ATTACHMENT - J1 - PERFORMANCE WORK STATEMENT - NDR.pdf

PDF 674 KB Posted

Attached to
Network Detection & Response (NDR) Modernization Federal contract opportunity
Solicitation number
19AQMM25R0299
Issued by
Department of State Office of Acquisition Management

About this file

This Performance Work Statement (PWS) details the Department of State's Network Detection and Response (NDR) Modernization project for the Office of Cyber Monitoring and Operations. The objective is to acquire and deploy an advanced NDR solution that enhances the Department's ability to detect, investigate, and respond to network-based threats across its globally distributed IT enterprise, which includes approximately 280,000 nodes, 160,000 managed endpoints, and over 200 cloud instances.

The solicitation requires a scalable, AI-driven NDR solution with capabilities including automated threat detection, encrypted traffic inspection, east-west visibility, and real-time threat analysis. Key requirements include integration with existing cybersecurity tools, compliance with federal standards like FedRAMP High and Executive Order 14028, and support for deployment across data centers, internet gateways, demilitarized zones, and foreign/domestic posts. The contract will be a combination of Firm Fixed Price and Time-and-Materials, with a one-year base period and one optional one-year extension, tentatively scheduled from September 30, 2025 to September 29, 2027.

View the file

Other files for this federal contract opportunity

Other files attached to Network Detection & Response (NDR) Modernization, newest first.
File Type Posted
RFP 19AQMM25R0299_0001_Amendment.pdf PDF
RFP 19AQMM25R0299_Clarifications_DOS_Response_9_12_25.pdf PDF
19AQMM25R0299_NDR.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Office of Cyber Monitoring and Operations

Network Detection &

Response (NDR)

Modernization

Performance Work Statement (PWS)

Version 0.5

Final

DS/CTS/CMO Network Detection and Response PWS

August 22, 2025 Page 2 of 32

Table of Contents

1. DEFINITIONS AND ACRONYMS

2. GENERAL REQUIREMENTS

2.1. Introduction

2.2. Background

2.3. Objectives

2.4. Type of Contract

2.5. Non-personal and Not Inherently Government Services

2.6. Place(s) of Performance

2.7. Performance Period of Delivery Date

2.8. Kickoff Meeting

2.9. Travel

2.10. Government-Furnished Property/Equipment and/or Services

2.10.1. Proprietary Information

2.10.2. Access Requirements

2.11. Onboarding Process

2.12. Contractor Personnel Staffing and Assignments

2.13. Compliance with IT Security Policies

2.14. Special Considerations

2.15. Order of Precedence

3. SCOPE OF WORK

3.1. General Scope

3.2. Requirements

3.2.1. Technical Requirements

3.2.2. Software Integration Requirements:

3.2.3. Compliance Requirements:

3.2.4. Key Personnel Requirements:

3.3. Tasks

3.4. Desired Outcomes

August 22, 2025 Page 3 of 32

4. Deliverables and Schedule

4.1. Monthly Performance Reports

4.2. Delivery

4.3. Operations and Maintenance

5. Quality Assurance Surveillance Plan (QASP)

5.1. Acceptance Criteria and Inspection

5.2. Basis of Acceptance

5.3. Review

5.4. Contract Closeout

6. Evaluation Process

6.1.1. Factor 1 - Technical Approach

6.1.2. Solution Requirements Matrix

6.1.3. Proof of Technology (POT)

6.1.4. Deployment Strategy

Factor 2 - Management Approach

6.1.5. Factor 3 - Key Personnel

6.1.6. Factor 4 - Past and Present Performance

6.1.7. All cryptographic functions must use FIPS 140-2 or FIPS 140-3 validated modules, in accordance with federal standards and Department policy

References

Table 2 List of Deliverables

August 22, 2025 Page 4 of 32

1. DEFINITIONS AND ACRONYMS

• Contracting Officer (CO): A person with authority to enter into, administer, and or terminate contracts and make related determinations and findings on behalf of the government. A CO is the only individual who can legally bind the government.

• Contracting Officer's representative (COR): A representative from the requiring activity appointed in writing by the CO to perform surveillance and to act as liaison to the

Contractor. This individual has the authority to provide technical direction to the

Contractor if that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have the authority to change the terms and conditions of the contract.

• Sprint - A sprint is a two-week cycle derived from Agile methodology that focuses on completing specific tasks or objectives. Each sprint begins with a planning meeting to define objectives and priorities, followed by a review meeting to assess progress and plan next steps. The goal is to ensure continuous development and improvement of deliverables.

2. GENERAL REQUIREMENTS

2.1. Introduction

The Office of Cyber Monitoring and Operations (DS/CTS/CMO) is enhancing the Department of

State’s cyber defense capabilities to address sophisticated and persistent network-based threats.

To support this mission, the Cyber Operations Division (DS/CTS/CMO/COD) is procuring a

Network Detection and Response (NDR) solution that delivers advanced capabilities such as AI-driven traffic analysis, encrypted traffic inspection, east-west visibility, and automated threat detection and response. This acquisition supports CMO’s broader efforts to modernize network security monitoring and reduce mean time to detect and respond to threats across enterprise and non-enterprise network environments.

2.2. Background

The U.S. Department of State operates one of the largest global IT enterprises in the federal government, supporting diplomatic operations across approximately 275 overseas posts in 175 countries and 150 domestic locations. The Department’s networks support over 125,000 users and include approximately 280,000 nodes and 160,000 managed endpoints. Additionally, the

Department maintains 356 FISMA systems deployed across its global infrastructure, including on-premises and managed cloud environments comprising more than 200 cloud instances.

This highly distributed and evolving enterprise spans traditional data centers, commercial and government cloud platforms, and third-party hosted services. Ongoing modernization efforts and

August 22, 2025 Page 5 of 32 expanding mission requirements continue to increase the complexity of securing Department-wide IT assets.

To address these challenges, the Office of Cyber Monitoring and Operations (DS/CTS/CMO) is enhancing its network security monitoring capabilities. This effort aligns with the Department’s

Target Security Architecture (TSA) and supports broader Departmental cybersecurity modernization initiatives.

2.3. Objectives

The objective of this procurement is to acquire and deploy a fully operational Network Detection and Response (NDR) solution that significantly enhances the Department of State’s ability to detect, investigate, and respond to advanced network-based threats across its globally distributed

IT enterprise.

Desired Outcomes

• Reduce mean time to detect and respond (MTTD/MTTR) by 50%.

• Achieve real-time threat visibility and automated response across on-premises and cloud environments.

• Ensure compliance with federal cybersecurity mandates, including EO 14028, FISMA, and FedRAMP High.

• Enable proactive threat hunting through AI-driven analytics and enriched context.

Key Objectives

• Improved Network Visibility: Enable deep inspection of raw network traffic and metadata enrichment to support threat detection, correlation, and forensics.

• Advanced Threat Detection: Leverage ML and behavioral analytics to identify abnormal activity and detect sophisticated adversary tactics, techniques, and procedures (TTPs).

• Cloud and Hybrid Support: Provide seamless coverage across on-premises, hybrid, and government/commercial cloud environments.

• Streamlined Incident Management: Automatically correlate related alerts into logical incidents to reduce alert fatigue and accelerate triage.

• Automated Response Capabilities: Support automated actions such as host isolation, traffic blocking, and orchestration through existing SOAR platforms.

• Enhanced Threat Hunting: Provide AI-assisted tools and contextual datasets to empower proactive investigations by SOC analysts.

• Scalability and Interoperability: Ensure the solution integrates with existing cybersecurity infrastructure and scales to meet enterprise needs.

August 22, 2025 Page 6 of 32

2.4. Type of Contract

DS/CTS/CMO/COD anticipates the award a combination of a Firm Fixed Price (FFP) and Time-and-Materials (T&M) contract. The initial term of the Contract will be one-year base period from the date of award with one, one-year option period that may be exercised solely at the government's discretion.

2.5. Non-personal and Not Inherently Government Services

It shall be the responsibility of the vendor to manage its employees and to guard against any actions that are of the nature of personal services or give the perception of personal services. If the vendor feels that any actions constitute, or are perceived to constitute, personal services, it shall be the vendor’s responsibility to notify the Contracting Officer (CO) immediately. These services shall not be used to perform work of a policy/decision making or management nature

(i.e., inherently Governmental functions). All decisions relative to programs supported by the vendor shall be the sole responsibility of the Government.

2.6. Place(s) of Performance

• DOS BIMC, 8101 Odell Rd Beltsville MD, 20705

• DOS ESOC West,1 Denver Federal Center, Building 17, Denver, Colorado 80225

• DOS SA-20, 1801 N Lynn Street Arlington VA, 22209

• As needed physical presence at other government locations within the National Capital

Region (NCR).

• Remote work can be authorized, as directed by the Contracting Officer or their

Representative.

2.7. Performance Period of Delivery Date

This Task Order is a Period of Performance (POP) from date of award one-year base period from the date of award with one, one-year option period that may be exercised solely at the government's discretion.

• Tentatively 30 September 2025 – 29 September 2026 Base Year

• 30 September 2026 – 29 September 2027 Option Year 1

2.8. Kickoff Meeting

Within 7 days of award the Contractor will host a kick-off meeting with the COR, GTM and relevant stakeholder aimed to align and initiate the process for developing and delivering on tasks and requirements outlined in Section 3 - Scope of Work, defining communication and reporting protocols, addressing questions and concerns, and outlining next steps.

August 22, 2025 Page 7 of 32

2.9. Travel

Any business travel required outside of the Place of Performance must be authorized by the

COR.

2.10. Government-Furnished Property/Equipment and/or Services

The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to provide support as defined in this Performance Work Statement (PWS) except for those items specified below as government furnished property and services:

• DOS Personal Identification Card – The COR will work with Contractor to obtain personal identification / network access cards for Contractor’s employees.

• Access to Department of State Networks/Systems

• Workspace and utilities shall be provided if applicable.

o Location: SA-26, 8101 O’Dell Rd. Beltsville, MD 20708 o Location: SA-20, 1801 N Lynn Street Arlington VA, 22209 o Location: DOS ESOC West, 1 Denver Federal Center, Building 17, Denver, Colorado 80225

2.10.1. Proprietary Information

In the event that performance of any work under this task order causes the Contractor to gain access to proprietary or confidential information of other firms/Contractors, the Contractor is required to immediately execute a Non-Disclosure Agreements with those firms/Contractors, in order to protect the information from unauthorized use. The Contractor is required to refrain from using any such information for any purposes other than for which it was furnished. The

Contractor must immediately provide the CO with a copy of any such agreements with original signatures affixed.

2.10.2. Access Requirements

The Contractor shall require access to Department of State Networks/Systems to perform work under the contract. The COR will oversee such access.

Building access to SA-20, SA-26, and ESOC West will be requested through the Uniform

Security Officer.

All Contractor personnel that will work on the NDR project shall have a current security clearance at a minimum of High Risk Public Trust (HRPT).

This is a Sensitive but Unclassified (SBU) contract. Contractor personnel specifically designated by the Contracting Officer's Representative (COR) will be required to have a High Risk Public

Trust (HRPT) determination conducted by the Bureau of Diplomatic Security.

August 22, 2025 Page 8 of 32

Please note, a DD Form 254 will not be issued for a Sensitive But Unclassified contract

2.11. Onboarding Process

The Contractor shall manage the onboarding of its staff for all Contractor personnel who have not yet been onboarded. Onboarding includes steps to obtain a network and email account, complete training, initiate background investigations, and gain physical and logical access, which may include elevated privileges to the necessary development and test environments for the various systems to be enhanced.

A single Contractor Onboarding point of contact (POC) shall be designated by the Contractor that tracks the onboarding status of all Contractor personnel. The Contractor Onboarding POC shall be responsible for accurate and timely submission of all required onboarding paperwork to the COR. The Contractor shall be responsible for tracking the status of all its staff’s onboarding activities and report the status at the staff level during onboarding status meetings. The

Contractor shall provide, to the COR, an Onboarding Status Report for any staff with outstanding onboarding requests.

The COR will provide onboarding assistance and guidance for onboarding

2.12. Contractor Personnel Staffing and Assignments

(a) In the event that any of the key personnel named in the Contractor’s quotation, as accepted by the Government at award, are unable to perform because of death, illness, resignation from the

Contractor’s employ, dissolution of agreement, or other reasons, the Contractor shall submit within 24 hours to the CO/COR, detailed written explanations of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any other information that the CO/COR deems pertinent to approve the substitution. No substitution is to be made without the prior written approval of the CO/COR. No increases in pricing will be allowed when substitutions are authorized by the Government.

(b) Personnel possessing unique technical specialties (sec. 3.2.4. Personnel Requirements) may be required for certain services related to the acquisition tasks. Such personnel shall have qualifications as required by the applicable tasks and approved by the CO/COR, which are appropriate to the nature of the services that will be provided.

(c) The CO will have the right to effect removals of any Contractor employees, if those employees are deemed not to possess the proper level of competence or abilities (sec. 3.2.4

Personnel Requirements), or otherwise found to be unsuitable for work required. In such cases, the Contractor must promptly submit the names and any other information pertinent to approvals of substitutions if requested.

(d) Failure or delays by the Contractor in providing qualified personnel who meet the stated requirements of this acquisition, may be deemed sufficient reason by the COR to recommend termination for cause to the CO.

August 22, 2025 Page 9 of 32

The Contractor shall provide the CO with a primary and alternate administrative point of contact

(POC) after award. One of these points of contact must be a Contract Executive. The Contractor shall notify your office of any changes in contact information as expeditiously as possible.

2.13. Compliance with IT Security Policies

DOS programs are pursuant to and the Contractor shall complete all work in accordance with the following security regulations, standards, policies, procedures, and guidelines: Contractors are also required to comply with current Federal regulations and guidance found in the:

1. Federal Information Security Management Act of 2002 (FISMA)

2. Omnibus Diplomatic Security and Anti-Terrorism Act of 1986, as amended.

3. President’s National Counter Intelligence Strategy

4. Computer Fraud and Abuse Act of 1986

5. Federal Financial Managers’ Financial Integrity Act of 1982

6. Privacy Act of 1974

7. Executive Order 14028

8. National Security Telecommunications and Information System Security Instruction

(NSTISSP) 5

9. Office of Management and Budget (OMB) Circulars A-123 and A-130 Appendix III

10. National Institute of Standards and Technology (NIST) Federal Information Processing

Standards (FIPS) and Special Publications (SPs)

11. National Information Assurance Certification and Accreditation Process (NIACAP)

12. National Security Agency Information Security Assessment Methodology (ISAM) and

NSA 4016

13. 1 Foreign Affairs Manual (FAM) Authority, Responsibility, and Organization

14. FAM 600 Information Security Technology

15. 12 FAH-6 H-540 Automated Information Systems Security

16. 5 FAM 600 Information Technology Systems

17. 5 FAH-5 H-100 Information Technology Systems

18. National Institute of Standards and Technology (NIST) Federal Information Processing

Standards (FIPS)

19. NIST 800-Series Special Publications (SP)

20. Office of Management and Budget (OMB) memoranda

Contractors are required to protect information regarding security issues and associated documentation to limit the likelihood that vulnerabilities in operational software are exposed. If new vulnerabilities are identified after the acceptance of COTS software, the Contractor must review and remediate the vulnerabilities and then present the results for Government approval within the timeframes documented in your office’s security policies.

August 22, 2025 Page 10 of 32

2.14. Special Considerations

Government Identification: The vendor needs to have U.S. citizenship and a valid government identification to access work location.

Contract Business Activities: The Vendor and its employees shall conduct ONLY business covered by this contract during periods paid for by the Government and shall NOT conduct any other business on Government premises.

2.15. Order of Precedence

In the event of inconsistencies, between the Contractor’s proposal/quote and PWS, the required work specified in this PWS will take precedence over the Contractor’s proposal/quote.

3. SCOPE OF WORK

3.1. General Scope

The Office of Cyber Monitoring and Operations (DS/CTS/CMO) within the Bureau of

Diplomatic Security manages cybersecurity tools to protect the Department of State’s networks and data. This section outlines requirements for delivering a scalable, AI-driven Enterprise

Network Detection and Response (NDR) system that integrates seamlessly with existing cybersecurity tools, provides comprehensive threat visibility, and supports proactive threat hunting and incident response. The desired end-state is a solution that reduces alert fatigue, improves triage efficiency, and enhances the Department’s ability to mitigate sophisticated adversary techniques."

In addition to addressing the functionality requirements referenced in Section 3.2 and 3.3, proposals must include:

• Sample Implementation Plan: A high-level phased plan with diagrams for designing, configuring, implementing, and delivering the NDR Solution.

• Test Plan: A sample plan for testing and acceptance of the NDR Solution.

• Training Plan: A detailed plan for training Agency staff, broken down by role/persona to specify required training levels.

• Ongoing Maintenance and Support: A description of post-implementation support and maintenance after transitioning to operations.

3.2. Requirements

The requirements defined in this section establish the minimum functional, performance, and interoperability capabilities that the proposed Network Detection and Response (NDR) solution

August 22, 2025 Page 11 of 32 must provide to achieve the desired outcomes. These outcomes include real-time threat detection, automated response capabilities, and compliance with federal cybersecurity mandates. Offerors shall demonstrate how their proposed solution meets or exceeds each capability, with a focus on delivering measurable improvements in threat detection and response efficiency. These requirements support the Department’s objective to enhance threat detection, investigation, and response across enterprise and non-enterprise networks, while ensuring integration with existing cybersecurity tools and infrastructure.

The solution shall be scalable to accommodate the Department’s global IT environment, including over 280,000 nodes and 200+ cloud instances, and shall operate across on-premises, virtual, hybrid, and cloud-native environments. All requirements in this section are mandatory unless otherwise stated, and Offerors shall clearly demonstrate how their proposed solution meets or exceeds each capability.

Each requirement is assigned a unique identifier (UID) to facilitate traceability and ensure alignment with evaluation criteria, system design, testing, and future performance assessments.

These requirements are evaluated under Factor 1 – Technical Approach and are traceable via

Offer submission of a Solution Requirements Matrix.

3.2.1. Technical Requirements

The following technical requirements define the mandatory capabilities of the Network

Detection and Response (NDR) solution. These capabilities are essential to support enterprise-wide threat detection, incident response, and security operations across the Department’s globally distributed and hybrid IT environment.

Offerors shall ensure that all listed requirements are met in full. Each item is assigned a unique identifier (UID) to support evaluation, traceability, and verification during deployment and testing phases. Solutions must be scalable, support cloud and on-premises environments, and integrate with the Department’s existing cybersecurity infrastructure.

UID Name Requirement

NDR.1 Local Account

Management

Provide local user account management on each deployed NDR device or sensor.

NDR.2 EDR/SOAR Integration Support integration with EDR solutions, including tipping and queuing into SOAR platforms.

NDR.3 Custom Signature

Development

Ability to create and deploy custom detection signatures.

NDR.4 Log Generation Produce high-fidelity logs for ingestion by downstream analytics and SIEM platforms.

NDR.5 Packet and Flow

Analysis

Capture and analyze raw network packets and flow data for threat identification and behavioral analysis.

NDR.6 Incident Aggregation Group individual alerts into correlated incidents to enhance threat

August 22, 2025 Page 12 of 32 triage and investigation efficiency.

NDR.7 Alert Correlation Detect and aggregate logical security incidents using multiple signals such as host, user, or anomaly patterns.

NDR.8 Automated Response Facilitate automatic isolation hosts or block network traffic based on detected threats across North-South and East-West paths.

NDR.9 Anomaly Detection Establish baselines of normal network activity and alert on deviations or suspicious anomalies.

NDR.10 Cloud Network

Monitoring

Analyze traffic in IaaS environments, including support for major cloud providers.

NDR.11 Traditional Detection

Techniques

Utilize detection methods such as IDP signatures, heuristics, and threshold-based rules.

NDR.12 Manual/Automated

Response

Offer real-time analyst-triggered and fully automated responses to malicious activity.

NDR.13 Behavioral Analytics and ML

Employ behavioral models and ML-based analytics to identify advanced threats and anomalies.

NDR.14 Data Normalization and

Enrichment

Add contextual metadata to captured data for enhanced analysis.

NDR.15 Automated Incident

Response

Allow definition and execution of automated workflows for security events.

NDR.16 Centralized

Management

Enable centralized management for deployment of updates, configurations, policies, and use cases.

NDR.17 Application Layer

Inspection

Inspect Layer 7 traffic to identify threats in application payloads or malformed protocols.

NDR.18 Real-Time Threat

Analysis

Collect and analyze live network traffic for detecting patterns, anomalies, and threats.

NDR.19 Vulnerability

Identification

Detect system or configuration weaknesses that could be exploited by attackers.

NDR.20 CSP API Monitoring Ingest and analyze telemetry from cloud provider APIs for additional threat context.

NDR.21 Traffic Flow Analysis Monitor and analyze North-South and East-West traffic flows across networks.

NDR.22 Network Forensics Enable deep incident investigation through historical traffic capture and metadata analysis.

NDR.23 Network Replay Replay captured sessions for retrospective analysis and threat hunting.

NDR.24 Rule/Threshold-Based

Alerts

Alert on security events based on custom rules or thresholds.

NDR.25 ML-Based Baseline

Detection

Detect anomalies using machine learning models based on expected behavior.

NDR.26 Hybrid Deployment

Support

Support deployment across on-premises, virtual, and cloud environments.

NDR.27 SSL/TLS Decryption Decrypt encrypted traffic for inspection where authorized.

NDR.28 Signature-Based Identify threats using updated malware signatures.

August 22, 2025 Page 13 of 32

Malware Detection

NDR.29 Behavioral Malware

Detection

Identify unknown malware through behavior analysis.

NDR.30 Command and Control

Detection

Identify outbound communications that resemble C2 traffic.

NDR.31 Data Exfiltration

Detection

Detect attempts to move sensitive data outside the network.

NDR.32 Encrypted Threat

Detection

Identify malicious activity in encrypted traffic, even without full decryption.

NDR.33 Incident Reporting Generate and export incident summaries to ticketing systems.

NDR.34 Audit Trail and

Forensics

Maintain logs and metadata for compliance and investigation.

NDR.35 Compliance Reporting Support compliance with RMF, FISMA, EO 14028, and OMB

M-21-31.

3.2.2. Software Integration Requirements:

The Contractor shall ensure that the proposed NDR solution integrates natively or via supported

APIs with the Department of State’s existing cybersecurity and IT platforms. At a minimum, the

NDR solution shall support integration with the following tools and platforms:

UID Name Requirement

NDR.36

Splunk Forward parsed or raw events and log data for centralized analysis and alert correlation.

NDR.37

Zeek Ingest and enrich network metadata from Zeek for behavioral and protocol-level insights.

NDR.38 Suricata Correlate Suricata alert data to support threat detection and validation workflows.

NDR.39

ServiceNow Automatically generate incident tickets and update status fields via bi-directional APIs.

NDR.40

Palo Alto

Networks

Ingest firewall telemetry and enable automated response actions (e.g., IP blocking).

NDR.41

Syslog Send logs and event data using standard syslog protocols (e.g., RFC

5424, RFC 3164).

NDR.42

Cribl Support integration into log pipelines and enrichment workflows managed via Cribl.

NDR.43

Microsoft

Defender Products

Integrate with Defender for Endpoint and Defender for Identity for alert sharing and correlation.

August 22, 2025 Page 14 of 32

3.2.3. Compliance Requirements:

To ensure alignment with federal cybersecurity mandates and Departmental policy, the NDR solution and associated contractor services must meet the compliance requirements outlined in this section. These requirements are intended to safeguard sensitive information, support system accreditation, and ensure adherence to applicable laws, regulations, and executive directives.

At a minimum, the proposed solution shall comply with requirement NDR-44, by being either

FedRAMP High authorized or actively undergoing FedRAMP High authorization with a formal submission to the FedRAMP PMO or a sponsoring agency. Solutions under review must demonstrate technical readiness to operate within a FedRAMP High environment.

The solution must be offered by a U.S.-based vendor, using personnel and infrastructure located within the United States.

The contractor shall also support the Department’s compliance obligations under applicable federal cybersecurity frameworks, including the Risk Management Framework (RMF), FISMA, Executive Order 14028, and OMB Memorandum M-21-31. This includes the timely provision of required documentation, security artifacts, and direct support for achieving and maintaining an

Authority to Operate (ATO) or Authority to Use (ATU).

UID Name Requirement

NDR.44 FedRAMP High The NDR solution shall be either:

• FedRAMP High authorized, with current certification issued by the PMO, or

• Actively undergoing FedRAMP High authorization, with a formal package submitted to the PMO or a sponsoring agency.

The Offeror shall provide verifiable documentation of its status, such as:

• A FedRAMP authorization letter or marketplace listing, a sponsor letter confirming JAB or agency review, or a submission confirmation with a System

Security Plan (SSP) aligned to FedRAMP High baselines.

Solutions still in review must also demonstrate technical readiness to operate within a FedRAMP High environment, including alignment with applicable security controls and architectural requirements.

NDR.45 U.S.-Based Vendor &

Services

All services and personnel supporting the NDR solution must be U.S.-based. All infrastructure must be located within the

United States.

NDR.46 FIPS Compliance All cryptographic functions must use FIPS 140-2 or FIPS 140-

August 22, 2025 Page 15 of 32

3 validated modules, in accordance with federal standards and

Department policy.

3.2.4. Key Personnel Requirements:

The success of the Network Detection and Response (NDR) solution depends not only on the capabilities of the technology, but also on the expertise of the personnel responsible for its implementation, integration, and ongoing support. This section defines the minimum qualifications for contractor personnel who will support the Department throughout the NDR lifecycle, including planning, deployment, configuration, tuning, training, and maintenance.

Each labor category includes a description of responsibilities, minimum education and certification expectations, and required experience. Offerors shall propose qualified personnel that meet or exceed the stated requirements and shall clearly map proposed staff to the labor categories defined below.

UID Labor

Category

Duties Education Certificati ons

Experience Minimum clearance level

NDR.47 Project

Manager

Serves as the contractor's task manager overseeing personnel and supporting the

NDR project.

A Bachelor's

Degree in

Computer

Science, Information

Systems, Engineering, Telecommun ications, or other related scientific or technical discipline is desirable.

Five (5) additional years of general experience may be substituted for the degree.

PMP or

CISSP

Specialized

Experience: Seven

(7) years of experience in network security with a focus on cyber threat analysis and advanced network security analysis.

Five (5) years of technical task management and supervisory experience.

High-Risk Public

Trust (HRPT)

August 22, 2025 Page 16 of 32

NDR.48 Cybersecuri ty Architect

Designs and define system architecture for new or existing complex networks.

Determines systems specifications, input/output processes, and working parameters for hardware/softw are compatibility and maintenance of system security.

Successfully coordinates design of subsystems and integration of total system.

Identifies, analyzes, and able to resolve project support deficiencies.

A Bachelor's

Degree in

Computer

Science, Information

Systems, Engineering, Telecommun ications, or other related scientific or technical discipline is desirable.

Five (5) additional years of general experience may be substituted for the degree.

CASP+

CE

CCNA-

Security

CISSP (or

Associate)

CND

CSSLP

CySA+

GICSP

GSEC

Security+

CE

SSCP

5 Years with

Bachelors in

Science; 3 Years with Masters; 0

Years with PhD.

August 22, 2025 Page 17 of 32

NDR.49 Senior

Engineer/A nalyst

Performs technical planning, system integration, verification and validation, cost and risk, and supportability and effectiveness analyses for total systems.

Skilled at performing analysis at all levels of total system product to include:

concept, design, fabrication, test, installation, operation, maintenance and disposal.

Has background of skills to ensure the logical and systematic conversion of customer or product requirements into total systems solutions that acknowledge technical, schedule, and cost constraints.

A Bachelor's

Degree in

Computer

Science, Information

Systems, Engineering, Telecommun ications, or other related scientific or technical discipline is desirable.

Five (5) additional years of general experience may be substituted

CCNA-

Security

CISSP (or

Associate)

CND

CSSLP

CySA+

GICSP

GSEC

Security+

CE

SSCP

5 Years with

Bachelors in

Science; 3 Years with Masters; 0

Years with PhD.

August 22, 2025 Page 18 of 32

Proficient with performing functional and timeline analysis.

NDR.50 Mid-Level

Engineer/A nalyst

Performs technical planning, system integration, verification and validation, cost and risk, and supportability and effectiveness analyses for total systems.

Skilled at performing analysis at all levels of total system product to include:

concept, design, fabrication, test, installation, operation, maintenance and disposal.

Has background of

A Bachelor's

Degree in

Computer

Science, Information

Systems, Engineering, Telecommun ications, or other related scientific or technical discipline is desirable.

Five (5) additional years of general experience may be substituted

CCNA-

Security

CISSP (or

Associate)

CND

CSSLP

CySA+

GICSP

GSEC

Security+

CE

SSCP

2 Years with

Bachelors in

Science; 0 Years with Masters.

August 22, 2025 Page 19 of 32 skills to ensure the logical and systematic conversion of customer or product requirements into total systems solutions that acknowledge technical, schedule, and cost constraints.

Proficient with performing functional and timeline analysis.

3.3. Tasks

NDR Deployment

The Contractor shall plan, deploy, and operationalize a modular and scalable Network Detection and Response (NDR) solution that is compliant with Department security standards and compatible with the Department’s enterprise architecture. The initial implementation shall be driven by Government stakeholder priorities and funding availability, with the expectation that the solution will support expansion in future phases.

Deployment shall prioritize, as directed by the Government, the following network environments:

• Department of State (DOS) Data Centers

• Trusted Internet Connections (TIC) and Internet Gateways

• Demilitarized Zones (DMZs)

• Foreign and Domestic DOS Posts

• Non-Enterprise Networks (NENs)

The Contractor shall:

August 22, 2025 Page 20 of 32

• Develop and deliver a comprehensive NDR Implementation Plan, to include timelines, phased deployment strategy, and milestone tracking.

• Execute a prioritized, phased deployment in accordance with stakeholder direction and available resources, ensuring the architecture supports future scaling.

• Provide hands-on-keyboard technical support for:

o Deployment of sensor nodes, agents, and physical/virtual appliances o Configuration of management consoles and tuning of sensor parameters o Development and deployment of operational dashboards for analyst use

• Coordinate and conduct pilot testing and functional validation of the solution in collaboration with designated Government stakeholders.

Compliance and Authorization Support

The Contractor shall support the Department’s efforts to achieve and maintain system authorization under the Risk Management Framework (RMF), including activities required for

Authority to Operate (ATO) or Authority to Use (ATU). The Contractor shall ensure the NDR solution aligns with FedRAMP High baselines and Department-specific security requirements.

At a minimum, the Contractor shall:

• Support all RMF lifecycle steps, including control implementation, assessment preparation, and continuous monitoring readiness.

• Provide documentation and security artifacts necessary for system boundary accreditation, including but not limited to:

o System Security Plans (SSP) o Risk Assessment Reports (RAR) o Security Control Traceability Matrix (SCTM) o Configuration Management Plans (CMP) o Privacy Threshold Analyses (PTA), if applicable

• Assist in preparing ATO/ATU packages, including participation in stakeholder reviews and information exchanges with the Information System Security Officer (ISSO), Authorizing Official (AO), and System Owner.

• Demonstrate compliance with requirement NDR-44, by either:

o Providing documentation of FedRAMP High authorization, or o Providing proof of active submission to the FedRAMP PMO or sponsoring agency, along with a deployment approach and system architecture that is fully capable of operating within a FedRAMP High environment.

• Deliver evidence of compliance or capability to operate within a FedRAMP High-authorized environment, including FedRAMP-compliant architecture, control inheritance documentation, and any subcontractor authorization materials.

• Draft and maintain a Deployment Risk Register, identifying and tracking risks associated with accreditation, including proposed mitigation strategies and resolution timelines.

August 22, 2025 Page 21 of 32

System Management and Sustainment

The Contractor shall support the operational readiness, sustainment, and optimization of the deployed Network Detection and Response (NDR) solution during the transition period and in coordination with Government stakeholders. The Contractor shall ensure the system is properly configured, documented, and transitioned for Government-led operations, while maintaining Tier

3-level subject matter expertise (SME) support for complex or escalated issues.

At a minimum, the Contractor shall:

• Support Transition to Operations (TTO) by:

o Coordinating with Government personnel to plan and execute the transition of system ownership o Providing technical walkthroughs, documentation, and shadowing opportunities for Government staff o Delivering a finalized Transition to Operations Plan including milestones, artifacts, and post-transition responsibilities

• Deliver all system documentation, including:

o System architecture and design documents o Sensor and appliance configuration baselines o Standard operating procedures (SOPs), tuning guides, and dashboard playbooks

• Ensure centralized system management capability across all deployed components to support configuration changes, rule updates, and health monitoring during transition

• Implement automated workflows for:

o Patching and signature updates o Policy distribution and performance tuning

• Provide role-based training and knowledge transfer, tailored for SOC analysts, ISSOs, and system administrators

• Assign a Tier 3 NDR Subject Matter Expert (SME) to provide ongoing expert-level technical support to the Government post-transition, including:

o Complex troubleshooting o Advanced detection tuning and analysis o Integration support for new data sources or threat intelligence feeds o Strategic advisory on future enhancements or scalability o Support for unplanned outages or system degradation events, including after-hours availability on an on-call basis when required by the Government

The Tier 3 SME resource shall remain available as a designated resource throughout the contract period of performance.

August 22, 2025 Page 22 of 32

3.4. Desired Outcomes

The desired outcomes of the Network Detection and Response (NDR) solution include:

• Real-time detection and automated response to advanced network-based threats.

• Enhanced threat visibility across on-premises, cloud, and hybrid environments.

• Reduction in alert fatigue through advanced incident aggregation and triage capabilities.

• Compliance with federal cybersecurity mandates, including Executive Order 14028, FISMA, and FedRAMP High standards.

• Improved scalability and interoperability with existing Departmental cybersecurity infrastructure.

• Offerors shall clearly demonstrate how their proposed solution will achieve these outcomes and provide measurable benchmarks for success.

4. Deliverables and Schedule

This section outlines the required deliverables, reporting, and support expectations for the

Network Detection and Response (NDR) solution. All deliverables shall be submitted to the

COR and CO, unless otherwise specified.

UID Deliverable Description Due Date

D-01 Kickoff Meeting Orientation on implementation strategy and goals

Within 7 days of contract award

D-02 Onsite Discovery &

Requirements

Validation

Contractor-led onsite discovery with ISSOs and analysts to validate requirements and inform planning

Within 10 business days

D-03 Baseline Assessment Review of current detection posture, log architecture, and threat landscape

Within 15 business days

D-04 Initial NDR Rollout Begin phased deployment of NDR sensors, agents, and appliances

Within 30 days of contract award

D-05 Platform Configuration Configure detection rules, dashboards, RBAC, and anomaly thresholds

Within 60 days

D-06 Integration Testing Integrate NDR with Splunk, ServiceNow, SOAR, and other security tools

Within 60 days

D-07 Help Desk & IR

Workflow Setup

Establish escalation matrix, KBAs, and incident response workflows

Within 90 days

D-08 Training Sessions Deliver tiered training for SOC analysts and engineers

By Day 90 and as requested

D-09 Monitoring Setup Enable telemetry, packet capture optimization, and alert tuning

Within 90 days

D-10 Engineering, Complete engineering, deployment, and By Day 180

August 22, 2025 Page 23 of 32

Configuration, and

Installation of NDR system configuration

D-11 Final Acceptance

Testing

Joint validation of NDR capabilities and simulation of core use cases

By Day 180

D-12 Transition to Operations

& Maintenance

Turn over system to Government with finalized architecture documentation and

SOPs

By Day 180

D-13 Ongoing Operational

Support

Provide Tier 2/3 support, tuning, and SOC optimization, including onsite presence as needed

Day 180 through contract duration

D-14 Security Compliance

Support

Support FedRAMP Authorization, RMF, and FISMA compliance including SSPs and

POA&Ms

Award through contract duration

D-15 Audit & Performance

Validation

Conduct periodic audits to validate operational, security, and performance metrics

Ongoing

D-16 Roadmap Planning Collaborate with stakeholders to plan enhancements and scalability improvements

Ad hoc, as requested

D-17 Weekly Status Meeting

Minutes

Provide minutes capturing status, blockers, actions, and sprint priorities

Weekly

Table 1 List of Deliverables

4.1. Monthly Performance Reports

The Contractor shall submit a Monthly Performance and Progress Report by the 5th of each month, summarizing:

• Accomplishments, risks, and mitigation actions

• Project milestones and deliverables status

• Cost reporting and cumulative performance data

• Analysis to support monthly COR review meetings

• Format must be approved by the COR within 10 business days of award.

4.2. Delivery

All deliverables will be submitted to the acquiring agency’s Contracting Officer’s Representative

(COR) with a copy to the acquiring agency’s Contracting Officer (CO). Inspection and acceptance of all work performance, reports, and other deliverables under this task order shall be performed by the COR. In addition, the Vendor shall provide deliverables to the following electronic mail addresses:

• Contract Officer Representative (COR), August 22, 2025 Page 24 of 32

• Cyber Operations Deputy Division Chief,

• Cyber Operations Division Chief,

4.3. Operations and Maintenance

The Contractor shall provide post-deployment support and sustainment services including:

• Include US-based OEM support accessible 24 hours a day x 7 days a week, by phone, web, email, and include a dedicated account subject matter expert (SME) for DoS, as well as a clearly defined escalation and resolution process included within the solution.

• Deliver detailed description of warranty, license, and maintenance support services to include service level agreements and mean time to resolution projections for standard and severe support incidents.

• Dedicated account SME with defined escalation process

• Warranty and maintenance support with SLAs and MTTR metrics

• Training options: admin, analyst (Jr/Mid/Sr), virtual or in-person

• Customer web portal with:

o Asset/version tracking o SOPs, guides, white papers o Searchable KBAs o Ticketing and historical incident tracking

• Outline clearly defined Returned Merchandise Authorization (RMA) processes, with 4-hour drop shipment of replacement components.

• Secure software updates, including:

o Security patches o Feature updates o IOCs, threat signatures, AI/ML model updates

• Contractor shall assume and accept that DOS will not return any hard drives.

5. Quality Assurance Surveillance Plan (QASP)

5.1. Acceptance Criteria and Inspection

The oversight provided for in the order and in this plan would help to ensure that service levels reach and maintain the required levels throughout the contract term. Further, this plan provides the COR with a proactive way to avoid unacceptable or deficient performance and provides verifiable input for the required Past Performance Information.

Assessments or Contractor Performance Assessment Reports (CPARS). Inspection and acceptance of all work performance, reports, and other deliverables under this task order shall be performed by the DOS COR at the COR designated work location.

August 22, 2025 Page 25 of 32

All documents and deliverables (‘work products’) produced by the Contractor as part of performance shall meet the following general acceptance criteria. Additionally, the Contractor shall ensure that the NDR solution achieves the following performance metrics:

• False positive rate below 5% under normal traffic conditions.

• False negative rate below 2% under known attack conditions.

• System uptime of 99.9% or higher.

• Reduction in mean time to detect and respond to threats by 50%. Deliverables that fail to meet these metrics will be subject to corrective action as outlined in Section 5.2.

The Contractor and its Sub-Contractors must meet the quality measures, described below, for any and all work products and deliverables submitted to the Government.

• Timeliness – Work products and deliverables shall be available at the time required and generated on or before specified due dates as stated in the Contractor or issued task order.

• Quality – Quality consists of the two elements, value and accuracy, as described below.

• Value – Work products shall directly address objectives as directed by the COR.

• Accuracy – Work products and deliverables shall be free errors and mistakes; and be developed in accordance with applicable laws, regulations, policies, and procedures.

• Completeness – Work products and deliverables shall address all content as directed by the COR.

• Clarity – Work products and deliverables shall be easy to understand. Work products and deliverables shall be designed to achieve agreed-to objectives, tailored to identified audiences, avoid materials not germane to the objective, and be of high quality with regard to grammar and sentence structure.

• Format – Work products and deliverables shall be submitted in soft copy via email, unless otherwise required by the COR.

The COR will review draft and final work products for completeness, accuracy, and appropriateness. If the COR identifies or encounters any significant deficiencies, and is therefore considered non-acceptable, then the COR will return the work product to the Contractor.

For all work products or deliverables that the COR deems unacceptable or deficient, the

Contractor will be required to correct or augment the deficiency as required.

The Contractor shall submit a revised, corrected work product or deliverable within two (2) business days from initial notification by the COR (or as otherwise specified by the COR).

Unacceptable deficiencies that would require Contractor resubmission at no extra cost to the

Government include, but are not limited to, the following examples:

• Omitting required documents or information;

• Non-conforming documents (according to pre-stated or mandatory standards regarding

August 22, 2025 Page 26 of 32 content and format);

• Disorganized or poorly organized review packages;

• Non-adherence to review protocols and accepted procedures;

• Making material errors or allowing substantial inadequacies; and,

• Any other fundamental error or mistake on the part of the Contractor.

The COR may delegate responsibility for review of any work product and/or deliverable to other

Government employees who possess the appropriate expertise for their consideration and input regarding acceptability or deficiencies.

All Contractor deliverables and work products produced as part of performance under this contract become Government property. As Government property, such deliverables and work products shall not be used by the Contractor for any other purposes.

5.2. Basis of Acceptance

The basis for acceptance shall be in compliance with the requirements set forth in the statement of work, the Contractor's proposal and other terms and conditions of the Contract. Deliverable items rejected shall be corrected in accordance with the applicable provisions.

• Reports, documents, and narrative type deliverables will be accepted when all discrepancies, errors or other deficiencies identified, in writing, by the Government have been corrected.

• If the draft deliverable is adequate, the Government may accept the draft and provide comments for incorporation into the final version.

• All of the Government's comments to deliverables must either be incorporated in the succeeding version or the Contractor must demonstrate, to the Government's satisfaction, why such comments should not be incorporated.

• If the Government finds that a draft or final deliverable contains spelling errors, grammatical errors, improper format, or otherwise does not conform to the requirements stated within this Contract, the document may be immediately rejected without further review and returned to the Contractor for correction and re-submission. If the Contractor requires additional Government guidance to produce an acceptable draft, the Contractor shall arrange a meeting with the COR.

5.3. Review

During the performance of this order, the COR will take periodic performance reviews, conduct meetings with DOS analysts and stake holders and analyze contractor provided reporting and observed performance, and will determine whether the performance meets the requirements set forth in this PWS. The COR will also perform random checks of the work products, files, and other outputs provided by the contractor.

August 22, 2025 Page 27 of 32

5.4. Contract Closeout

Contract closeout procedures will be issued upon 90 days after this task order has ended. The determination of final costs for this effort shall be requested. This does not preclude the

Contractor’s right to funds invoiced but not collected, if any. (FAR 42.708) A release of claims document shall be submitted within 90 days of completion of this task by the Contractor.

6. Evaluation Process

Proposals will be evaluated based on the criteria described in this solicitation to determine the offeror's ability to fulfill the Department’s requirements for a Network Detection and Response

(NDR) solution. The Government will use a best-value tradeoff process, considering both technical merit and overall risk. Technical proposals will be evaluated independently against the stated factors and subfactors; they will not be compared directly to other offers.

Technical Submission Instructions

Formatting Requirements:

• The technical submission shall include a Table of Contents identifying all sections and subsections with corresponding page numbers.

• All files must be compatible with Microsoft Office 2019 or later and shall not be password-protected.

• Pages shall be…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .