signature of Contracting Officer:
To: (Contracting Officer)
From: (Contractor)
Contractor Response as to Cause, Corrective Action and Actions to Prevent Recurrence (Attach Continuation Sheet if Necessary)
Signature of Contractor Representative:
Date:
Government Evaluation:
Government Actions:
Close Out
| Name |
| Title |
| Signature |
| Date |
Contractor Notified
Project Officer
Contracting Officer
File details come from the government source that posted it. Updated .