This pricing worksheet provides estimated costs for replacing two culverts along Walker and Swartz Creeks under solicitation number 140L0621R0031 issued by the Department of the Interior Bureau of Land Management National Office. Work includes clearing, excavating, installing prefabricated bridge structures, placing riprap and aggregate base, seeding, and installing temporary traffic control for both culvert sites. The Swartz Creek portion estimates work quantities and unit pricing for multiple line items such as 40 cubic yards of roadway excavation, 45 tons of class 5 riprap, and 55 tons of aggregate base. The Walker Creek portion similarly includes estimated quantities for line items like 52 cubic yards of roadway excavation, 120 feet of steel pipe, 24 cubic yards of structural concrete, and 120 cubic yards of streambed simulation rock. The worksheet also includes sections for the contractor to provide rates for profit, overhead, insurance, and bonding to calculate total project costs and fees.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L0621R0031_Amd_0003.pdf | ||
| Sol_140L0621R0031_Amd_0002.pdf | ||
| Attch_9_Walker_Creek_Drawings_0001.pdf | ||
| Attch_8_Walker_Creek_Specifications_0001.pdf | ||
| Sol_140L0621R0031_Amd_0001.pdf | ||
| Attch_1_Specifications.pdf | ||
| Attch_6_Wage_Determination.pdf | ||
| Attch_5_Swartz_Creek_Map.pdf | ||
| Sol_140L0621R0031.pdf | ||
| Attch_4_Walker_Creek_Map.pdf | ||
| Attch_3_Area_Map.pdf | ||
| Attch_2_Drawings.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Pricing Worksheet | ||||||
| Walker and Swartz Creek Bridges | ||||||
| 140L0621R0031 | ||||||
| Swartz Creek Bridge | ||||||
| Work Division | Description | Payment | Est. Quantity | Unit Price | Line Item Total | |
| 15101 | Mobilization | Lump Sum | N/A | N/A | ||
| 15201 | Survey and Staking | Lump Sum | N/A | N/A | ||
| 15713 | Erosion and Pollution Control | Lump Sum | N/A | N/A | ||
| 15755 | Dewatering Structure | Lump Sum | 1 | |||
| 20155 | Clearing and Grubbing | Lump Sum | N/A | N/A | ||
| 20301 | Removal of Existing Culvert | Lump Sum | N/A | N/A | ||
| 20407 | Roadway Excavation | Lump Sum | 40 CY | |||
| 20426 | Drainage Excavation | Lump Sum | N/A | N/A | ||
| 20701 | Earthwork Geosynthetics, Type IV-B | Lump Sum | 50 SY | |||
| 20858 | Structure Excavation | Lump Sum | N/A | N/A | ||
| 20860 | Structural Backfill | Lump Sum | 142 Tons | |||
| 25102 | Placed Riprap, Class 5 | Lump Sum | 45 Tons | |||
| 30202 | Aggregate Base | Lump Sum | 55 Tons | |||
| 57103 | Prefabricated Bridge Superstructure and Substructure | Lump Sum | N/A | N/A | ||
| 62552 | Seeding and Mulching | Lump Sum | N/A | N/A | ||
| 63306 | Object Markers, Type III | Lump Sum | 4 | |||
| 63501 | Temporary Traffic Control | Lump Sum | N/A | N/A | ||
| Swartz Creek Subtotal: | ||||||
| Walker Creek Bridge | ||||||
| Work Division | Description | Payment | Est. Quantity | Unit Price | Line Item Total | |
| 15101 | Mobilization | Lump Sum | N/A | N/A | ||
| 15201 | Survey and Staking | Lump Sum | N/A | N/A | ||
| 15713 | Erosion and Pollution Control | Lump Sum | N/A | N/A | ||
| 15755 | Dewatering Structure | Lump Sum | 1 | |||
| 20158 | Clearing and Grubbing | Lump Sum | N/A | N/A | ||
| 20301 | Removal of Existing Culvert | Lump Sum | N/A | N/A | ||
| 20407 | Roadway Excavation | Lump Sum | 52 CY | |||
| 20426 | Drainage Excavation | Lump Sum | N/A | N/A | ||
| 20701 | Earthwork Geosynthetics, Type IV-B | Lump Sum | 332 SY | |||
| 20801 | Structure Excavation | Lump Sum | 85 CY | |||
| 20804 | Structural Backfill | Lump Sum | 82 Tons | |||
| 25102A | Placed Riprap, Class 6 | Lump Sum | 438 Tons | |||
| 25102B | Placed Riprap, Class 1 | Lump Sum | 6 Tons | |||
| 30202 | Aggregate Base | Lump Sum | 102 Tons | |||
| 40304 | Asphalt Concrete, ODOT Type 1 | Lump Sum | 56 Tons | |||
| 55156 | Steel Pipe | Lump Sum | 120 Feet | |||
| 55158 | Pile Drilling Equipment | Lump Sum | N/A | N/A | ||
| 55160 | Concrete Filled Steel Pipe Piles | Lump Sum | 6 | |||
| 55201 | Structural Concrete, Class A, Type 1 | Lump Sum | 24 CY | |||
| 55301 | Precast, Prestressed Concrete Structural Members | Lump Sum | 5 | |||
| 55401 | Reinforcing Steel | Lump Sum | 2830 lbs | |||
| 56401 | Elastomeric Bearing Device | Lump Sum | 20 | |||
| 62529 | Seeding and Mulching | Lump Sum | N/A | N/A | ||
| 63502 | Temporary Traffic Control | Lump Sum | N/A | N/A | ||
| 64802 | Streambed Simulation Rock, Class 6 | Lump Sum | 120 CY | |||
| 64805 | Stream Channel Rocks, Size 3 | Lump Sum | 18 | |||
| Walker Creek Subtotal: | ||||||
| Contractor Fees | ||||||
| Description | Payment | Base ($) | Rate (%) | Line Item Total | ||
| Profit* | Lump Sum | *Please show how your profit is calculated. For example, total direct costs + percentage | ||||
| Overhead* | Lump Sum | *Please show how your overhead is calculated. For example, total direct costs + percentage | ||||
| Insurance | Lump Sum | N/A | ||||
| Bonding | Lump Sum | N/A | ||||
| Contractor Fees Subtotal: | ||||||
| PROJECT GRAND TOTAL: |