Attachments.pdf

PDF 2 MB Posted

Attached to
Fire Suppression System, Aircraft, C-5 Federal contract opportunity
Solicitation number
FA8538-21-R-0006_Solicitation
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

View the file

Other files for this federal contract opportunity

Other files attached to Fire Suppression System, Aircraft, C-5, newest first.
File Type Posted
FA8538-21-R-0006-0003.pdf PDF
FA8538-21-R-0006-0002.pdf PDF
Q and A for FA8538-21-R-0006.pdf PDF
FA8538-21-R-0006-0001.pdf PDF
FA8538-21-R-0006_Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

C-5

E. CONTRACT / PR NO.

FD20602100201

F. CONTRACTOR

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

Quality Program Plan (QPP)

3. SUBTITLE

Contractor's Quality Control Program

4. AUTHORITY

DI-QCIC-81722

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS PARA 5.8

6. REQUIRING OFFICE

409 SCMS/GUMAB

7. DD 250 REQ

DD

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

B

10. FREQUENCY

ASREQ

11. AS OF DATE

12. DATE OF FIRST

SUBMISSION

13. DATE OF SUBSEQUENT

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Boswell, Deidra ANAME: 16 MAR 2021DATE:

Block 4, 10-13: The Quality Control Plan (QCP) is submitted after award in accordance with the DD1423 and is approved by the Contracting Officer Representative (COR) before any work begins. The Plan shall be comprehensive, detailed, and logical if the contractor's quality control program is to be effective and shall include a site safety checklist when applicable. The Plan shall demonstrate that the contractor has fully considered the specific contract requirements and specified level of quality. If changes to the plan are necessary, the changes must be made and accepted by the Government Contracting Officer, prior to implementation.

Block 14: Reports shall be electronically submitted via email to the personnel listed below.

Procurement Contracting Officer: brandon.jones.96@us.af.mil Program Manager: janet.butcher@us.af.mil

COORDINATORS:

15. TOTAL

G. PREPARED BY

Wright, Deidra L

409 SCMS / GUMAB

478-926-5893

H. DATE

08 APR 2021

I. APPROVED BY

//ELECTRONICALLY SIGNED//

Mitchell, Rosalind F

409 SCMS / GUMB 478-926-2593 / 468-2593

J. DATE

08-APR-21

Page 4 of 5DD FORM 1423-1, FEB 2001 Version 4Generated by PRPS using Jasper Reports on 23 Jun 2021

PREVIOUS EDITION MAY BE USED.

A002

Contract Depot Maintenance (CDM) Production Report

CDM Production Monthly Status Report

DI-PSSS-81995

PWS Paragraph 4.7

FA8538

LT

D

MTHLY

see block 16

See block 16

Wright, Deidra LNAME: 04 MAR 2021DATE:

NAME: WRIGHT, Deidra L DATE: 04 MAR 2021

1. Block 4:

a. All reporting shall be submitted in the English Language.

b. The Contractor's CAV AF Reporting shall reflect their inventory property control management system data records which shall represent timely and accurate accountability of AF inventory assets at the physical location(s) of the contractor's repair facility (including subcontractor facilities); shop floor, bond room and/or receiving/shipping docks, etc. for each repair.

c. The Contractor shall report by contract delivery order on all applicable categories, totals and on-hand balances, providing TABLE I (DI-PSSS-81995) for EACH repair location, including subcontractor facilities, for the contracts maintenance occurrence actions during the reporting period.

d. The Contractor shall report on production, providing TABLE I (DI-PSSS-81995) for EACH repair location, including subcontractor facilities, for which the contractor produced assets during the reporting period.

2. Blocks 10, 11, 12, 13:

a. The reports shall be provided monthly within 5 (five) business days of the previous month's last calendar date.

b. Reports shall continue to be submitted by the contractor unless the requirement is terminated by the (Requiring Office), Program Manager (PM) or the Production Management Specialist (PMS).

c. The Final Report submitted following

3. Block 9:

a. DISTRIBUTATION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only (Critical Technology). (04 March 2021). Other requests for this document shall be referred to (DoD Controlling Office)

b. EXPORT CONTROL WARNING: All technical documents/data (printed, digital/electronic) that are determined to contain export-controlled technical data, shall be marked with the following statement:

EXPORT CONTROL WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate IAW provisions of DoD Directive 5230.25.

c. DESTRUCTION NOTICE: For classified documents, follow the procedures, in DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DoD 5200.1-R, Information Security Program Chapter VI. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

4. Block 7, 14: Submit the CDM Production Monthly Status Reports to the following email addresses:

janet.butcher@us.af.mil deidra.wright.1@us.af.mil

See block 16 0 1 0

0 1 015. TOTAL

Page 2 of 5DD FORM 1423-1, FEB 2001 Version 4Generated by PRPS using Jasper Reports on 23 Jun 2021

GFP Attachment Status: Approved

GFP Attachment Information:

Solicitation Information:

Serialized Item(s):

Non-Serially Managed Item(s):

Attachment Description Attachment Number Attachment Date Solicitation 1 2021-02-24

Solicitation Number

FA853821R0004

Program Title C-5 Fire Suppresion System (FSS) Component Repair Comments

Non-Serialized Item - Line Number: 001 Item Name Item

Description NSN CAGE Code Part Number Model

Number Valve, Diaphragm, Stop

2 inch Zone Fire Valve

481001003351

59211 7720011-106

Quantity Unit Of Measure Unit Acquisition Cost Use As-Is 10 Each 2872.90 true Delivery Date Duration Time Unit Delivery Event

Notes

Non-Serialized Item - Line Number: 002

Valve Regulating, Fluid Pressure

Isolation Valve 481001003351

59211 7720012-105

95 Each 13366.38 true

Non-Serialized Item - Line Number: 003

Regulating, Shutoff valve 481001003351

59211 7720013-107

95 Each 9726.08 true

Non-Serialized Item - Line Number: 004

Valve, Diaphragm, Stop

1 ¼ - Inch Zone Fire

481001004655

59211 7720015-107

10 Each 18365.92 true

Non-Serialized Item - Line Number: 005

Assembly

Primary Pressure Relief and Overboard Relief Valve

482000185103

59211 7720125-101

38 Each 18365.92 true

Non-Serialized Item - Line Number: 006

Regulating

Pressure Limiter Valve

59211 7720142-101

10 Each 5200.00 true

Requisitioned Item(s):

Non-Serialized Item - Line Number: 007

Regulating

Secondary

Regulator

59211 7720224-101

10 Each 10054.99 true

Non-Serialized Item - Line Number: 008

Receptacle, Fill Couping

Fill Coupling Receptacle

482000186700

59211 7720017-101

10 Each 10699.20 true

Non-Serialized Item - Line Number: 009

Valve, Safety Relief

Back-pressure Relief Valve

482000270068

59211 7720119-102

20 Each 8563.79 true

PR: FD2060-21-00201PWS REVISION: 0 1

Distribution Statement: A

Performance Work Statement for

C-5 Fire Suppression System (FSS) Component Repair

Purchase Request: FD2060-21-00201

Date: 02 February 2021

Distribution Statement A: Approved for public release: distribution unlimited.

PR: FD2060-21-00201PWS REVISION: 0 2

1.0 Description of Services:

1.1 Objective(s): This Performance Work Statement (PWS) describes the services required to provide serviceable Fire Suppression System (FSS) components for the C-5 Galaxy aircraft. The Contractor shall perform depot level repair on the components to bring them to a serviceable condition in accordance with the appropriate Air Force (AF) Technical Manual. The Contractor shall provide on time delivery in accordance with the negotiated contract delivery schedule. The Contractor shall provide reporting in Commercial Asset Visibility Air Force (CAV-AF) system, and all other requested data accurately and in a timely manner.

It is the intent of this acquisition to provide repair coverage for competitive C-5 FSS components. The items to be included in this acquisition are listed in section 9.0 Appendix A.

1.2 Benefit to United States Air Force (USAF): This acquisition will benefit the USAF by providing serviceable assets to maintain the C-5 Aircraft’s mission capability.

1.3 Background: These C-5 FSS components were designed specifically for the C-5 Galaxy aircraft which is a military transport aircraft. These parts are peculiar to and will only be used on the C-5 Aircraft.

2.0 Services Summary

Performance Objective PWS Reference

Performance Threshold

Quality of repair

4.3 & 4.6 Assets shall be repaired in accordance with appropriate AF Technical Manual Overhaul Instructions, Technical Order (TO). Repaired assets shall pass DCMA inspection with no more than one failure per year. At a minimum, 95% of repaired assets shall pass initial inspection.

Remaining 5% (or less) of failed assets shall pass on the second attempt. This metric will be calculated monthly. There shall be no more than one validated Product Quality Deficiency Reports (PQDR) and/or Quality Deficiency Reports (QDR) per contract ordering period (12 months).

3.0 Government Property.

3.1 The Contractor shall be responsible for Government property in accordance with the Federal Acquisition Regulation (FAR) and as specified in the contract/order.

3.2 The only Government property to be provided will be the unserviceable condition assets furnished for repair. An annual Government Property Physical Inventory Report shall be

PR: FD2060-21-00201PWS REVISION: 0 3

provided to the Government Production Management Specialist. (CDRL A003, DI-MGMT- 80441-D Government Property Inventory Report / Annual Government Property Physical Inventory Report)

3.3 The Government will furnish available technical data. Technical manuals shall be obtained from the C5 Commodity Technical Order Manager upon contract award. The contractor shall furnish all material, parts, labor, tools, equipment, and facilities necessary for the repair of the items.

3.4 Reporting of Government Property: The Contractor shall create and maintain records of all Government property accountable to the contract/order. The Contractor shall record receipt and return of Government-Furnished Property (GFP) in the Item Unique Identification (IUID) Registry.

3.5 Loss of Government Property

3.5.1 Definition of Loss of Government Property: “Loss of Government property” means unintended loss of or damage to Government property including property that cannot be found after a reasonable search, loss due to inadequate storage, loss due to lack of security, theft, damage requiring repair to restore the item to usable condition, or damage that renders the property useless for its intended purpose or Beyond Economical Repair (BER). Loss of Government property does not include manufacturing defects, obsolescence, normal wear and tear, or purposeful destructive testing. Unless otherwise stated in the contract/order, loss of Government property does not include normal and reasonable inventory adjustments, i.e., losses of low priority consumable material, such as common hardware, as agreed to by the Contractor and the Government Property Administrator.

3.5.2 Reporting Loss of Government Property: The Contractor shall report loss of Government property using Defense Contract Management Agency (DCMA) / Access To eTools.

3.6 Return or Retention of Government Property: All property provided by the Government remains the property of the Government and shall be returned to the Government as directed, but no later than completion of the contract/order, unless the Procuring Contracting Officer (PCO) directs the Contractor to retain the property for continued use under a successor contract. All Government property shall be returned to the Government in the condition provided unless approved in advance by the PCO. All material generated under the contract/order becomes the property of the Government and shall be returned to the Government as directed, but no later than completion of the contract/order, unless the PCO directs the Contractor to retain the material for continued use under a successor contract.

4.0 Technical Requirements

4.1 Period and Place of Performance

PR: FD2060-21-00201PWS REVISION: 0 4

4.1.1 Contract Period of Performance: The period of performance for the contract will be five years (basic year with four one year ordering periods).

4.1.2 Place of Performance: These services will be performed at the Contractor’s facility.

4.2 Contract Data Requirements List(s) (CDRL)

Document Identifier

DID Title PWS Reference(s)

A001 DI-MGMT-81838 Commercial Asset Visibility Air Force (CAVAF) / Government Furnished Material Report

4.10

A002 DI-PSSS-81995-A Contract Depot Maintenance (CDM) Production Report

4.7

A003 DI-MGMT-80441-D Government Property Inventory Report

3.2

A004 DI-QCIC-81722 Quality Program Plan (QPP) 5.8

A005 DI-MGMT-81803A Item Unique Identification (IUID) Marking Plan

4.8.1

4.2.1 Quality of CDRL Deliverable. There shall be no more than two (2) total rejection(s) of deliverables per contract year. The Government will reject a deliverable if one or more technical errors or two (2) or more minor errors are found within the deliverable. A technical error is defined as the format not being in accordance with the CDRL or the content not being accurate and complete in accordance with the CDRL, PWS or contract. A minor error is exemplified by a typographical error, a grammatical error, etc. The rejected deliverable shall be corrected and resubmitted within ten (10) business days of notification of Government rejection.

4.2.2 Receipt of CDRL Deliverable. CDRL deliverables, except for CAVAF reporting, shall be submitted via Procurement Integrated Enterprise Environment (PIEE) / Wide Area WorkFlow.

Contractor shall notify the Multi-Functional Team (MFT) member(s) identified on the CDRL when submission is completed. There shall be no more than two (2) late submission(s) of deliverables per contract year. The Contractor shall notify the Government if the delivery of any data/document will not meet the scheduled delivery date and negotiate a revised delivery date.

The data/document shall be delivered by the revised delivery date acceptable to the Government.

4.3 General Repair Information

4.3.1 Special Tooling and Test Equipment. The Technical Manuals identify special tooling and test equipment requirements for all items to be repaired under this effort. It shall be the responsibility of the contractor to provide all necessary special tooling and test equipment to perform necessary repairs IAW technical manuals. Any substitution for tooling or test equipment identified in the technical manuals shall be approved in writing by the Air Force C5 system engineer prior to use by the contractor.

PR: FD2060-21-00201PWS REVISION: 0 5

4.3.2 Inspection and Induction. Upon receipt, the contractor shall perform a visual inspection of each asset to ensure proper identification, completeness, and to identify missing components and subassemblies. Contractor shall use a Standard Form (SF) 364, Report of Discrepancy (ROD), to report any items which are misidentified, misdirected or have Air Force recoverable modules/subassemblies missing to the Procurement Contracting Officer (PCO) through the Administrative Contracting Officer (ACO) for disposition instructions within ten working days of receipt. The contractor shall maintain inspection records documenting the condition of the item as received, including identification of missing components and subassemblies. The contractor is authorized to conduct a more thorough pre-induction inspection to identify estimated repair time and anticipated materials required for repair. The contractor is also authorized to induct items for repair on other than a first-in, first-out basis.

4.3.3 Production unit(s). Assets shall be repaired in accordance with the applicable Technical Manual listed on section 9.2 Appendix B, Technical Manuals. Per section 3.3, Technical Manuals shall be obtained from the C5 Commodity Technical Order Manager upon contract award. WR-ALC AFLCMC/WLSEAB, C-5 Engineering, reserves the right to audit repair.

Inspections will be conducted on a non-interference basis at the contractor’s facility.

4.3.3.1 The Contractor shall submit an Engineer Technical Assistance Request and Reply, Air Force Material Command (AFMC) Form 202, for any deviation from the AF technical manual.

AFMC 202 forms are submitted through the AutoTAR system. Instructions for system access is stated in section 5.2.3.1 of this document.

4.3.3.2 No Fault Found (NFF). When an asset is provided to the contractor for repair, but the contractor cannot duplicate the fault, NFF, the contractor shall notify the Procuring Contracting Officer (PCO) to report same to the Government. The PCO will notify the Government Production Management Specialist who will in turn notify the appropriate system engineer. If engineering agrees with the serviceability of the item, the contractor shall return the item as condition code “A” under the NFF contract line item. The contractor shall not charge the full repair cost, but only the negotiated cost associated with their testing actions. If engineering does not agree with the serviceability of the item, the contractor shall repair the item in accordance with the applicable Technical Manual.

4.3.4 Over and Above. Over and above shall only be considered for missing recoverable components or for work out of scope of this PWS. Identification of missing part(s) must be revealed within ten working days after the assets is removed from the shipping container and reported to the PCO through the ACO in the form of a ROD using SF 364. Prior approval from the PCO shall be obtained prior to performing work out of scope.

4.3.5 Condemnations. When the total repair costs for a unit exceed 75% of the Standard List Price, that unit should be recommended for condemnation as Beyond Economical Repair (BER).

After coordination by Defense Contract Management Agency (DCMA) QAR the contractor will forward requests for approval to condemn units they consider to BER to the PCO for government disposition. Supporting documentation/rationale should be included to expedite processing of

PR: FD2060-21-00201PWS REVISION: 0 6

the requests and disposition by the government. The contractor shall not condemn or scrap any asset without government authorization.

4.3.5.1 Replacement assets. The Government is authorized to replace a condemned end item with a replacement reparable end item of the same stock number at no additional cost.

4.3.5.2 Disposition. For instances of asset discrepancy identification or condemnation, the contractor shall contact the PCO to obtain disposition instruction.

4.4 Quality Assurance. The DCMA QAR will perform on-site inspections of the contractor’s production and quality control programs to monitor performance and ensure satisfactory services are received. Quality compliance will be monitored using the deficiency reporting systems defined in T.O. 00-35D-54, USAF Deficiency Reporting, Investigation and Resolution. The contractor shall be responsible for initially validating customer complaints. However, the Deficiency Reporting Information System (DRIS) Air Force Action Point shall make final determination of the validity of customer complaint(s) in cases of disagreement. Government acceptance of the repaired item will be made at the contractor’s facility and will be documented via Wide Area Work Flow (WAWF), Material Inspection and Receiving Report. No more than one valid PQDR/QDR per contract ordering period (12 months) shall be allowed.

4.5 On-time Delivery. The contractor shall use fast transportation to ship all serviceable end items. Air Force Materiel Command Instruction (AFMCI) 21-149 Contract Depot Maintenance (CDM) Program defines fast transportation as the means accomplishing the shipment planning process in the least amount of time and then using express transportation to deliver the shipment to the customer. In addition to fast transportation, transit visibility is required throughout the process. The customer should be able to track a requisition until it reaches the final destination.

Delayed deliveries negatively impact aircraft availability and the C-5 day- to- day mission readiness posture. Adherence to delivery schedules is imperative. Assets shall be delivered on-time 95% of the time in accordance with contract schedule to be negotiated prior to contract award. The remaining 5% can be no more than seven calendar days later. If delivery slips more than seven calendar days from contract delivery schedule, the Contractor shall notify the contracting officer in order to negotiate a revised delivery date. Delivery of assets to fulfill a SURGE or MICAP requirement shall be thirty calendar days after contractor receives notification of SURGE or MICAP requirement if asset is already on hand at contractor’s facility.

If no assets on hand at the time of notification delivery shall be thirty calendar days after receipt of asset.

4.6 Quality of Repair. Repaired assets shall pass DCMA inspection with no more than one failure per year. At a minimum, 95% of repaired assets shall pass initial inspection. Remaining 5% (or less) of failed assets shall pass on the second attempt. This metric will be calculated monthly. There shall be no more than one validated Product Quality Deficiency Reports (PQDR) and/or Quality Deficiency Reports (QDR) per contract ordering period (12 months).

PR: FD2060-21-00201PWS REVISION: 0 7

4.7 Production Status and Inventory. The Contractor shall provide a monthly status report to the Government Production Management Specialist. (CDRL A002 DI-PSSS-81995-A Contract Depot Maintenance (CDM) Production Report / CDM Production Monthly Status Report).

4.8 Item Unique Identification (IUID)

4.8.1 Marking Requirement. IUID is required for all items to be delivered to the DoD that meet the criteria established by the FAR. The Contractor shall provide an IUID Marking Plan for evaluation and approval. (CDRL A005, DI-MGMT-81803A, IUID Marking Plan.)

4.8.2 Reporting in IUID Registry. Transmission of Government property must be recorded in the IUID Registry. The Government is required to record the transfer of Government Furnished Property (GFP) to the Contractor. The Contractor is required to record the receipt of GFP from the Government. The Contractor is required to record the return of GFP to the Government.

4.9.2.1 The Government or contractor/subcontractor personnel responsible for causing a “life cycle event” (i.e., abandoned, consumed, destroyed by accident, destroyed by combat, donated, exchanged – repair, exchanged – sold, exchanged – warranty, expended – experimental/target, expended – normal use, leased, loaned, lost, reintroduced, retired, scrapped, sold – foreign government, sold – historic, sold – nongovernment, sold – other federal, sold – state/local, and stolen) will update the item record in the IUID Registry.

4.9 Packaging: The Contractor shall package and mark material in accordance with the contract/order Air Force Materiel Command (AFMC) Form 158, Packaging Requirements, and applicable Government regulations. The Contractor shall ensure that classified material is packaged, marked and delivered in accordance with DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM).

4.10 Commercial Asset Visibility-Air Force (CAV-AF): The Contractor is required to comply with all CAVAF requirements identified in the CDRLs and attachments to the contract, and shall report production in CAV-AF. Additionally, upon completion of the repair, the contractor is required to print the DD1348-1 (in triplicate) from CAVAF. One copy is to be placed inside the box with the returnable repair asset, one outside the box and one copy will be electronically uploaded to WAWF as part of the Receiving Report (DD250). The Contractor shall provide data on the actions conducted for each unit and report as actions occur. [CDRL A001, DI-MGMT- 81838, Commercial Asset Visibility Air Force (CAVAF) / Government Furnished Material Report]

5.0 General Information

5.1 Continuation of Mission-Essential Services During a Crisis: The Functional Commander or civilian equivalent has determined these services are not mission-essential and will not continue in the event of a crisis.

5.2 Security Requirements

PR: FD2060-21-00201PWS REVISION: 0 8

5.2.1 Security Regulations: The Contractor shall ensure personnel, information, system, property, facility and, if applicable, international security requirements are met. The Contractor shall comply with Government security regulations including, but not limited to, Department of Defense Directive (DoDD) 5205.02E, DoD Operations Security (OPSEC) Program; Department of Defense (DoD) Manual 5205.02-M, DoD Operations Security (OPSEC) Program Manual; and DoD 5220.22-M.

5.2.2 Security Clearance. It is not expected contractor/subcontractor personnel will require security clearances for proper accomplishment of contract/order requirements.

Contractor/subcontractor personnel shall not be authorized access to classified information and/or Controlled Unclassified Information (CUI) and/or classified items or be permitted to work on classified projects and/or programs without an appropriate security clearance and a need-to-know.

5.2.3 Access to Government System(s). Access to Government system(s) will not be required to perform tasks under the contract/order except for submissions of AFMC Form 202, Engineer Technical Assistance Request and Reply.

5.2.3.1 Access to AutoTAR for AFMC Form 202 submission. Contractor must have or be able to purchase an External Certificate Authority (ECA) from an authorized vendor. The ECA must be at the minimum 'Medium Assurance'. Further instruction on obtaining an ECA can be found at:

https://iase.disa.mil/pki/eca/Pages/index.aspx.

Contractor shall contact WR-ALC AFLCMC/WLS, C-5 Engineering, to coordinate submission of an automated System Authorization Access Request (Form 2875) for system access and registration in the AutoTAR system and registration within the AutoTar application ((https://afsc202.robins.af.mil).

5.2.4 Security Incident or Violation: The Contractor shall immediately notify the Government Security Office of any potential or actual security incident or violation.

5.3 Environmental Management System (EMS). These services shall not be performed at a Government facility; therefore, the EMS requirement does not apply.

5.4 Agency Affirmative Procurement Programs: This acquisition does not require the purchase of Environmental Protection Agency (EPA)-designated products or United States Department of Agriculture (USDA)-designated products; therefore, the requirement does not apply.

5.5 Safety Requirements

5.5.1 Contractor Compliance. The Contractor shall comply with Government Safety and Health regulations including, Public Law 91-596 as amended by Public Law 101-552 [Occupational Safety and Health Act of 1970 (OSHA)] and DoDD 4715.1E, Environment, Safety, and Occupational Health (ESOH).

https://iase.disa.mil/pki/eca/Pages/index.aspx

PR: FD2060-21-00201PWS REVISION: 0 9

5.5.2 Mishap Notification/Investigation: The Contractor shall report mishaps including damage to DoD property; occupational illness to DoD military or civilian personnel; injury to on- or off-duty DoD military personnel; injury to on-duty DoD civilian personnel; and damage to public or private property or injury or illness to non-DoD personnel caused by Government operations.

The Contractor shall ensure the Safety Office and the PCO are notified of mishaps. The Contractor shall contact the PCO, if available, or another MFT member by telephone within four business hours. The Contractor shall cooperate with Government safety investigations.

5.6 Inspection of Services: In accordance with the Inspection of Supply/Services clause(s) identified in the contract/order, the Government reserves the right to inspect Contractor performance.

5.7 Service Contract Reporting: In accordance with 10 United States Code 2330a, the Contractor shall provide an annual count of contractor/subcontractor personnel performing work for each fiscal year if the DoD is the requiring activity and if the acquisition is in excess of $3,000,000.00. The Contractor shall report all Contractor labor hours, including subcontractor labor hours, required for performance of the services provided under the contract in System for Award Management (SAM). Reporting shall be conducted for each fiscal year, which extends October 1 through September 30. While inputs may be made any time during the fiscal year, all data shall be reported no later than October 31 of the following fiscal year. The Contractor shall establish a record for the contract/order in SAM no later than 30 calendar days after contract/order award. The Contractor shall enter Order Data, Contact Data and Location Data.

Data for Air Force service requirements. Additional information and user manuals for government personnel and contractors are available at the SAM website.

(https://www.sam.gov).

5.8 Quality Control Plan/Quality Management System (QMS). The Contractor shall ensure the quality of services through a quality and/or inspection system. The Contractor shall submit a Quality Control Plan (QCP) addressing detection of quality program problems and defects, identification of root causes for quality related problems/defects, correction of root causes related to detected problems/defects, and follow-up to ensure quality related problems/defects do not recur. The plan shall include the schedule of quality assurance/control inspections planned by the Contractor. 100% compliance with the QMS is required. (CDRL A004, DI-QCIC-81722, Quality Program Plan (QPP)/ Contractor's Quality Control Plan)

5.9 Trafficking in Persons. The Contractor shall comply in accordance with the FAR and applicable supplements and shall be in compliance with all applicable guidance and clauses listed in the contract as it relates to Trafficking in Persons. Additional information about Trafficking in Persons is available at the site for the Department of State’s Office to Monitor and Combat Trafficking in Persons. http://www.state.gov/j/tip

5.10 Invoicing/Payment and Receipt/Acceptance: The Contractor shall submit/process payment requests and receipt/acceptance documents via WAWF.

6.0 Plan for Corrective Action

https://www.sam.gov/ http://www.state.gov/j/tip

PR: FD2060-21-00201PWS REVISION: 0 10

6.1 Unsatisfactory Contractor performance will result in the issuance of a negative PAR. The program office will set a suspense date and forward the PAR to the Procuring Contracting Officer (PCO) for submission to the Contractor. The PCO will submit the PAR to the Contractor for corrective action. The Contractor shall explain the deficiency and identify the corrective action they shall take to resolve the deficiency and prevent recurrence. The Contractor shall sign and return a negative PAR to the PCO by the suspense date.

6.2 If repetitive negative PARs or a single negative PAR identifying critical Contractor non-compliance are issued without satisfactory resolution, the program office will initiate the corrective action report (CAR) process. However, the Multi-Functional Team (MFT) reserves the right to issue a CAR at any time based on the severity of the Contractor non-compliance. The PCO will set a suspense date and submit the CAR to the Contractor for corrective action. The Contractor shall sign and return the CAR, with a corrective action plan, to the PCO for acceptance by the Multi-functional team (MFT) by the suspense date. The corrective action will be tracked and documented until the deficiency is resolved to the satisfaction of the MFT. The CAR will become part of the PCO contract file. If the CAR process fails to resolve the deficiency, the PCO has the right to invoke the Inspection of Supply/Services clause(s) identified in the contract/order.

7.0 Contractor Responsibilities

7.1 The Contractor shall ensure the quality of services through a quality and/or inspection system. In order to meet the government’s quality requirements, a contractor’s QMS should be robust enough and resourced adequately to execute four key quality functions: 1) Detection of quality program problems and defects; 2) Identification of root causes for quality related problems/defects; 3) Correction of root causes related to detected problems/defects; and, 4) Follow-up to ensure quality related problems/defects do not recur; a mature QMS requires the contractor be the proactive party on quality issues. The goal is to obtain performance reflective of continuous improvement with no reliance on DCMA’s surveillance to detect problems/defects, determine root causes, or ensure quality related problems/defects do not recur.

7.2 Maintains an inspection process acceptable to the Government and records of inspections, which shall be made available to the Government as long as the contract requires in accordance with the Inspection of Supply/Services clause(s) identified in the contract/order.

7.3 Responsible for ensuring personnel, information, system, property, facility and, if applicable, international security requirements are met in accordance with the DD Form 254, Department of Defense Contract Security Classification Specification, and applicable Government regulations.

7.4 Signs and returns a positive PAR within five business days. Signs and returns a negative PAR with corrective action identified by the suspense date. Signs and returns a CAR with a corrective action plan by the suspense date.

PR: FD2060-21-00201PWS REVISION: 0 11

8.0 Contractor Performance Assessment Reporting System (CPARS): The total estimated value of the contract exceeds $1,000,000.00; therefore, CPARS reporting is required.

9.0 Appendices

9.1 Appendix A, National Stock Number (NSN) Listing of Contract Items:

NSN Part Number Applicable Technical Manuals(s) 4810010033512 7720011-106 13F7-9-3 4810010033513 7720012-105 13F7-10-3 4810010033514 7720013-107 13F7-11-3 4810010046559 7720015-107 13F7-12-3 4820001851031 7720125-101 13F7-18-3 4820001851033 7720142-101 13F7-20-3 4820001851037 7720224-101 13F12-2-3 4820001867007 7720017-102 13F8-2-3 4820002700682 7720119-102 13F7-17-3

9.2 Appendix B, Technical Manuals

Part Number Applicable Technical Manuals(s)

Title of Publication Date of Publication and Changes

7720011-106 13F7-9-3 OI w/IPB 2 - Inch Zone Fire

01 Oct 2004

7720012-105 13F7-10-3 OI w/IPB Isolation Valve 09 Jun 2010 7720013-107 13F7-11-3 OI w/IPB Shutoff Valve 05 Oct 2010 7720015-107 13F7-12-3 OI w/IPB 1 ¼ - Inch Zone Fire

10 Jun 2010

7720125-101 13F7-18-3 OI w/IPB Primary Pressure Relief & Overboard Relief Valve

14 Oct 2010

7720142-101 13F7-20-3 OI w/IPB Pressure Limiter Valve 25 May 2010 7720224-101 13F12-2-3 OI w/IPB Secondary Pressure

Regulator 03 Apr 2015

7720017-102 13F8-2-3 OI w/IPB Fill Coupling Receptacle

01 Dec 2005

7720119-102 13F7-17-3 OI W/IPB Backpressure Relief

06 Oct 2010

9.3 Appendix C, Reference(s)

Publication Title of Publication Date of Publication

Sections(s) that Apply

PR: FD2060-21-00201PWS REVISION: 0 12

DoD 5220.22-M

National Industrial Security Program Operating Manual

(NISPOM).

February 28, 2006 Change 1 - March 28, 2013

Entire

DoDD 4715.1E

Environment, Safety, and Occupational Health (ESOH)

March 19, 2005 Entire

Public Law 91-596 as amended by Public Law 101-552

Occupational Safety and Health Act of 1970

December 29, as amended through January 1, Entire

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A001

Commercial Asset Visibility Air Force (CAVAF)

CFM End Item Reporting

DI-MGMT-81838

PWS Paragraph 4.10

See Block 16

NAME: WRIGHT, DEIDRA L DATE: 04 March 2021

1. Block 5: Contract Reference: PWS Paragraph 4.3.3 and CAV AF Reporting Requirements Document

2. Block 4: All reporting shall be submitted in the English Language.

3. Blocks 10, 11, 12, 13:

a. Date of first submission shall be within 24 hours following a supply or maintenance transaction, after the contract award date.

b. Contractor reporting requirements to CAV AF shall be submitted daily and/or within 24 hours of a supply or maintenance action occurrence IAW the CAV AF Reporting Requirements Document.

c. Data shall be current within 24 hours of the last End Item maintenance occurrence.

4. Blocks 7, 8, 14:

a. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF website or CICA XML.

b. The contractor shall submit a DD Form 250 (Material Inspection and Receiving Report) electronically via the Internet to WAWF (PIEE) website address: https://piee.eb.mil/piee-landing/, using DODAAC FA8538. MARK FOR:

Address in block 14A.

c. A Letter of Transmittal shall be submitted in the month the delivery order is completed, covering all reports transmitted for that order. Submit the Letter to the following email addresses:

Janet.butcher@us.af.mil Deidra.wright.1@us.af.mil

See Block 16 0 1 0

Page 1 of 5DD FORM 1423-1, FEB 2001 Version 4Generated by PRPS using Jasper Reports on 23 Jun 2021

CAVAF Reporting Requirements, v4, January 2021, page 1

Commercial Asset Visibility Air Force

CAV AF REPORTING REQUIREMENTS

The purpose of this attachment is to provide Contract Depot Maintenance (CDM) guidance for contractor technical responsibilities and reporting requirements of the CAV AF system. CAV AF is the mandated primary system of record for providing daily status of all Government owned assets located at contractor repair facilities. Reporting within CAV AF is not limited to end items subject to repair but includes assets stored within a contractor Inventory Control Point (ICP). CAV AF system down-time will be identified on the CAV AF home page banner.

Contractors are responsible for ensuring the most current Contractor User Guides are utilized by their assigned reporters.

NOTE:

Contractor User’s Guide can be accessed from the CAV AF homepage.

CAV AF FAMILIARIZATION TRAINING:

1. Familiarization training for CAV AF reporting can be requested by the contractor via the applicable ICP CAV AF system administrator (SA). For assistance, guidance, general questions or specific contract transactional reporting requirements can be addressed to the CAV AF contract monitor (CM). ICP CAV AF (SA and/or CM) points of contact (See Contractor Responsibility Item #4).

CONTRACTOR RESPONSIBILITY:

1. Contractor shall ensure asset record in CAV AF is an accurate reflection of physical assets on hand at all times. This shall be accomplished via CAV AF reporting daily and/or within one (1) business day of a maintenance action occurrence IAW the applicable CAV AF CDRL.

NOTE:

A valid PKI is required prior to accomplishing # 2 and #3 of contractor responsibilities

2. Each CAV AF reporter shall submit a completed System Authorization Access Request, DD Form 2875, per instructions within 10 days after contract award date. All DD Form 2875(s) shall be digitally signed. There must be two CAV AF reporters assigned to ensure contractual reporting requirements do not experience a lapse in reporting coverage.

3. Reporter(s) shall complete initial and refresher (as required) DoD Information Assurance (IA) Cyberawareness Challenge training and submit a course completion certificate with the completed DD Form 2875.

a. Reporter(s) can access IA training on the CyberAwareness Challenge website, using the following website: https://iase.disa.eta/cyberchallenge/launchPage.htm

b. Department of Defense Employees section

c. click hyperlink; “Launch New CyberAwareness Challenge Department of Defense

Version”

CAVAF Reporting Requirements, v4, January 2021, page 2

d. First time CAV AF Reporter(s) will email initial IA CyberAwareness Challenge course completion certificates, AF Form 4394, AF User Agreement Statement, and completed DD Form 2875 to point of contact at applicable ICP (see item #4).

e. All follow on refresher course completion certificates shall be completed before lapse in certification occurs and will be emailed to respective ICP identified in paragraph 4a, 4b, and 4c below.

f. Cyber Awareness Challenge course completions are a contractual requirement and the contractor must comply. Contact your loca CAV AF SA if you experience technical difficulties.

4. Reporters requiring the default password or password resets should contact their applicable ICP CAV AF System Administrator POC listed below:

a. Robins AFB, GA, call (478) 327-6602 or 327-6603, or send email request to:

406scms.cav.af.ar@us.af.mil

b. Hill AFB, UT, call (801) 586-3736, or send email request to:

420scms.cdm@us.af.mil

c. Tinker AFB, OK, call (405) 739-3229, or send email request to:

420.scms.tinker.cdm.workflow@us.af.mil

5. To access the CAV AF system, contractor and subcontractor reporters shall follow “initial log-in procedures” as prescribed within the Contractors User’s Guide.

6. Contractor shall ensure accountability of all Government Furnished Property (GFP) within their Enterprise Resource Planning (ERP) or Commercial Off-the-Shelf (COTS) system, which must be reported accurately for same GFP records within CAV AF at all times.

7. Contractual Induction-at-Risk of end items is prohibited on all repair contracts.

8. Contract/Delivery Order Closure Disposition– Government will provide disposition instructions to contractor’s reporter. Contractor shall begin shipping assets within 10 days of receiving government disposition instructions and have completed all shipping actions 30 days thereafter. Contractor shall be fully responsible to ensure all corresponding CAV AF reporting actions associated with disposition occur within one (1) business day of related shipment action.

9. All NSNs identified as Nuclear Weapon Related Materiel (NWRM) shall require contractor CAV AF reporting for production management, to track and report NWRM end items in repair with Serial Number identification within one (1) business day for asset visibility and serial number tracking. When receipted, Contractor’s reporter shall capture each NWRM asset’s Serial Number when reparable is received. Contractors shall follow all NWRM management requirements outlined in AFI 20-110, NWRM Management, to include, but not limited to packaging, marking, labeling, storage, transportation and receipt of all NWRM assets, with emphasis on Positive Inventory Control (PIC) and records management by the contractor and government to assure compliance. The successful application of these procedures requires the full cooperation of all personnel associated with the storage, shipping, transshipping and receiving of all NWRM assets.

CAVAF Reporting Requirements, v4, January 2021, page 3

SPECIFIC CAV AF CONTRACTOR TRANSACTIONAL REPORTING

REQUIREMENTS:

1. “Not-on-Contract” (NOC) receipt transactions apply to assets which are associated to a contractor facility DoDAAC and not an active contract delivery order. Regardless of asset condition code status, Not-on-contract shall be used for the following reporting actions:

a. Discrepancy Items – Are identified as misrouted shipments, misidentified shipments, or damaged end items. Contractor’s reporter will verify resolution weekly to acquire resolution to discrepancy within 30-days of receipt transaction. The contractor shall comply with disposition instructions provided by the Government within 10-days and complete all associated reporting actions within same period. Contractor reporting actions shall be resolved using reversals of individual Record Control Document Numbers (RCDN) or may be accomplished utilizing a ‘bulk’ shipment action of RCDN.

b. Inventory Control Point Items – are identified as assets stored at contractor facility and are not repair end items or discrepancies items. Movement of assets from “Not-on- Contract” category shall be resolved using reversals of individual RCDN or may be accomplished utilizing a ‘bulk’ shipment action of RCDN.

NOTE: Contractor is responsible for all “Not-on-Contract” assets ensuring physical asset balances are reflected and CAV AF reporting actions occur within one (1) business day of occurrence.

2. CAV AF receipt or reporting actions will not be utilized for Quality Deficiency Report (QDR) items, as there is a separate process and tracking mechanism for them.

3. All Contract Line Item Number (CLIN) repairable assets shall be receipted in CAV AF under Receipt Type: On Contract. CAV AF generates a RCDN for each unit receipted and allows the reporter to assign a reference or serialization number for tracking purposes. Where no reference or serialization numbers are utilized,the oldest RCDNs (listed first) shall always be processed first. Any reversal actions shall be accomplished using the last RCDNs processed.

4. The “Complete Date” entered into CAV AF cannot be dated prior to the DD250 date entered in the same screen. Contractor will validate that the DD250 shipment number and date entered into CAV AF are accurate. This requirement is also applicable to Condition Code H (Condemned) only when specifically directed by the contract.

5. Proper usage of DD Form 1348-1A, Issue Release/Receipt Document in relation to CAV AF reporting requirements.

a. Receipt Actions: Contractor’s reporter will use government issued shipment document numbers for CAV AF end item receipt transaction reporting only in the absence of missing DD Form 1348-1A or shipment document number. Contractors are not authorized to generate pseudo shipment document numbers for receipt transactions because this creates disconnects in shipment tracking within government inventory systems. Note: If the DD Form 1348-1A is missing or no shipment document number is

CAVAF Reporting Requirements, v4, January 2021, page 4 available, contractors are to immediately contact Production Management Specialist (PMS), who will acquire government issued shipment document number from the Inventory Management Specialist (IMS).

b. Shipping Actions: DD Form 1348-1A shall be used as the shipping document for shipment transactions of all end items. A DD Form 1348-1A is also applicable to all Consolidated Serviceable Inventory/Consolidated Reparable Inventory (CSI/CRI) assets regardless of tracking or reporting purposes. A Material Inspection and Receiving Report, DD Form 250 or Requisition and Invoice/Shipping Document, DD Form 1149 are not authorized as a shipment document, and shall not accompany any material shipments on repair contracts. CAVAF provides a DD Form 1348-1A in a Portable Document Format (PDF). DD Form 1348-1A shipping documents will be prepared for each NSN shipment from contractor’s facility, regardless of destination. The entire form, complete with bar coding, will be printed on a laser printer as specified under technical considerations. It is recommended the PDF be saved at the contractor’s facility prior to printing (note: The DD1348-1A forms are not saved/stored in CAV AF and cannot be reproduced by the system). The Contractor shall print three copies as required for shipping. Place one copy on the outside of the shipment container, one copy inside the shipment container, and retain the third copy for the contractor’s records. For end item shipments the DD Form 1348-1A shipment document number shall be comprised as one of the following actions:

i.Back to Depot Shipments:

(1) For a “single” unit NSN shipment, the default shipment document number will be the CAV AF RCDN of item being shipped.

(2) For “multiple” quantity shipments, it is recommended the CAV AF RCDN of the lead item of the shipment be used as the shipment document number.

ii. Ammended Shipping Instructions (ASI): Are used to divert material that is due-in from a contractor to a requisitioner. Government disposition instructions will provide a shipment document number to the contractor to be utilized for CAV AF shipment transaction reporting and the DD Form 1348-1A.

c. In the event CAV AF system is inoperable or is on a scheduled downtime:

i. The DD Form 1348-1A shall be manually completed and generated (printed) by contractor, using the AFPUBS website.

ii. When CAV AF is again operational, the contractor shall resume with transactional reporting actions in a timely and accurate manner, including completing a DD Form 1348-1A (printing not required if manual DD1348-1A PDF file utilized) and the shipment process in CAV AF.

CAVAF Reporting Requirements, v4, January 2021, page 5

6. Upon contract expiration and/or becoming production complete, the contractor will complete a 100% physical inventory inspection. Any assets remaining at the facility within 30-days must be noted in an email request to the Contracting Officer (CO) and Production Management Specialist (PMS) for disposition instructions by the government. If none is provided, assets are to be returned to the depot and reported within CAV AF, shipping to the following addresses according to each National Stock Number (NSN) inventory management location by Source of Supply (SOS) code:

a. FHZ – Tinker AFB, the ship for disposition address to SW3211:

TYPE/CODE: A SW3211

DEF DISTRIBUTION DEPOT OF OKLAHOMA

CEN REC 3301 F AVE

BLDG 506, DR 22

TINKER AFB, OK, 73145-8000

b. FGZ – Ogden AFB, the ship for disposition address to SW3210:

TYPE/CODE: A SW3210

DLA DISTRIBUTION DEPOT HILL

7537 WARDLEIGH RD

BLDG 849W

HILL AFB, UT 84056-5734

c. FLZ – Robins AFB, the ship for disposition address to SW3119:

TYPE/CODE: A SW3119

DLA DISTRIBUTION WARNER ROBINS

455 BYRON STREET

BLDG 376

ROBINS AFB, GA 31098-1887

7. Systemic data problems created by contractor’s failure to report data accurately or in a timely manner are subject to immediate Program Management Review (PMR). Examples of documented system data problems include but are not limited to: