Attachment C Instructions To Offerors Evaluatio Factors.pdf
PDF 61 KB Posted
- Attached to
- Three Rivers Ranger District West Side Trail Maintenance Federal contract opportunity
- Solicitation number
- 1205MM620Q0054
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment B Schedule of Items.pdf | ||
| Attachment A Project Information.pdf | ||
| Attachment D Offerors Representation and Certifications.pdf | ||
| Attachment E Terms and Conditions FAR 52.212-4 Addenda and FAR 52.212-5.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT C – INSTRUCTIONS TO OFFERORS AND EVALUATION
FACTORS RFQ NO. 1205M620Q0049
THREE RIVERS RANGER DISTRICT EAST TRAIL MAINTENANCE
COLVILLE NATIONAL FOREST
FAR PAR 52.212-1 INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS (MAR 2020)
(a) North American Industry Classification System (NAICS) code and small business size standard. The NAICS code(s) and small business size standard(s) for this acquisition appear elsewhere in the solicitation. However, the small business size standard for a concern which submits an offer in its own name, but which proposes to furnish an item which it did not itself manufacture, is 500 employees.
(b) Submission of offers. Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation. Offers may be submitted on the SF 1449, letterhead stationery, or as otherwise specified in the solicitation. As a minimum, offers must show—
(1) The solicitation number;
(2) The time specified in the solicitation for receipt of offers
(3) The name, address, and telephone number of the offeror;
(4) A technical description of the items being offered in sufficient detail to evaluate compliance with the requirements in the solicitation. This may include product literature, or other documents, if necessary;
(5) Terms of any express warranty;
(6) Price and any discount terms;
(7) “Remit to” address, if different than mailing address;
(8) A completed copy of the representations and certifications at FAR 52.212-3 (see FAR 52.212-3(b) for those representations and certifications that the offeror shall complete electronically);
(9) Acknowledgment of Solicitation Amendments;
(10)Past performance information, when included as an evaluation factor, to include recent and relevant contracts for the same or similar items and other references (including contract numbers, points of contact with telephone numbers and other relevant information); and
(11) If the offer is not submitted on the SF 1449, include a statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation. Offers that fail to furnish required representations or information, or reject the terms and conditions of the solicitation may be excluded from consideration.
(c) Period for acceptance of offers. The offeror agrees to hold the prices in its offer firm for 30 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation.
(d) Product samples. When required by the solicitation, product samples shall be submitted at or prior to the time specified for receipt of offers. Unless otherwise specified in this solicitation, these samples shall be submitted at no expense to the Government, and returned at the sender’s request and expense, unless they are destroyed during preaward testing.
(e) Multiple offers. Offerors are encouraged to submit multiple offers presenting alternative terms and conditions, including alternative line items (provided that the alternative line items are consistent with subpart 4.10 of the Federal Acquisition Regulation), or alternative commercial items for satisfying the requirements of this solicitation. Each offer submitted will be evaluated separately.
(f) Late submissions, modifications, revisions, and withdrawals of offers.
THREE RIVERS RANGER DISTRICT EAST TRAIL MAINTENANCE
(1) Offerors are responsible for submitting offers, and any modifications, revisions, or withdrawals, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that offers or revisions are due.
(2)
(i) Any offer, modification, revision, or withdrawal of an offer received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and-
(A) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of offers; or
(B) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government’s control prior to the time set for receipt of offers; or
(C) If this solicitation is a request for proposals, it was the only proposal received.
(ii) However, a late modification of an otherwise successful offer, that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(3) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the offer wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(4) If an emergency or unanticipated event interrupts normal Government processes so that offers cannot be received at the Government office designated for receipt of offers by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation or other notice of an extension of the closing date, the time specified for receipt of offers will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
(5) Offers may be withdrawn by written notice received at any time before the exact time set for receipt of offers.
Oral offers in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile offers, offers may be withdrawn via facsimile received at any time before the exact time set for receipt of offers, subject to the conditions specified in the solicitation concerning facsimile offers. An offer may be withdrawn in person by an offeror or its authorized representative if, before the exact time set for receipt of offers, the identity of the person requesting withdrawal is established and the person signs a receipt for the offer.
(g) Contract award (not applicable to Invitation for Bids). The Government intends to evaluate offers and award a contract without discussions with offerors. Therefore, the offeror’s initial offer should contain the offeror’s best terms from a price and technical standpoint. However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary. The Government may reject any or all offers if such action is in the public interest; accept other than the lowest offer; and waive informalities and minor irregularities in offers received.
(h) Multiple awards. The Government may accept any item or group of items of an offer, unless the offeror qualifies the offer by specific limitations. Unless otherwise provided in the Schedule, offers may not be submitted for quantities less than those specified. The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit prices offered, unless the offeror specifies otherwise in the offer.
THREE RIVERS RANGER DISTRICT EAST TRAIL MAINTENANCE
(i) Availability of requirements documents cited in the solicitation.
(1)
(i) The GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101- 29, and copies of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained for a fee by submitting a request to-
GSA Federal Supply Service Specifications Section Suite 8100 470 East L’Enfant Plaza, SW Washington, DC 20407 Telephone (202) 619-8925 Facsimile (202) 619-8978.
(ii) If the General Services Administration, Department of Agriculture, or Department of Veterans Affairs issued this solicitation, a single copy of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained free of charge by submitting a request to the addressee in paragraph (i)(1)(i) of this provision. Additional copies will be issued for a fee.
(2) Most unclassified Defense specifications and standards may be downloaded from the following ASSIST websites:
(i) ASSIST ( https://assist.dla.mil/online/start/).
(ii) Quick Search ( http://quicksearch.dla.mil/).
(iii) ASSISTdocs.com (http://assistdocs.com).
(3) Documents not available from ASSIST may be ordered from the Department of Defense Single Stock Point (DoDSSP) by-
(i) Using the ASSIST Shopping Wizard (https://assist.dla.mil/wizard/index.cfm);
(ii) Phoning the DoDSSP Customer Service Desk (215) 697-2179, Mon-Fri, 0730 to 1600 EST; or
(iii) Ordering from DoDSSP, Building 4, Section D, 700 Robbins Avenue, Philadelphia, PA 19111-5094, Telephone (215) 697-2667/2179, Facsimile (215) 697-1462.
(4) Nongovernment (voluntary) standards must be obtained from the organization responsible for their preparation, publication, or maintenance.
(j) Unique entity identifier. (Applies to all offers exceeding $3,500, and offers of $3,500 or less if the solicitation requires the Contractor to be registered in the System for Award Management (SAM).) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “Unique Entity Identifier” followed by the unique entity identifier that identifies the Offeror's name and address. The Offeror also shall enter its Electronic Funds Transfer (EFT) indicator, if applicable. The EFT indicator is a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the Offeror to establish additional SAM records for identifying alternative EFT accounts (see subpart 32.11) for the same entity. If the Offeror does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for unique entity identifier establishment directly to obtain one. The Offeror should indicate that it is an offeror for a Government contract when contacting the entity designated at www.sam.gov for establishing the unique entity identifier.
(k) [Reserved]
THREE RIVERS RANGER DISTRICT EAST TRAIL MAINTENANCE
(l) Debriefing. If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:
(1) The agency’s evaluation of the significant weak or deficient factors in the debriefed offeror’s offer.
(2) The overall evaluated cost or price and technical rating of the successful and the debriefed offeror and past performance information on the debriefed offeror.
(3) The overall ranking of all offerors, when any ranking was developed by the agency during source selection.
(4) A summary of the rationale for award;
(5) For acquisitions of commercial items, the make and model of the item to be delivered by the successful offeror.
(6) Reasonable responses to relevant questions posed by the debriefed offeror as to whether source-selection procedures set forth in the solicitation, applicable regulations, and other applicable authorities were followed by the agency.
(End of provision)
THREE RIVERS RANGER DISTRICT EAST TRAIL MAINTENANCE
FAR 52.212-2 EVALUATION – COMMERCIAL ITEMS (OCT 2014)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
1. Past Performance
2. Project Management
3. Technical Approach
3. Price
Past performance, project management and technical approach, are ranked and when combined, are more important when compared to price.]
a) Past Performance: The offeror will be evaluated on performance relative to experience on similar projects and types of work. In accordance with FAR 15.305, in the case of an offeror without a record of relevant past performance or for whom information on past performance is not available, the offeror will not be evaluated either favorably or unfavorably in this area, but instead will receive a neutral rating in the area of past performance. Experience Questionnaire Attachment or similar may be used to submit Past Performance information. Past performance sub-criteria include:
1. Minimum (3) Years of Past Experience on projects similar in scope and complexity to the proposed project;
2. Efficiency and effectiveness on past projects;
3. Whether the firm’s performance conformed to the terms and conditions of their contract;
4. How reasonable and cooperative the firm was during performance; and,
5. Firm’s commitment to customer satisfaction.
b) Project Management: The offeror will be evaluated on project management criteria. The technical submittal shall be incorporated by reference and become a binding part of the resulting contract. That criteria is comprised of the offerors:
1. Key personnel and planned subcontractors.
2. Evidence of understanding the project requirements.
3. Project coordination including plans for communication between the Forest Service, Contractor, and
Subcontractors, management of working relationships, and effectiveness of the communication plan.
c) Technical Approach:
1. Quality control plan and how it will be maintained to ensure a quality product is delivered.
2. Safety plan and how it will be implemented throughout the life of the project.
3. Proposed construction schedule and its realism.
4. Other resources planned for use on the project (including equipment), and how realistic that plan is given concurrent obligations.
d) Price: This criterion will include consideration of cost/price information entered in the Schedule of Items. It is the Government’s intent to determine reasonableness and the offerors understanding of the work and the ability to perform the contract. Where past performance evaluations and other factors are determined to be substantially
THREE RIVERS RANGER DISTRICT EAST TRAIL MAINTENANCE
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party.
Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
USDA – Forest Service
EXPERIENCE QUESTIONNAIRE
(Ref. FSH 6309.31 and 41 USC 1)
INSTRUCTIONS: See Box 11, Remarks, if extra space is needed to answer any questions below. Mark “X” in appropriate boxes.
1.CONTRACTOR NAME, ADDRESS, AND TELEPHONE NO.
2. SUBMITTED TO (office Name and Address) 3. BUSINESS
Company Co-partnership Corporation Individual Non-profit Organization
4. How many years do you or your firm have in the line of work contemplated by this solicitation?
5. How many years experience in contracting have you or your business had as a (a) prime contractor ____ and/or (b) sub-contractor ____?
6. List below the projects your business has completed within the last three years:
CONTRACT
AMOUNT
TYPE OF PROJECT
DATE
COMPLETED
NAME, ADDRESS, AND TELEPHONE NO. OF
OWNER/PERSON TO CONTACT FOR PROJECT
INFORMATION
CONTRACT
NUMBER
DOLLAR AMT.
OF AWARD
NAME, ADDRESS, AND TELEPHONE NO. OF
BUSINESS/GOVERNMENT AGENCY INVOLVED
AWARDED
(Units)
PERCENT
COMPLETED
DATE CONTRACT
COMPLETED
8a. Have you ever failed to complete any work awarded to you? Yes No 8b. Has work ever been completed by performance bond? Yes No 8c. If “Yes” to either item 8a or 8b specify location(s) and reason(s) why:
Previous edition is obsolete (OVER) FS-6300-27 (3/00)
9.Organization and work that will be available for this project.
a. (1) Minimum number of employees: _____ and a(2) Maximum number of employees: ______ ?
b. Are employees regularly on your payroll: Yes No
c. Specify equipment available for this contract:
d. Estimate rate of progress below (such as 2.0 acres/man/day):
(1) Minimum progress rate: ________________________________ and (2) maximum progress rate: ________________________________
10.List below the experience of the principal individuals of your business:
INDIVIDUAL’S NAME
PRESENT
POSITION
YEARS
OF EXP.
MAGNITUDE AND TYPE OF WORK
11. List all the equipment (including vehicles) you plan to use on this contract. Provide a detailed description of the Equipment including the your maintenance plan.
12. Contractor Inspection. Describe Contractor Self Inspection Procedures which you will use to insure quality for this contract.
13. Remarks. Specify Box Numbers (Attach sheets if extra space is needed to fully answer any above question):
CERTIFICATION
I certify that all of the statements made by me are complete and correct to the best of my knowledge and that any persons name as references are authorized to furnish the Forest Service with any information needed to verify my capability to perform this project.
12a. CERTIFYING OFFICIAL’S NAME AND TITLE
b. SIGNATURE (Sign in ink) 13. DATE
EVALUATION QUESTIONNAIRE CONTINUED
ANSWERS MUST BE RETURNED WITH QUOTE FOR CONSIDERATION
1. Contractor Quality Control Plan (Reference Section E). Describe your Quality Control Plan.
The plan must demonstrate how you will assure that quality of performance meets the objectives and requirements of the contract. It shall include how quality will be monitored to assure performance standards are met; how the work will be supervised; and how results of the monitoring will result in quality.
2. Production Levels. List the estimated daily production levels you will maintain during this contract. List size of crew used to determine production levels. Note the estimated effect that slope will have on your productions.
3. Safety Plan. Describe your safety plan for this job. Please include mitigation procedures for COVID 19 and CDC direction to your safety plan
4. Have you visited the project site? Yes No
File details come from the government source that posted it. Updated .