Attachment I_Minimum Required Specifications _Pump Ops Simulator.pdf

PDF 204 KB Posted

Attached to
Pump Operations Simulator at RAF Mildenhall, United Kingdom Federal contract opportunity
Solicitation number
FA558720Q1085
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

View the file

Other files for this federal contract opportunity

Other files attached to Pump Operations Simulator at RAF Mildenhall, United Kingdom, newest first.
File Type Posted
Solicitation_Pump Ops Simulator_RAF Mildenhall.pdf PDF
Attachment II_ Quote Sheet_Pump Ops Simulator_RAF Mildenhall UK.pdf PDF
Attachment III - Pump Ops Simulator - Brand Name Justification - Redacted.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment I - Minimum Required Specifications - Fire Department Pump Simulator

1) The Fire Pump Panel Simulator require the following features:

a) A modular unit build in to a free-standing cabinet

b) Modular unit should have wheels

c) Modular unit should fit through standard doorways

d) Modular Unit should replicate a Pierce Hybrid panel top mount position

e) Power to modular unit and all components run off of 220v power supply

f) A mixture of authentic hands on components and LCD displays

g) Multiple Pump, Nozzle, and Hose configurations

h) The inner workings of the panel are simulated through a software program that reacts according to how the user works the panel

i) Simulation software is controlled by an Instructor station

2) The Instructor Station requires the following features:

a) Touch Screen menu-driven interface

b) Ability to set hose configurations

c) Ability to select training evolution

d) Monitor evolution

e) Insert malfunctions

f) Set option and other values

g) Student performance assessment and report

File details come from the government source that posted it. Updated .