attachment - SOW_Posturography.docx
DOCX document 205 KB Posted
- Attached to
- 6515--Notice of Intent to Sole Source Computerized Dynamic Posturography (CDP/IVR) System Federal contract opportunity
- Solicitation number
- 36C77621Q0119
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| JandA SingleSourceJustification - Posturography System.pdf | ||
| 36C77621Q0119.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Redding Outpatient Clinic VA Northern California Healthcare System Redding VA Clinic 3455 Knighton Road Redding, CA 96002
VA Redding Outpatient Clinic – Initial Outfitting, Transition & Activation Project- Equipment Package – Basis of Design (BOD) General Conditions and Statement of Work Computerized Dynamic Posturography Introduction The VA Redding Outpatient Clinic has a requirement to purchase Computerized Dynamic Posturography with an authorized vendor to supply and deliver the item(s) identified in Table 1 below. This requirement is in support of a brand name requirement. This requirement is in support of the activation of the VA Redding Outpatient Clinic. Item(s) are to be delivered to the location specified in section 2.4.1.
Table 1 – Package Items Summary
| Item Number |
| Item Description |
| Quantity |
| 0001 |
| Bertec CDP/IVR System with one-year mfg. warranty |
| 1 |
| 0002 |
| Head Shake – Sensory Organization Test with one-year mfg. |
warrranty
| 0003 |
| Bertec Vision Advantage with mfg. one-year warranty |
| 1 |
| 0004 |
| Installation |
| 1 |
| 0005 |
| Training |
| 1 |
General Conditions Site Address The address of the VA Redding Outpatient Clinic is listed below. Additional information on delivery is located in section 2.4.
VA Redding Outpatient Clinic Initial Outfitting, Transtition & Activation Project 3455 Knighton Road Redding, CA 96002 Delivery Schedule Items shall be delivered no earlier than the estimated delivery start date and no later than the delivery end date listed in Table 2 below.
Table 2 – Anticipated Building Outfitting Schedule
| Building Name |
| Building # & Letter |
| Acronym |
| Est. Delivery Start Date |
| Est. Delivery End Date |
| VA Redding Outpatient Clinic |
| N/A |
| VA ROC |
| 6/11/2020 |
| 8/19/2020 |
Schedule and Order Management The above delivery schedule is based upon the current construction schedule. The vendor shall not increase prices for a change in delivery date for up to 30+ days due to construction delays.
The awardees actual delivery dates will be confirmed by VA upon award.
Post-award the vendor will coordinate delivery prior to beginning any work (see section 2.4). Once the dates have been confirmed, modifications to the schedule are subject to written approval by the COR and the vendor. Schedule changes that are beyond the dates specified in the contract will require approval by the Contracting Officer and a contract modification.
Delivery and Receiving Delivery and receipt of the proposed items is anticipated to be directed to the location identified below. Confirmation of delivery location will be provided post-award. To coordinate delivery, contact Carl Chaker at 760-267-8651 Carl.chaker@va.gov, Daniel Chavez at 940-782-0724 daniel.chavez@goenergistics.com, or Don Black at 916-275-3000 Don.black3@va.gov.
Delivery to:
VA Northern California Healthcare System Redding VA Clinic 3455 Knighton Road Redding, CA 96002
Delivery shall be freight on board (FOB) – Destination.
The vendor is required to define the need for a staging area to accommodate item delivery, if needed. Post-award, this information will be confirmed with the vendor.
The delivery of items identified in this document shall take place during normal business hours which are defined as: 0800 to 1630 (i.e.: 8:00am to 4:30pm Pacific Standard Time), Monday through Friday, and excluding Federal Holidays.
Delivery trucks will not be permitted to remain at the loading dock. Trucks shall be unloaded, moved from the dock, and then brought back to the dock if required to haul out any waste, tools, or excess materials.
Labeling of delivered items shall include the VA facilities contract number and VA purchase order number for identification and reference upon receipt of product.
Use of Warehouse If the vendor requires the use of the Government’s activation contractor’s warehouse to meet the requirements of this contract the vendor must provide a certificate of insurance prior to the delivery and offloading of the item(s). This insurance certificate must be completed and presented to the activation contractor prior to delivery.
The vendor shall communicate through the VA POC any required coordination requirements.
Clean Up and Disposal There are no dumpsters available for vendor use.
The removal of waste and/or excess material shall be conducted through the loading dock area. Delivery trucks and/or other vendor vehicles will not be permitted to remain at the loading dock. Vehicles will need to be brought back to the dock if required to remove any waste, tools, or excess materials.
Deliverables The vendor shall provide CAD drawings (including shop drawings) and specifications for site prep for their product as required.
The vendor shall provide a completed VA Form 6550 with submittal documents for any and all item(s) that may connect to the VA network and medical devices that store sensitive patient information.
Assembly and Installation The vendor is required to manage and coordinate installation at the VA ROC with the COR.
On-site assembly and installation of items, and performance of services identified in this document shall take place during normal business hours which are defined as: 0800 to 1630 (i.e.: 8:00am to 4:30pm Pacific Standard Time), Monday through Friday, and excluding Federal Holidays.
The vendor is required to define the need for a staging area to accommodate item assembly and installation, if needed. Post-award, this information will be confirmed with the vendor.
The vendor is required to provide tools, labor and materials to complete assembly and installation of the items detailed in this document.
The vendor shall protect all finished spaces and surfaces as required from delivery and installation damage. The vendor shall use covering and protection to the extent necessary to prevent damage to finished spaces. Any damage occurred during delivery and installation is the responsibility of the vendor. The vendor will be responsible for paying for and repairing any damage or noted deficiencies to finished spaces and surfaces that occur as a result of the vendor’s (or associated sub-contractors) installation.
During the entire duration of assembly and installation, the vendor will have a competent representative on-site as the vendor’s contact, and to serve as the interface between the vendor and VA ROC. On-site representative can be the installer. All instructions provided from COR to the representative will be binding as if given to the vendor’s main contact. The COR may provide specific instructions, however, only the Contracting Officer may change the terms or conditions of the contract.
Training The vendor shall coordinate through the VA POC to provide a hands-on training session to staff selected by the VA. Training shall be completed within 45 days after final installation of equipment. The vendor will record the training and provide a copy of the training to the VA POC for VA to use to train additional personal at a future date. In addition, the vendor shall provide additional training documents to the VA POC for training additional persons at a future date.
Use of Premises During the performance of this contract, work will be carried out on VA ROC premises. The vendor will perform all work in such a manner that will cause a minimum interference with VA ROC operations and the operations of other contractors on the premises.
The vendor will communicate through the VA POC any required coordination requirements with the GC prior to and during delivery and installation activities.
The project may be an active construction site during delivery and installation. The vendor will take all necessary precautions to protect the premises and all persons and property therein from damage or injury. The vendor will assume responsibility for taking precautions for the vendor's (and associated subcontractors’) employees, agents, licensees, and permittees. The vendor shall abide by any safety requirements imposed by the GC (e.g. hard hats, safety vests).
VA Redding Outpatient Clinic U1115
3455 Knighton Road
Redding, CA 96002
| Project: VA Redding Outpatient Clinic, IOTA |
| Issue Date: OCT 2020 |
Total Quantity: 1
Item Name Computerized Dynamic Posturography Brand: Bertec Model: 97P-0036
Salient Characteristics:
· Computerized Posturograhy to include :
· CDP/IVR System
· Head Shake Sensory Organization Test
· Vision Advantage
· Baseline Visual Acuity - measures a patient’s visual acuity with the head stationary. The results are then
· used for comparison to later assessments of visual acuity with the head moving (DVA and GST).
· Visual Processing Speed - ensures that the patient can process the optotype stimuli quickly enough to
· use the DVA and GST protocols accurately.
· Dynamic Visual Acuity (DVA) - provides an assessment of the smallest character a patient can identify
· accurately while the head is moving at a specified velocity. Data can be collected for any axis of
· rotation (yaw, pitch or roll) and are independently analyzed and reported for each direction of rotation.
· Results indicating significant loss of visual acuity in one or both directions are considered an indication
· of VOR impairment.
· Gaze Stabilization Test (GST) - measures the rotational head velocity at which visual acuity breaks
· down (due to retinal slip). Results provide insight into a patient’s VOR function as related to demands
· during activities of daily living, and clinicians can use the data to make rehabilitation decisions and
· document progress.
· Sensory Organization Test (SOT) -- a six-condition test to isolate and evaluate individual sensory inputs
· to balance-visual, somatosensory and vestibular
· Motor Control Test (MCT) -- test of automatic motor response to an abrupt translation (forward and
· backward) of the support surface
· Adaptation Test (ADT) -- test of the patient’s ability to develop compensatory balance strategies in
· response to repeated surface perturbations image1.jpg image2.jpeg
File details come from the government source that posted it. Updated .