ATTACHMENT - I - SOW Jackson Boiler Replacement (1).pdf
PDF 955 KB Posted
- Attached to
- Remove and Replace Boiler - Bldg. 83-Jackson, TN Federal contract opportunity
- Solicitation number
- 12405B22R0027
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 01.pdf | ||
| 12405B22R0027- Amendment 01 - Questions and Answers.pdf | ||
| 12405B22R0027- SF-1442- Request for Proposal.pdf | ||
| ATTACHMENT - II - Davis Bacon Wage Determination TN20220183.pdf | ||
| 12405B22R0027 - Clauses and Provisions.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Remove and Replace Boiler USDA Building #83
Asset ID # 640200B083
USDA-ARS
Jackson Tennessee
Prepared by:
Scott Feutz 29 Nov. 2021
Reviewed by:
Kevin Magee 8 April 2022
Table of Contents
Location Map Page 3
Statement of Work Page 4
Floor Plan Page 5
Existing Boiler, plumbing and specs Page 6
Contractor Responsibility Page 8
Project Schedule/Contacts Page 9
Location Map
Statement of Work: Remove and replace boiler and all associated piping.
Project Objective: The objective of this Project is to remove Existing Boiler and reinstall new Lochinvar FTX725N Heating Boiler or approved equal. The boiler shall be a high efficiency, fully condensing, natural gas fired heating boiler with 725,000 Btu/hr input and 705,000 Btu output. This project is located at USDA-ARS, 605 Airways Blvd.
Jackson, TN.
Contractor must be registered in System for Award Management, (SAM), prior to submitting a bid. Registration can be obtained through:
www.sam.gov
Site Visit: Bidders are encouraged to visit the site and be escorted by a government representative to confirm locations, dimensions, and conditions of the project before a bid is submitted. The site visit shall be for the purpose of observing firsthand any conditions relevant to the completion of this project. No consideration will be given to claims based on lack of knowledge of existing conditions, except where contract documents make definite provisions for adjustment in cost or extension due to existing conditions not readily foreseeable. This project is located at USDA-ARS in Jackson, TN.
Utilization of Bio-Based Products: The contractor shall utilize products and material based on bio-based materials, (e.g. bio-based greases; bio-based hydraulic fluids, bio-based absorbents), to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user.
All supplies and materials shall be of a type and quality that conform to the applicable Federal Specifications and Standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer Representative (COR). Products can be found at: https://www.biopreferred.gov
Safety: The contractor will submit a Site Safety Specific Plan/Accident Prevention Plan in industry recognizable format to the Contracting Officer within 14 days of contract award. The Plan shall include phone numbers and maps to the local Dr. Office and nearest Hospital.
Base Bid: Provide all equipment, labor, and materials necessary to:
• Demo and remove existing boiler, flue vent, electrical and piping
• Install (1) Lochinvar FTX725N Heating Boiler or approved equal high efficiency, fully condensing, natural gas fired heating boiler with 725,000 Btu/hr input and 705,000 Btu output.
• Provide and install new flue vent
• Install 3” water and return lines to supply both Greenhouses
• Re-connect piping to existing pumps
• Re-connect boiler to existing 1 ½” gas line
• Start up, verify proper operation, leak check
• Insulate new hot water piping
• Test and balance boiler system after installation
• Supply and install emergency shutoff and high pressure blow off.
• All state and local permits to be included http://www.sam.gov/ https://www.biopreferred.gov/
Basis of Design:
Hot Water Boiler Heating Data Electrical HEX
Water Volume
Basis of Design
Type Fuel Input
(MBH)
Output
(MBH)
Turn Down
Efficiency Volts/PH/HZ GPM Max
Lochinvar
FTX725N
Indoor Natural Gas
725 705 7:1 97% 120/1/60 150 17
Floor Plan
Boiler room
Existing Plumbing
Current Boiler
All proposals shall be in unlocked MS Word format and all cost proposals shall be detailed and presented in unlocked MS Excel format with formulas working.
Contractor Responsibility:
1. Contractor will verify all dimensions and site conditions prior to beginning work.
2. Contractor will perform the work as listed in the above outlined Base Bid.
3. Contractor shall keep work area clean daily and take measures to control debris while work is being performed.
4. Contractor is required to manage the project and consult with the Government prior to beginning all work phases. And, to work in a manner that minimizes the impact of the work on Government operations, research, and functions.
5. All work must be performed in such a manner as to not adversely affect daily operations of the facility, its workers, and the onsite facility operations.
6. Contractor must always have a Foreman on the job while working on this project.
7. Contractor will provide their own restroom facility and dumpster.
8. Contractor will remove all demolished material and debris from the worksite and dispose off-site.
Material / Submittals:
The Contractor shall supply all materials necessary to successfully complete the project and deliver a functioning system as required. Submittals on all material incorporated into the work, including shop drawings and specifications, used on this project shall be submitted to the EPM and Contracting Specialist as noted in this document. Electronic submittals are acceptable otherwise three written submittals are required.
Execution of Work:
Contractor will verify all dimensions and site conditions prior to beginning work. Contractor will schedule the work between working hours as listed below. Contractor is required to provide labor, specified material, equipment, and other tools required to perform the job fully and completely. No Government equipment will be available for use by the contractor. The contractor shall always be responsible for protecting his work and ensuring the safety of his crew and ARS employees. Upon completion of the project, the contractor shall remove from the premises all accumulated materials and rubbish caused by the project. Premises shall be left in a clean, orderly, and acceptable condition.
Damage to Property:
Any damage to the Government buildings, utilities, etc. caused as the result of the contractor’s activities shall be repaired or replaced to the satisfaction of the Government.
Inspection and Acceptance:
A government representative shall inspect and approve the work performed on this project. The Contractor shall schedule inspection a minimum of 3 days in advance, in writing, to the Contracting Officer.
Project Schedule:
The completion of this project shall not exceed 30 days from date of Notice to Proceed. A request for time extension must be submitted to the Contracting Specialist in writing. Each request must include specific and detailed reasons in support of the schedule alteration.
Work Hours:
Contractor work hours shall be Monday through Friday, seven (7) A.M. to four (4) P.M. with the exception of Government holidays. Any changes to work schedule shall be submitted to Contacting Officer for written approval prior to schedule change.
Project Contacts:
To Be Determined, Contract Specialist USDA, ARS, Southeast Area Administrative Office Acquisitions, Personal Property & Fleet Management
| Site Visit: Bidders are encouraged to visit the site and be escorted by a government representative to confirm locations, dimensions, and conditions of the project before a bid is submitted. The site visit shall be for the purpose of observing first... |
| Site Visit: Bidders are encouraged to visit the site and be escorted by a government representative to confirm locations, dimensions, and conditions of the project before a bid is submitted. The site visit shall be for the purpose of observing first... |
| Contractor Responsibility: |
| Material / Submittals: |
| Execution of Work: |
| Damage to Property: |
| Any damage to the Government buildings, utilities, etc. caused as the result of the contractor’s activities shall be repaired or replaced to the satisfaction of the Government. |
| Inspection and Acceptance: |
| Project Schedule: |
| Work Hours: |
| Project Contacts: |