Gov't Est
| SHIL Rehab : Fabrication Independent Government Estimate | | |
| Notice to Bidders : This is not a comprehensive list, and reflectives a best line item assessment of the design. The Bidder is responsible to identifying all components required to complete the exhibit production as refered to in the Attachment Documents. | |
| PROJECT MANAGEMENT | $0.00 |
| FABRICATION DRAWINGS | $0.00 |
| SAMPLES | $0.00 |
| Lighting | $0.00 |
| EXHIBIT STRUCTURES | $0.00 |
| CUSTOM ELEMENTS | $0.00 |
| Audio Description Installation | $0.00 |
| Audio Description Equipment | $0.00 |
| GRAPHICS | $0.00 |
| CONSERVATION | $0.00 |
| PROJECT CLOSEOUT | $0.00 |
| SHIPPING | $0.00 |
| INSTALLATION | $0.00 |
| TRAVEL | $0.00 |
Grand Total $0 $0.00
| PROJECT MANAGEMENT (excluding travel) | | | | | |
| LABOR | | hours | x | rate | amount |
| Project Manager | 0 | hours @ | $0.00 | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Project Management $0.00
| Fabrication Drawings | | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| Hard copies, Proofs and Templates | 0 | job | $0.00 | $0.00 |
| SUBTOTAL MATERIALS | | | $0.00 |
| MARK-UP on materials | 0 | percent | $0.00 |
| TOTAL ALL MATERIALS | | | | $0.00 |
| LABOR | | hours | x | rate | amount |
| Detailling | 0 | hours @ | $0.00 | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Fabrication Drawings $0.00
| Samples/Mock-ups/Prototypes | | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| graphic samples | 0 | job | $0.00 | $0.00 |
| graphic samples-color proofs | 0 | job | $0.00 | $0.00 |
| custom elements samples | 0 | job | $0.00 | $0.00 |
| prototypes | 0 | job | $0.00 | $0.00 |
| SUBTOTAL MATERIALS | | | | $0.00 |
| MARK-UP on materials | 0 | percent | | $0.00 |
| TOTAL ALL MATERIALS | | | | $0.00 |
| LABOR | | hours | x | rate | amount |
| exhibit spec-fabrication | 0 | hours @ | $0.00 | $0.00 |
| TOTAL ALL LABOR | | | | $0.00 |
TOTAL Samples $0.00
| Lighting | | | | |
| MATERIALS: | qty. | unit | unit cost | amount |
| 0 | LF | $0.00 | $0.00 |
| 0 | ea | $0.00 | $0.00 |
| SUBTOTAL, AV EQUIPMENT | | | $0.00 |
| MARK-UP on materials | 0 | percent | $0.00 |
| TOTAL ALL MATERIALS | | | | $0.00 |
| LABOR | | hours | x | rate | amount |
| | 0 | hours @ | $85.00 | $0.00 |
| TOTAL ALL LABOR | | | | $0.00 |
TOTAL Lighting $0.00
| Exhibit Structures | | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| ST-06.02-120 Curved Rail with Graphic | 1 | job | $0.00 | $0.00 |
| ST-08.02-120 Curved Rail with Graphic | 1 | job | $0.00 | $0.00 |
| CA-11.03-300 Major John Wiley McFerren Case | 1 | Job | $0.00 | $0.00 |
| CA-11.03-200 Maj. Francis Eugene Whitfield Case | 1 | Job | $0.00 | $0.00 |
| CA-04.03-100 Stibbs Uniform Case | 1 | Job | $0.00 | $0.00 |
| CA-04.04-100 Those who were there, Case Temporary Door | 1 | Job | $0.00 | $0.00 |
| CA-09.01-100 First Shots Case, Temporary Door | 1 | Job | $0.00 | $0.00 |
| CA-11.01-600 Individual Stories Case. Temporary Door | 1 | Job | $0.00 | $0.00 |
| CA-11.03-400 Log with Shot case, Temporary Door | 1 | Job | $0.00 | $0.00 |
| SUBTOTAL MATERIALS | | | | $0.00 |
| MARK-UP on materials | 0 | percent | | $0.00 |
TOTAL ALL MATERIALS $0.00
| LABOR | | hours | x | rate | amount |
| shop supervisor | 0 | hours @ | $0.00 | $0.00 |
| Fab Tech Millwork | 0 | hours @ | $0.00 | $0.00 |
| TOTAL ALL LABOR | 0 | | | $0.00 |
TOTAL Exhibit Structures $0.00
| Custom Elements | | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| CE-01.02-150 Flat Tactile Orientation Map | 1 | job | $0.00 | $0.00 |
| CE-03.01-302 Tactile Bird Print | 1 | job | $0.00 | $0.00 |
| CE-03.03-213 Coriinth Element - Tacile Epoxy 3D Casting | 1 | job | $0.00 | $0.00 |
| SUBTOTAL MATERIALS | | $0.00 |
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | | | | $0.00 |
| LABOR | | hours | x | rate | amount |
| Fab Tech Modelmaker | 0 | hours @ | $0.00 | $0.00 |
| TOTAL ALL LABOR | | | | $0.00 |
TOTAL CE $0.00
| Electrical/Electronic | | | | | |
| MATERIALS - AV EQUIPMENT: | | qty. | unit | unit cost | amount |
| AD | Audio Description | 0 | ea | $0.00 | $0.00 |
| Beacons | 20 | each | 0 | $0.00 |
| Headphone cushion sanitary cover, black, 50 pair | 1 | each | 0 | $0.00 |
| Headphone cushion sanitary cover, black, Master carton of (12) 50 pair | 1 | each | 0 | $0.00 |
| Headphones | 5 | each | 0 | $0.00 |
| Induction neckloop | 2 | each | 0 | $0.00 |
| iPhone (Minimum Spec capabale Model), 128GB, unlocked sim-free | 2 | each | 0 | $0.00 |
| Lanyard, 5/8", breakaway, cell phone loop / keyring, dark forest green, NPS text | 3 | each | 0 | $0.00 |
| Lightning to 3.5 mm Headphone Jack Adapter, 2 pack | 2 | each | 0 | $0.00 |
| Refresh Kit, replacement cushion and bag | 5 | each | 0 | $0.00 |
| Ruggedized case for media player | 3 | each | 0 | $0.00 |
| Sreen Protector for media player | 3 | each | 0 | $0.00 |
| USB charging station, 6 ports, 6 Apple cables, white | 1 | each | 0 | $0.00 |
| SUBTOTAL, AV EQUIPMENT | | | $0.00 |
| MARK-UP on materials | 0 | percent | $0.00 |
| TOTAL ALL MATERIALS | | | | $0.00 |
| LABOR (Production) | | hours | x | rate | amount |
| Audio Description, Programing and Installation | 0 | | $0.00 | $0.00 |
| TOTAL ALL LABOR (see AV Estimate for Detail) | | | | $0.00 |
TOTAL Electrical/Mechanical/AV $0.00
| Graphics | | | | | | |
| MATERIALS: | | qty. | unit | | amount | |
| GL-01.03-100 2D Map Panel (Vinyl wrapped sign blank) | 1 | ea | $0.00 | $0.00 | |
| GL-01.03-200 2D Map Panel (Vinyl wrapped sign blank) | 1 | ea | $0.00 | $0.00 | |
| GL-01.03-300 2D Map Panel (Vinyl wrapped sign blank) | 1 | ea | $0.00 | $0.00 | |
| IM-03.04-103 Vinyl wrapped sign blank | 1 | ea | $0.00 | $0.00 | |
| GL-04.01-100 3M Control tack | 1 | ea | $0.00 | $0.00 | |
| GL-04.03-100 Vinyl wrapped sign blank | 1 | ea | $0.00 | $0.00 | |
| GL-04.03-125 Vinyl wrapped sign blank | 1 | ea | $0.00 | $0.00 | |
| GL-06.02-100 1/16" Phenolic | 1 | ea | $0.00 | $0.00 | |
| GL-07.01-200 Vinyl wrapped sign blank | 1 | ea | $0.00 | $0.00 | |
| GL-08.02-100 1/16" Phenolic | 1 | ea | $0.00 | $0.00 | |
| GL-10.01-100 3M Control Tack/Dreamscape | 1 | ea | $0.00 | $0.00 | |
| GL-11.01-700 Laminated | 1 | ea | $0.00 | $0.00 | |
| GL-11.03-100 Vinyl wrapped sign blank double sided, MDF Subsrate | 1 | ea | $0.00 | $0.00 | |
| GL-11.03-200 Vinyl wrapped sign blank | 1 | ea | $0.00 | $0.00 | |
| GL-11.03-300 Vinyl wrapped sign blank | 1 | ea | $0.00 | $0.00 | |
| GL-11.03-325 Vinyl wrapped sign blank | 1 | ea | $0.00 | $0.00 | |
| GL-11.03-350 Vinyl wrapped sign blank | 1 | ea | $0.00 | $0.00 | |
| GL-12.01-100 Vinyl wrapped sign blank, kerf core substrate curved wrap | 1 | ea | $0.00 | $0.00 | |
| GL-13.04-150 Vinyl wrapped sign blank | 1 | ea | $0.00 | $0.00 | |
| GL-13.05-100 Vinyl | 1 | ea | $0.00 | $0.00 | |
| | | | | | 0 |
| SUBTOTAL MATERIALS | | | $0.00 |
| MARK-UP on materials | 0 | percent | $0.00 |
TOTAL ALL MATERIALS $0.00
| LABOR | | hours | x | rate | amount |
| Graphic Specialist | 0 | hours @ | $0.00 | $0.00 |
| Graphic Supervisor | 0 | hours @ | $0.00 | $0.00 |
TOTAL ALL LABOR 0 $0.00
TOTAL Graphics $0.00
| Conservation (Artifact/Prop Mounting) | | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| AO0403104 Capt. John H. Stibbs' coat | 1 | job | $0.00 | $0.00 |
| AO1103206 Whitfield frock coat, seen in the round | 1 | job | $0.00 | $0.00 |
| AO1103302 The saddle of Union Major John W. McFerren | 1 | job | $0.00 | $0.00 |
| AO1103303 McFerren pistol holsters | 1 | job | $0.00 | $0.00 |
| AO1103304 McFerren belt | 1 | job | $0.00 | $0.00 |
| AO1103305 McFerren sword | 1 | job | $0.00 | $0.00 |
| Pipe | | | | |
| SUBTOTAL MATERIALS | | | $0.00 |
| MARK-UP on materials | 0 | percent | $0.00 |
| TOTAL ALL MATERIALS | | | | $0.00 |
| LABOR | | hours | x | rate | amount |
| Mount maker | 0 | hours @ | $0.00 | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Conservation $0.00
| PROJECT CLOSEOUT | | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| Digital Media drives and paper printing | 0 | | $0.00 | $0.00 |
| SUBTOTAL MATERIALS | | | $0.00 |
| MARK-UP on materials | 0 | percent | $0.00 |
TOTAL ALL MATERIALS $0.00
| LABOR | | hours | x | rate | amount |
| Project Specialist | 0 | hours | $0.00 | $0.00 |
| Production Document Manager | 0 | hours | $0.00 | $0.00 |
| Project Manager | 0 | hours @ | $0.00 | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Project Closeout $0.00
| SHIPPING | | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| 0 | 0 | job @ | $0.00 | $0.00 |
| 0 | 0 | job @ | $0.00 | $0.00 |
TOTAL MATERIALS $0.00
| LABOR | | hours | x | rate | amount |
| 0 | 0 | hours @ | $0.00 | $0.00 |
TOTAL ALL LABOR $0.00
Total Shipping $0.00
| INSTALLATION | | | | | |
| Project manager | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| air fare | 0 | job @ | $0.00 | $0.00 |
| per diem | 0 | days @ | $0.00 | $0.00 |
| Rental Van and Gas | 0 | days @ | $0.00 | $0.00 |
| Lodging | 0 | days @ | $0.00 | $0.00 |
| Total | | | | $0.00 |
| LABOR | | hours | x | rate | amount |
| Project Manager (1 Person) | 0 | hours @ | $0.00 | $0.00 |
| Total Travel and Accomodation for: Project Manager | | | | $0.00 |
| 2 x Fabrication Installers | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| air fare | 0 | job @ | $0.00 | $0.00 |
| per diem | 0 | days @ | $0.00 | $0.00 |
| Lodging | 0 | days @ | $0.00 | $0.00 |
| | | | | $0.00 |
| LABOR | | | | | |
| Exhibit Spec - Fabricator | 0 | hours @ | $0.00 | $0.00 |
| Exhibit Spec - Fabricator | 0 | hours @ | $0.00 | $0.00 |
| Total | | | | $0.00 |
Total Travel and Accomodation for: Installer $0.00
| Lighting | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| air fare | 0 | job @ | $0.00 | $0.00 |
| per diem | 0 | days @ | $0.00 | $0.00 |
| Lodging | 0 | days @ | $0.00 | $0.00 |
| | | | | $0.00 |
| LABOR | | | | | |
| Lighting Technician | 0 | hours @ | $0.00 | $0.00 |
| Lighting Specialist | 0 | hours @ | $0.00 | $0.00 |
| Ligthing Electrical Specialist | 0 | hours @ | $0.00 | $0.00 |
| Total | | | | $0.00 |
Total Travel and Accomodation for: Installer $0.00
| 1 x Exhibit AV integration Specialist | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| air fare | 0 | Each | $0.00 | $0.00 |
| Rental Car and Gas | 0 | days@ | $0.00 | $0.00 |
| per diem | 0 | days @ | $0.00 | $0.00 |
| Lodging | 0 | days @ | $0.00 | $0.00 |
| | | | | $0.00 |
| LABOR | | | | | |
| AV Technician | 0 | hours @ | $65.00 | $0.00 |
| Total | | | | $0.00 |
Total Travel and Accomodation for: AV Specialist $0.00
| 1 x Object Mounter and Installer | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| air fare | 0 | Each | $0.00 | $0.00 |
| Rental Car and gas | 0 | days @ | $0.00 | $0.00 |
| per diem | 0 | days @ | $0.00 | $0.00 |
| Lodging | 0 | days @ | $0.00 | $0.00 |
| | | | | $0.00 |
| LABOR | | | | | |
| Object Installer and Mount Maker | 0 | hours @ | $0.00 | $0.00 |
| | | | | $0.00 |
Total Travel and Accomodation for: AV Specialist $0.00
TOTAL ALL MATERIALS: INSTALLATION $0.00
TOTAL ALL LABOR: INSTALLATION $0.00
Total Installation $0.00
| TRAVEL | | | | | |
| Postaward meeting | | | | | |
| MATERIALS: | | | | | |
| | qty. | unit | unit cost | amount |
| air fare (2 x Round trips) | 0 | job @ | $0.00 | $0.00 |
| per diem (2 x for 1 days) | 0 | days @ | $0.00 | $0.00 |
| lodging (2 x for 1 days) | 0 | days @ | $0.00 | $0.00 |
| Rental car and gas | 0 | days @ | $0.00 | $0.00 |
| Misc. | 0 | job @ | $0.00 | $0.00 |
TOTAL MATERIALS 1 PM $0.00
| LABOR | | hours | x | rate | amount |
| Project Manager attend meeting (Trip report) | 0 | hours @ | $0.00 | $0.00 |
| Object Measuring | 0 | hours @ | $0.00 | $0.00 |
| Object Measuring | 0 | hours @ | $0.00 | $0.00 |
TOTAL ALL LABOR $0.00
Total Travel $0.00