Attch_7_Pricing_Worksheet.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Walker and Swartz Creek Culverts Federal contract opportunity
Solicitation number
140L0621R0031
Issued by
Department of the Interior Bureau of Land Management National Office

About this file

This pricing worksheet provides estimated costs for replacing two culverts along Walker and Swartz Creeks under solicitation number 140L0621R0031 issued by the Department of the Interior Bureau of Land Management National Office. Work includes clearing, excavating, installing prefabricated bridge structures, placing riprap and aggregate base, seeding, and installing temporary traffic control for both culvert sites. The Swartz Creek portion estimates work quantities and unit pricing for multiple line items such as 40 cubic yards of roadway excavation, 45 tons of class 5 riprap, and 55 tons of aggregate base. The Walker Creek portion similarly includes estimated quantities for line items like 52 cubic yards of roadway excavation, 120 feet of steel pipe, 24 cubic yards of structural concrete, and 120 cubic yards of streambed simulation rock. The worksheet also includes sections for the contractor to provide rates for profit, overhead, insurance, and bonding to calculate total project costs and fees.

View the file

Other files for this federal contract opportunity

Other files attached to Walker and Swartz Creek Culverts, newest first.
File Type Posted
Sol_140L0621R0031_Amd_0003.pdf PDF
Sol_140L0621R0031_Amd_0002.pdf PDF
Attch_9_Walker_Creek_Drawings_0001.pdf PDF
Attch_8_Walker_Creek_Specifications_0001.pdf PDF
Sol_140L0621R0031_Amd_0001.pdf PDF
Attch_1_Specifications.pdf PDF
Attch_6_Wage_Determination.pdf PDF
Attch_5_Swartz_Creek_Map.pdf PDF
Sol_140L0621R0031.pdf PDF
Attch_4_Walker_Creek_Map.pdf PDF
Attch_3_Area_Map.pdf PDF
Attch_2_Drawings.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Pricing Worksheet
Walker and Swartz Creek Bridges
140L0621R0031
Swartz Creek Bridge
Work DivisionDescriptionPaymentEst. QuantityUnit PriceLine Item Total
15101MobilizationLump SumN/AN/A
15201Survey and StakingLump SumN/AN/A
15713Erosion and Pollution ControlLump SumN/AN/A
15755Dewatering StructureLump Sum1
20155Clearing and GrubbingLump SumN/AN/A
20301Removal of Existing CulvertLump SumN/AN/A
20407Roadway ExcavationLump Sum40 CY
20426Drainage ExcavationLump SumN/AN/A
20701Earthwork Geosynthetics, Type IV-BLump Sum50 SY
20858Structure ExcavationLump SumN/AN/A
20860Structural BackfillLump Sum142 Tons
25102Placed Riprap, Class 5Lump Sum45 Tons
30202Aggregate BaseLump Sum55 Tons
57103Prefabricated Bridge Superstructure and SubstructureLump SumN/AN/A
62552Seeding and MulchingLump SumN/AN/A
63306Object Markers, Type IIILump Sum4
63501Temporary Traffic ControlLump SumN/AN/A
Swartz Creek Subtotal:
Walker Creek Bridge
Work DivisionDescriptionPaymentEst. QuantityUnit PriceLine Item Total
15101MobilizationLump SumN/AN/A
15201Survey and StakingLump SumN/AN/A
15713Erosion and Pollution ControlLump SumN/AN/A
15755Dewatering StructureLump Sum1
20158Clearing and GrubbingLump SumN/AN/A
20301Removal of Existing CulvertLump SumN/AN/A
20407Roadway ExcavationLump Sum52 CY
20426Drainage ExcavationLump SumN/AN/A
20701Earthwork Geosynthetics, Type IV-BLump Sum332 SY
20801Structure ExcavationLump Sum85 CY
20804Structural BackfillLump Sum82 Tons
25102APlaced Riprap, Class 6Lump Sum438 Tons
25102BPlaced Riprap, Class 1Lump Sum6 Tons
30202Aggregate BaseLump Sum102 Tons
40304Asphalt Concrete, ODOT Type 1Lump Sum56 Tons
55156Steel PipeLump Sum120 Feet
55158Pile Drilling EquipmentLump SumN/AN/A
55160Concrete Filled Steel Pipe PilesLump Sum6
55201Structural Concrete, Class A, Type 1Lump Sum24 CY
55301Precast, Prestressed Concrete Structural MembersLump Sum5
55401Reinforcing SteelLump Sum2830 lbs
56401Elastomeric Bearing DeviceLump Sum20
62529Seeding and MulchingLump SumN/AN/A
63502Temporary Traffic ControlLump SumN/AN/A
64802Streambed Simulation Rock, Class 6Lump Sum120 CY
64805Stream Channel Rocks, Size 3Lump Sum18
Walker Creek Subtotal:
Contractor Fees
DescriptionPaymentBase ($)Rate (%)Line Item Total
Profit*Lump Sum*Please show how your profit is calculated. For example, total direct costs + percentage
Overhead*Lump Sum*Please show how your overhead is calculated. For example, total direct costs + percentage
InsuranceLump SumN/A
BondingLump SumN/A
Contractor Fees Subtotal:
PROJECT GRAND TOTAL: