Attachment D Farm Map.pdf

PDF 1 MB Posted

Attached to
GROUNDS MAINTENANCE State and local contract opportunity
Solicitation number
5400023840
Issued by
York County, South Carolina

About this file

This is a Farm Map attachment for a Grounds Maintenance contract opportunity with the State of South Carolina. The document depicts three designated work areas (Farm - Area 1, Farm - Area 2, and Farm - Area 3) with specific measurement parameters for maintenance boundaries. Each area is defined by precise distances from roadways and sidewalks, including 8-foot offsets from the edge of roadway extending 8 feet past the sidewalk, 8-foot distances on each side of sidewalks, and 8-foot offsets from the roadway. The map establishes clear spatial boundaries for the grounds maintenance work, with one area spanning from the edge of roadway to 8 feet past the sidewalk and including a hedge-to-roadway measurement for delineation purposes.

The attachment serves as a reference document for bidders to understand the physical scope and geographic boundaries of the grounds maintenance services required. The map provides visual demarcation of the work zones, which is essential for contractors to accurately estimate costs, resource allocation, and project timelines. This visual specification helps ensure consistency in bid submissions and establishes clear expectations for service delivery across the identified farm areas within South Carolina.

View the file

Other files for this state and local contract opportunity

Other files attached to GROUNDS MAINTENANCE, newest first.
File Type Posted
Attachment C Main Map.pdf PDF
Amendment 1.docx DOCX document
Award Extension.doc DOC document
IFB 5400023840.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

From edge of roadway to 8’ past the sidewalk

8’ off of roadway

8’ on each side of sidewalk

Area inside boundary

Farm - Area 1

8’ on each side of sidewalk

Roadway to hedge 8’ off of roadway

From edge of roadway to 8’ past the sidewalk

Farm - Area 2

From edge of roadway to 8’ past the sidewalk

8’ on each side of sidewalk

8’ off of roadway

Farm - Area 3

File details come from the government source that posted it. Updated .