Attch_2_Drawings.pdf
PDF 3 MB Posted
- Attached to
- Walker and Swartz Creek Culverts Federal contract opportunity
- Solicitation number
- 140L0621R0031
About this file
This document package includes engineering drawings and construction notes for a federal land management project to replace culverts on Walker and Swartz Creeks. The project involves excavating and installing new culverts to improve stream flow and drainage. Key aspects include excavating the stream bed, installing bedding material, placing riprap, backfilling, and erosion control measures. Mobilization, surveying, soil erosion controls, and dewatering structures are also specified. The estimated quantities and unit prices for these work items are provided. The solicitation for this project was issued by the Bureau of Land Management National Office as opportunity number 140L0621R0031 to replace the culverts and improve the creek crossings.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L0621R0031_Amd_0003.pdf | ||
| Sol_140L0621R0031_Amd_0002.pdf | ||
| Attch_9_Walker_Creek_Drawings_0001.pdf | ||
| Attch_8_Walker_Creek_Specifications_0001.pdf | ||
| Sol_140L0621R0031_Amd_0001.pdf | ||
| Attch_1_Specifications.pdf | ||
| Attch_6_Wage_Determination.pdf | ||
| Attch_5_Swartz_Creek_Map.pdf | ||
| Sol_140L0621R0031.pdf | ||
| Attch_7_Pricing_Worksheet.xlsx | XLSX spreadsheet | |
| Attch_4_Walker_Creek_Map.pdf | ||
| Attch_3_Area_Map.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESCRIPTIONREV. NO. DATE APPROVED
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
NORTHWEST OREGON DISTRICT OR/WA STATE OFFICE
TITLE SHEET & AREA MAP
ENG. APPROVAL
RECOMMENDED
APPROVED
SUBMITTED
DISTRICT ENGINEER
FIELD OFFICE MANAGER
ADM SUPPORT SERVICES
DISTRICT MANAGER
DRAWN: C.L.S.
DATE: NOVEMBER 2018
DRAWING NO. --
SCALE: AS SHOWN
SHEET 1 OF 9
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
SWARTZ CREEK AOP
NORTHWEST OREGON DISTRICT
AREA MAP
SHEET INDEX
SHEET DESCRIPTION
TITLE SHEET & AREA MAP
ESTIMATE OF QUANITITEIS
EXISTING SITE PLAN & PROJECT BOUNDARY
ROAD PLAN & PROFILE
GENERAL LAYOUT
FOUNDATION PLAN & ROAD SECTION
STREAM CONSTRUCTION DETAILS
DEWATERING TYPICAL
TRAFFIC CONTROL & DISPOSAL AREA DETAILS
LOCATION T15S, R6W, SECTION 31
BLM ROAD 15-6-31 M.P. 0.07
(LAT 44.228387°, LONG -123.470775°)
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text W
CONSTRUCTION NOTES:
1) PERFORM CONSTRUCTION IN CONFORMANCE WITH THE STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL LANDS FP-14 US CUSTOMARY UNITS
EXCEPT AS MODIFIED BY SUPPLEMENTAL SPECIFICATIONS AND CLAUSES IN THE CONTRACT DOCUMENT OR THE PLANS.
2) WATER FOR FIRE PREVENTION & SUPPRESSION REQUIREMENTS UNDER THE CONTRACT, AS WELL AS FOR USE WITH CONSTRUCTION ACTIVITIES, MAY BE OBTAINED FROM SWARTZ CREEK. ENSURE PROPER WATER DRAFTING
PROTOCOLS ARE MET.
3) DESIGN DOES NOT INCLUDE EXCAVATION FOR EQUIPMENT ACCESS TO THE BOTTOM OF THE EXCAVATION AREAS. ALL EXCAVATION AND OTHER WORK FOR ACCESS IS INDIRECT TO PAY ITEM 20804.
4) PRIOR TO DIGGING, CALL "DIG SAFELY OREGON" 1-800-332-2344. LOCATING AND PROTECTION OF ALL UTILITIES (PUBLIC & PRIVATE) IS THE RESPONSIBILITY OF THE CONTRACTOR.
5) CONTRACTING OFFICER APPROVAL IS REQUIRED PRIOR TO THE PLACEMENT OF THE FOLLOWING ITEMS: BEDDING OR LEVELING COURSE OF ANY STRUCTURE, STREAM FLOW THROUGH TEMPORARY BYPASS OR OVER NEWLY CONSTRUCTED
STREAMBED, AND CRUSHED AGGREGATE BASE/SURFACING.
6) REMOVE ALL CONSTRUCTION RELATED REFUSE FROM GOVERNMENT LAND PRIOR TO FINAL ACCEPTANCE.
7) REPAIR ANY DAMAGE TO THE EXISTING ROAD SYSTEM DUE TO CONTRACTOR'S OPERATIONS, INSIDE OR OUTSIDE THE PROJECT BOUNDARY, AT THE CONTRACTOR'S EXPENSE, PRIOR TO FINAL ACCEPTANCE.
8) CONFINE CONSTRUCTION EQUIPMENT TO THE ROADWAY, UNLESS OTHERWISE SHOWN ON THE PLANS OR APPROVED BY THE CONTRACTING OFFICER.
9) STORING OF ALL EQUIPMENT ON GOVERNMENT LANDS WILL BE AT THE CONTRACTOR'S RISK AND AT A LOCATION APPROVED BY THE CONTRACTING OFFICER.
10) DEPTHS OF SOIL AND AGGREGATE ARE GIVEN AS FINAL COMPACTED DEPTHS.
11) PLACE ALL RIPRAP BY MACHINE OR HAND; DO NOT SIDE CAST OR END DUMP.
12) CONSTRUCTION TOLERANCE IS 'A' UNLESS OTHERWISE NOTED ON THE DRAWINGS.
BASE BID ITEMS
ITEM NUMBER DESCRIPTION PAY UNIT ESTIMATED QUANTITY REMARKS
15101 MOBILIZATION LUMP SUM ALL FIRE PROTECTION & EQUIPMENT CLEANING INDIRECT TO PAY ITEM
15201
CONSTRUCTION SURVEY AND STAKING, METHOD 1, TOLERANCE A
LUMP SUM ALL
15713 SOIL EROSION AND POLLUTION CONTROL LUMP SUM ALL
INCLUDES EROSION CONTROL PLAN PREP, INSTALLATION & REMOVAL
15755 DEWATERING STRUCTURE EACH 1
INCLUDES DEWATERING PLAN PREP, INSTALLATION & REMOVAL
20155 CLEARING AND GRUBBING LUMP SUM ALL
SCATTER TOPS, LIMBS AND TREES (<12" Ø) WITHIN PROJECT BOUNDARY, AS SHOWN ON SHEET 3
20301
REMOVAL OF EXISTING CULVERT, DISPOSAL METHOD A
LUMP SUM ALL REMOVE CULVERT AND DISPOSE LEGALLY OFF OF GOVERNMENT LAND
20407 ROADWAY EXCAVATION *CUBIC YARD 40 ESTIMATED VALUE. REMOVE EXCESS MATERIAL TO DESIGNATED DISPOSAL AREA
20426
DRAINAGE EXCAVATION, TYPE CHANNEL BANK MATERIAL
LUMP SUM ALL REMOVE EXCESS MATERIAL TO DESIGNATED DISPOSAL AREA
20701
EARTHWORK GEOSYNTHETICS, TYPE IV-B
*SQUARE YARD 50 COMMERCIAL SOURCE
20858 STRUCTURE EXCAVATION LUMP SUM ALL
20860 STRUCTURAL BACKFILL *TON 142 COMMERCIAL SOURCE. 1" MINUS AGGREGATE MEETING 703.06 IS ACCEPTABLE.
25102
PLACED RIPRAP, CLASS 5
*TON 45 COMMERCIAL SOURCE.
30202
AGGREGATE BASE, COMPACTION PLACEMENT METHOD 2
*TON 55 COMMERCIAL SOURCE. 1" MINUS AGGREGATE MEETING 703.06 IS ACCEPTABLE
57103
PREFABRICATED BRIDGE SUPERSTRUCTURE & SUBSTRUCTURE, DESIGN, FABRICATE,
DELIVER AND INSTALL
LUMP SUM ALL
ALL COMPONENTS NECESSARY FOR BRIDGE INSTALLATION INCLUDING CONNECTION TO
SUBSTRUCTURE, BEARINGS & WINGWALLS INDIRECT TO PAY ITEM. PAY ITEM INCLUDES LOAD RATING
REPORT AFTER COMPLETION OF THE PROJECT.
62552
SEEDING AND MULCHING, DRY METHOD
LUMP SUM ALL CONTRACTOR FURNISHED WEED FREE STRAW. GOVERNMENT FURNISHED SEED.
63306
OBJECT MARKERS, TYPE III
EACH 4
INCLUDES PAYMENT FOR POST, HARDWARE AND INSTALLATION.
63501 TEMPORARY TRAFFIC CONTROL LUMP SUM ALL
* DENOTES CONTRACT
QUANTITY (CQ) PER FP14
SECTION 109.02
ESTIMATE OF QUANITITIES
DESCRIPTIONREV. NO. DATE APPROVED
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
NORTHWEST OREGON DISTRICT
SWARTZ CREEK AOP
ESTIMATE OF QUANTITIES
DESIGNED
REVIEWED
APPROVED
C.L.S.
DATE: NOVEMBER 2018
SCALE: AS SHOWN
SHEET 2 OF 9
DRAWING NO. --
CHIEF, BRANCH OF ENGINEERING OR DISTRICT ENGINEER
BUREAU OF LAND MANAGEMENT
SWARTZ CREEK AOP
EXISTING SITE PLAN &PROJECT
BOUNDARY
DESIGNED
REVIEWED
APPROVED
C.L.S.
DATE: NOVEMBER 2018
SCALE: AS SHOWN
SHEET 3 OF 9
DRAWING NO. --
CHIEF, BRANCH OF ENGINEERING OR DISTRICT ENGINEER
NORTHWEST OREGON DISTRICT
LEGEND
CONTROL POINT
EXISTING CONTOURS
PROJECT BOUNDARY & CLEARING LIMITS
EXISTING EDGE OF ROAD
EXISTING EDGE OF CREEK
1) COORDINATES ARE ARBITRARY. BEARINGS ARE BASED ON HAND
COMPASS BEARING.
2) CONTOUR INTERVALS ARE ONE-FOOT.
3) THE ELEVATION OF 840.00' AT CP1 IS ASSUMED.
4) THE LINES DEFINED BY THE COORDINATE REFERENCES ARE THE LIMITS
OF THE PROJECT BOUNDARY.
5) PROVIDE CLEARING AND GRUBBING OF DEBRIS AND VEGETATION
WITHIN THE PROJECT BOUNDARY AS NECESSARY TO COMPLETE THE
PROJECT.
SURVEY NOTES:
CONTROL TABLE
POINT
#1
#2
#3
#5
#7
NORTHING
5000.00
4458.94
4741.08
4588.81
4725.96
EASTING
5000.00
5232.54
5115.28
5098.87
5060.73
ELEVATION
840.00
835.92
820.28
826.93
813.92
DESCRIPTION
REBAR
REBAR
SPIKE
SPIKE
HUB
N: 4795.40
E: 5090.44
N: 4767.50
E: 5046.76
N: 4735.05
E: 5048.89
N: 4806.68
E: 5113.14
N: 4765.28
E: 5175.58
N: 4702.13
E: 5152.68
N: 4695.14
E: 5127.93
N: 4743.34
E: 5176.79
CP1
APPROX. 180' NORTH AND 25' EAST OF
EDGE OF ROAD
B
L
M
R
O
A
D
CP2
APPROX. 130 FT SOUTH AND 5 FT EAST OF
THE EDGE OF ROADWAY
EDGE OF EXISTING AGGREGATE ROAD
EXISTING 14' SPAN X 9' RISE X 55' LENGTH
CORRUGATED METAL PIPE ARCH CULVERT
EXISTING SITE PLAN & PROJECT BOUNDARY
SCALE IN FEET
20' 0' 20' 40'
SWARTZ CREEK
NORTH
BUREAU OF LAND MANAGEMENT
SWARTZ CREEK AOP
ROAD PLAN & PROFILE
DESIGNED
REVIEWED
APPROVED
C.L.S.
DATE: NOVEMBER 2018
SCALE: AS SHOWN
SHEET 4 OF 9
DRAWING NO. --
CHIEF, BRANCH OF ENGINEERING OR DISTRICT ENGINEER
NORTHWEST OREGON DISTRICT
E L
E V
A T
I O
N
1+00
STATION
1+500+50
EXISTING 14' SPAN X 9' RISE X 55'
LENGTH CORRUGATED STEEL PIPE
ARCH CULVERT TO BE REMOVED
NEW STREAM CONSTRUCTION. SEE
DETAILS, SHEET 7
0+25
24' -0" MIN.
(MEASURED NORMAL TO CHANNEL)
16'-0" TYP.
NEW PRE-ENGINEERED, PRECAST
CONCRETE BRIDGE STRUCTURE
BEGIN PROJECT. STA.
0+45.00 MATCH EXISTING
AGGREGATE WIDTH,
ELEVATION & CROWN
END PROJECT. STA. 1+30.53
MATCH EXISTING AGGREGATE
WIDTH, ELEVATION & CROWN
EXISTING TOP OF
ROADWAY ELEVATION
ROAD CENTERLINE PROFILE
SCALE IN FEET
10' 0' 10'
20'
CENTERLINE ROADWAY LAYOUT TABLE
STATION
0+45.00
0+75.00
1+00.53
1+30.53
NORTHING
4798.42
4761.86
4738.03
4709.89
EASTING
5100.91
5117.11
5126.31
5136.70
ELEVATION
820.74
820.69
820.36
820.02
DESCRIPTION
BEGIN NEW ROAD CONSTRUCTION
CENTERLINE INSIDE FACE OF ABUTMENT 1
CENTERLINE INSIDE FACE OF ABUTMENT 2
END NEW ROAD CONSTRUCTION
ROAD PLAN
BEGIN PROJECT, STA. 0+45.00
MATCH EXISTING AGGREGATE
WIDTH, ELEVATION AND CROWN
LEGEND
CONTROL POINT
EXISTING EDGE OF ROAD
EXISTING EDGE OF CREEK
EXISTING CONTOURS
PROPOSED CONTOURS
SW
ARTZ
C R
EEK F
LO
W
END PROJECT, STA. 1+30.53
MATCH EXISTING AGGREGATE
WIDTH, ELEVATION AND CROWN
INSIDE FACE OF
ABUTMENT 1 AT ℄ BRIDGE & ROADWAY,
STA. 0+75.00
INSIDE FACE OF
ABUTMENT 2 AT ℄ BRIDGE & ROADWAY,
STA. 1+00.53
E
X
I
S
T
I
N
G
A
G
G
R
E
G
A
T
E
E
X
I
S
T
I
N
G
A
G
G
R
E
G
A
T
E
SCALE IN FEET
20' 0' 20' 40'
INSIDE FACE OF
ABUTMENT 2 AT ℄ BRIDGE
& ROADWAY, STA. 1+00.53
INSIDE FACE OF
ABUTMENT 1 AT ℄ BRIDGE
& ROADWAY, STA. 0+75.00
BUREAU OF LAND MANAGEMENT
DESIGNED
REVIEWED
APPROVED
C.L.S.
SCALE: AS SHOWN
SHEET 5 OF 9
DRAWING NO. --
CHIEF, BRANCH OF ENGINEERING OR DISTRICT ENGINEER
GENERAL NOTES
SWARTZ CREEK AOP
GENERAL LAYOUT
DATE: NOVEMBER 2018
NORTHWEST OREGON DISTRICT
15'-6" ROADWAY
OUT-OUT SUPERSTRUCTURE AS
NEEDED FOR 15'-6" ROADWAY + CURBS
PRE-ENGINEERED,
PRECAST CONCRETE
SUPERSTRUCTURE
BRIDGE & ROAD
7'-9"
TOP OF AGGREGATE ROADWAY
PRECAST CONCRETE ABUTMENT PER
MANUFACTURER'S DESIGN, TYP.
PRECAST CONCRETE FOOTING PER
MANUFACTURER'S DESIGN, TYP.
BOTTOM OF ABUTMENT ELEVATION, TYP.
SEE FOUNDATION PLAN, SHEET 6
NEW CHANNEL. SEE DETAILS ON SHEET 7
FOR NEW CHANNEL PROFILE ELEVATIONS
AND CHANNEL RECONSTRUCTION
PRECAST CONCRETE BRIDGE CURB, TYP.
PER MANUFACTURER'S DESIGN
PRE-ENGINEERED PRECAST
CONCRETE SUPERSTRUCTURE
24'-0" CLEAR BETWEEN INSIDE FACE OF ABUTMENTS
MEASURED NORMAL TO THE CHANNEL
25'-6 9/16" CLEAR BTWN.
ABUTMENTS MEASURED ALONG
ROADWAY CENTERLINE
℄ ROADWAY
PRECAST CONCRETE BRIDGE CURB, TYP.
PER MANUFACTURER'S DESIGN
C
L E
A R
20 DEGREE
SKEW, TYP.
PRECAST CONCRETE WINGWALLS AT ALL
CORNERS PER MANUFACTURER'S DESIGN
PRECAST CONCRETE BRIDGE CURB, TYP. DESIGN STANDARD
FOR CURBS IS AASHTO TL-1, LATERAL LOADS ONLY. CURBS
ARE NOT REQUIRED TO MEET CRASH TEST REQUIREMENTS.
CURB HEIGHT TO BE A MINIMUM OF 18 INCHES ABOVE
WEARING SURFACE. CURB GEOMETRY MEETING
REQUIREMENTS PER MANUFACTURER'S SPECIFICATIONS.
SPECIFICATIONS:
1. DESIGN: "AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS" 2014.
2. CONSTRUCTION: "STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS", (FP-14), 2014 WITH SUPPLEMENTAL SPECIFICATIONS.
"AASHTO LRFD BRIDGE CONSTRUCTION SPECIFICATIONS", 2ND EDITION WITH 2009 INTERIMS.
DESIGN LOADS:
1. DEAD LOAD: CONCRETE AT 150 PCF, STEEL AT 490 PCF, EARTH PRESSURE AT AN EQUIVALENT FLUID PRESSURE WEIGHT OF 36
PCF, ASPHALT AT 140 PCF (ASSUME 3" FUTURE WEARING SURFACE), EARTH AT 140 PCF.
2. LIVE LOAD: AASHTO HL93 WITH IMPACT.
LOAD RATING:
1. LOAD RATE STRUCTURE IN ACCORDANCE WITH THE "MANUAL FOR BRIDGE EVALUATION", CURRENT EDITION WITH INTERIMS, USING LRFR METHODOLOGY (CH. 6A). RATE FOR THE FOLLOWING VEHICLES AND CONFIGURATIONS USING THE
DESIGNATED LOAD MODIFICATION FACTORS: HL-93 (VEHICLE + LANE OR TANDEMS AXLES + LANE); TYPE 3, TYPE 3S2, AND TYPE 3-3; SPECIAL HAUL VEHICLES SU4 THROUGH SU7; EMERGENCY VEHICLE CONFIGURATIONS EV2 AND EV3;
AND OREGON SPECIAL PERMIT LOADS OR-STP-3, 4A, 4B. RATE THE HL-93 FOR INVENTORY AND OPERATING, AND
RATE ALL OTHER VEHICLES FOR THE SAFE LOAD CAPACITY. LOAD RATING CALCULATIONS AND REPORT SHALL BE
STAMPED BY A REGISTERED PROFESSIONAL ENGINEER IN THE STATE OF OREGON.
MATERIALS:
1. CONCRETE: PRECAST REINFORCED CONCRETE SHALL BE AIR ENTRAINED CLASS "A" WITH A MINIMUM 28 DAY COMPRESSIVE
STRENGTH OF 4000 PSI. PRESTRESSED CONCRETE SHALL BE CLASS "P" WITH A MINIMUM 28 DAY COMPRESSIVE
STRENGTH AND A RELEASE PICKUP STRENGTH AS SPECIFIED BY THE MANUFACTURER.CAST IN PLACE CONCRETE
SHALL BE AIR ENTRAINED CLASS "A" WITH A 28 DAY COMPRESSIVE STRENGTH OF 4000 PSI. CHAMFER ALL EXPOSED
EDGES & FILLET ALL RE-ENTRANT ANGLES
" UNLESS OTHERWISE NOTED. CLASS 1, ORDINARY FINISH ALL CONCRETE
SURFACES.
2. REINFORCING STEEL: REINFORCING STEEL SHALL CONFORM TO AASHTO M31 GRADE 60. CONCRETE COVER SHALL BE 2"
MINIMUM, EXCEPT AS NOTED.
3. STRUCTURAL STEEL: CONFORM TO AASHTO M183 (ASTM A36). HOT DIP GALVANIZE ALL EXPOSED
STRUCTURAL STEEL AFTER FABRICATION ACCORDING TO AASHTO M111. HOT DIP GALVANIZE
EXPOSED STEEL FASTENERS, BOLTS AND NUTS, AND HARDWARE ACCORDING TO AASHTO M32.
4. PRESTRESSING STEEL: FURNISH 7-WIRE LOW RELAXATION STRAND FOR PRESTRESSED CONCRETE CONFORMING TO AASHTO
M203, GRADE 270. SUPPLEMENT 1.
5. ELASTOMERIC BEARING PADS: CONFORM TO AASHTO LRFD DESIGN SPECIFICATIONS, 2012, CHAPTER 14.7.6.
FOUNDATION INVESTIGATION:
1. THE FACTORED BEARING CAPACITY AT THE PROPOSED BOTTOM OF BRIDGE FOOTING IS 2500 POUNDS PER SQUARE FOOT.
HYDROLOGY AND HYDRAULICS:
1. THIS BRIDGE IS DESIGNED TO PASS A 100 YEAR FLOOD OF 657 CFS WITH A MINIMUM FREEBOARD OF 5 FEET. HIGH WATER DEPTH
IS APPROXIMATELY 5.4 FEET.
PRECAST CONCRETE BRIDGE:
1. MANUFACTURER CERTIFICATION BY PCI OR NPCA IS REQUIRED. ALTERNATIVELY, MANUFACTURER MAY SUBMIT A QUALITY
CONTROL PLAN FOR APPROVAL. PRECAST MODULAR CONCRETE STRUCTURE (PACIFIC BRIDGE OR APPROVED
EQUAL) WITH DIMENSIONS 15'-6" INSIDE CONCRETE CURB TO INSIDE CONCRETE CURB AND 24'-0" CLEAR - INSIDE
FACE OF ABUTMENT TO INSIDE FACE OF ABUTMENT (MEASURED PERPENDICULAR TO STREAM FLOW).
SUBMITTALS:
1. SHOP DRAWINGS AND DESIGN CALCULATIONS FOR PRECAST COMPONENTS SHALL BE STAMPED BY A REGISTERED
PROFESSIONAL ENGINEER IN THE STATE OF OREGON. SUBMIT SHOP DRAWINGS INCLUDING REBAR LOCATIONS TO
THE CO FOR REVIEW PRIOR TO BEGINNING CONSTRUCTION OF BRIDGE COMPONENTS. ONCE CONSTRUCTION IS
COMPLETE, PROVIDE A PLAN SET INDICATING THE AS-BUILT CONDITION. AS BUILT DRAWINGS ARE THE
RESPONSIBILITY OF THE CONTRACTOR.
TYPICAL BRIDGE SECTION
ELEVATION
PLAN
SCALE IN FEET
10' 0' 10' 20'
SCALE IN FEET
10' 0' 10' 20'
SCALE IN FEET
2' 0' 2' 4'
Q100 ELEV. =
813.56'
1.3% ON BRIDGE
BUREAU OF LAND MANAGEMENT
DESIGNED
REVIEWED
APPROVED
C.L.S.
SCALE: AS SHOWN
SHEET 6 OF 9
DRAWING NO. --
CHIEF, BRANCH OF ENGINEERING OR DISTRICT ENGINEER
SWARTZ CREEK AOP
FOUNDATION PLAN & ROAD
SECTION
DATE: NOVEMBER 2018
NORTHWEST OREGON DISTRICT
1V:2H TYP.
MATCH EXISTING FILL SLOPE
SUB-BASE: CONSTRUCT IN
ACCORDANCE WITH
SUBSECTION 204.10
MATCH EXISTING
MATCH EXISTING
*** 10" DEPTH AGGREGATE
CONFORMING TO SUBSECTION
703.06. COMPACTION METHOD "B"
ROADWAY WIDTH VARIES**
ROADWAY
FINISHED
GRADE
VARIES**
MATCH EXISTING
SHOULDER, TYP.
**AGGREGATE ROADWAY WIDTH TO BE 15'-6" AT BOTH BRIDGE ENDS,
THEN TAPER (STRAIGHT LINE) TO MATCH EXISTING ROADWAY WIDTH AT
THE BEGINNING AND END OF PROJECT AS SPECIFIED ON SHEET 4.
***CONTRACTOR MAY CONSERVE AND RE-USE EXISTING AGGREGATE
SURFACE ROCK AND BASE ROCK.
EMBANKMENT CONSTRUCTION (EACH APPROACH) IS INDIRECT TO PAY ITEM 20860 -
STRUCTURAL BACKFILL. USE SUITABLE ON SITE MATERIAL (PER SUBSECTION 704.06)
TO BUILD UP THE APPROACH FILL. COMPACT ACCORDING TO SUBSECTION 204.11(b), COMPACTION B. FOR BRIDGE MANUFACTURER DESIGN PURPOSES, THE ASSUMED
FRICTION ANGLE OF COMPACTED ON SITE FILL MATERIAL IS φ = 31 DEGREES. IF THE
BRIDGE MANUFACTURER'S DESIGN REQUIRES ADDITIONAL GEOTEXTILE AND A
LARGER QUANTITY OF STRUCTURAL BACKFILL THAN SHOWN ON THIS SHEET,
PAYMENT FOR THE ADDITIONAL MATERIAL IS INDIRECT TO PAY ITEM 57103.
UNDISTURBED GROUND, TYP.
STRUCTURAL BACKFILL (EACH APPROACH). 1" MINUS AGGREGATE
CONFORMING TO SUBSECTION 703.06. COMPACT AGGREGATE IN 6"
MAX. LIFTS WITH 3 PASSES OF A VIBRATING PLATE COMPACTOR
EXCAVATE SLOPE TO COMPLY WITH
OCCUPATIONAL SAFETY AND HEALTH
ORGANIZATION (OSHA) GUIDELINES, TYP.
1'-6" PER
SUBSECTION
208, TYP.
FOOTING, TYP. PER MANUFACTURER'S
DESIGN. ASSUMED FOOTING WIDTH
FOR QUANTITY CALCULATIONS IS 4'-0"
6", TYP.
*BOTTOM FOOTING
ELVATION (TYP.) = 804.60'
*FOOTINGS MAY BE DEEPER THAN THE PROPOSED
BOTTOM OF FOOTING ELEVATION BY NO MORE THAN
1'-6" IN ORDER TO ACCOMMODATE PREFABRICATED
PRECAST CONCRETE MEMBER DEPTHS
GEOTEXTILE, TYPE IV-B AT ALL NATIVE
MATERIAL & AGGREGATE CONTACTS,
EACH ABUTMENT
6" DEPTH OF 1" MINUS AGGREGATE CONFORMING
TO SUBSECTION 703.06 AT EACH ABUTMENT.
PLACE IN 2 LIFTS AND COMPACT WITH 3 PASSES
WITH A VIBRATING PLATE COMPACTOR
PRECAST CONCRETE ABUTMENT, TYP.
PRECAST CONCRETE SUPERSTRUCTURE
10" DEPTH AGGREGATE
TYPICAL ROADWAY CROSS SECTION
SCALE IN FEET
FOUNDATION PLAN
NOT TO SCALE
2' 0' 2' 4'
BUREAU OF LAND MANAGEMENT
SWARTZ CREEK AOP
STREAM CONSTRUCTION
DETAILS
DESIGNED
REVIEWED
APPROVED
C.L.S.
DATE: NOVEMBER 2018
SCALE: AS SHOWN
SHEET 7 OF 9
DRAWING NO. --
CHIEF, BRANCH OF ENGINEERING OR DISTRICT ENGINEER
NORTHWEST OREGON DISTRICT
STREAMBED NOTES:
1) THE FINISHED STREAMBED CHANNEL
SURFACE SHALL BE CONSTRUCTED SUCH
THAT STREAM WATER IS FLOWING ON TOP OF
THE STREAMBED SURFACE.
2) FILL RIPRAP VOIDS WITH WELL GRADED
ROCK CONTAINING APPROXIMATELY 10% SOIL
TO PREVENT STREAM FROM FLOWING
THROUGH RIPRAP.
3) BACKFILL EXCAVATED AREAS, SCOUR HOLE
AND SUMP HOLES AS STAKED BY THE CO.
4) FINISHED CHANNEL DIMENSIONS TO
TRANSITION SMOOTHLY TO UPSTREAM AND
DOWNSTREAM CHANNEL. STREAM
CONSTRUCTION COORDINATES ARE LABELED
ON THE NEW STREAM CONSTRUCTION
PROFILE ON THIS SHEET.
3+50
STREAM PROFILE
STATION
4+00 4+50 5+003+00
E L E
V A
T I O
N
2+50
EXISTING GROUND AT
STREAM THALWEG
BEGIN STREAM CONSTRUCTION
N: 4751.59
E: 5150.01
MATCH EXISTING ELEVATION
4+00
END STREAM CONSTRUCTION
N: 4751.10
E: 5082.79
MATCH EXISTING ELEVATION
SCALE IN FEET
10' 0' 10' 20'
NEW BRIDGE SUPERSTRUCTURE
EXISTING CULVERT
TO BE REMOVED
NEW STREAMBED
ELEVATION
STREAM PLAN
SCALE IN FEET
10' 0' 10' 20'
SWARTZ
CREEK FLOW
END STREAM CONSTRUCTION
N: 4751.10
E: 5082.79
MATCH EXISTING ELEVATION
BEGIN STREAM CONSTRUCTION
N: 4751.59
E: 5150.01
MATCH EXISTING ELEVATION
ABUTMENT 1
ABUTMENT 2
CLASS 5 RIPRAP
PROTECTION AT
ABUTMENT AND
WINGWALLS, TYP.
A
A
PRECAST CONCRETE
ABUTMENT, TYP.
BOTTOM OF
ABUTMENT
ELEVATION, TYP.
SEE FOUNDATION
PLAN, SHEET 6
TYPICAL STREAM SECTION A-A
SCALE IN FEET
2' 0' 2' 4'
CLASS 5
RIPRAP, TYP.
18'-0"
STREAM
9'-0"
NATIVE
STREAMBED
MATERIAL TO
BE RE-SHAPED
AS SHOWN
3'-0"
TYP.
1'-0"
TYP.
1.5H: 1V
TYP.
1'-0"
4'-0"
TYP.
TYPICAL STREAM SECTION B-B
SCALE IN FEET
2' 0' 2' 4'
18'-0"
STREAM
9'-0"
NATIVE
STREAMBED
MATERIAL TO
BE RE-SHAPED
AS SHOWN
MATCH
EXISTING
CHANNEL
SLOPE, TYP.
1'-0"
1.5%
REMOVE AND CONSERVE
OVERBURDEN STREAM MATERIAL
FILL SCOUR HOLE
WITH CONSERVED ON
SITE STREAMBED
MATERIAL AS SHOWN
TRANSITION SMOOTHLY INTO EXISTING
STREAM BANKS AT ALL 4 CORNERS
B
B
MATCH EXISTING
NATIVE MATERIAL
STREAM BANK, TYP.
BUREAU OF LAND MANAGEMENT
SWARTZ CREEK AOP
DEWATERING TYPICAL
DESIGNED
REVIEWED
APPROVED
C.L.S.
DATE: NOVEMBER 2018
SCALE: AS SHOWN
SHEET 8 OF 9
DRAWING NO. --
CHIEF, BRANCH OF ENGINEERING OR DISTRICT ENGINEER
PIPE
NEW BRIDGE
CONSTRUCTION AREA
BANKFULL
IMPERVIOUS MEMBRANE KEY TRENCH.
KEY MEMBRANE INTO TRENCH BEFORE
DRAPING OVER SANDBAG DAM.
BYPASS DAM (SEE
DETAILS)
AA
NEW BRIDGE CONSTRUCTION AREA
BANKFULL
GEOTEXTILE-WRAPPED STRAW BALE
SEDIMENT CONTROL WEIR
OUTLET LOCATION
APPROVED BY CO
BYPASS PIPE 24"
DIAMETER MINIMUM
ELBOW JOINTS AS NEEDED
BYPASS PIPE
STABLE BENCH
VARIES AS NEEDED
VARIES AS NEEDED
STREAMBED
STREAMBED
SANDBAGS
18" MIN.
BYPASS PIPE 24" DIAMETER
MIN.
SANDBAGS
ANTI-SEEP COLLAR
IMPERVIOUS MEMBRANE
18" MIN.
ANCHOR IMPERVIOUS MEMBRANE (SANDBAGS,
STONES, ETC.)
IMPERVIOUS MEMBRANE KEY TRENCH, FILL WITH CLEAN
GRAVEL AS NEEDED TO CONTROL SEEPAGE UNDER
IMPERVIOUS MEMBRANE
ANTI-SEEP COLLAR.
PLACE ANTI-SEEP COLLAR
OVER MEMBRANE & PIPE, THEN CUT
MEMBRANE TO ALLOW
WATER THROUGH PIPE.
6 MIL PLASTIC
SHEETING MINIMUM
BYPASS PIPE
STRAW BALES
GEOTEXTILE MIRAFI 140N
OR EQUAL
GRANULAR BACKFILLGRANULAR BACKFILL
STREAM FLOW
STRAW BALES
GEOTEXTILE MIRAFI 140N
OR EQUAL
NOTES:
1) THE DEWATERING & SEDIMENT CONTROL TYPICALS & DETAILS SHOWN
BY THE GOVERNMENT DEPICT SEVERAL MINIMALLY ACCEPTABLE
FEATURES TO BE PART OF A CONTRACTOR'S PLAN. REGARDLESS OF ANY
PLAN APPROVED BY THE CO, MAINTAINING WATER QUALITY DOWNSTREAM
OF THE PROJECT REMAINS THE RESPONSIBILITY OF THE CONTRACTOR
THROUGHOUT THE DURATION OF THE PROJECT.
2) PUMP STREAM AROUND SITE DURING INSTALLATION OF THE PRIMARY
DEWATERING SYSTEM. MAINTAIN PUMPING SYSTEM AS A CONTINGENCY,
TO DISASSEMBLE THE PRIMARY SYSTEM, AND TO INTRODUCE STREAM
FLOW ONTO THE NEWLY CONSTRUCTED STREAMBED.
3) DRAIN THE FOUNDATION SOIL TO A MOISTURE CONTENT NEEDED TO
COMPLETE THE REQUIREMENTS OF SUBSECTION 209.08, 208.09(d), AND
209.09.
4) CONTRACTOR SHALL NOTIFY THE CO AT LEAST 14 DAYS PRIOR TO
BEGINNING STREAM DEWATERING.
CLEAR WATER SUMPS
STREAM FLOW
"BROWN WATER SUMP"
REMOVE SEDIMENT / TURBIDITY BEFORE
ALLOWING WATER TO RE-ENTER STREAM
BYPASS TYPICAL PLAN VIEW
NOT TO SCALE
FLOW
STREAM FLOW
SECTION VIEW PLAN VIEW
GEOTEXTILE-WRAPPED STRAW BALE SEDIMENT CONTROL WEIR
NOT TO SCALE
NOT TO SCALE
SANDBAG BYPASS DAM DETAILS
BYPASS DAM PROFIILE VIEW
NOT TO SCALE
BYPASS DAM ELEVATION VIEW
NOT TO SCALE
OVERFLOW 1/2 "BANKFULL"
TYPICAL SECTION A-A
NOT TO SCALE
1.5
EXCAVATION
SLOPE
NORTHWEST OREGON DISTRICT
AutoCAD SHX Text P
P
BUREAU OF LAND MANAGEMENT
SWARTZ CREEK AOP
TRAFFIC CONTROL & DISPOSAL
AREA DETAILS
DESIGNED
REVIEWED
APPROVED
C.L.S.
DATE: NOVEMBER 2018
SCALE: AS SHOWN
SHEET 9 OF 9
DRAWING NO. --
CHIEF, BRANCH OF ENGINEERING OR DISTRICT ENGINEER
NORTHWEST OREGON DISTRICT
"TRUCKS AHEAD" (36"x36")
"ROAD CLOSED AHEAD" (36"x36")
(2) X ROAD CLOSURE BARRICADES,
TYPE III W/ "ROAD CLOSED SIGN
(SEE DETAIL, THIS SHEET)
"CONSTRUCTION AHEAD" (36"x36")
1000FT 500FT 500FT 100FT 1000FT500FT500FT100FT
PROJECT
SITE
T O
1.5H
1.5H
1V
1V
DISPOSAL AREA DETAIL
NOT TO SCALE
EXISTING
GROUND
M
A X
DISPOSAL AREA NOTES:
1) CO WILL FLAG DISPOSAL AREA LIMITS
2) LAYER PLACE, EQUIPMENT COMPACT MATERIAL
1) SIGN DISTANCES AND LOCATIONS MAY BE ADJUSTED IN THE FIELD BASED
ON ROAD CONDITIONS.
2) ALL SIGNS MUST COMPLY WITH THE STANDARDS OF THE MOST CURRENT
EDITION OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD)
3) PLACE ADDITIONAL ROAD CLOSURE WARNING SIGNS AS SPECIFIED ON THE
AREA MAP.
LEGEND
SIGN NOTES:
NOT TO SCALE
CONCEPTUAL TRAFFIC CONTROL DIAGRAM
T
O
M
I N
I M
U M
4' MINIMUM
ROAD
CLOSED
TYPE III BARRICADE
FURNISHED WITH A R11 - 2
TYPE III BARRICADE DETAIL
NOT TO SCALE
B
L
M
R
O
A
D
EXISTING 14' SPAN X 9' RISE X 55' LENGTH
CORRUGATED METAL PIPE ARCH CULVERT
APPROX. DISPOSAL AREA LOCATION.
EXTENTS OF DISPOSAL TO BE FIELD
STAKED BY THE CO.
SWARTZ CREEK
DISPOSAL AREA LOCATION
NOT TO SCALE
OBJECT MARKER AND POST
NOT TO SCALE
SECTION A-A
NOT TO SCALE
1'-0"
POST: GALVANIZED STEEL
U-CHANNEL POST WITH 3/8" HOLES
ON 1" CENTERS, 2 LBS PER FOOT
MIN. FURNISH TYPE 3 OBJECT
MARKER IN CONFORMANCE WITH
"MANUAL OF UNIFORM TRAFFIC
CONTROL DEVICES"
NOTE:
BRIDGE SUPERSTRUCTURE
CONCRETE ABUTMENT
CONCRETE ABUTMENT
CONCRETE CURB
A
A
4"
ATTACH POST TO CONCRETE CURB
WITH (2) - 5/16" Ø X 6" LENGTH A307
ALL THREAD (ATTACHED BY HEX NUT
& STD. WASHER) WITH SIMPSON
SET-XP EPOXY (OR EQUIVALENT).
PLACE BOTTOM OF POST
AT TOP OF ABUTMENT
4"
PLACE BOTTOM OF POST
AT TOP OF ABUTMENT
6"
ATTACH POST TO CONCRETE RAIL
WITH (2) - 5/16" Ø X 6" LENGTH A307 ALL
THREAD (ATTACHED BY HEX NUT &
STD. WASHER) WITH SIMPSONSET-XP
EPOXY (OR EQUIVALENT).
INSIDE VERTICAL FACE OF OBJECT MARKER PLATE INSTALLED
FLUSH WITH THE INSIDE FACE OF THE CONCRETE RAIL. STRIPES TO
SLOPE DOWN AND IN TOWARD ROADWAY.
BRIDGE SUPERSTRUCTURE
| SHEET 1 - Title-Model |
| Sheets and Views |
| Model |
| Sheet 2 - Estimate of Quantities-Model |
| Sheets and Views |
| Model |
| Sheet 3 - Existing Site Plan & Project Boundary-Model |
| Sheets and Views |
| Model |
| Sheet 4 - New Site Plan & Roadway Details-Model |
| Sheets and Views |
| Model |
| Sheet 5 - General Layout-Model |
| Sheets and Views |
| Model |
| Sheet 6 - Foundation Plan & Road Section-Model |
| Sheets and Views |
| Model |
| Sheet 7 - Stream Construction Details-Model |
| Sheets and Views |
| Model |
| Sheet 8 - Dewatering Typical-Model |
| Sheets and Views |
| Model |
| Sheet 9 - Traffic Control & Disposal Area Details-Model |
| Sheets and Views |
| Model |
| 15101: | |
| MOBILIZATION: | |
| LUMP SUM: | |
| ALL: | |
| 15201: | |
| CONSTRUCTION SURVEY AND STAKING METHOD 1 TOLERANCE A: | |
| LUMP SUM_2: | |
| FIRE PROTECTION EQUIPMENT CLEANING INDIRECT TO PAY ITEMALL: | |
| 15713: | |
| SOIL EROSION AND POLLUTION CONTROL: | |
| LUMP SUM_3: | |
| ALL_2: | |
| INCLUDES EROSION CONTROL PLAN PREP INSTALLATION REMOVAL: | |
| 15755: | |
| DEWATERING STRUCTURE: | |
| EACH: | |
| 1: | |
| INCLUDES DEWATERING PLAN PREP INSTALLATION REMOVAL: | |
| 20155: | |
| CLEARING AND GRUBBING: | |
| LUMP SUM_4: | |
| ALL_3: | |
| SCATTER TOPS LIMBS AND TREES 12 Ø WITHIN PROJECT BOUNDARY AS SHOWN ON SHEET 3: | |
| REMOVAL OF EXISTING CULVERT DISPOSAL METHOD A: | |
| ROADWAY EXCAVATION: | |
| DRAINAGE EXCAVATION TYPE CHANNEL BANK MATERIAL: | |
| REMOVE EXCESS MATERIAL TO DESIGNATED DISPOSAL AREA: | |
| EARTHWORK GEOSYNTHETICS TYPE IVB: | |
| STRUCTURE EXCAVATION: | |
| COMMERCIAL SOURCEALL: | |
| STRUCTURAL BACKFILL: | |
| PLACED RIPRAP CLASS 5: | |
| COMMERCIAL SOURCE: | |
| AGGREGATE BASE COMPACTION PLACEMENT METHOD 2: | |
| 62552: | |
| SEEDING AND MULCHING DRY METHOD: | |
| LUMP SUM_5: | |
| ALL_4: | |
| CONTRACTOR FURNISHED WEED FREE STRAW GOVERNMENT FURNISHED SEED: | |
| 63306: | |
| OBJECT MARKERS TYPE III: | |
| EACH_2: | |
| 4: | |
| 63501: | |
| TEMPORARY TRAFFIC CONTROL: | |
| LUMP SUM_6: | |
| INCLUDES PAYMENT FOR POST HARDWARE AND INSTALLATIONALL: | |
| 1_2: | |
| DESIGNED: | |
| REVIEWED: | |
| APPROVED: | |
| CLS: | |
| SCALE AS SHOWN: | |
| SHEET 2 OF 9: | |
| DRAWING NO: | |
| undefined: | |
| undefined_2: | |
| 4 MINIMUM: | |
| ROAD CLOSED: | |
| TRUCKS AHEAD 36x36: | |
| undefined_3: | |
| 2 X ROAD CLOSURE BARRICADES: | |
| 500FT 100FT: | |
| 100FT 500FT: | |
| undefined_4: | |
| undefined_5: | |
| undefined_6: | |
| undefined_7: | |
| PROJECT SITE: | |
| undefined_8: | |
| undefined_9: | |
| 6: | |
| 1_3: | |
| DESIGNED_2: | |
| REVIEWED_2: | |
| APPROVED_2: | |
| CHIEF BRANCH OF ENGINEERING OR DISTRICT ENGINEER: | |
| SCALE AS SHOWN_2: | |
| SHEET 9 OF 9: | |
| DATE NOVEMBER 2018: | |
| 2020-05-05T09:49:17-0700 | |
| CHERYL ADCOCK |
| 2020-05-05T11:54:57-0700 | |
| DAVID HOWELL |
File details come from the government source that posted it. Updated .