Attachment_D_-_Price_Sheet.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- Nandivada Multi-Use Parcel – Phase I State and local contract opportunity
- Solicitation number
- B-8-25-38
- Issued by
- Brevard County, Florida
About this file
This is a Price Sheet (Attachment D) for Bid B-8-25-38 issued by Brevard County Purchasing Services for the Nandivada Multi-Use Parcel - Phase I project. The comprehensive bid includes 21 line items covering preconstruction activities, site preparation, and infrastructure development, with quantities ranging from 1 unit to 2,536 square yards. Key items include sediment barrier installation (2,041 linear feet), utility pipe installation (982 linear feet), performance turf sodding (2,536 square yards), and concrete sidewalks (65 square yards). The project involves a construction testing allowance of $10,000, with a total bid amount of $10,000.00. The bid requires a pre-bid meeting on July 10, 2025, at 2:00 PM, with final bids due on July 24, 2025, at 10:00 AM.
The pricing sheet includes provisions for ACH payments and allows contractors to offer prompt payment discounts, though these will not factor into bid determination. Contractors must acknowledge any addenda and provide comprehensive company details, including contact information and an authorized signature. The project is part of a larger stormwater infrastructure development on Merritt Island, with an estimated budget of $474,000.00. Contractors are expected to commence work within 15 calendar days after the Notice to Proceed and complete the project within 120 calendar days. The bid requires a 5% bid security bond and compliance with various regulatory requirements, including E-Verify and insurance provisions covering general liability, workers' compensation, and contractors pollution liability.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Notice_of_Award.pdf | ||
| Bid_Tabulation.pdf | ||
| Bid_Tabulation_-_Names_Only.pdf | ||
| Bid_Tabulation_-_Names_Only.pdf | ||
| Addendum_1.pdf | ||
| Attachment_F_-_Drawing_Bid_Set.pdf | ||
| Addendum_1.pdf | ||
| Attachment_F_-_Drawing_Bid_Set.pdf | ||
| B-8-25-38_INV_&_SPECS.pdf | ||
| B-8-25-38_INV_&_SPECS.pdf | ||
| B-8-25-38_INV_&_SPECS.pdf | ||
| Attachment_C_-_SPECIFICATIONS.pdf | ||
| Attachment_D_-_Price_Sheet.xlsx | XLSX spreadsheet | |
| Attachment_A_-_Permit_Plans.pdf | ||
| Attachment_E_-Draft_Contract.pdf | ||
| Attachment_C_-_SPECIFICATIONS.pdf | ||
| Attachment_A_-_Permit_Plans.pdf | ||
| Attachment_B_-_Geotechnical_Report.pdf | ||
| Attachment_D_-_Price_Sheet.xlsx | XLSX spreadsheet | |
| Attachment_E_-Draft_Contract.pdf | ||
| Attachment_A_-_Permit_Plans.pdf | ||
| Attachment_B_-_Geotechnical_Report.pdf | ||
| Attachment_C_-_SPECIFICATIONS.pdf | ||
| Attachment_E_-Draft_Contract.pdf | ||
| Attachment_B_-_Geotechnical_Report.pdf |
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Sheet B-8-25-38 Nandivada Multi-Use Parcel - Phase I Attachment D - Price Sheet
| Lump Sum Fixed Costs - Base Bid | |||||
| Bid Item | Item Description | Qty. | Unit | Unit Cost | Extended Cost |
| 1 | Preconstruction Video | 1 | EA | $ - 0 | |
| 2 | Mobilization and Demobilization | 1 | LS | $ - 0 | |
| 3 | Maintenance of Traffic | 1 | LS | $ - 0 | |
| 4 | Sediment Barrier | 2041 | LF | $ - 0 | |
| 5 | Floating Turbidity Barrier | 50 | LF | $ - 0 | |
| 6 | Soil Tracking Prevention Device | 1 | EA | $ - 0 | |
| 7 | Regular Excavation | 1 | LS | $ - 0 | |
| 8 | Embankment | 1 | LS | $ - 0 | |
| 9 | Type B Stabilization | 200 | SY | $ - 0 | |
| 10 | Option Base Group 3 | 0 | SY | $ - 0 | |
| 11 | Option Base Group 6 | 181 | SY | $ - 0 | |
| 12 | Superpave, Asphalt, Conc, Traffic Level C | 205 | SY | $ - 0 | |
| 13 | U Type Endwall w Baffles (Index 430-011), 18" | 1 | EA | $ - 0 | |
| 14 | Removal of Existing Concrete | 86 | SY | $ - 0 | |
| 15 | Concrete Sidewalks (6") | 65 | SY | $ - 0 | |
| 16 | Performance Turf, Sodding (Bahia) | 2,536 | SY | $ - 0 | |
| 17 | Utility Pipe, Install, 8-19.9" | 982 | LF | $ - 0 | |
| 18 | Flowable Fill, Excavatable | 13 | CY | $ - 0 | |
| 19 | Pavement, Marking, Striping, and Signage | 1 | LS | $ - 0 | |
| 20 | Rubble Riprap (Ditch Lining) | 9 | TN | $ - 0 | |
| 21 | Construction Testing Allowance | 1 | Allow | $10,000.00 | $10,000.00 |
TOTAL BID: $10,000.00
| ACH PAYMENTS |
| Does your company accept ACH Payment Method? _____Yes / _____ No |
| PROMPT PAYMENT DISCOUNT |
| Brevard County shall remit payment in accordance with the Florida Prompt Payment Act, Florida Statutes section 218.70. Contractors may offer cash discounts for prompt payment but they will not be considered in determination of award. If a Contractor offers a discount, it is understood that the discount time will be from the date of satisfactory delivery, at the place of acceptance, and receipt of correct invoice, at the office specified, whichever occurs last. |
| * If Prompt Payment Discount is offered, please state discount and terms: |
| __________________________________ |
| ADDENDUM ACKNOWLEDGMENT |
| Contractor acknowledges receipt of Addenda by indicating Addendum number and date of issue. |
| Add. No.________ Dated_______________ // Add. No.________ Dated_______________ |
| Add. No.________ Dated_______________ // Add. No.________ Dated_______________ |
| Add. No.________ Dated_______________ // Add. No.________ Dated_______________ |
| I hereby acknowledge that I have read, understand, and agree to all terms, conditions, insurance, scope of work, specifications and pricing for B-8-25-38 Nandivada Multi-Use Parcel - Phase I. |
| COMPANY NAME___________________________________________________________ |
| ADDRESS__________________________________________________________________ |
| AUTHORIZED SIGNATURE_____________________________________________________ |
| PRINTED SIGNATURE_________________________________DATE____________________ |
| TELEPHONE #__________________________________FAX #________________________ |
| EMAIL_____________________________________________________________________ |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .