Attachment3_Groups1_2_5_TreeShrubEstablishmentJobsheets.pdf

PDF 5 MB Posted

Attached to
1010349 - TREE-SHRUB ESTABLISHMENT Federal contract opportunity
Solicitation number
1010349
Issued by
Department of Agriculture Under Secretary for Farm Production and Conservation

View the file

Other files for this federal contract opportunity

Other files attached to 1010349 - TREE-SHRUB ESTABLISHMENT, newest first.
File Type Posted
S01 - Amendment 0003 to RFQ 10103149 Gorton Planting Plan updated.pdf PDF
S01 - Amendment 0003 to RFQ 1010349.docx DOCX document
S01 - Amendment 0003 to RFQ 10103149 UPDATED_Gorton_Planting_Map.pdf PDF
Amendment 0001 - Attachment 3.pdf PDF
Amendment 0001 to RFQ 1010349.pdf PDF
Amendment 0001 - Attachment 2.pdf PDF
Attachment1_Groups1_2_5_Tree_Planting_Group_Maps.pdf PDF
S01 - RFQ 1010349.pdf PDF
Attachment2_Groups1_2_5_TreeShrubEstablishmentMaps.pdf PDF
S01 - SOW.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

Job Sheet –Tree/Shrub Establishment (612) Revised March 2017

Tree/Shrub Establishment Conservation Practice Job Sheet VT-612

Definition Establishing woody plants by planting seedlings, cuttings, direct seeding or natural regeneration.

Purpose To establish woody plants for forest products, wildlife habitat, long-term erosion control and improvement of water quality, treat waste, reduction of air pollution, sequestration of carbon, energy conservation, to maintain or restore natural genetic diversity and enhance aesthetics.

Where used Establish trees/shrubs on any area where woody plants can be grown.

Operation and maintenance Access by vehicles or equipment during or after tree/ shrub establishment shall be controlled to protect new plants and minimize erosion, compaction and other site impacts. Refer to the standard Access Control (472).

The trees and shrubs will be inspected periodically and protected from adverse impacts including insects, diseases or competing vegetation, fire and damage from livestock or wildlife.

If needed, competing vegetation will be controlled until the woody plants are established.

Noxious weeds will be controlled.Replanting will be required when survival is inadequate.

Supplemental water will be provided as needed.

Criteria Composition of species will be adapted to site conditions and suitable for the planned purpose(s).

Priority will be given to plant materials grown from locally collected seeds.

No plants on the Federal or state noxious or invasive weeds list shall be planted.

Planting or seeding rates will be adequate to accomplish the planned purpose for the site.

Planting dates, and care in handling and planting of the seed, cuttings or seedlings will ensure that planted materials have an acceptable rate of survival.

Bare-root stock shall be planted during the dormant season in the spring after the ground thaws until May 30 as soil moisture and local weather conditions permit.

Only viable, high-quality and adapted planting stock or seed will be used.

A precondition for tree/shrub establishment is appropriately prepared sites. Refer to practice standard Tree/Shrub Site Preparation (490).

Adequate seed sources or advanced reproduction needs to be present or provided for when using natural regeneration to establish a stand.

Specifications Requirements for the site are found within this jobsheet.

See practice standard and Supplemental Specifications for Tree/Shrub Establishment, code 612 and Forest Site Preparation, code 490 for specific requirements.

Tree/Shrub Establishment – Job Sheet VT - 612

For: Farm #:

Field(s): Tract #:

Designed By: Approved By:

Signature:

Date: Date:

Purpose (check all that apply) Forest Products Reduction of Air Pollution

Wildlife Habitat Sequestration of carbon Long-term erosion control Energy Conservation Improvement of Water Quality Maintain or restore natural genetic diversity Waste Treatment Aesthetic enhancement

Other: (Specify)

Type of Planting Planting in Open Areas Natural Regeneration Seeding Interplanting Clearcut Regeneration Interseeding Underplanting

Woody Plant Materials Information - Refer to 612 Specification for more information on care, handling, planting techniques, etc.

See VT NRCS Forestry Technical Note 2 - Vermont Trees and Shrubs for Conservation for plant characteristics.

Field Ac Species/cultivars: Kind of Stock1 :

Total No.

Plants Per acre:

Planting dates: Avg. Spacing2:

Ft X Ft

1 BAreroot, COntainer, CUtting; include size, caliper, height, and age as applicable.

2 Spacing between plants to achieve plants/acre.

Plants/acre = 43,560 (ft2/ac) ÷ [Between-Row Spacing (ft) X In-Row Spacing (ft)}

Temporary Storage and Handling Instructions (Refer to VT Standard and Specification 612) Planting stock that is dormant may be stored temporarily in a cooler or cool, moist, darkened area up to 3 days. For more than 3 days or for stock that is expected to begin growth before planting, dig a V-shaped trench (heeling-in-bed) sufficiently deep and bury seedlings so that all roots are covered by soil. Pack the soil firmly and water thoroughly. During planting, keep plant material out of direct sun or covered to avoid drying. Be sure to keep roots moist. Additional requirements:

Site Preparation See VT Standard and Specification and Job Sheet 490 – Forest Site Preparation Remove weeds and grass prior to planting and keep out for at least two years.

Additional requirements or special site preparation instructions:

Planting Method (Refer to VT Standard and Specification 612) Hand Machine (circle and indicate amount) For container and bareroot stock, plant stock to a depth even with the root collar in holes deep and wide enough to fully extend the roots. Pack the soil firmly around each plant. Cuttings are inserted in moist soil with at least 2 to 3 buds showing above ground.

Plants will be established prior to May 30 unless containerized seedlings are used or plants will be watered.

Additional requirements or special planting instructions/arrangements:

Cultural Practices (Refer to VT Standard and Specification 612 for specific requirements)

Pest Management is required. Weed control is necessary, either by mechanical cutting, herbiciding or mulching for at least 2 years after planting.

Vegetation Mat-Size # Tree Shelter-Size #

Mulch- coverage # Other:

Additional requirements:

Operation and Maintenance The planted area must be inspected periodically and protected from damage so proper function is maintained. Replace dead or dying tree/shrub stock to provide adequate plant densities as described in the 612 standard and continue control of competing vegetation to allow proper establishment for at least 2 years. Periodic harvesting of trees and shrubs may be necessary to maintain the health and vigor of mature stands. Keep large dead and dying trees for cavity nesting birds and a source of large wood in aquatic habitats. Additional requirements:

Questions regarding the planting or maintenance of the tree/shrub establishment should be directed to , at .

If needed, an aerial view or a side view of the practice can be shown below. Other relevant information, complementary practices and measures, and additional specifications may be included.

Recommendation: Import digital photographs to indicate practice before and after effects. For instructions regarding importing graphics to this doc go to: ftp://ftp-fc.sc.egov.usda.gov/VT/Technical/Help/Adobe_PDF_Help_1.pdf

Scale 1"=________ ft. (NA indicates sketch not to scale: grid size=1/2" by 1/2")

Additional Specifications and Notes:

The United States Department of Agriculture (USDA) prohibits discrimination in its programs on the basis of race, color, national origin, sex, religion, age, disability, political beliefs and marital or familial status. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication program information (Braille, large print, audiotape, etc.) should contact the USDA Office of Communications (202) 720-2791.

To file a complaint of discrimination write USDA, Director, Office of Civil Rights, Room 326-W, Whitten Building, 14th and Independence Avenue, SW, Washington, DC 20250-9410 or call (202) 720-5964 (voice or TDD). USDA is an equal opportunity provider and employer.

T

Purpose (check all that apply)

Forest Products

Reduction of Air Pollution

Wildlife Habitat

Sequestration of carbon

Long-term erosion control

Energy Conservation

Improvement of Water Quality

Maintain or restore natural genetic diversity

Waste Treatment

Aesthetic enhancement

Other: (Specify)

Temporary Storage Instructions (Refer to VT Standard and Spe

Planting stock that is dormant may be stored temporarily in

Site Preparation See VT Standard and Specification and Job S

Planting Method (Refer to VT Standard and Specification 612)

For container and bareroot stock, plant stock to a depth eve

Cultural Practices (Refer to VT Standard and Specification 6

Pest Management is required. Weed control is necessary, eith

Vegetation Mat-Size #

Mulch- coverage #

Operation and Maintenance

Text2:

Text4:

Text5: Joe Bondi

Text6:

Text7: 2/5/2018

Text8:

Check Box2: Off

Check Box3: Yes

Check Box4: Off

Check Box5: Off

Check Box6: Off

Check Box7: Yes

Check Box8: Yes

Check Box9: Off

Check Box10: Off

Check Box11: Off

Check Box1: Off

Check Box13: Off

Check Box14: Off

Check Box15: Off

Check Box16: Off

Check Box17: Off

Check Box12: Yes

Check Box18: Off

Text11:

Combo Box15: [Bare Root]

Combo Box16: [Bare Root]

Combo Box17: [Bare Root]

Combo Box18: [ ]

Combo Box19: [Bare Root]

Combo Box20: [Bare Root]

Combo Box14: [ ]

Combo Box22: [ ]

Combo Box23: [Bare Root]

Combo Box24: [Bare Root]

Combo Box25: [Bare Root]

Combo Box21: [Bare Root]

Combo Box26: [Bare Root]

Text9:

Text10:

Text12:

Text13:

Text14:

Text18: 10

Text19: 600

Text20: 50

Text21: Before May 30

Text22: 15

Text23: 15

Text15:

Text16:

Text17:

Text24:

Text25: 10

Text26: 900

Text27: 75

Text28: Before May 30

Text29: 15

Text30: 15

Text34: 75

Text35: Before May 30

Text36: 15

Text37: 15

Text38:

Text39:

Text41:

Text42:

Text43:

Text44:

Text53: 4.5

Text45:

Text72:

Text46: 4.5

Text47: 338

Text48: 75

Text49: Before May 30

Text50: 15

Text51: 15

Text58: 15

Text56: Before May 30

Text57: 15

Text65: 15

Text63: Before May 30

Text64: 15

Text66:

Text70:

Text71:

Text73:

Text75: 150

Text76: 50

Text77: Before May 30

Text78: 8

Text79: 8

Text80:

Text81: 3

Text82: 150

Text83: 50

Text84: Before May 30

Text85: 8

Text86: 8

Text91: Before May 30

Text92: 8

Text93: 8

Text94:

Text98: Before May 30

Text99: 8

Text100: 8

Text101:

Text102: Reed canary grass control is planned in a majority of the areas prior to planting. Two years of follow-up spot treatment around planted trees and shurbs are planned.

Text1: Leo Gorton

Text3: Gorton WRE

Text31:

Text32: 10

Text40:

Text33: 900

Text67:

Text74: 3

Text87:

Text52:

Text59:

Text95: 3

Text88: 3

Text60: 4.5

Text96: 150

Text89: 150

Text68:

Text54: 337

Text97: 50

Text90: 50

Text69:

Text55: 75

Text103: See map for planting locations. Trees should be 3-4 feet tall. Shrubs should be 2-3 feet tall.

Text104:

Text105:

Text106:

Text107:

Text108:

Text109:

Text110:

Text111: NRCS archeologist will be onsite to monitor installation of practice.

Text112:

Text113:

Text114:

Text115:

Text116:

Text61: 225

Text62: 50

Button1:

Button2:

Combo Box1: [ Riparian Trees ]

Combo Box2: [American Sycamore (Platanus occidentalis)]

Combo Box3: [Silver Maple (Acer saccharinum) (3-4ft tall)]

Combo Box4: [Black Willow (Salix nigra) (3-4ft tall)]

Combo Box5: [ Upland Trees]

Combo Box6: [Basswood (Tilia americana) (3-4ft tall)]

Combo Box7: [Northern Red Oak (Quercus rubra) (3-4ft tall)]

Combo Box8: [Quaking Aspen (Populus tremuloides) (3-4ft tall)]

Combo Box9: [ SHRUBS]

Combo Box10: [Native Shrub Willow (Salix spp.)]

Combo Box11: [Silky Dogwood (Cornus amomum)]

Combo Box12: [Red-osier Dogwood (Cornus sericea)]

Combo Box13: [Buttonbush (Cephalanthus occidentalis)] wildlife habitat, long-term erosion control and improvement of water quality, treat waste, reduction of air pollution, sequestration of carbon, energy shrub establishment shall be controlled to protect new plants and minimize erosion, compaction and other

Noxious weeds will be controlled.Replanting will be conditions and suitable for the planned purpose(s).

Priority will be given to plant materials grown from locally collected seeds.

No plants on the Federal or state noxious or invasive weeds list shall be planted.

Planting or seeding rates will be adequate to accomplish the planned purpose for the site.

Planting dates, and care in handling and planting of the seed, cuttings or seedlings will ensure that planted materials have an acceptable rate of survival.

Bare-root stock shall be planted during the dormant season in the spring after the ground thaws until May 30 as soil moisture and local weather conditions permit.

Only viable, high-quality and adapted planting stock or seed will be used.

A precondition for tree/shrub establishment is appropriately prepared sites. Refer to practice standard Tree/Shrub Site Preparation (490).

Adequate seed sources or advanced reproduction

Woody Plant Materials Information - Refer to 612 Specification for more information on care, handling, planting techniques, etc.

See VT NRCS Forestry Technical Note 2 - Vermont Trees and Shrubs for Conservation for plant characteristics.

Planting stock that is dormant may be stored temporarily in a cooler or cool, moist, darkened area up to 3 days. For more than 3 days or for stock that is expected to begin growth before planting, dig a V-shaped trench (heeling-in-bed) sufficiently deep and bury seedlings so that all roots are covered by soil. Pack the soil firmly and water thoroughly. During planting, keep plant material out of direct sun or covered to avoid drying. Be sure to keep roots moist. Additional requirements:

Planting Method (Refer to VT Standard and Specification 612) Hand Machine (circle and indicate amount) For container and bareroot stock, plant stock to a depth even with the root collar in holes deep and wide enough to fully extend the roots. Pack the soil firmly around each plant. Cuttings are inserted in moist soil with at least 2 to 3 buds showing above ground.

Plants will be established prior to May 30 unless containerized seedlings are used or plants will be watered.

Pest Management is required. Weed control is necessary, either by mechanical cutting, herbiciding or mulching for at least 2 years

The planted area must be inspected periodically and protected from damage so proper function is maintained. Replace dead or dying tree/shrub stock to provide adequate plant densities as described in the 612 standard and continue control of competing vegetation to allow proper establishment for at least 2 years. Periodic harvesting of trees and shrubs may be necessary to maintain the health and vigor of mature stands. Keep large dead and dying trees for cavity nesting birds and a source of large wood in

Questions regarding the planting or maintenance of the tree/shrub establishment should be directed to

If needed, an aerial view or a side view of the practice can be shown below. Other relevant information, complementary practices and measures, and additional specifications may be included.

Recommendation: Import digital photographs to indicate practice before and after effects. For instructions regarding importing

The United States Department of Agriculture (USDA) prohibits discrimination in its programs on the basis of race, color, national origin, sex, religion, age, disability, political beliefs and marital or familial status. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication program information (Braille, To file a complaint of discrimination write USDA, Director, Office of Civil Rights, Room 326-W, Whitten Building, 14th and Independence Avenue, SW, Washington, DC 20250-9410 or call (202) 720-5964 (voice or TDD). USDA is an equal opportunity

T

Purpose (check all that apply)

Forest Products

Reduction of Air Pollution

Wildlife Habitat

Sequestration of carbon

Long-term erosion control

Energy Conservation

Improvement of Water Quality

Maintain or restore natural genetic diversity

Waste Treatment

Aesthetic enhancement

Other: (Specify)

Temporary Storage Instructions (Refer to VT Standard and Spe

Planting stock that is dormant may be stored temporarily in

Site Preparation See VT Standard and Specification and Job S

Planting Method (Refer to VT Standard and Specification 612)

For container and bareroot stock, plant stock to a depth eve

Cultural Practices (Refer to VT Standard and Specification 6

Pest Management is required. Weed control is necessary, eith

Vegetation Mat-Size #

Mulch- coverage #

Operation and Maintenance

Text2:

Text4:

Text5: Joe Bondi

Text6:

Text7: 2/7/2017

Text8:

Check Box2: Off

Check Box3: Yes

Check Box4: Off

Check Box5: Off

Check Box6: Off

Check Box7: Yes

Check Box8: Yes

Check Box9: Off

Check Box10: Off

Check Box11: Off

Check Box1: Off

Check Box13: Off

Check Box14: Off

Check Box15: Off

Check Box16: Off

Check Box17: Off

Check Box12: Yes

Check Box18: Off

Text11:

Combo Box15: [Bare Root]

Combo Box16: [Bare Root]

Combo Box17: [Bare Root]

Combo Box18: [Bare Root]

Combo Box19: [ ]

Combo Box20: [Bare Root]

Combo Box14: [ ]

Combo Box22: [Bare Root]

Combo Box23: [ ]

Combo Box24: [ ]

Combo Box25: [ ]

Combo Box21: [Bare Root]

Combo Box26: [ ]

Text9:

Text10:

Text12:

Text13:

Text14:

Text18: 22

Text19: 330

Text20: 15

Text21: Before May 30

Text22: 15

Text23: 15

Text15:

Text16:

Text17:

Text24:

Text25: 22

Text26: 1100

Text27: 50

Text28: Before May 30

Text29: 15

Text30: 15

Text34: 30

Text35: Before May 30

Text36: 15

Text37: 15

Text38:

Text39: 22

Text41: 25

Text42: Before May 30

Text43: 15

Text44: 15

Text53: 22

Text45:

Text72: 8

Text46:

Text47:

Text48:

Text49:

Text50:

Text51:

Text58: 8

Text56: Before May 30

Text57: 8

Text65: 8

Text63: Before May 30

Text64: 8

Text66:

Text70: Before May 30

Text71: 8

Text73:

Text75:

Text76:

Text77:

Text78:

Text79:

Text80:

Text81:

Text82:

Text83:

Text84:

Text85:

Text86:

Text91:

Text92:

Text93:

Text94:

Text98:

Text99:

Text100:

Text101:

Text102: Reed canary grass control is planned for the year prior to planting. Two years of follow-up spot treatment around planted trees and shurbs are planned.

Text1: VT Fish & Wildlife Department

Text3: Payne WRE

Text31:

Text32: 22

Text40: 550

Text33: 660

Text67: 22

Text74:

Text87:

Text52:

Text59:

Text95:

Text88:

Text60: 22

Text96:

Text89:

Text68: 660

Text54: 550

Text97:

Text90:

Text69: 30

Text55: 25

Text103: Trees should be a minimum of 3-4 feet tall. Shrubs should be a minimum of 2-3 feet tall.

Text104:

Text105:

Text106:

Text107:

Text108:

Text109:

Text110:

Text111:

Text112:

Text113:

Text114:

Text115:

Text116:

Text61: 550

Text62: 25

Button1:

Button2:

Combo Box1: [ TREES]

Combo Box2: [Black Ash (Fraxinus nigra)]

Combo Box3: [Silver Maple (Acer saccharinum) (3-4ft tall)]

Combo Box4: [Black Willow (Salix nigra) (3-4ft tall)]

Combo Box5: [American Sycamore (Platanus occidentalis)]

Combo Box6: [ SHRUBS]

Combo Box7: [Native Shrub Willow (Salix spp.) (2-3ft tall)]

Combo Box8: [Silky Dogwood (Cornus amomum) (2-3ft tall)]

Combo Box9: [Native Shrub Willow (Salix spp.)]

Combo Box10: [ ]

Combo Box11: [ ]

Combo Box12: [ ]

Combo Box13: [ ] wildlife habitat, long-term erosion control and improvement of water quality, treat waste, reduction of air pollution, sequestration of carbon, energy shrub establishment shall be controlled to protect new plants and minimize erosion, compaction and other

Noxious weeds will be controlled.Replanting will be conditions and suitable for the planned purpose(s).

Priority will be given to plant materials grown from locally collected seeds.

No plants on the Federal or state noxious or invasive weeds list shall be planted.

Planting or seeding rates will be adequate to accomplish the planned purpose for the site.

Planting dates, and care in handling and planting of the seed, cuttings or seedlings will ensure that planted materials have an acceptable rate of survival.

Bare-root stock shall be planted during the dormant season in the spring after the ground thaws until May 30 as soil moisture and local weather conditions permit.

Only viable, high-quality and adapted planting stock or seed will be used.

A precondition for tree/shrub establishment is appropriately prepared sites. Refer to practice standard Tree/Shrub Site Preparation (490).

Adequate seed sources or advanced reproduction

Woody Plant Materials Information - Refer to 612 Specification for more information on care, handling, planting techniques, etc.

See VT NRCS Forestry Technical Note 2 - Vermont Trees and Shrubs for Conservation for plant characteristics.

Planting stock that is dormant may be stored temporarily in a cooler or cool, moist, darkened area up to 3 days. For more than 3 days or for stock that is expected to begin growth before planting, dig a V-shaped trench (heeling-in-bed) sufficiently deep and bury seedlings so that all roots are covered by soil. Pack the soil firmly and water thoroughly. During planting, keep plant material out of direct sun or covered to avoid drying. Be sure to keep roots moist. Additional requirements:

Planting Method (Refer to VT Standard and Specification 612) Hand Machine (circle and indicate amount) For container and bareroot stock, plant stock to a depth even with the root collar in holes deep and wide enough to fully extend the roots. Pack the soil firmly around each plant. Cuttings are inserted in moist soil with at least 2 to 3 buds showing above ground.

Plants will be established prior to May 30 unless containerized seedlings are used or plants will be watered.

Pest Management is required. Weed control is necessary, either by mechanical cutting, herbiciding or mulching for at least 2 years

The planted area must be inspected periodically and protected from damage so proper function is maintained. Replace dead or dying tree/shrub stock to provide adequate plant densities as described in the 612 standard and continue control of competing vegetation to allow proper establishment for at least 2 years. Periodic harvesting of trees and shrubs may be necessary to maintain the health and vigor of mature stands. Keep large dead and dying trees for cavity nesting birds and a source of large wood in

Questions regarding the planting or maintenance of the tree/shrub establishment should be directed to

If needed, an aerial view or a side view of the practice can be shown below. Other relevant information, complementary practices and measures, and additional specifications may be included.

Recommendation: Import digital photographs to indicate practice before and after effects. For instructions regarding importing

The United States Department of Agriculture (USDA) prohibits discrimination in its programs on the basis of race, color, national origin, sex, religion, age, disability, political beliefs and marital or familial status. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication program information (Braille, To file a complaint of discrimination write USDA, Director, Office of Civil Rights, Room 326-W, Whitten Building, 14th and Independence Avenue, SW, Washington, DC 20250-9410 or call (202) 720-5964 (voice or TDD). USDA is an equal opportunity

T

Purpose (check all that apply)

Forest Products

Reduction of Air Pollution

Wildlife Habitat

Sequestration of carbon

Long-term erosion control

Energy Conservation

Improvement of Water Quality

Maintain or restore natural genetic diversity

Waste Treatment

Aesthetic enhancement

Other: (Specify)

Temporary Storage Instructions (Refer to VT Standard and Spe

Planting stock that is dormant may be stored temporarily in

Site Preparation See VT Standard and Specification and Job S

Planting Method (Refer to VT Standard and Specification 612)

For container and bareroot stock, plant stock to a depth eve

Cultural Practices (Refer to VT Standard and Specification 6

Pest Management is required. Weed control is necessary, eith

Vegetation Mat-Size #

Mulch- coverage #

Operation and Maintenance

Text2:

Text4:

Text5: Joe Bondi

Text6:

Text7: 6/10/2020

Text8:

Check Box2: Off

Check Box3: Yes

Check Box4: Off

Check Box5: Off

Check Box6: Off

Check Box7: Yes

Check Box8: Yes

Check Box9: Off

Check Box10: Off

Check Box11: Off

Check Box1: Off

Check Box13: Off

Check Box14: Off

Check Box15: Off

Check Box16: Off

Check Box17: Off

Check Box12: Yes

Check Box18: Off

Text11:

Combo Box15: [Bare Root]

Combo Box16: [Bare Root]

Combo Box17: [Bare Root]

Combo Box18: [Bare Root]

Combo Box19: [ ]

Combo Box20: [Bare Root]

Combo Box14: [ ]

Combo Box22: [Bare Root]

Combo Box23: [Bare Root]

Combo Box24: [ ]

Combo Box25: [ ]

Combo Box21: [Bare Root]

Combo Box26: [ ]

Text9:

Text10:

Text12:

Text13:

Text14:

Text18: 55.5

Text19: 1943

Text20: 35

Text21: Before May 30

Text22: 15

Text23: 15

Text15:

Text16:

Text17:

Text24:

Text25: 55.5

Text26: 1387

Text27: 25

Text28: Before May 30

Text29: 15

Text30: 15

Text34: 15

Text35: Before May 30

Text36: 15

Text37: 15

Text38:

Text39: 55.5

Text41: 25

Text42: Before May 30

Text43: 15

Text44: 15

Text53: 55.5

Text45:

Text72: 8

Text46:

Text47:

Text48:

Text49:

Text50:

Text51:

Text58: 8

Text56: Before May 30

Text57: 8

Text65: 8

Text63: Before May 30

Text64: 8

Text66:

Text70: Before May 30

Text71: 8

Text73:

Text75: 1388

Text76: 25

Text77: Before May 30

Text78: 8

Text79: 8

Text80:

Text81:

Text82:

Text83:

Text84:

Text85:

Text86:

Text91:

Text92:

Text93:

Text94:

Text98:

Text99:

Text100:

Text101:

Text102: Reed canary grass control is planned prior to planting. Two years of follow-up spot treatment around planted trees and shurbs are planned.

Text1: SD Ventures, LLC

Text3: SD Ventures WRE

Text31:

Text32: 55.5

Text40: 1387

Text33: 832

Text67: 55.5

Text74: 55.5

Text87:

Text52:

Text59:

Text95:

Text88:

Text60: 55.5

Text96:

Text89:

Text68: 1388

Text54: 1387

Text97:

Text90:

Text69: 25

Text55: 25

Text103: Trees should be 3-4 feet tall and shrubs should be 2-3 feet tall.

Text104:

Text105:

Text106:

Text107:

Text108:

Text109:

Text110:

Text111:

Text112:

Text113:

Text114:

Text115:

Text116:

Text61: 1387

Text62: 25

Button1:

Button2:

Combo Box1: [ TREES]

Combo Box2: [Silver Maple (Acer saccharinum) (3-4 ft tall)]

Combo Box3: [Black Willow (Salix nigra) (3-4ft tall)]

Combo Box4: [Green Ash (Fraxinus pennsylvanica) (3-4ft tall)]

Combo Box5: [American Elm (Ulmus americana)]

Combo Box6: [ SHRUBS]

Combo Box7: [Red-osier Dogwood (Cornus sericea) (2-3ft tall)]

Combo Box8: [Silky Dogwood (Cornus amomum) (2-3ft tall)]

Combo Box9: [Native Shrub Willow (Salix spp.)]

Combo Box10: [Buttonbush (Cephalanthus occidentalis) (2-3ft tall)]

Combo Box11: [ ]

Combo Box12: [ ]

Combo Box13: [ ] wildlife habitat, long-term erosion control and improvement of water quality, treat waste, reduction of air pollution, sequestration of carbon, energy shrub establishment shall be controlled to protect new plants and minimize erosion, compaction and other

Noxious weeds will be controlled.Replanting will be conditions and suitable for the planned purpose(s).

Priority will be given to plant materials grown from locally collected seeds.

No plants on the Federal or state noxious or invasive weeds list shall be planted.

Planting or seeding rates will be adequate to accomplish the planned purpose for the site.

Planting dates, and care in handling and planting of the seed, cuttings or seedlings will ensure that planted materials have an acceptable rate of survival.

Bare-root stock shall be planted during the dormant season in the spring after the ground thaws until May 30 as soil moisture and local weather conditions permit.

Only viable, high-quality and adapted planting stock or seed will be used.

A precondition for tree/shrub establishment is appropriately prepared sites. Refer to practice standard Tree/Shrub Site Preparation (490).

Adequate seed sources or advanced reproduction

Woody Plant Materials Information - Refer to 612 Specification for more information on care, handling, planting techniques, etc.

See VT NRCS Forestry Technical Note 2 - Vermont Trees and Shrubs for Conservation for plant characteristics.

Planting stock that is dormant may be stored temporarily in a cooler or cool, moist, darkened area up to 3 days. For more than 3 days or for stock that is expected to begin growth before planting, dig a V-shaped trench (heeling-in-bed) sufficiently deep and bury seedlings so that all roots are covered by soil. Pack the soil firmly and water thoroughly. During planting, keep plant material out of direct sun or covered to avoid drying. Be sure to keep roots moist. Additional requirements:

Planting Method (Refer to VT Standard and Specification 612) Hand Machine (circle and indicate amount) For container and bareroot stock, plant stock to a depth even with the root collar in holes deep and wide enough to fully extend the roots. Pack the soil firmly around each plant. Cuttings are inserted in moist soil with at least 2 to 3 buds showing above ground.

Plants will be established prior to May 30 unless containerized seedlings are used or plants will be watered.

Pest Management is required. Weed control is necessary, either by mechanical cutting, herbiciding or mulching for at least 2 years

The planted area must be inspected periodically and protected from damage so proper function is maintained. Replace dead or dying tree/shrub stock to provide adequate plant densities as described in the 612 standard and continue control of competing vegetation to allow proper establishment for at least 2 years. Periodic harvesting of trees and shrubs may be necessary to maintain the health and vigor of mature stands. Keep large dead and dying trees for cavity nesting birds and a source of large wood in

Questions regarding the planting or maintenance of the tree/shrub establishment should be directed to

If needed, an aerial view or a side view of the practice can be shown below. Other relevant information, complementary practices and measures, and additional specifications may be included.

Recommendation: Import digital photographs to indicate practice before and after effects. For instructions regarding importing

The United States Department of Agriculture (USDA) prohibits discrimination in its programs on the basis of race, color, national origin, sex, religion, age, disability, political beliefs and marital or familial status. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication program information (Braille, To file a complaint of discrimination write USDA, Director, Office of Civil Rights, Room 326-W, Whitten Building, 14th and Independence Avenue, SW, Washington, DC 20250-9410 or call (202) 720-5964 (voice or TDD). USDA is an equal opportunity

T

Purpose (check all that apply)

Forest Products

Reduction of Air Pollution

Wildlife Habitat

Sequestration of carbon

Long-term erosion control

Energy Conservation

Improvement of Water Quality

Maintain or restore natural genetic diversity

Waste Treatment

Aesthetic enhancement

Other: (Specify)

Temporary Storage Instructions (Refer to VT Standard and Spe

Planting stock that is dormant may be stored temporarily in

Site Preparation See VT Standard and Specification and Job S

Planting Method (Refer to VT Standard and Specification 612)

For container and bareroot stock, plant stock to a depth eve

Cultural Practices (Refer to VT Standard and Specification 6

Pest Management is required. Weed control is necessary, eith

Vegetation Mat-Size #

Mulch- coverage #

Operation and Maintenance

Text2:

Text4:

Text5: Joe Bondi

Text6:

Text7: 4/12/2018

Text8:

Check Box2: Off

Check Box3: Yes

Check Box4: Off

Check Box5: Off

Check Box6: Off

Check Box7: Yes

Check Box8: Yes

Check Box9: Off

Check Box10: Off

Check Box11: Off

Check Box1: Off

Check Box13: Off

Check Box14: Off

Check Box15: Off

Check Box16: Off

Check Box17: Off

Check Box12: Yes

Check Box18: Off

Text11:

Combo Box15: [Bare Root]

Combo Box16: [Bare Root]

Combo Box17: [Bare Root]

Combo Box18: [Bare Root]

Combo Box19: [Bare Root]

Combo Box20: [ ]

Combo Box14: [ ]

Combo Box22: [Bare Root]

Combo Box23: [Bare Root]

Combo Box24: [Bare Root]

Combo Box25: [ ]

Combo Box21: [Bare Root]

Combo Box26: [ ]

Text9:

Text10:

Text12:

Text13:

Text14:

Text18: 5.5

Text19: 83

Text20: 15

Text21: Before May 30

Text22: 15

Text23: 15

Text15:

Text16:

Text17:

Text24:

Text25: 5.5

Text26: 192

Text27: 35

Text28: Before May 30

Text29: 15

Text30: 15

Text34: 50

Text35: Before May 30

Text36: 15

Text37: 15

Text38:

Text39: 5.5

Text41: 50

Text42: Before May 30

Text43: 15

Text44: 15

Text53:

Text45:

Text72: 8

Text46: 5.5

Text47: 275

Text48: 50

Text49: Before May 30

Text50: 15

Text51: 15

Text58:

Text56:

Text57:

Text65: 8

Text63: Before May 30

Text64: 8

Text66:

Text70: Before May 30

Text71: 8

Text73:

Text75: 100

Text76: 50

Text77: Before May 30

Text78: 8

Text79: 8

Text80:

Text81: 2

Text82: 100

Text83: 50

Text84: Before May 30

Text85: 8

Text86: 8

Text91:

Text92:

Text93:

Text94:

Text98:

Text99:

Text100:

Text101:

Text102: Reed canary grass control is planned for the year prior to planting. Two years of follow-up spot treatment around planted trees and shurbs are planned.

Text1: James Choiniere

Text3: Choiniere WRE

Text31:

Text32: 5.5

Text40: 275

Text33: 275

Text67: 2

Text74: 2

Text87:

Text52:

Text59:

Text95:

Text88:

Text60: 2

Text96:

Text89:

Text68: 100

Text54:

Text97:

Text90:

Text69: 50

Text55:

Text103: See map for planting locations. Trees should be 3-4 feet tall and shrubs should be 2-3 feet tall.

Text104:

Text105:

Text106:

Text107:

Text108:

Text109:

Text110:

Text111:

Text112:

Text113:

Text114:

Text115:

Text116:

Text61: 100

Text62: 50

Button1:

Button2:

Combo Box1: [ TREES]

Combo Box2: [Green Ash (Fraxinus pennsylvanica) (3-4 ft tall)]

Combo Box3: [Yellow Birch (Betula alleghaniensis)]

Combo Box4: [Silver Maple (Acer saccharinum) (3-4 ft tall)]

Combo Box5: [Black Willow (Salix nigra) (3-4 ft tall)]

Combo Box6: [Red Maple (Acer rubrum)]

Combo Box7: [ SHRUBS]

Combo Box8: [Red-osier Dogwood (Cornus sericea) (2-3 ft tall)]

Combo Box9: [Silky Dogwood (Cornus amomum) (2-3 ft tall)]

Combo Box10: [Arrowwood (Viburnum dentatum) (2-3ft tall)]

Combo Box11: [Native Shrub Willow (Salix spp.) (2-3ft tall)]

Combo Box12: [ ]

Combo Box13: [ ]

File details come from the government source that posted it. Updated .