Attachment IV - Performance Work Statement (PWS) - Pricing Spreadsheet Nauticus.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Nauticus Repair Services Federal contract opportunity
Solicitation number
N0018922Q0185
Issued by
Department of the Navy Naval Supply Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to Nauticus Repair Services, newest first.
File Type Posted
Attachemnet III Nauticus Photograph References.pdf PDF
Attachement II - Performance Work Statement.pdf PDF
Attachemnet I - Combined Synopsis.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 2022 Nauticus Museum Upgrades

Deliverable 1: Kick-off meeting and Deliverables Schedule
Contractor shall perform a site visit to the Stewards of the Sea exhibit at the Hampton Roads Naval Museum located in Nauticus Maritime Museum in Norfolk, VA. 3 ppl x 8hrs, per diem (2 d, 1night)
Deliverable 2: Conceptual Exhibit Plan
Contractor shall develop and deliver a Conceptual Exhibit Plan for updated features/panels.
Deliverable 3: Remove Decibel Reader and Design, Fabricate, and Install Curved Wall Panel for “Science of Sound”
One (1) Curved wall panel: Total of one (1) curved panel with the content created with the Government, the approximately 42 1/4” x 64”panel connects to the existing structure via eight (8) total screws per panel, with four (4) screws on each of the vertical sides. The panel shall be constructed to exactly replace the existing panel, maintaining the existing design of the exhibit.
Deliverable 4: Design, Fabricate, and Install a Wall Panel with a Touchscreen for “Environmental Careers”
Two (2) Flat wall panels: One (1) flat panel approximately 43 1/2" x 92 1/4" and one (1) flat panel approximately 32" x 72", each connecting to the existing structure via eight (8) total screws per panel, with four (4) screws on each of the vertical sides. The panel shall be constructed to exactly replace the existing panel, maintaining the existing design of the exhibit.
Touchscreen: One (1) 42-inch ELO Interactive Digital Signage (IDS) touch display or equal Model: 4201L
Interactive Computer: One (1) Intel ® Mini PC NUC Kit or equal Model: NUC6i5SYK
Transfer existing Career displays; design and upload Environmental Engineer career display.
Deliverable 5: Design, Fabricate, and Install Flat Display for “Navy Projects” Wall
Display Panel: One (1) flat display with the content created with the Government, the approximately 18” x 34 1/4” display connects to the existing wall via three (3) total screws, one (1) screw in each of the bottom corners and one (1) screw centered at the top of the display. The display shall be constructed to exactly replace the existing display, maintaining the existing design of the exhibit.
Deliverable 6: Design, Fabricate, and Install Four Curved Wall Panels for "At-Sea Compliance"
Four (4) curved panels with the content created with the Government, each 22” x 64” panel connects to the existing structure via eight (8) total screws per panel, with four (4) screws on each of the vertical sides. The panels should be constructed to exactly replace the existing four curved panels.
Deliverable 7: Design, Fabricate, and Install Four Curved Wall Panels for “City at Sea”
Four (4) curved panels with the content created with the Government, one (1) panel approximately 33 3/4" x 64" and three (3) panels approximately 39" x 64" connecting to the existing structure via eight (8) total screws per panel, with four (4) screws on each of the vertical sides. The panels should be constructed to exactly replace the existing four curved panels.
Deliverable 8: Revise Protective Measures Assessment Protocol (PMAP) Interactives
Programming as per scope of work.
Deliverable 9: Replace and Revise Button Surrounds for Whale Tagging Wall
Button Surround: Five (5) button surrounds, approximately 9 3/4" x 10 1/2" ovals. The button surrounds should be consutrcuted to exactly replace the existing button surrounds.
Deliverable 10: Repair and Update “Big Eyes”
Mechanical Movement: Repair movement, up/down hydraulic arm is bent and does not function to stabilise movement of the right Big Eye
View Movement: Programming to correct the view movement on the right Big Eye.
Handle Replacement: Install new handle on the left big eye.
Raise/Lower Gear Ratio: Increase gear ratio so fewer turns of the handle are required to raise/lower the Big Eyes.
Movement Labels: Install label to indicate direction to turn the handle for movement.
Movement Distance: Modify physical movement and re-program video screen.
Crosshair Range: Re-program video so that objects needing to be 'found' are within the range of the cross-hairs.
Physical Stops: Modify movement to have hard, physical stops.
Deliverable 11: Design, Fabricate, and Install "Marine Protection" Feature
Feature: One (1) feature to replace existing 'lift and see' interactive. Feature to be constructed to replace the existing feature without need to replace the wall panel.
Deliverable 12: Remove and Replace “Learning through Listening” Interactive Digital Signage
Touchscreen: One (1) 42-inch ELO Interactive Digital Signage (IDS) touch display or equal Model: 4201L.
One (1) Flat wall panel: One (1) flat panel approximately 28" x 83 1/4" connecting to the existing structure via eight (8) total screws per panel, with four (4) screws on each of the vertical sides. The panel shall be constructed to exactly replace the existing panel, maintaining the existing design of the exhibit.
Deliverable 13: Install Ventilation Fans and Dehumidifiers
Ventilation Fans (10 total intake fans and 10 total exhaust fans): Coolerguys 2U Bracket with 80mm fans/Programmable Fan Controller/2A PSU, Model: 840556091691 or equal.
Dehumidifier (10 total): EVA-DRY 500 mini-dehumidifier or equal.
Deliverable 14: Develop Instruction Manual
Complete and concise exhibit instruction manual for the new equipment including detail on how to operate and troubleshoot all components.
Design and project management
Estimate for project management.

Warranty (5 year as outlined in PWS)

Total$0.00
See statement of work for complete specifications